Loading...
HomeMy WebLinkAboutSW3221006_Stormwater Report_20230419STORMWA TER MANAGEMENT AND EROSION CONTROL DESIGN THE COTTAGES A T W/NGA TE - PHASE I W/NGA TE, NORTH CAROL/NA For SHELBY CATTLE FARM, LLC. EAGLE ENGINEERING Creating Communities. Together. MATTHEW C. KIRCHNER, P.E. EAGLE ENGINEERING, INC. 2013 Van Buren Ave. Indian Trail, NC 28079 EEI PROJECT NO.: 7516 DULY 25, 2022 Initials Date SAP 08-22-2022 KAP 10-13-2022 SAP 04-17-2023 N CAR O� FEssio 9 SEAL _ 04550 = z. IN .• G i C i K\ ��b4-17-23 The Cottages at Wingate 7516-C-NC Stormwater Management Report June 7, 2022 1.0 Project Address and Summary The project is located on Edgewood Drive and Maye Street, approximately 0.10 miles north of the intersection of Edgewood Drive and Andrew Jackson Highway (US 74). The proposed development will include the construction of 180 single family homes and the associated site grading, roadways, stormwater management facilities, and landscaping. In addition, Phase 2 of the property is set aside for future development to the north which will contain an additional 119 single family homes. Site improvements will include the site grading, paving, storm drain systems, public roadways, and three wet pond storm water devices. These devices will treat all proposed single-family homes and infrastructure. Phase 2 of the development will include storm water ponds of their own to manage and treat the impervious area. As mentioned above, the site will include the construction of three stormwater BMP's located adjacent to the stream that splits the site in two, at the topographically low point of each drainage shed. The development of the site must comply with the City of Wingate Stormwater Management Ordinance and therefore will provide stormwater quality and provide peak controls for stormwater runoff of the 2- and 10-year storm events while providing safe conveyance of the 100-year storm event. The BMP's chosen were three wet ponds to provide for both WQv and detention designed per the NCDEQ Stormwater BMP Manual. Runoff calculations were performed following the procedures outlined in the NCDEQ Stormwater BMP Manual and by the SCS method. The receiving drainage system for this site is an existing channel/stream located on -site, which splits the site in half, and flows to the southwest until it leaves the property along the western property line, at which point the stream continues to the north. Soils on the site consist of: • BdB2: Badin channery silty clay loam, 2 to 8% slopes • BaC: Badin channery silt loam, 8 to 15% slopes • ChA: Chewacla silt loam, 0 to 2% slopes • GsB: Goldston-Badin complex, 2 to 8% slopes • GsC: Goldston-Badin complex, 8 to 15% slopes • GsE:Goldston-Badin complex, 15 to 45% slopes • TaB: Tarrus gravelly silt loam, 2 to 8% slopes • TbB2: Tarrus gravelly silty clay loam, 2 to 8% slopes This soil is labeled as hydrologic soil group (HSG) "B". A USDA NRCS soils map and supporting information can be found in the Appendix A. 2.0 Water Quality Volume Control and Peak Flow Control Water Quality Volume and Release Rate calculations were performed as outlined in Appendix B. The Cottages at Wingate 7516-C-NC Stormwater Management Report June 7, 2022 3.0 Predeveloped Conditions Under existing conditions, the site is an undeveloped property consisting primarily of woods in good condition with a large area of open fields in good condition. There are no existing structures on -site. The site has 3 different streams that split the site into 3 different sections. The section to the east and adjacent to Edgewood Road is the largest section and the area that consists of Phase 1. The section between the western most channels is a smaller area, but will be the land that contains Phase 2 of the development. Finally, the section of land to the far west is split my an existing channel, but will be undeveloped. All of these sections drain to the 3 different streams and the floodplain located to the far west of the site along the boundary. Although the site all drains to the floodplain, there are 2 distinct drainage areas for the purposes of this development. One drainage basin that consists of all the land of Phase 1 (and uphill drainage) and one drainage basin that consists of all of the land of Phase 2 of the development (and all uphill runoff). The easternmost portion of the site (Phase 1) is the largest drainage basin and drains from east to west into the previously mentioned existing channels and 100-year floodplain. The point at which this stream enters the floodplain was considered the study point (Point of Analysis A). This drainage shed has a rather large portion of offsite drainage in the southeast which makes its way onto the site. However, bypass swales will be utilized to divert much of this offsite drainage away from the site. The predevelopment drainage from the site was delineated as indicated on the Pre Development Drainage Area Map included in Appendix B. The pre -development time of concentration calculations utilize a combination of overland sheet flow and shallow concentrated flow to determine the longest possible scenarios with a minimum 5 minute time interval. These calculations are outlined in Appendix B. The Curve Number (CN) for the pre -development basin was computed as a combination of woods and open areas (fields) with some impervious. Offsite areas used actual condition curve numbers where applicable. These calculations resulted in a predevelopment CN of 74 for the drainage area of Phase 1. A NRCS soil data table (Table 8.03e) from the NCDEQ Erosion and Sediment Control Planning and Design Manual depicting the soils designation for the site is included in Appendix A. 4.0 Post Developed Conditions The proposed development will include the construction of 180 single family detached homes, pavement and hardscape with associated site grading. Phase 1's drainage area will utilize three BMP's at various points within the drainage basin to provide the required water quality and detention volumes. The first BMP is a wet pond (A1) located at the most westerly part of the development, on the west side of the stream crossing connecting Phase 1 and Phase 2. The pond is located at the topographical low point of its' drainage basin on the site and outfalls to the northwest toward the stream channel that cuts the site in half between Phase 1 and Phase 2. This pond measures approximately 435' x 85' and contains two separate forebays and a single outfall control structure. This is also the largest BMP in the entire drainage basin. The second BMP is a wet pond (A2) located central to the site and adjacent to the road crossing leading to Phase 2, but on the east side of the roadway. This pond measures approximately 145' x 75' and contains a single forebay and outfall control structure. The third BMP in this drainage shed is a wet pond (A3) and is located along the northern portion of the site, adjacent to the stream crossing that splits the site in two halves and between lots 62/63 and 70/71. This BMP measures approximately 90' x 65' and contains a forebay as well as a single outfall structure. These 3 BMP's will capture runoff from the entirety of Phase 1, excluding the small area of bypass. All these BMPs will eventually have their drainage reach Point of Analysis A. All of these devices are being utilized for primary detention as well as for water quality treatment. They have been modeled to mitigate the sites requirements for post development flow and water quality. Calculations in The Cottages at Wingate 7516-C-NC Stormwater Management Report June 7, 2022 Appendix B (see Hydrograph Return Period Recap, Page 1) have been provided to show that the detention system is adequately sized for the 2-year and 10-year storm events, and adequately size to safely convey the 100-year 24-hour storm event. Any increase in peak flow in the bypass drainage sheds from Pre and Post development conditions has been accounted for with the over -detention of the flow from the development onsite within each wet pond. The composite Curve Numbers were calculated for each post developed basins and are summarized below. • Pre -Development Area A: 74 • Post Development Area Al: 83 • Post Development Area A2: 83 • Post Development Area A3: 81 • Post Development Area A -Bypass: 76 See Post Development Drainage Area Map. A comparison of pre -developed, post -developed, and detained peak flows is shown below. The pre - development peak flows (Hyd. No. 2) should be compared to the total post -development peak flows (Hyd. No. 10). The drainage area reduces it' respective peak flow rates from pre -developed to post -developed conditions utilizing the wet pond detention. These BMPs's have been oversized to account for the un-detained flows from the respective bypass drainage sheds. Complete calculations including time of concentration and full hydrographs for the 2-year, 10-year, and 100-year 24-hour storm events are included in Appendix B. Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (ds) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 10D-yr 1 SGS Runoff 162.81 250.44 396.51 519.33 699.35 850.20 1010.95 TOTAL PRE-DEV 2 SGS Runoff 97.80 132.87 207.55 269.94 361.36 437.55 518.59 PRE-DEV PHASE 1 3 SCS Runoff 67.63 91.11 127.68 156.86 198.04 231.31 266.10 POST DEV Al 4 Reservoir 3 3.782 8.054 15.05 1962. 24.54 28.30 35.96 WET POND A7 5 SCS Runoff 26.01 35.04 49.11 60.33 76.17 88.97 102.35 POST DEV A2 6 Reservoir 5 3226 5.832 8.101 9.399 10.84 11.74 14.92 WET POND A2 7 SCS Runoff 12.06 16.46 23.49 29.15 37.17 43.67 50.48 POST DEV A3 8 Reservoir 7 1.731 4.548 7.051 8.360 9.685 10.56 11.34 WET POND A3 9 SGS Runoff 59.00 10124 153.91 197.92 261.80 314.44 376.18 PHASE 1 BYPASS 10 Combine 4,6.8. 76.54 118.69 133.64 234.97 306.64 364.84 432.11 COMBINED 9 5.0 Stormwater System The storm water system consists of proposed reinforced concrete pipes, ranging in size from 15" up to 30", conveying runoff to the proposed BMP's through a combination of underground pipes and catch basins. Adequate cover has been provided for all pipes and all pipes are proposed as class 3 and class 4 reinforced concrete pipe. The system has been modeled for a 10-year storm event for capacity and HGL. The results of the system have been provided in Appendix C. The Cottages at Wingate Stormwater Management Report 6.0 Erosion Control 7516-C-NC June 7, 2022 Erosion control will be provided by utilizing temporary sediment basins, perimeter silt fence, temporary diversion ditch, and inlet protection where necessary. These mechanisms will be in place until the project is stabilized. Upon approval of the NCDEQ inspector, these mechanisms can be removed and the final storm drain measures can be put in place. Calculations for the sediment traps and sediment basins have been provided in Appendix D. The Cottages at Wingate Stormwater Management Report Appendix A Hydrologic Soils Map and Summary Report Curve Number Determinations 7516-C-NC June 7, 2022 547II100 34o 59' 41" N J. Hydrologic Soil Group —Union County, North Carolina 5474W 547700 548000 5483M 548600 5489M 34o 58' 42" N— I 547100 547400 547700 548000 548300 548600 N Map Scale: 1:12,900 if printed on A landscape (11" x 8.5") sheet. $ N Meters 0 150 300 E00 900 Feet 0 500 1000 2000 3000 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 549800 11 M_ N 34' 59' 41" N f N "L 0 34o 58' 42" N 549800 5/23/2022 Pagel of 4 Hydrologic Soil Group —Union County, North Carolina MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 22, Jan 21, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Oct 30, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 5/23/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Badin channery silt C 0.9 0.1 % loam, 2 to 8 percent slopes BaC Badin channery silt C 16.2 2.1 % loam, 8 to 15 percent slopes BdB2 Badin channery silty C 321.7 41.1 % clay loam, 2 to 8 percent slopes, moderately eroded BdC2 Badin channery silty C 27.9 3.6% clay loam, 8 to 15 percent slopes, moderately eroded BuB Badin-Urban land C 81.1 10.3% complex, 2 to 8 percent slopes ChA Chewacla silt loam, 0 to B/D 65.4 8.3% 2 percent slopes, frequently flooded CmB Cid channery silt loam, 1 D 67.9 8.7% to 5 percent slopes GsB Goldston-Badin D 36.5 4.7% complex, 2 to 8 percent slopes GsC Goldston-Badin D 74.9 9.6% complex, 8 to 15 percent slopes GsE Goldston-Badin D 21.6 2.8% complex, 15 to 45 percent slopes TaB Tarrus gravelly silt loam, B 57.3 7.3% 2 to 8 percent slopes TbB2 Tarrus gravelly silty clay B 9.1 1.2% loam, 2 to 8 percent slopes, moderately eroded Ud Udorthents, loamy C 2.2 0.3% W Water 0.8 0.1 % Totals for Area of Interest 783.4 100.0% USDA Natural Resources Web Soil Survey 5/23/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 5/23/2022 Conservation Service National Cooperative Soil Survey Page 4 of 4 Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for ---------------------------------------Cover Description------------------------- --------- hydrologic soil g^roup------- Cover type and hydrologic condition Average percent impervious area A FBI F]c FD Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, etc.) 3: Poor condition (grass cover < 50%) ........................... Fair condition (grass cover 50% to 75%) .................... Good condition (grass cover > 75%) .......................... Impervious areas: Paved parking lots, roofs, driveways, etc. (excluding right-of-way) ............................................. Streets and roads: Paved; curbs and storm sewers (excluding right-of-way)................................................................ Paved; open ditches (including right-of-way) .............. Gravel (including right-of-way) .................................... Dirt (including right-of-way) ......................................... Urban districts: Commercial and business .............................................. Industrial......................................................................... Residential districts by average lot size: 1/8 acre or less (town houses) ........................................ 1/4 acre........................................................................... 1/3 acre........................................................................... 1/2 acre........................................................................... 1 acre.............................................................................. 2 acres............................................................................ Developing urban areas Newly graded areas (pervious areas only, no vegetation) 4 ............................. Idle lands (CN's are determined using cover types similar to those in table 2-2c). EMININ MMEMEM MMININ 83 89 92 93 76 85 89 91 72 82 87 89 85 89 92 94 95 72 81 88 91 93 65 77 85 90 92 38 61 75 83 87 30 57 72 81 86 25 54 70 80 85 20 51 68 79 84 12 46 65 77 82 77 86 91 94 1. Average runoff condition, and la = 0.2S. 2. The average percent impervious area shown was used to develop the composite CN's. Other assumptions are as follows: impervious areas are directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open space in good hydrologic condition. CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3. CN's shown are equivalent to those of pasture. Composite CN's may be computed for other combinations of open space cover type. 4. Composite CN's to use for the design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development (impervious area percentage) and the CN's for the newly graded pervious areas. Rev. 6/06 8.03.17 Appendices Table 8.03g Runoff curve numbers for other agriculture lands' Curve numbers for ---------------------------Cover description ------------------------------- --------------hydrologic soil groups ----------- Hydrologic77 Cover type conditions3 A C D Pasture, grassland, or range— Poor 68 n79 86 89 continuous forage for grazing. 2 Fair 49 79 84 Good 39 61 74 80 Meadow —continuous grass, protected — 30 58 71 78 from grazing and generally mowed for hay. Brush —brush -weed -grass mixture with Poor 48 67 77 83 brush the major element. 3 Fair 35 56 70 77 Good 304 48 65 73 Woods —grass combination (orchard or Poor 57 73 82 86 tree farm). 5 Fair 43 65 76 82 Good 32 58 72 79 Woods .6 Poor 45 66 77 83 Fair 36 60 73 79 Good 304 55 70 74 __f82 H86 Farmsteads—buildings, lanes, — 59 driveways, and surrounding lots. 1 Average runoff condition, and la= 0.2S. 2 Poor.' <50% ground cover or heavily grazed with no mulch. Fair: 50 to 75% ground cover and not heavily grazed. Good: > 75% ground cover and lightly or only occasionally grazed. 3 Poor.' <50% ground cover. Fair: 50 to 75% ground cover. Good: >75% ground cover. 4 Actual curve number is less than 30; use CN = 30 for runoff computations. 5 CN's shown were computed for areas with 50% woods and 50% grass (pasture) cover. Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor: Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned, and some forest litter covers the soil. Good: Woods are protected from grazing, and litter and brush adequately cover the soil. Rev. 6/06 8.03.19 The Cottages at Wingate Stormwater Management Report 7516-C-NC June 7, 2022 Appendix B Pre -Development Drainage Area Map Post -Development Drainage Area Map Water Quality Volume (WQv) and Peak Flow Calculations (I-inchrainfall) Stormwater Hydrographs (2-yr, 10-yr, and 100-yr 24-hr) I _ X _ l i---------------- % — / I - '9 \ l l i►. - s i T 7 �• I vv I \ l \ I _ _ I 1 _ 00 00 / I 1 _ _ /i i / 1 1 I ♦ _ . I \ i''. / / I %- / 1 I t '1 I r I _ "I i I \ _ l �I; I I .i / I 1 I I I I / , J _•\, iI •I' / •i / J _ . / " •i / 1 I .j 1 — 1 \ / I -- 1 / \ Y\ 1 \ / \ I \' s 41 \ i" / I 1 I l; \ \• / ------------- 1 \ / 7 LF F SHALLOW •I/ J 05 O S O I / FONCENTRATED FLOW AT 0 V I / /. /. % • / r �l iI _ _ I r� \ \. 2 933 LF OF CHANNEL � \ � _ / I \ \ - \ FLOW AT 2.07 I 1 \ --- :I / \ . I ) / I ._ - �I 3 . 1\ \ — r.= / — - -. 1 _ 1 T I f — �'wo _ J _ /•' '" _ ------ _ "T 1 - 1 I I I 1 _ I I - 1 1 \I •� 1 : 1 _ I / .i .j 0 / \ /. - :', ,• ,- / / 100 LF OF SHEET FLOW AT 1.50/I \ "i :�' • - .j l------------- k / 1 / 1'\ I 1 / \ 1 / i' 8AFLANE ' ------------ :j I / l / 1 ------ \ .