Loading...
HomeMy WebLinkAboutNCC231170_Site Plan or Location Map_20230424 • CON JCTION SCHEDUL SITE TOPOGRAPHIC(USGS)MAP 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. NOTIFY NCDEQ INSPECTOR WHEN PROJECT BEGINS. 3. FLAG THE WORK LIMITS ,,( 4. HOLD PRECONSTRUCTION MEETING AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION. _ '•y '1!, !•,- \\ 5. INSTALL SEDIMENT CONTROL MEASURES AS THE FIRST CONSTRUCTION ACTIVITY. (7 ee.l 6. INSTALL STORM DRAIN WITH BLOCK AND GRAVEL INLET PROTECTION AT CONSTRUCTION ENTRANCE/EXIT. 4 tr _ '�jz. 7. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT ■r ./ �� j 8. NO MAJOR GRADING ACTIVITIES ARE TO BE PERFORMED DURING WET WEATHER OR PERIODS OF PREDICTED WET - { WEATHER. - ` ,i 1 9. CONSTRUCT TEMPORARY DIVERSIONS ABOVE PROPOSED CABIN SITES.INSTALL LEVEL SPREADER AND SEDIMENT _ - - _ ` TRAP AND VEGETATE DISTURBED AREAS. �„ / - 10. COMPLETE SITE CLEARING AND GRUBBING FOR AREAS WITHIN THE DISTURBED DELINEATION. ie��}� I Deosr f' 1/° Raga n S m ith 11. CLEAR WASTE DISPOSAL AREAS i�� I/ = fe,e ar,�,. -,` 12. ROUGH GRADE SITE,STOCKPILE TOPSOIL,CONSTRUCT CHANNELS,INSTALL CULVERTS AND OUTLET PROTECTION, j i x'�\ ��'^�\ AND INTSTALL SEDIMENT FENCE AS NEEDED.MAINTAIN DIVERSIONS ALONG TOP OF FILL SLOPE DAILY. �r`� NANTAHALA C 1 N.C.CORP.LIC#C-270 13. FINISH SLOPES AROUND CABINS AS SOON AS ROUGH GRADING IS COMPLETED.LEAVE SURFACE ROUGHENED AND \ \ `\Sr APPALACHIAN NATIONAL NATIONAL VEGETATE AND MULCH IMMEDIATELY. PP Ol+e - SCENIC TRAIL = FOREST - 111, 14. COMPLETE FINAL GRADING OF ROAD AND PARKING AND STABILIZE WITH GRAVEL R/// ;hosrA° \ii� '� ow L} ,?SITE / 5 cgs �_ Nashville-Murfreesboro-Chattanooga 15. COMPLETE FINAL GRADING FOR CABINS. // ce ,e h 16. COMPLETE FINAL GRADING OF GROUNDS,TOPSOIL CRITICAL AREAS,AND PERMANENTLY VEGETATE,LANDSCAPE, ///// wau ,�� j�' '\ - ��:_- �1 _ �, ragansmith.com AND MULCH. crc ck/ / --4, i% ---- -i '1 N 2 yu ^ s / \�\' 17. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. // � ////// ,//���\°RA`T`\ - NEEDED REPAIRS WILL BE MADE IMMEDIATELY. / 1_ / //i // / '<a C•A Fj 18. AFTER SITE STABILIZATION,REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT VEGETATION. '" / 19. ESTIMATED TIME BEFORE STABILIZATION-9 MONTHS. m // / - .- 20. NOTIFY NCDEQ INSPECTOR WHEN PROJECT IS READY FOR CLOSE-OUT INSPECTION. //////J , ® - ) - -- --_ - �\„ .,. 21. FILE a-NOT FOR NPDES NCG010000 COVERAGE ONCE CLOSE OUT INSPECTION REPORT IS RECEIVED BY NCDEQ. - / C \ \ .yam - J'I_) _/ / \ js USGS Th Nati I Map;Nffilo I Boundaries Must,3DEP EI atl G og am Geogreghic Nam I n f m ati n J System.Nat I LHydrogrephy 6aWzM,National land Cover Databa Nati nal Structures Da6uet nd Nat na1 / - �' ,i / - Transportation Data.%USGS Global'L systems U.S.CensusBureau TIGEWL data;US*Road data Natural �� */ ' fl�i - _ Mirth Data U.S.D partmeht of State HIU,NOAA National Centers for€ mnta1 Information / III r / EROSION AND SEDIMENTATION CONTROL PLAN NOTES / I', 'j/ �- 1. THE SITE IS LOCATED IN THE LITTLE TENNESSEE RIVER BASIN 11 ❑ a.aAK II I (' , PyesP 2. THE NATURE OF CONSTRUCTION IS TO UPDATE AND REBUILD A PRIVATE ROAD. I I I I c,�,. , , ,.24•OAR ', / CONSTRUCTION WILL ALSO INCLUDE 9 CABINS(INCLUDING UTILITY�: '- �'// CONSTRUCTION)ALONG WITH UPDATING A SCENIC WALKING TRAIL.THE I I I ,° rl I r / \ EXISTING SITE IS MOSTLY A DENSELY WOODED AREA WITH AN ASPHALT ROAD ���"k 1�� xe-° ��•i, / AND A FEW STRUCTURES,INCLUDING A WATER STORAGE FACILITY.EARTH I I I III I�''� �� ^ DISTURBING ACTIVITIES INCLUDE CLEARING,GRUBBING,TOPSOIL REMOVAL AND STOCKPILING,EARTH CUT AND FILL OPERATIONS. CO Z LIJ �i I '� z° ',4 3. THE PROJECT'S APPROXIMATE START DATE IS 10/01/2022 AND HAS AN , APPROXIMATE END DATE OF 10/01/2023 w 892.96 I 1 34 rrre wK ' RA a\\ I 1�r jl/ 1,411 1 Jodi 1MAINTENANCE PLAN 0 \ ) AC ' Q O \ I I \` - 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR IAA�,NII°� � / \\ STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING RAINFALL Q / / 111 I II 1 It l\.