Loading...
HomeMy WebLinkAboutNC0025445_2022 PAR Review_20230424Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes ® No ❑ Did they send any other submissions with it? Yes ® No ❑ Included? Adequate? Narrative ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA PPS Form Yes ❑ No ® Yes ❑ No SNCR ® Yes ❑ No ® Yes ❑ No IDSF ® Yes ❑ No ® Yes ❑ No Allocation Table ® Yes ❑ No ® Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA Public Notice ❑ Yes ❑ No RNA ❑ Yes ❑ No ® NA Program Information 4 Yes ❑ No W Yes ❑ No Historical SNC ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA D E Regional Office: Winston Salem POTW: Randleman NPDES Permit # NC 0025445 Report Period: 1/1/22 to 12/31/22 IF Full ❑ Modified* POTW noted Corrections? ® Yes ❑ No ❑ Yes 0 No ❑ NA If Wo ; check recommendation below: 1. Have at least 90% of SIU permits been issued with 180 days ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: - The only IUP #0004 Deep River Dyeing shut down production on 10/21/2022. The business is closed. Randleman does not have any IU's discharging to WWTP. They do want to keep pretreatment program for any future developments. They have attached the letter of IU permit termination in PAR. Reviewed by: %4zcl.�GVQi�y Date: 4/24/2023