•ice. '/. _---- --1- - ; �' \' I SITE OUTFACE _ -------------- 1' 1 �I� POINT OF ANALYSIS 'A' I• 1 iI .i r" \ I — �i .i r' \ / I _ / _ I J 1 / / / 1 \ I/ I \ / I 1 l I ''•I I \ I / / 1 i 1 1 \. 1 \ 'i / ii _ i / I �' / — . 'I / i �.- ---------------- _ _ I Q / \ - / - / r I� /< \ — / — -- — -- - ---- / — — t ) / I/I / 1 , I --------------- --------------------- ------------- 1 40 100 \ - .i i _ i — � Yam•. 00 '� ---•' � � _ ---•- � - - — � `�� '� � \------•-•-- / -mac. - ;;,� / "/ %' \ /---------- ------------------- --------- ------' -------- - - ' J - I l -------------- 1 / -- .00 ----------------------------- 019 wo ow ON \ \ •` '1 1 '1 '1 1 I tI 1 I' I �' I '" t I ' �_' r /' -- I w♦ �, lI ,•` GRAPIM _wo - ----------------------- ------------------ - _ ( / \ \ —_ — ----- — - - -- - ` - \ '\ \ ', '\ � — '\ •:� =ram -� _ _ ---------•- ------- "----- _- �' \ _ - - - �� \ \�I ` ----•--•- ----------------------' - `'� '� I \> � / - � / '125'-_ ?50' ------ - - - .. / ( IN -'FEET Y. 1 inch = 80' ft. _z (e Co � P" W W Co ~ U Q N N c zI-- N a� Q) Cl) Co z ' Co LLJ , Oz W J Q L`-� J O ��a 0 LL N Q W w Q) m w 0 z � Co LU 0� Q U U J LLJ uj �N � w Q�U Q Q LL Uj zz Job ~ W Q �U- QLL� Qo `Q1Lz uj O OU z J� Q w O 2 CoL v J O U M N Co U m mo CL z L U z n o w� CL W DC O W uj W p CC C m o N QQ w z wCL Q CL Q o C/) m Lji 2 o in Sheet PRE-DEV -• / \ I F \ \ I I III rI _ 1 I •'i _ / 1 \ i COS 11 II �\ 'i I _ / _ r - l _ 1 1 / \ / I 1 _ / \I _ f _ \ _ .I. I I 'I I ems' -_ t= - -�• /�'�' I i I I I l1 1 I I r _ _ r_ , WET POND A3 '` _ i" J iI _ 2. I _ — y/ - •t ------- "-"�..-=.-.�'� � — _ =ram .•', \ POST DEV. A \ •i w \ I 1 BYPASS ., SS 7 POST DEV. A3 1 .40, DA 78.05 AC i\ DA 5.36AC 1' / / T — 29.0 MIN. Tc 5.0 MIN. 5� MP N 1 _ CO C 8 / / 55' 1 • w I• \ --- /--------------- - WET P ND A2 \ i O 4 \' / \ •, 7. 1 I l - '1 �I \ 1 \ _ a3 --- \ I I .j 46 -80- II I 1'66 _ ' w _ ,♦ , /.':' .j61 11 \ w I'\ l - ' — _ - _ - P T DEV. A2 'i. - OS / 401/ zzn I --- - DA 10.55 AC _ .. I I 1 / 56 w I \ I 'j. �•"i ' POND 15 Tc 5 0 MIN. COMP CN 83 48 / \ � l I 1 w _ 1 I \ 1 _ 1 \T — 58 _ "i _ / I II i / �! .;.�-- "-�%'---:::_ '14.1 � 159 173 / w / _ -- 160 \ \ 139 1 �. :\'• ''/, __. -� }- ------ - LEAF .� i LAN • 01 1 ,_�j- .\'� / � -1- I • I "�" SITE OUTFACE YSISA' POINTOFANAL' U7 �100 ,98 2743 AC l� ;27\ 2TC 5.0 MIN. -------------- 3,8 / , 4 / I' 0 .9.9 I 12 / I r_ L \ 1 -- ',\'•' Iram` 1a / \ '.. •'I I / _ 9 \ --7 iI 1 l / — 33 / - 2 _ �r 3 r' 9 .\. •a2 c 1 _ L \• 1 11 10 _ _ I �26 1 _ 9 2 / i I �• 8 \ \ Po ,�• 1 / I .I I I Imo. \ � 11 / i' I- i 1 \- j✓ i l - ss. ------------- ------------ ----------------- ------------- R / _ Tom• - - / oA- 1 o iI eo '' I 9 I --------------- - I / '/ / / \ l ' �,' •'' :k 1 i \ T PI / \ 1 �" ------ ------ --------- 100 100 / i,1 s� .I 100 00,00 / / % 1 — 41 so 0014 amnow mom wo ----------_------------- wo - ♦♦ _ 1 l �'' J /. r r \' ` ' /' II I I' II 'I rI I I ', l 1 '` \ ... \ ► , / ' - - ' 'I / / /'_ I '` '\ /' / / _ l as no as I 1 I /--------- -' -GR _---- ------ - nAP.IICeA�E \ \----------- — — —------- \ \ -0 80', 16 . ` ' / \ / 0' -ram \ ` - - - - - - - - - -------- - - -� \ \ ---- 'i 1 - i i ',• \ '> -------------- / ' - 1 inch = 80' ft. _z CL Co � rn LU~ LU Co c UQNN c _z C�zCo m—Co z w cz -, , LU J J O �Cna 0 LL N Q LU w Q) m w 0 0 Z Co LLJ m V U W ~ rn CL J�o Q U zz JoLL uj QO ULL z O Q uj I� m U w z LL Cof� O M U N U C CCo u'i I m mo zQ Lij m W Lu f r1 m C° �z 0 0 O� C C O 00 z 2 o Sheet POST-DEV Weighted Curve Number Calculations EAGLE ENGINEERING 4# V.— Project Cottages at Wingate Client Moser Group 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 Project # 7516 Date 5/25/2022 Designation Pre -Development Designer MDP Pre -Developed Area A L— Total Area: 121.99 ac Acreage Land Use Hydrologic Group CN Weighted CN (Acreage/ Total Area)X(CN) 10.78 Impervious - 98 8.7 0.76 Water - 98 0.6 6.14 Open Space (Lawn) B 61 3.1 4.69 Woods B 55 2.1 21.62 Open Space (Lawn) C 74 13.1 47.55 Woods C 70 27.3 4.50 Open Space (Lawn) D 80 3.0 25.95 Woods D 77 16.4 121.99 CN PRE = 74 EAGLE ENGINEERING, INC. PRE DEV - PHASE 1 2013 VAN BUREN AVENUE, STE A 7516 - CN Pre.xls INDIAN TRAIL, NC 28079 6/10/2022 Weighted Curve Number Calculations EAGLE ENGINEERING 4# V.— Project Cottages at Wingate Client Moser Group 2013A Van Buren Ave. Indian Trail, NC 28079 (704) 882-4222 Project # 7516 Date 5/25/2022 Designation Bypass Designer MDP Bypass Area A L— Total Area: 78.05 ac Acreage Land Use Hydrologic Group CN Weighted CN (Acreage/ Total Area)X(CN) 10.77 Impervious - 98 13.5 0.50 Water - 98 0.6 1.91 Open Space (Lawn) B 61 1.5 3.23 Woods B 55 2.3 7.69 Open Space (Lawn) C 74 7.3 31.17 Woods C 70 28.0 2.43 Open Space (Lawn) D 80 2.5 20.35 Woods D 77 20.1 78.05 CN PRE = 76 EAGLE ENGINEERING, INC. BYPASS - PHASE 1 2013 VAN BUREN AVENUE, STE A 7516 - CN Pre.xls INDIAN TRAIL, NC 28079 6/10/2022 Wet Detention Pond E N GI NEE R PROJECT: Cottages at Wingate CLIENT: The Moser Group PROJ. #: 7516 DATE: 4/15/2023 2013A Van Buren Avenue PHASE: POND#Al DESIGN BY: MDP Indian Mrai1,NC28079 Wet Detention Pond - NCDEQ BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 1,194,724 Ftz 27.43 ac. New Impervious Area = 463,280 Ftz 10.64 ac. Impervious Fraction (IA) = 0.39 39 % Rv = 0.05+0.9(IA) = 0.40 Runoff Coefficient Water Quality Volume Required (WQV) = 39,724 ft3 Where: WQV = 3630 * Rp * Rv * A Rainfall Depth (Rp) = 1.0 in. Runoff Coefficient (Rv) = 0.40 unitless Watershed Area (A) = 27.43 ac. WQV Volume Calculation WQV Elev. = 513.00 WQV provided = 49,853 ft3 OK 512 46,581 0 0 512.5 49,839 24,105 24,105 513 53,152 25,748 49,853 Length, Width (Area), Depth, Geometry Permanent Pool Average Depth (dav) = 3.4 ft 3.0 ft. (rounded down) da = [Vperm_pool] / [Aperm_pool] Main Pool Volume Calculation Area at bottom of shelf = Area at perm. Pool = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = 36,137 Abot shelf (ft) 36,137 Apermyool (ft z) 26,269 Abotyond (ft) Contour Area Volume Net Vol 508 26,269 0 0 509 28,690 27,480 27,480 510 31,141 29,916 57,395 511 33,624 32,383 89,778 512 1 36,137 1 34,881 1 124,658 4.00 Depth (ft) 124,658 ft3 39 % 1.47 % 17,544 ftz 36,137 ftz 100 ft 50 ft 2.0 :1 -based on assumed bottom, add V to design pond bottom to provide add'I sediment storage SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 40 1.51 1.38 1.24 50 1.71_ 1.65 1.51 60 2.09 1.93 1.77 Values from Table: 1 (NCDEQStormwater Design Manual -Section C-3) Region: Piedmont Efficiency: 90 % EEI Project No. 6700 Wet Detention Pond Page 1 Orifice diameter = Orifice inv. Elev. = Orifice Equation: 2-day Avg Discharge (Qza") = 5-day Avg Discharge (Q5a") = Average Discharge (Q) = Discharge Coefficient (CD) _ X-sect area of orifice (A) _ Accel. due to gravity (g) _ Avg. driving head (Ho) = WQV Outlet Device 3.5 in. Q = CD A (29(Ho/3))D.s 0.2885 cfs (max.) 0.1154 cfs (min.) 16 cfs (provided) 0.0668 ftz 32.2 ft/seC 0.2847 ft Days to Discharge WQV 3.36 OK Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebav Volume Calculation Forebay Design Forebay Vol. Required(min.): 18,699 f? (15% main pool) Approx. Area Required: 4,675 fe Vol. Provided: 20,643 fe OK Area Provided: 7,078 fe OK Design Percentage of Main Pond 17% OK (15-20% Req'd) Contour Area Volume Net Vol 508 3400 0 0 509 4225 3,813 3,813 510 5114 4,670 8,482 511 6065 5,590 14,072 512 7078 6,572 20,643 The area and volume values shown above are the EEI Project No. 6700 Wet Detention Pond Page 2 Wet Detention Pond E N G I N E E R PROJECT: Cottages at Wingate CLIENT: The Moser Group PROJ. #: 7516 DATE: 4/15/2023 2013A Van Buren Avenue PHASE: POND#A2 DESIGN BY: MDP Indian Trail, NC28079 Wet Detention Pond - NCDEQ BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 459,674 Ftz New Impervious Area = 174,676 Ftz Impervious Fraction (IA) = 0.38 38 % Rv = 0.05+0.9(IA) = 0.39 Runoff Coefficient Water Quality Volume Required (WQV) = 15,016 ft3 Where: WQV = 3630 * Rp * Rv * A Rainfall Depth (Rp) = 1.0 in. Runoff Coefficient (Rv) = 0.39 unitless Watershed Area (A) = 10.55 ac. WQV Elev. = 515.00 WQV provided = 15,167 ft3 OK Length, Width (Area), Depth, Geometry Permanent Pool Average Depth (dav) = 3.3 ft 3.0 ft. (rounded down) da = [Vperm_pool] / [Aperm_pool] Main Pool Volume Calculation 10.55 ac. 4.01 ac. Area at bottom of shelf = Area at perm. Pool = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = WQV Volume Calculation 514 13,399 0 0 514.5 15,146 7,136 7,136 515 16,975 8,030 15,167 z 10,853 Abot shelf (ft) 10,853 Apermyool (ft)513 z 7,258 Abotyond (ft) Contour Area Volume Net Vol 510 7,258 0 0 511 8,108 7,683 7,683 512 8,991 8,550 16,233 9,906 9,449 25,681 514 10,853 10,380 36,061 4.00 Depth (ft) 36,061 ft3 38 % 1.44 % 6,628 ft, 10,853 ftz 100 ft 50 ft 2.0 :1 -based on assumed bottom, add V to design pond bottom to provide add'I sediment storage SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 40 1.51 1.38 1.24 50 1.79 1.65 1.5. 