Loading...
HomeMy WebLinkAboutSW3171201_Response to Comments_20180419DPR Response to NCDENR Second Review Comments April 17, 2018 Request for Additional Information #2 Stormwater Permit No. SW3171201 Village at Granite Quarry Rowan County Review Comments Dated March 7, 2018 1. Repeat comment: The person signing the application, O&M Agreement, and deed restrictions form must be a member/manager of LGI Homes — NC, LLC as listed with the NC Secretary of State. Or provide a signed letter from one of the member/managers listed giving Cedric Combo signature authority. Not in the most recent submittal. DPR Response: The revised signed/notarized O&M and Deed Restriction are included with submittal package. 2. Repeat comment: The notary mistakenly signed in the space where the applicant and property owner are supposed to sign. Please provide a corrected signed original of SWU-101, O&M agreement, and the deed restrictions. Not in the most recent submittal DPR Response: The revised signed/notarized O&M, SWU-101 and Deed Restriction forms are included with submittal package. 3. Repeat comment: Revise SWU-101 Sect. IV -10: Provide the BUA breakdowns for each DA in the bottom table. These were left blank. Not in the most recent submittal DPR Response: Done. 4. The plans provided are not printed to scale (Sht. L-3 through L-8, and L-19). DPR Response: Done. 5. The design calcs for sand filter 1 are not consistent with the plans or DA breakdown calcs. DA and BUA shown as 5 vs. 4.5 and 2.4 vs. 2.16, respectively. Note that for sand filters, you may choose to use 75% of the WQV per the MDC. DPR Response: The plans, DA breakdown and BUA are consistent with each other. The proposed sand filters were overdesigned to treat 100% of the water quality volume to compensate for the untreated runoff at the proposed road improvement for existing Faith Road. Revise the supplement forms: a. All sand filters: still a few items were left blank (el. of bypass, desc. of bypass, flow dist., ponding depth from sf top to bypass). DPR Response: This was corrected b. Sand filter 1: the design volume minimum and provided are not consistent with the plans and calcs. DPR Response: This was corrected.