HomeMy WebLinkAboutSW3171201_Deed Restriction Form_20180419Hi h Denft Residential Subdivisions
Deed Restrictions & Protective Covenances
In accordance with Title 15 NCAC 2H,'1000 and S.L. 2006-246, the Stormwater Management Regulations, deed
restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be
subdivided and sold and runoff will be treated in an engineered stormwater control facility, Deed restrictions and protective
covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria
used to size the stormwater control facility.
David Hensley , acknowledge, affirm and agree by my slgnature•below, that l will cause the
following deed restrictions and covenants to be retarded prior to the sale of any lot:
1. The following -covenants are Intended to ensure ongoing compliance with State Stormwater Management Permit
Number S W 3171201 as issued by the Division of Energy, Mineral and Land Resources under the
Stormwater Management Regulations.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain
compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming under them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the .express written consent of
the State of North Carolina, Division of Energy, Mineral and Land Resources.
5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the
Division of Energy, Mineral and Land Resources.
8. The maximum built -upon area per lot, In square feet, is as listed below:
Lot #f BUA
1-5,46-64, 67--89, 99103 .4,040
6-45, 65, 66, 90.98, 104-198 3,190
This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion
of the right-of-way between the front lot line and the edge of the pavement. Buiit upon area includes, but is not
limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, btit does not
Include raised, open wood decking, or the water surface of swimming pools,
7. Each lot swill maintain a 30** foot wide vegetated buffer between all Impervious areas and surface waters,
**50 foot for projects located in the 20 coastal counties.
8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished
through a variety of means Including roof drain gutters which drain to the street, grading the lot to drain toward the
street, or grading perimeter swoles to collect the lot runoff and directing them into a component of the stormwater
collection system. Lots that W aturally drain into the system are not required to provide these additional
measures. _
Sig
a Notary Public in the
State of R of 6AY6fdfiL' � , County of mee�L�in
do hereby certify that DtWict 14-!4 s
personally appeared
before me this the day off r __ T, 20 M and acknowledge
the dueexecution of the foregoing instrument. Witness my hand and official seal, SEAL
44401 VI Signature
� '1 —
My Commission expires �'�"' f
Iris C �efFsrson
Foma DRPC-3 Rev.2 05Nov2009 Pa -e 1 of 1 Notary Public
County
Isl slto� r e ra res
7 d1