60 2.09 1.93 1.77 Values from Table: 1 (NCDEQ Stormwater Design Manual - Section C-3) Region: Piedmont Efficiency: 90 % EEI Project No. 6700 Wet Detention Pond Page 1 Orifice diameter = Orifice inv. Elev. = Orifice Equation: WQV Outlet Device 2 in. Q = Co A (29(Ho/3))o.s 2-day Avg Discharge (Qza") = 0.0878 cfs (max.) 5-day Avg Discharge (Q5a") = 0.0351 cfs (min.) Average Discharge (Q) = Icfs (provided) Discharge Coefficient (Co) _ X-sect area of orifice (A) = 0.0218 ftz Accel. due to gravity (g) = 32.2 ft/secz Avg. driving head (Ho) = 0.3056 ft Days to Discharge WQV Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design Forebay Vol. Required(min.): 5,409 ft3 (15% main pool) Approx. Area Required: 1,352 ftz Vol. Provided: 6,280 ft3 OK Area Provided: 2,546 ftz OK Design Percentage of Main Pond 17% OK (15-20% Req'd) Forebav Volume Calculation Contour Area Volume Net Vol 510 666 0 0 511 1093 880 880 512 1548 1,321 2,200 513 2033 1,791 3,991 514 2546 2,290 6,280 The area and volume values shown above are the EEI Project No. 6700 Wet Detention Pond Page 2 Wet Detention Pond E N G I N E E R PROJECT: Cottages at Wingate CLIENT: The Moser Group PROJ. #: 7516 DATE: 4/15/2023 2013A Van Buren Avenue PHASE: POND #A3 DESIGN BY: KAP Indian Trail, NC 28079 Wet Detention Pond - NCDEQ BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 233,461 Ftz New Impervious Area = 65,776 Ftz Impervious Fraction (IA) = 0.28 28 % Rv = 0.05+0.9(IA) = 0.30 Runoff Coefficient Water Quality Volume Required (WQV) = 5,906 ft3 Where: WQV = 3630 * Rp * Rv * A Rainfall Depth (Rp) = 1.0 in. Runoff Coefficient (Rv) = 0.30 unitless Watershed Area (A) = 5.36 ac. WQV Elev. = 533.00 WQV provided = 7,785 ft3 OK 5.36 ac. 1.51 ac. WQV Volume Calculation 532 6,786 0 0 532.5 7,770 3,639 3,639 533 8,812 4,146 7,785 Length, Width (Area), Depth, Geometry Permanent Pool Average Depth (da") = 4.0 ft 4.0 ft. (rounded down) da = [Vperm_pool] / [Aperm_pool] Main Pool Volume Calculation Area at bottom of shelf = Area at perm. Pool = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = 4,067 Abot shelf (ftz) 4,067 Apermyool (ft z) 2,258 Abotyond (ft z ) Contour Area Volume Net Vol 526 1,537 0 0 527 1,881 1,709 1,709 528 2,258 2,070 3,779 529 2,667 2,463 6,241 530 3,104 2,886 9,127 531 3,571 3,338 12,464 532 4,067 3,819 16,283 4.00 Depth (ft) 16,283 ft3 28 % 0.89 % 2088, ftz 4,067 ftz 100 ft 50 ft 2.0 :1 -based on assumed bottom, add V to design pond bottom to provide add'I sediment storage SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 3.0 3.5 4.0 40 1.SI 1.38 I.L4 50 1.79 1.65 1.51 60 1 2.09 1.93 1 1.77 Values from Table: 1 (NCDEQ Stormwater Design Manual - Section C-3) Region: Piedmont Efficiency: 90 % EEI Project No. 7516 Wet Detention Pond Page 1 Orifice diameter = Orifice inv. Elev. = Orifice Equation: WQV Outlet Device 5 in. Q = Co A (29(Ho/3))o.s 2-day Avg Discharge (Qza") = 0.0450 cfs (max.) 5-day Avg Discharge (Q5a") = 0.0180 cfs (min.) Average Discharge (Q) = Icfs (provided) Discharge Coefficient (Co) _ X-sect area of orifice (A) = 0.0123 ftz Accel. due to gravity (g) = 32.2 ft/secz Avg. driving head (Ho) = 0.3125 ft Days to Discharge WQV Ho = Driving Head (ft), measured from the centroid of the orifice area to the water surface Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Design Forebay Vol. Required(min.): 2,442 ft3 (15% main pool) Approx. Area Required: 611 ftz Vol. Provided: 2,963 ft3 OK Area Provided: 1,640 ftz OK Design Percentage of Main Pond 18% OK (15-20% Req'd) Forebav Volume Calculation Contour Area Volume Net Vol 0 0 529 442 0 0 530 761 602 602 531 1161 961 1,563 532 1640 1,401 2,963 The area and volume values shown above are the EEI Project No. 7516 Wet Detention Pond Page 2 Hydraflow Table of Contents 7516-Wingate Hydrographs.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV.................................................................. 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1.............................................................. 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 3, SCS Runoff, POST DEV Al ....................................................................... 8 Hydrograph No. 4, Reservoir, WET POND Al ......................................................................... 9 Pond Report - WET POND Al ........................................................................................... 10 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 12 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 13 Pond Report - WET POND A2........................................................................................... 14 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 16 Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 17 Pond Report - WET POND A3........................................................................................... 18 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 20 TR-55 Tc Worksheet......................................................................................................... 21 Hydrograph No. 10, Combine, COMBINED........................................................................... 22 2 - Year SummaryReport ....................................................................................................................... 23 HydrographReports................................................................................................................. 24 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 24 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 25 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 26 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 27 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 28 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 29 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 30 Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 31 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 32 Hydrograph No. 10, Combine, COMBINED........................................................................... 33 5 - Year SummaryReport ....................................................................................................................... 34 HydrographReports................................................................................................................. 35 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 35 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 36 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 37 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 38 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 39 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 40 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 41 Contents continued... 7516 -Wingate Hydrographs.gpw Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 42 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 43 Hydrograph No. 10, Combine, COMBINED........................................................................... 44 10 -Year SummaryReport ....................................................................................................................... 45 HydrographReports................................................................................................................. 46 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 46 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 47 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 48 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 49 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 50 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 51 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 52 Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 53 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 54 Hydrograph No. 10, Combine, COMBINED........................................................................... 55 25 - Year SummaryReport ....................................................................................................................... 56 HydrographReports................................................................................................................. 57 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 57 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 58 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 59 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 60 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 61 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 62 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 63 Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 64 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 65 Hydrograph No. 10, Combine, COMBINED........................................................................... 66 50 - Year SummaryReport ....................................................................................................................... 67 HydrographReports................................................................................................................. 