Loading...
HomeMy WebLinkAboutSW3221003_Supplement-EZ Form_202304020 SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name Rockwell ABC _2 .Project L--e,{acj 1.52 3 Coastal Wetland Area(ao) _ 0 4 Surface Water Area tin 0 5 Is this poject Hi h'or Low Density? 6 Does this pro)eet use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1 003(4)(c-d)? N/A 1 o [is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCM9: — -- 11 Infiltration 12 Bioretention Cell ` 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader-Filter Strip LS-FS) 20 Disconnected lm ervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS L._QAD.ED RTIFICATION - - - i- 27 Name and Title: Zsch Gardner PE-Civil Engineer 28 Organization: I Summey Engineering Associates.PLLC 29 Street address: 150 S.Feyetteville St 30 City.State,Zip: j Asheboro,NC 27203 31 Phone number(s):_ 336-328-0902 32 Email: zach®summeyengineering.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting Information were prepared under my direction or supervision;that the Information provided In the forth is,to the beat of my knowledge and belief,We,accurate,and complete;and that the engineering plans,specifications, operation and maintenance agreements and other supporting Information are consistent with the Information provided here. Ousfcrrer ,�tilfllill!/f! L]V I -,� %•• nature of Designer SF" - 50 �. -20 202 3 r /ff Date 7�7ll1llllt,�` DRAINAGE AREAS 1 Is lhls a high density pralect7 Yes 2 _.oeIf so,.number of drainage areas?SCNls 1 3 Ds this prrn gr!_have low density areas?. _ Na 4 _ If so,number of low density drainage areas U Is all/part of this project subject to previous rule 5 versions? Yes FORMS LOADED DRAiNADE AREA INFORMATION Entire 51ts 1 4 Type of SCM N/A _ _ Sand Filter__ 5 Total BUA from project;sq ft) 42633 sf 42833 sf _ 6 1995 rules SL 200&246 2008 rules 2017 rules New BUA on subdivided lots(subject to 7permitting)(sq ft 1995 rules SL 2006-246 2008 rules 2017 rules New BUA not on subdivided lots(subject to 8 permitting)(sf) 42633 of 42833 sf 1995 rules SL 2006-246 j 2008 rules 2617 rules I 9 Offsits-total area(sq fd) sf sf 1895 rules SL 2006-246 2008 rules 2017 rules 10 OffsM BUA(sq ft) sf sf 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm(nches) 1 In 1 In 1995 rules sL 2oos240 2008 rules 2017 rules 12 Breakdown of new BUA: Parking Jsq ft). 33714 of 33714 of Sidewalk(sq ft 2903 sf f 2903 sf Roof(sq ft 8016 sf 6016 sf Roadway(sq ft) Future(sq ft Other,please specify in the comment box below f fsq ft I New infiltrating permeable pavement on subdivided 13 lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots Jsq Existing BUA that will remain(not subject to 15 permittin )(sq ft 16 Existing BUA that is alread ermitted fsq ft sf of 17 Existinq BUA that will be removed(sq ft) sf sf 18 Percent BUA 64% 89% 19 Design volume of SCM(cu f li 2551 cf 20 Calculation method for design volume SIMPLE METHOD ADbMbNAL INFORMATION 21 1 Please use this space to provide any additional information about the drainage area(s): SAND FILTER i Qrafnage area number_ 1 2I Minimum rye Wred treatment volume[Gu$) 2s5i sf GENERAL MDC 3 Is the SCM si2.1s_d to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located gway:from contaminated soils? Yes What are the side slopes of the SCM(H:V)? n/a 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side 51opas1 Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm? } Yes 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? _ _ 91 What is the method for dewatering the SCM for maintenance? Pump_(P_referredL 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the idralndpe easement comply wlth_General MW{9}$ Yss 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A General MDC 10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC J12? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17'Was the SCM designed by an NC licensed rofessional? Yes - ?N 1056 . _ . 18,SHWT elevafion(fmsl)^ 45 19'T. e of sand filter(open or closed) Closed 20 Ir closed,will the filter will be re-cast or pour-in-place? Cast In Piece 211 If closed,top of rate elevation(fmsl) 761.5 22 Is this sand filter designed to attenuate peak flows? Nip SeditN tE 23 Vulufne that can be retained in the sediment chamber(cubic feet) 1350 cf 24'Will there be a permanent pool in the sediment chamber? I. Yes 25 Bottom of the sediment chamber fmsl 752.17 26,Area of the sediment chamber(square fee 300 of 271 Physical depth of the sediment chamber inches 761n 28 depth in the sediment chamber,above any permanent pool 54 In �Ponding Elevation of top of weir between chambers fmsl 754 Sand Chamber 30 1 Volume that can be retained In the sand chamber(Cubic feat) 1350 cf 31 Bottom of the sand chamber(fmsl) F 754.00 32 Area:of the sand chamber(square W 300 of 33 Physical depth of the sand chamber(inches) 76 In 34 Ponding depth in the sand chamber,above the sand surface(inches) 58 In 35 Elevation of the bypass device(fmsl) 758.5 36 Type of bvoass device Orifice Pipe 37 Mechanism for distributing flow over the sand surface Multiple Small Orifces 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe inches 12 In 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each Yes underdrain line? 42 Will clean-out i es be ca ed? Yes ADDITIONAL INFORMATION 43 Please use this space to provide any additional information about the sand filter(s): Sand Filter 3 3:09 PM 4/20/2023