Loading...
HomeMy WebLinkAboutWQ0004438_Monitoring - 02-2023_20230301Monitoring Report Submittal ................................................... Permit Number#* WQ0004438 Name of Facility:* New Bern Asphalt Plant WWTF Month: * February Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR 20230301090742613.pdf 878.08KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * hawkinst@newbernnc.gov Name of Submitter: * Tony Hawkins Signature: Date of submittal: 3/1/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00004438 Is the monitoring report accepted?* Yes NO Regional Office* Washington Reviewer: _anonymous Review Date: 4/25/2023 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1 of 2 Permit No.: VVQ0004438 Facility Name: New Bern Asphalt Plant VVVVTF County: Craven Month: February INNNOON .......... ...... Did gation occur —OEM= at thisiracility'? �gZ11111111 WITITIT171W.1 w llzm=��OO Field lrrigated?� Field Irrigated? OEM MMMMM EOMMMMM NM=m= uagT FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Did the application rates exceed the limits in Attachment B of your permit? Yes Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Yes Was a suitable vegetative cover maintained on all sites as specified in your permit? Yes Were all setbacks listed in your permit maintained for every application to each permitted site? Yes Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Yes If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Tony R Hawkins Permittee: ST Wooten Corporation Certification No.: 990822 Signing Official: Robert L. Hunt Jr. Grade: WW 4 Phone Number: (252)639-7555 Signing Official's Title: Division Manager Has the ORC changed since the previous NDAR-1? Phone Number: (252) 637-4294 Permit Exp.: 7/31/22 �,,4� 1'�- � , 3 -1-2- 3 Sf zaz-7 / Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations MailOriginal and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of[ Permit No.: WQ0004438 Facility Name: New Bern Asphalt Plant VVVVTF County: Craven Month: February Year: 2023 Ppl: 001 Flow Measuring Point: Effluent Parameter Monitoring Point: Effluent Parameter Code 50050:.: 00310 00940 50060 31616 00610 ...00625 00620 00600.::. 00400 00665 00076 70100 00530 . ....... ......... . . . . ....... . . . .... ...... . . . . . .. . .. . ..... ..... .................... E ..................... cis 0 2 M Z 0 0 E LL. . .... . ... .. 0 S u It 8.0 = MEKMT,M°° •f FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Sampling Person(s) Certified Laboratories Name: Tony Hawkins Name: Not applicable for this report. Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? Yes If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Tony R Hawkins Permittee: ST Wooten Corporation Certification No.: 990822 Signing Official: Robert L. Hunt Jr. Grade: WW 4 Phone Number: 252-639-7555 Signing Official's Title: Division Manager Has the ORC changed since the previous NDMR? Phone Number: 252-637-4294 Permit Expiration: 7/31/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617