68 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 68 Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 69 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 70 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 71 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 72 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 73 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 74 Hydrograph No. 8, Reservoir, WET POND Aa...................................................................... 75 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 76 Hydrograph No. 10, Combine, COMBINED........................................................................... 77 100 - Year SummaryReport....................................................................................................................... 78 HydrographReports................................................................................................................. 79 Hydrograph No. 1, SCS Runoff, TOTAL PRE-DEV................................................................ 79 Contents continued... 7516 -Wingate Hydrographs.gpw Hydrograph No. 2, SCS Runoff, PRE-DEV PHASE 1............................................................ 80 Hydrograph No. 3, SCS Runoff, POST DEV Al ..................................................................... 81 Hydrograph No. 4, Reservoir, WET POND Al ....................................................................... 82 Hydrograph No. 5, SCS Runoff, POST DEV A2..................................................................... 83 Hydrograph No. 6, Reservoir, WET POND A2....................................................................... 84 Hydrograph No. 7, SCS Runoff, POST DEV A3..................................................................... 85 Hydrograph No. 8, Reservoir, WET POND A3....................................................................... 86 Hydrograph No. 9, SCS Runoff, PHASE 1 BYPASS.............................................................. 87 Hydrograph No. 10, Combine, COMBINED........................................................................... 88 OFReport.................................................................................................................. 89 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 1 2 3 5 7 ED 9 Legend yd. Origin Description 12 1 SCS Runoff TOTAL PRE-DEV CD 2 SCS Runoff PRE-DEV PHASE 1 10 3 SCS Runoff POST DEV Al 4 Reservoir WET PONDA1 5 SCS Runoff POST DEV A2 6 Reservoir WET PONDA2 7 SCS Runoff POST DEV A3 8 Reservoir WET PONDA3 9 SCS Runoff PHASE 1 BYPASS 10 Combine COMBINED 12 SCS Runoff STREAM CULVERT Project: 7516 - Wingate Hydrographs.gpw Tuesday, 07 / 26 / 2022 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 162.81 250.44 ------- 396.61 519.33 699.35 850.20 1010.95 TOTAL PRE-DEV 2 SCS Runoff ------ 87.80 132.87 ------- 207.55 269.94 361.36 437.55 518.58 PRE-DEV PHASE 1 3 SCS Runoff ------ 67.63 91.11 ------- 127.68 156.86 198.04 231.31 266.10 POST DEV Al 4 Reservoir 3 3.782 8.054 ------- 15.05 19.62 24.54 28.30 35.96 WET POND Al 5 SCS Runoff ------ 26.01 35.04 ------- 49.11 60.33 76.17 88.97 102.35 POST DEV A2 6 Reservoir 5 3.226 5.832 ------- 8.101 9.399 10.84 11.74 14.92 WET POND A2 7 SCS Runoff ------ 12.06 16.46 ------- 23.49 29.15 37.17 43.67 50.48 POST DEV A3 8 Reservoir 7 1.731 4.548 ------- 7.051 8.360 9.685 10.56 11.34 WET POND A3 9 SCS Runoff ------ 69.00 101.24 ------- 153.91 197.92 261.80 314.44 370.18 PHASE 1 BYPASS 10 Combine 4, 6, 8, 76.54 118.69 ------- 183.64 234.97 306.64 364.84 432.11 COMBINED 9 12 SCS Runoff ------ 57.40 83.14 ------- 125.03 159.83 210.12 251.45 295.13 STREAM CULVERT Proj. file: 7516 - Wingate Hydrographs.gpw Tuesday, 07 / 26 / 2022 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 162.81 2 734 778,150 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 87.80 2 734 412,915 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 67.63 2 716 136,538 ------ ------ ------ POST DEV Al 4 Reservoir 3.782 2 780 132,595 3 513.50 77,162 WET POND Al 5 SCS Runoff 26.01 2 716 52,515 ------ ------ ------ POST DEV A2 6 Reservoir 3.226 2 736 50,822 5 515.46 24,684 WET POND A2 7 SCS Runoff 12.06 2 718 24,240 ------ ------ ------ POST DEV A3 8 Reservoir 1.731 2 730 23,619 7 533.30 10,627 WET POND A3 9 SCS Runoff 69.00 2 732 291,405 ------ ------ ------ PHASE 1 BYPASS 10 Combine 76.54 2 732 498,441 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 57.40 2 732 239,997 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 1 Year Tuesday, 07 / 26 / 2022 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Peak discharge = 162.81 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 778,150 cuft Drainage area = 243.450 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 30.30 min Total precip. = 3.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 TOTAL PRE-DEV Hyd. No. 1 -- 1 Year 1 1 1 .1 :1 .11 1 1 •.1 1:1 11 III C, 1 1 .1 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.64 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 22.59 + 0.00 + 0.00 = 22.59 Shallow Concentrated Flow Flow length (ft) = 1012.00 0.00 0.00 Watercourse slope (%) = 3.85 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.17 0.00 0.00 Travel Time (min) = 5.33 + 0.00 + 0.00 = 5.33 Channel Flow X sectional flow area (sqft) = 20.00 0.00 0.00 Wetted perimeter (ft) = 14.00 0.00 0.00 Channel slope (%) = 2.07 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =18.15 0.00 0.00 Flow length (ft) ({0})2626.0 0.0 0.0 Travel Time (min) = 2.41 + 0.00 + 0.00 = 2.41 Total Travel Time, Tc.............................................................................. 30.30 min Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Peak discharge = 87.80 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 412,915 cuft Drainage area = 121.990 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 30.30 min Total precip. = 3.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 PRE-DEV PHASE 1 Hyd. No. 2 -- 1 Year 1 1 1 •1 :1 •11 1 1 •.1 1:1 11 III C, 1 1 •1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 I 0 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.64 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 22.59 + 0.00 + 0.00 = 22.59 Shallow Concentrated Flow Flow length (ft) = 1012.00 0.00 0.00 Watercourse slope (%) = 3.85 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.17 0.00 0.00 Travel Time (min) = 5.33 + 0.00 + 0.00 = 5.33 Channel Flow X sectional flow area (sqft) = 20.00 0.00 0.00 Wetted perimeter (ft) = 14.00 0.00 0.00 Channel slope (%) = 2.07 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =18.15 0.00 0.00 Flow length (ft) ({0})2626.0 0.0 0.0 Travel Time (min) = 2.41 + 0.00 + 0.00 = 2.41 Total Travel Time, Tc.............................................................................. 30.30 min Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 27.430 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.02 in Storm duration = 24 hrs Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 70.00 50.00 40.00 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DEV Al Hyd. No. 3 -- 1 Year Tuesday, 07 / 26 / 2022 = 67.63 cfs = 716 min = 136,538 cuft = 83* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 70.00 *1 01 50.00 40.00 30.00 20.00 10.00 0.00 '1 1 1 --.W►-- ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 3.782 cfs Storm frequency = 1 yrs Time to peak = 780 min Time interval = 2 min Hyd. volume = 132,595 cuft Inflow hyd. No. = 3 - POST DEV Al Max. Elevation = 513.50 ft Reservoir name = WET POND Al Max. Storage = 77,162 cuft Storage Indication method used. Q (cfs) 70.00 50.00 40.00 30.00 10.00 0.00 0 600 — Hyd No. 4 WET POND Al Hyd. No. 4 -- 1 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 3 ® Total storage used = 77,162 cult Pond Report 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Pond No. 1 - WET POND Al Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 512.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 512.00 46,582 0 0 1.00 513.00 53,152 49,826 49,826 2.00 514.00 56,522 54,823 104,649 3.00 515.00 59,948 58,221 162,870 4.00 516.00 63,432 61,676 224,545 5.00 517.00 66,971 65,187 289,732 6.00 518.00 70,567 68,754 358,487 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 24.00 3.50 0.00 0.00 Crest Len (ft) = 16.00 3.00 20.00 0.00 Span (in) = 24.00 3.50 0.00 0.00 Crest El. (ft) = 516.00 513.00 517.00 0.00 No. Barrels = 1 1 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 512.00 512.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 512.