\ \ \ ')24-"OAK 6. 2°W BUT IN NO CASE LESS THAN ONCE EVERY WEEK.ANY NEEDED REPAIRS WILL BE Z I I ` \ MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. - o zaroowd± \, - 2. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND BLOCK AND GRAVEL H $�. / z<�� A G INLET PROTECTION DEVICE WHEN STORAGE CAPACITY HAS BEEN f:Ld' 1- / oo FFE-1893.14 I sH / APPROXIMATELY 50%FILLED GRAVEL WILL BE CLEARED OR REPLACED WHEN O 0 O O oa.(3 \ ,I THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. LL 0 P --�11 \ J § e 3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT 3 I�I �y P \ \ S BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE.THE SEDIMENT FENCE WILL BE O TL/ ,e°mar r_ " / uu, o- REPAIRED AS NECESSARY TO MAINTAIN THE BARRIER. J / 4. ALL SEEDED AREAS WILL BE FERTILIZED,RESEEDED AS NECESSARY,AND / CO .//',/,,, �� 16 o�K \�� r\ MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN / / `� A VIGOROUS,DENSE VEGETATIVE COVER. I �R J orH 5 W Q ❑ i �� 0zi- ��� ��'' � 1;1 a \ ul, s __ N .°"^ \ \ \I� ��lir��`^ `' //' r \` 'HICKORY 24 HOUR CONTACT LLI )4e�®�:��r , /�� o na Z ' / THE 24-HOUR LOCAL CONTACT RESPONSIBLE FOR EROSION, O. ,' SEDIMENTATION AND POLLUTION CONTROLS WILL BE COLIN ��'Y -_� , \1 ;, if _ - - LOCAL CONTACT'S CELL PHONE i =S �+ �' '• (' OM ERNS 423-4049400.R ��' ,' �, - ��1 .: _ na c - - jig- - i SEE SCALE -__- -_ IScale: BAR J � � � �� OWNER / PERMITTEE FOR THIS PROJECT IS THE ' � - -VS- \ / r �� THE caa`�- � ��/ � �\� ��'� �" � �/' ', NANTAHALA OUTDOOR CENTER;13077 HIGHWAY 19 W BRYSON JEa"`� 5H As / / Ho e/aKeo // �� _ '/ /,,,���'aaaV _ CITY, NC; MR. ANDREW STANFIELD; (828)488-7253; BH / _ - / /�.(/ �\ Date: 11/16/2022 �� / / / / / 2'/ �� - 2,. / / - �„ -, / - - i - andrewstanfield@noncom a� / t u P / ss�_ �aoa-ne V 4��/ / Iw_c I 4 ` � / 2" --,r'P I 2 0� \\ \`/ / / / ,�, I APProved By: BAS e =�$� �� uc I / ( 2'/ /GP V '.* / �V' -- Revisions: 6. loglik _ _ 1 cc-sY ,o<, � �/ ��2 I II� VICINITY MAP /IR \ ennLr RAIL ,q / \ LIMITS OF DISTURBANCE(TVP) / Berm m:v. ,, - Cw ���, ` •,�� BITE 2 01/09/2023 NCDEQ COMMENTS / \ ' ` I END SILT FENCE AT PAVED AREA•/ %-/ / /- `��•;; HIGHWAY 19 W. - - - v \V/ \v/ 11 2.00 // Q �� DOUBLE ROW OF SEE ESPC DETAILS ON SHEETS C2 5-C2.8 STRUCTURAL PRACRCES /FGETA1IVE PRACRfOE SILT FENCE r.SS // /' `�, c` �" Drawing Title: y T17' LIMITS OF DISTURBANCE ASPHALT / F 1 i LATITUDE-35.3332058° QO LONGITUDE--083.5927893° CONCRETE // Kw-tit „0,,, INITIAL E&SC PLAN %mow' FILL SLOPE )0 EXISTING GRADE POSSIBLE UG Wean R TEMP.GRAeEL 3 ®1 CONsioucncR v ° �ffi! 1 ENTRANCE/Dr 2 _.„,_ SECIMENT w 3 FENCE 5' 8 INLET TYPICAL SILT FENCE INSTALLATION TRANS. DISTURBED AREA-2.59 ACRES m N Roo(MpE TOTAL DISTURBED AREA ore,,vh19 No INLET NOTES: rA) F �, -BMP'S SHALL BE CONSISTENT WITH THE E Al� C2. 1 soc� REQUIREMENTS AND RECOMMENDATIONS CONTAINED IN Fo THE CURRENT EDITION OF CHAPTER 6 OF NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 811 1 p -NO CONSTRUCTION TO BEGIN UNTIL NCG01 NOTICE OF -. COVERAGE IS RECEIVED FROM NCDEQKnow 0 30 60 w. Project No. k Sc Kn Call before ore you V ////�\\\ ////� aCall before you dig. 22-0195