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 4,983 512.10 0.02 is 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0.021 0.20 9,965 512.20 0.07 is 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.073 0.30 14,948 512.30 0.13 is 0.13 is --- --- 0.00 0.00 0.00 --- --- --- 0.126 0.40 19,930 512.40 0.16 is 0.16 is --- --- 0.00 0.00 0.00 --- --- --- 0.159 0.50 24,913 512.50 0.18 is 0.18 is --- --- 0.00 0.00 0.00 --- --- --- 0.185 0.60 29,896 512.60 0.22 is 0.21 is --- --- 0.00 0.00 0.00 --- --- --- 0.208 0.70 34,878 512.70 0.24 is 0.23 is --- --- 0.00 0.00 0.00 --- --- --- 0.229 0.80 39,861 512.80 0.25 is 0.25 is --- --- 0.00 0.00 0.00 --- --- --- 0.249 0.90 44,843 512.90 0.27 is 0.27 is --- --- 0.00 0.00 0.00 --- --- --- 0.269 1.00 49,826 513.00 0.29 is 0.29 is --- --- 0.00 0.00 0.00 --- --- --- 0.286 1.10 55,308 513.10 0.60 is 0.29 is --- --- 0.00 0.32 0.00 --- --- --- 0.602 1.20 60,790 513.20 1.20 is 0.28 is --- --- 0.00 0.89 0.00 --- --- --- 1.174 1.30 66,273 513.30 1.92 is 0.27 is --- --- 0.00 1.64 0.00 --- --- --- 1.916 1.40 71,755 513.40 2.81 is 0.27 is --- --- 0.00 2.53 0.00 --- --- --- 2.797 1.50 77,237 513.50 3.80 is 0.26 is --- --- 0.00 3.53 0.00 --- --- --- 3.795 1.60 82,720 513.60 4.90 is 0.26 is --- --- 0.00 4.64 0.00 --- --- --- 4.900 1.70 88,202 513.70 6.06 is 0.26 is --- --- 0.00 5.79 s 0.00 --- --- --- 6.044 1.80 93,684 513.80 7.16 is 0.25 is --- --- 0.00 6.86 s 0.00 --- --- --- 7.117 1.90 99,167 513.90 8.28 is 0.25 is --- --- 0.00 7.93 s 0.00 --- --- --- 8.180 2.00 104,649 514.00 9.27 is 0.25 is --- --- 0.00 9.01 s 0.00 --- --- --- 9.267 2.10 110,471 514.10 10.44 is 0.25 is --- --- 0.00 10.10 s 0.00 --- --- --- 10.35 2.20 116,293 514.20 11.46 is 0.25 is --- --- 0.00 11.20 s 0.00 --- --- --- 11.46 2.30 122,115 514.30 12.55 is 0.25 is --- --- 0.00 12.30 s 0.00 --- --- --- 12.55 2.40 127,937 514.40 13.59 is 0.25 is --- --- 0.00 13.34 s 0.00 --- --- --- 13.59 2.50 133,759 514.50 14.58 is 0.25 is --- --- 0.00 14.33 s 0.00 --- --- --- 14.58 2.60 139,581 514.60 15.43 is 0.24 is --- --- 0.00 15.19 s 0.00 --- --- --- 15.43 2.70 145,403 514.70 16.30 is 0.24 is --- --- 0.00 16.07 s 0.00 --- --- --- 16.30 2.80 151,225 514.80 17.14 is 0.23 is --- --- 0.00 16.91 s 0.00 --- --- --- 17.14 2.90 157,048 514.90 17.94 is 0.23 is --- --- 0.00 17.71 s 0.00 --- --- --- 17.94 3.00 162,870 515.00 18.70 is 0.22 is --- --- 0.00 18.48 s 0.00 --- --- --- 18.70 3.10 169,037 515.10 19.43 is 0.22 is --- --- 0.00 19.21 s 0.00 --- --- --- 19.43 3.20 175,205 515.20 20.13 is 0.21 is --- --- 0.00 19.91 s 0.00 --- --- --- 20.12 3.30 181,372 515.30 20.79 is 0.21 is --- --- 0.00 20.59 s 0.00 --- --- --- 20.79 3.40 187,540 515.40 21.44 is 0.20 is --- --- 0.00 21.24 s 0.00 --- --- --- 21.44 3.50 193,707 515.50 22.06 is 0.20 is --- --- 0.00 21.86 s 0.00 --- --- --- 22.06 Continues on next page... 11 WET POND Al Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.60 199,875 515.60 22.66 is 3.70 206,043 515.70 23.23 is 3.80 212,210 515.80 23.79 is 3.90 218,378 515.90 24.34 is 4.00 224,545 516.00 24.86 is 4.10 231,064 516.10 25.57 is 4.20 237,583 516.20 26.32 is 4.30 244,101 516.30 26.95 is 4.40 250,620 516.40 27.49 is 4.50 257,139 516.50 27.99 is 4.60 263,657 516.60 28.45 is 4.70 270,176 516.70 28.90 is 4.80 276,695 516.80 29.32 is 4.90 283,214 516.90 29.74 is 5.00 289,732 517.00 30.14 is 5.10 296,608 517.10 30.53 is 5.20 303,483 517.20 30.92 is 5.30 310,359 517.30 31.29 is 5.40 317,234 517.40 31.66 is 5.50 324,109 517.50 32.03 is 5.60 330,985 517.60 32.39 is 5.70 337,860 517.70 32.75 is 5.80 344,736 517.80 33.10 is 5.90 351,611 517.90 33.45 is 6.00 358,487 518.00 33.79 is ... End CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.19 is --- --- 0.00 22.46 s 0.00 --- --- --- 22.65 0.19 is --- --- 0.00 23.04 s 0.00 --- --- --- 23.23 0.18 is --- --- 0.00 23.61 s 0.00 --- --- --- 23.79 0.18 is --- --- 0.00 24.15 s 0.00 --- --- --- 24.33 0.18 is --- --- 0.00 24.69 s 0.00 --- --- --- 24.86 0.16 is --- --- 1.68 23.72 s 0.00 --- --- --- 25.56 0.13 is --- --- 4.66 s 21.53 s 0.00 --- --- --- 26.32 0.11 is --- --- 6.99 s 19.84 s 0.00 --- --- --- 26.94 0.10 is --- --- 8.88 s 18.51 s 0.00 --- --- --- 27.48 0.09 is --- --- 10.47 s 17.42 s 0.00 --- --- --- 27.98 0.08 is --- --- 11.85 s 16.52 s 0.00 --- --- --- 28.45 0.07 is --- --- 13.06 s 15.77 s 0.00 --- --- --- 28.90 0.07 is --- --- 14.13 s 15.11 s 0.00 --- --- --- 29.30 0.06 is --- --- 15.10 s 14.56 s 0.00 --- --- --- 29.72 0.06 is --- --- 15.98 s 14.08 s 0.00 --- --- --- 30.11 0.05 is --- --- 16.80 s 13.68 s 2.11 --- --- --- 32.63 0.05 is --- --- 17.52 s 13.30 s 5.95 --- --- --- 36.82 0.04 is --- --- 18.22 s 12.98 s 10.94 --- --- --- 42.19 0.04 is --- --- 18.89 s 12.71 s 16.84 --- --- --- 48.48 0.04 is --- --- 19.49 s 12.45 s 23.54 --- --- --- 55.52 0.04 is --- --- 20.08 s 12.23 s 30.94 --- --- --- 63.29 0.04 is --- --- 20.66 s 12.05 s 38.99 --- --- --- 71.74 0.03 is --- --- 21.19 s 11.86 s 47.64 --- --- --- 80.72 0.03 is --- --- 21.64 s 11.67 s 56.84 --- --- --- 90.19 0.03 is --- --- 22.16 s 11.55 s 66.60 --- --- --- 100.34 12 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 26.01 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 52,515 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.02 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.010 x 98) + (6.540 x 74)] / 10.550 Q (cfs) 28.00 24.00 16.00 12.00 4.00 POST DEV A2 Hyd. No. 5 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 5 - POST DEV A2 Reservoir name = WET POND A2 Storage Indication method used. Q (cfs) 28.00 24.00 16.00 12.00 4.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND A2 Hyd. No. 6 -- 1 Year Tuesday, 07 / 26 / 2022 = 3.226 cfs = 736 min = 50,822 cuft = 515.46 ft = 24,684 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' ' _ ' 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) — Hyd No. 6 Hyd No. 5 ® Total storage used = 24,684 cult Pond Report 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Pond No. 2 - WET POND A2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 514.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 514.00 14,597 0 0 1.00 515.00 17,709 16,126 16,126 2.00 516.00 19,349 18,521 34,647 3.00 517.00 21,047 20,190 54,837 4.00 518.00 22,800 21,915 76,753 5.00 519.00 24,610 23,697 100,450 6.00 520.00 26,477 25,535 125,985 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 15.00 2.00 0.00 0.00 Crest Len (ft) = 16.00 3.00 10.00 0.00 Span (in) = 15.00 2.00 0.00 0.00 Crest El. (ft) = 518.00 515.00 519.00 0.00 No. Barrels = 1 1 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 514.00 514.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- Length (ft) = 50.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 514.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 1,613 514.10 0.01 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.015 0.20 3,225 514.20 0.04 is 0.04 is --- --- 0.00 0.00 0.00 --- --- --- 0.036 0.30 4,838 514.30 0.05 is 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.047 0.40 6,451 514.40 0.06 is 0.06 is --- --- 0.00 0.00 0.00 --- --- --- 0.057 0.50 8,063 514.50 0.07 is 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.065 0.60 9,676 514.60 0.08 is 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.073 0.70 11,288 514.70 0.08 is 0.08 is --- --- 0.00 0.00 0.00 --- --- --- 0.080 0.80 12,901 514.80 0.09 is 0.09 is --- --- 0.00 0.00 0.00 --- --- --- 0.086 0.90 14,514 514.90 0.09 is 0.09 is --- --- 0.00 0.00 0.00 --- --- --- 0.092 1.00 16,126 515.00 0.10 is 0.10 is --- --- 0.00 0.00 0.00 --- --- --- 0.098 1.10 17,978 515.10 0.41 is 0.09 is --- --- 0.00 0.32 0.00 --- --- --- 0.410 1.20 19,831 515.20 1.01 is 0.09 is --- --- 0.00 0.89 0.00 --- --- --- 0.983 1.30 21,683 515.30 1.73 is 0.09 is --- --- 0.00 1.64 0.00 --- --- --- 1.727 1.40 23,535 515.40 2.61 is 0.08 is --- --- 0.00 2.53 0.00 --- --- --- 2.607 1.50 25,387 515.50 3.61 is 0.07 is --- --- 0.00 3.53 s 0.00 --- --- --- 3.605 1.60 27,239 515.60 4.36 oc 0.07 is --- --- 0.00 4.30 s 0.00 --- --- --- 4.362 1.70 29,091 515.70 4.83 oc 0.06 is --- --- 0.00 4.77 s 0.00 --- --- --- 4.827 1.80 30,943 515.80 5.35 oc 0.05 is --- --- 0.00 5.29 s 0.00 --- --- --- 5.346 1.90 32,795 515.90 5.80 oc 0.05 is --- --- 0.00 5.75 s 0.00 --- --- --- 5.797 2.00 34,647 516.00 6.20 oc 0.05 is --- --- 0.00 6.15 s 0.00 --- --- --- 6.198 2.10 36,666 516.10 6.56 oc 0.04 is --- --- 0.00 6.51 s 0.00 --- --- --- 6.558 2.20 38,685 516.20 6.89 oc 0.04 is --- --- 0.00 6.85 s 0.00 --- --- --- 6.889 2.30 40,704 516.30 7.19 oc 0.04 is --- --- 0.00 7.15 s 0.00 --- --- --- 7.193 2.40 42,723 516.40 7.48 oc 0.04 is --- --- 0.00 7.44 s 0.00 --- --- --- 7.479 2.50 44,742 516.50 7.75 oc 0.03 is --- --- 0.00 7.71 s 0.00 --- --- --- 7.748 2.60 46,761 516.60 8.01 oc 0.03 is --- --- 0.00 7.97 s 0.00 --- --- --- 8.006 2.70 48,780 516.70 8.25 oc 0.03 is --- --- 0.00 8.22 s 0.00 --- --- --- 8.251 2.80 50,799 516.80 8.49 oc 0.03 is --- --- 0.00 8.46 s 0.00 --- --- --- 8.488 2.90 52,818 516.90 8.72 oc 0.03 is --- --- 0.00 8.69 s 0.00 --- --- --- 8.714 3.00 54,837 517.00 8.94 oc 0.03 is --- --- 0.00 8.91 s 0.00 --- --- --- 8.933 3.10 57,029 517.10 9.15 oc 0.03 is --- --- 0.00 9.12 s 0.00 --- --- --- 9.145 3.20 59,221 517.20 9.35 oc 0.03 is --- --- 0.00 9.33 s 0.00 --- --- --- 9.351 3.30 61,412 517.30 9.56 oc 0.02 is --- --- 0.00 9.53 s 0.00 --- --- --- 9.555 3.40 63,604 517.40 9.75 oc 0.02 is --- --- 0.00 9.72 s 0.00 --- --- --- 9.747 3.50 65,795 517.50 9.94 is 0.02 is --- --- 0.00 9.91 s 0.00 --- --- --- 9.931 Continues on next page... 15 WET POND A2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.60 67,987 517.60 10.12 is 3.70 70,178 517.70 10.29 is 3.80 72,370 517.80 10.46 is 3.90 74,561 517.90 10.63 is 4.00 76,753 518.00 10.80 is 4.10 79,123 518.10 10.97 is 4.20 81,492 518.20 11.14 is 4.30 83,862 518.30 11.31 is 4.40 86,232 518.40 11.46 is 4.50 88,601 518.50 11.62 is 4.60 90,971 518.60 11.77 is 4.70 93,341 518.70 11.92 is 4.80 95,710 518.80 12.07 is 4.90 98,080 518.90 12.21 is 5.00 100,450 519.00 12.35 is 5.10 103,003 519.10 12.49 is 5.20 105,557 519.20 12.63 is 5.30 108,110 519.30 12.77 is 5.40 110,664 519.40 12.91 is 5.50 113,217 519.50 13.04 is 5.60 115,771 519.60 13.18 is 5.70 118,325 519.70 13.31 is 5.80 120,878 519.80 13.44 is 5.90 123,432 519.90 13.57 is 6.00 125,985 520.00 13.70 is ... End CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.02 is --- --- 0.00 10.09 s 0.00 --- --- --- 10.11 0.02 is --- --- 0.00 10.27 s 0.00 --- --- --- 10.29 0.02 is --- --- 0.00 10.43 s 0.00 --- --- --- 10.45 0.02 is --- --- 0.00 10.60 s 0.00 --- --- --- 10.62 0.02 is --- --- 0.00 10.78 s 0.00 --- --- --- 10.79 0.02 is --- --- 1.11 s 9.84 s 0.00 --- --- --- 10.97 0.01 is --- --- 2.15 s 8.97 s 0.00 --- --- --- 11.13 0.01 is --- --- 3.03 s 8.26 s 0.00 --- --- --- 11.30 0.01 is --- --- 3.76 s 7.68 s 0.00 --- --- --- 11.45 0.01 is --- --- 4.37 s 7.18 s 0.00 --- --- --- 11.56 0.01 is --- --- 4.91 s 6.80 s 0.00 --- --- --- 11.72 0.01 is --- --- 5.41 s 6.50 s 0.00 --- --- --- 11.91 0.01 is --- --- 5.82 s 6.21 s 0.00 --- --- --- 12.04 0.01 is --- --- 6.19 s 5.96 s 0.00 --- --- --- 12.15 0.01 is --- --- 6.50 s 5.72 s 0.00 --- --- --- 12.22 0.01 is --- --- 6.84 s 5.56 s 1.05 --- --- --- 13.46 0.00 is --- --- 7.17 s 5.43 s 2.98 --- --- --- 15.58 0.00 is --- --- 7.39 s 5.26 s 5.47 --- --- --- 18.13 0.00 is --- --- 7.54 s 5.07 s 8.42 --- --- --- 21.04 0.00 is --- --- 7.94 s 5.07 s 11.77 --- --- --- 24.79 0.00 is --- --- 8.07 s 4.91 s 15.47 --- --- --- 28.46 0.00 is --- --- 8.37 s 4.88 s 19.50 --- --- --- 32.74 0.00 is --- --- 8.30 s 4.64 s 23.82 --- --- --- 36.76 0.00 is --- --- 8.81 s 4.75 s 28.42 --- --- --- 41.99 0.00 is --- --- 8.82 s 4.59 s 33.30 --- --- --- 46.71 Hydrograph Report 16 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 5.360 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.02 in Storm duration = 24 hrs Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 14.00 12.00 10.00 M . M@ 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DEV A3 Hyd. No. 7 -- 1 Year Tuesday, 07 / 26 / 2022 = 12.06 cfs = 718 min = 24,240 cuft = 81* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 M ee 4.00 ItM 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 1.731 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 23,619 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 533.30 ft Reservoir name = WET POND A3 Max. Storage = 10,627 cuft Storage Indication method used. WET POND A3 Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 8 Hyd No. 7 ® Total storage used = 10,627 cult Pond Report 18 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Pond No. 3 - WET POND A3 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 532.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 532.00 6,786 0 0 1.00 533.00 8,812 7,776 7,776 2.00 534.00 9,909 9,354 17,130 3.00 535.00 11,064 10,480 27,611 4.00 536.00 12,275 11,663 39,274 5.00 537.00 13,542 12,902 52,176 6.00 538.00 14,866 14,197 66,373 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.50 0.00 0.00 Crest Len (ft) = 16.00 3.00 10.00 0.00 Span (in) = 15.00 1.50 0.00 0.00 Crest El. (ft) = 536.00 533.00 537.00 0.00 No. Barrels = 1 1 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 532.00 532.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- Length (ft) = 45.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 532.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.10 778 532.10 0.01 is 0.01 is --- --- 0.00 0.00 0.00 --- --- --- 0.011 0.20 1,555 532.20 0.02 is 0.02 is --- --- 0.00 0.00 0.00 --- --- --- 0.022 0.30 2,333 532.30 0.03 is 0.03 is --- --- 0.00 0.00 0.00 --- --- --- 0.028 0.40 3,110 532.40 0.03 is 0.03 is --- --- 0.00 0.00 0.00 --- --- --- 0.033 0.50 3,888 532.50 0.04 is 0.04 is --- --- 0.00 0.00 0.00 --- --- --- 0.038 0.60 4,666 532.60 0.05 is 0.04 is --- --- 0.00 0.00 0.00 --- --- --- 0.042 0.70 5,443 532.70 0.05 is 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.046 0.80 6,221 532.80 0.05 is 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.050 0.90 6,999 532.90 0.06 is 0.05 is --- --- 0.00 0.00 0.00 --- --- --- 0.053 1.00 7,776 533.00 0.06 is 0.06 is --- --- 0.00 0.00 0.00 --- --- --- 0.056 1.10 8,712 533.10 0.37 is 0.05 is --- --- 0.00 0.32 0.00 --- --- --- 0.369 1.20 9,647 533.20 0.94 is 0.05 is --- --- 0.00 0.89 0.00 --- --- --- 0.944 1.30 10,582 533.30 1.69 is 0.05 is --- --- 0.00 1.64 0.00 --- --- --- 1.689 1.40 11,518 533.40 2.57 is 0.05 is --- --- 0.00 2.53 0.00 --- --- --- 2.572 1.50 12,453 533.50 3.57 is 0.04 is --- --- 0.00 3.53 0.00 --- --- --- 3.573 1.60 13,389 533.60 4.23 oc 0.04 is --- --- 0.00 4.19 s 0.00 --- --- --- 4.225 1.70 14,324 533.70 4.77 oc 0.03 is --- --- 0.00 4.73 s 0.00 --- --- --- 4.766 1.80 15,260 533.80 5.30 oc 0.03 is --- --- 0.00 5.27 s 0.00 --- --- --- 5.300 1.90 16,195 533.90 5.77 oc 0.03 is --- --- 0.00 5.74 s 0.00 --- --- --- 5.767 2.00 17,130 534.00 6.18 oc 0.03 is --- --- 0.00 6.16 s 0.00 --- --- --- 6.183 2.10 18,178 534.10 6.56 oc 0.02 is --- --- 0.00 6.53 s 0.00 --- --- --- 6.558 2.20 19,226 534.20 6.90 oc 0.02 is --- --- 0.00 6.88 s 0.00 --- --- --- 6.901 2.30 20,274 534.30 7.22 oc 0.02 is --- --- 0.00 7.20 s 0.00 --- --- --- 7.218 2.40 21,322 534.40 7.52 oc 0.02 is --- --- 0.00 7.49 s 0.00 --- --- --- 7.515 2.50 22,370 534.50 7.80 oc 0.02 is --- --- 0.00 7.78 s 0.00 --- --- --- 7.796 2.60 23,419 534.60 8.06 oc 0.02 is --- --- 0.00 8.05 s 0.00 --- --- --- 8.064 2.70 24,467 534.70 8.32 oc 0.02 is --- --- 0.00 8.30 s 0.00 --- --- --- 8.316 2.80 25,515 534.80 8.55 is 0.02 is --- --- 0.00 8.53 s 0.00 --- --- --- 8.544 2.90 26,563 534.90 8.76 is 0.02 is --- --- 0.00 8.74 s 0.00 --- --- --- 8.761 3.00 27,611 535.00 8.97 is 0.02 is --- --- 0.00 8.96 s 0.00 --- --- --- 8.971 3.10 28,777 535.10 9.18 is 0.01 is --- --- 0.00 9.16 s 0.00 --- --- --- 9.172 3.20 29,943 535.20 9.37 is 0.01 is --- --- 0.00 9.36 s 0.00 --- --- --- 9.370 3.30 31,109 535.30 9.57 is 0.01 is --- --- 0.00 9.55 s 0.00 --- --- --- 9.563 3.40 32,276 535.40 9.75 is 0.01 is --- --- 0.00 9.73 s 0.00 --- --- --- 9.747 3.50 33,442 535.50 9.94 is 0.01 is --- --- 0.00 9.92 s 0.00 --- --- --- 9.936 Continues on next page... 19 WET POND A3 Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 3.60 34,608 535.60 10.12 is 3.70 35,775 535.70 10.29 is 3.80 36,941 535.80 10.46 is 3.90 38,107 535.90 10.63 is 4.00 39,274 536.00 10.80 is 4.10 40,564 536.10 10.97 is 4.20 41,854 536.20 11.14 is 4.30 43,144 536.30 11.31 is 4.40 44,434 536.40 11.46 is 4.50 45,725 536.50 11.62 is 4.60 47,015 536.60 11.77 is 4.70 48,305 536.70 11.92 is 4.80 49,595 536.80 12.07 is 4.90 50,885 536.90 12.21 is 5.00 52,176 537.00 12.35 is 5.10 53,595 537.10 12.49 is 5.20 55,015 537.20 12.63 is 5.30 56,435 537.30 12.77 is 5.40 57,855 537.40 12.91 is 5.50 59,274 537.50 13.04 is 5.60 60,694 537.60 13.18 is 5.70 62,114 537.70 13.31 is 5.80 63,534 537.80 13.44 is 5.90 64,953 537.90 13.57 is 6.00 66,373 538.00 13.70 is ... End CIvB CIvC PrfRsr WrA WrB WrC WrD ExfiI User Total cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.01 is --- --- 0.00 10.10 s 0.00 --- --- --- 10.11 0.01 is --- --- 0.00 10.28 s 0.00 --- --- --- 10.29 0.01 is --- --- 0.00 10.44 s 0.00 --- --- --- 10.46 0.01 is --- --- 0.00 10.61 s 0.00 --- --- --- 10.63 0.01 is --- --- 0.00 10.79 s 0.00 --- --- --- 10.80 0.01 is --- --- 1.11 s 9.84 s 0.00 --- --- --- 10.97 0.01 is --- --- 2.15 s 8.97 s 0.00 --- --- --- 11.13 0.01 is --- --- 3.03 s 8.26 s 0.00 --- --- --- 11.29 0.01 is --- --- 3.76 s 7.68 s 0.00 --- --- --- 11.44 0.01 is --- --- 4.39 s 7.22 s 0.00 --- --- --- 11.62 0.00 is --- --- 4.91 s 6.80 s 0.00 --- --- --- 11.71 0.00 is --- --- 5.41 s 6.50 s 0.00 --- --- --- 11.91 0.00 is --- --- 5.82 s 6.21 s 0.00 --- --- --- 12.03 0.00 is --- --- 6.19 s 5.96 s 0.00 --- --- --- 12.15 0.00 is --- --- 6.50 s 5.72 s 0.00 --- --- --- 12.22 0.00 is --- --- 6.84 s 5.56 s 1.05 --- --- --- 13.46 0.00 is --- --- 7.17 s 5.43 s 2.98 --- --- --- 15.58 0.00 is --- --- 7.39 s 5.26 s 5.47 --- --- --- 18.13 0.00 is --- --- 7.54 s 5.07 s 8.42 --- --- --- 21.04 0.00 is --- --- 7.94 s 5.07 s 11.77 --- --- --- 24.79 0.00 is --- --- 8.07 s 4.91 s 15.47 --- --- --- 28.45 0.00 is --- --- 8.37 s 4.88 s 19.50 --- --- --- 32.74 0.00 is --- --- 8.61 s 4.82 s 23.82 --- --- --- 37.26 0.00 is --- --- 8.81 s 4.75 s 28.42 --- --- --- 41.98 0.00 is --- --- 8.82 s 4.59 s 33.30 --- --- --- 46.71 Hydrograph Report 20 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.02 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 40.00 30.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 1 Year Tuesday, 07 / 26 / 2022 = 69.00 cfs = 732 min = 291,405 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 70.00 .1 01 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1—w ' ' ' ' ' ' ' �-. ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) 21 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.64 0.00 0.00 Land slope (%) = 1.50 0.00 0.00 Travel Time (min) = 22.59 + 0.00 + 0.00 = 22.59 Shallow Concentrated Flow Flow length (ft) = 705.00 0.00 0.00 Watercourse slope (%) = 3.85 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.17 0.00 0.00 Travel Time (min) = 3.71 + 0.00 + 0.00 = 3.71 Channel Flow X sectional flow area (sqft) = 20.00 0.00 0.00 Wetted perimeter (ft) = 14.00 0.00 0.00 Channel slope (%) = 2.07 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =18.15 0.00 0.00 Flow length (ft) ({0})2933.0 0.0 0.0 Travel Time (min) = 2.69 + 0.00 + 0.00 = 2.69 Total Travel Time, Tc.............................................................................. 29.00 min 22 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 76.54 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 498,441 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 80.00 70.00 50.00 40.00 30.00 10.00 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydrograph Summary Report 23 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 250.44 2 734 1,140,556 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 132.87 2 734 599,662 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 91.11 2 716 184,540 ------ ------ ------ POST DEV Al 4 Reservoir 8.054 2 748 182,102 3 513.89 98,520 WET POND Al 5 SCS Runoff 35.04 2 716 70,977 ------ ------ ------ POST DEV A2 6 Reservoir 5.832 2 726 69,296 5 515.91 32,958 WET POND A2 7 SCS Runoff 16.46 2 716 33,245 ------ ------ ------ POST DEV A3 8 Reservoir 4.548 2 724 32,536 7 533.66 13,947 WET POND A3 9 SCS Runoff 101.24 2 732 415,845 ------ ------ ------ PHASE 1 BYPASS 10 Combine 118.69 2 732 699,779 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 83.14 2 732 339,632 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 2 Year Tuesday, 07 / 26 / 2022 Hydrograph Report 24 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 2 Year Tuesday, 07 / 26 / 2022 = 250.44 cfs = 734 min = 1,140, 556 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 1 1l ' ' ' ' ' ' ' '*' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 2 Year Tuesday, 07 / 26 / 2022 = 132.87 cfs = 734 min = 599,662 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 .1 01 40.00 20.00 0.00 ' 1 1 1' --.O� ' ' ' ' ' ' ' I% ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 27.430 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.64 in Storm duration = 24 hrs Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 e Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DEV Al Hyd. No. 3 -- 2 Year Tuesday, 07 / 26 / 2022 = 91.11 cfs = 716 min = 184,540 cuft = 83* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Hydrograph Report 27 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 3 - POST DEV Al Reservoir name = WET POND Al Storage Indication method used. Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND Al Hyd. No. 4 -- 2 Year Tuesday, 07 / 26 / 2022 = 8.054 cfs = 748 min = 182,102 cuft = 513.89 ft = 98,520 cuft Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) — Hyd No. 4 Hyd No. 3 ® Total storage used = 98,520 cult 28 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 35.04 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 70,977 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.010 x 98) + (6.540 x 74)] / 10.550 Q (cfs) 40.00 30.00 10.00 0.00 -L— ---J— 0 120 240 — Hyd No. 5 POST DEV A2 Hyd. No. 5 -- 2 Year 360 480 600 720 840 Q (cfs) 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 5.832 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 69,296 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 515.91 ft Reservoir name = WET POND A2 Max. Storage = 32,958 cuft Storage Indication method used Q (cfs) 40.00 30.00 10.00 0.00 0 360 — Hyd No. 6 WET POND A2 Hyd. No. 6 -- 2 Year 720 1080 1440 Hyd No. 5 1800 2160 2520 2880 3240 ® Total storage used = 32,958 cuft Q (cfs) 40.00 30.00 20.00 10.00 ---1- 0.00 3600 Time (min) Hydrograph Report 30 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 16.46 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 33,245 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(1.510 x 98) + (3.850 x 74)] / 5.360 POST DEV A3 Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) Hydrograph Report 31 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 7 - POST DEV A3 Reservoir name = WET POND A3 Storage Indication method used. Q (cfs) 18.00 15.00 12.00 am 3.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND A3 Hyd. No. 8 -- 2 Year Tuesday, 07 / 26 / 2022 = 4.548 cfs = 724 min = 32,536 cuft = 533.66 ft = 13,947 cuft Q (cfs) 18.00 15.00 12.00 3.00 WIVIT11 240 480 720 960 1200 1440 1680 1920 2160 2400 Time (min) Hyd No. 8 Hyd No. 7 ® Total storage used = 13,947 cult Hydrograph Report 32 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.64 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 2 Year 0.00 '1 1 1 1� 0 120 240 360 480 600 720 — Hyd No. 9 840 Tuesday, 07 / 26 / 2022 = 101.24 cfs = 732 min = 415,845 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 33 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 118.69 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 699,779 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 120.00 100.00 40.00 COMBINED Hyd. No. 10 -- 2 Year 0.00 ' 0 120 240 360 480 600 720 — Hyd No. 10 Hyd No. 4 Hyd No. 9 Q (cfs) 120.00 100.00 40.00 20.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 8 Hydrograph Summary Report 34 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 396.61 2 734 1,750,360 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 207.55 2 734 911,994 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 127.68 2 716 261,073 ------ ------ ------ POST DEV Al 4 Reservoir 15.05 2 738 261,104 3 514.56 137,016 WETPONDA1 5 SCS Runoff 49.11 2 716 100,413 ------ ------ ------ POST DEV A2 6 Reservoir 8.101 2 726 98,768 5 516.64 47,542 WET POND A2 7 SCS Runoff 23.49 2 716 47,743 ------ ------ ------ POST DEV A3 8 Reservoir 7.051 2 724 46,893 7 534.25 19,721 WET POND A3 9 SCS Runoff 153.91 2 732 621,559 ------ ------ ------ PHASE 1 BYPASS 10 Combine 183.64 2 730 1,028,324 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 125.03 2 730 503,423 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 5 Year Tuesday, 07 / 26 / 2022 Hydrograph Report 35 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 420.00 240.00 180.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 5 Year Tuesday, 07 / 26 / 2022 = 396.61 cfs = 734 min = 1,750,360 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 1 1 1 1 .y/ I I I I I I II% 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 36 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 210.00 180.00 150.00 120.00 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 5 Year Tuesday, 07 / 26 / 2022 = 207.55 cfs = 734 min = 911,994 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 '1 1 1 — ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Peak discharge = 127.68 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 261,073 cuft Drainage area = 27.430 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 140.00 120.00 100.00 40.00 Q (cfs) 140.00 120.00 100.00 •1 01 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 3 Time (min) Hydrograph Report 38 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Storm frequency = 5 yrs Time interval = 2 min Inflow hyd. No. = 3 - POST DEV Al Reservoir name = WET POND Al Storage Indication method used. Q (cfs) 140.00 120.00 100.00 40.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WET POND Al Hyd. No. 4 -- 5 Year Tuesday, 07 / 26 / 2022 = 15.05 cfs = 738 min = 261,104 cuft = 514.56 ft = 137,016 cuft Q (cfs) 140.00 120.00 100.00 .1 01 40.00 20.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) — Hyd No. 4 — Hyd No. 3 ® Total storage used = 137,016 cult 39 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 49.11 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 100,413 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.010 x 98) + (6.540 x 74)] / 10.550 Q (cfs) 50.00 40.00 30.00 10.00 POST DEV A2 Hyd. No. 5 -- 5 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 1-'- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 5 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 8.101 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 98,768 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 516.64 ft Reservoir name = WET POND A2 Max. Storage = 47,542 cuft Storage Indication method used. WET POND A2 Q (cfs) Hyd. No. 6 -- 5 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 -jk 0.00 - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 6 — Hyd No. 5 ® Total storage used = 47,542 cult 41 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 23.49 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 47,743 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 24.00 16.00 12.00 : M 4.00 POST DEV A3 Hyd. No. 7 -- 5 Year Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 -L— ---J— I ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 7 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 7.051 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 46,893 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 534.25 ft Reservoir name = WET POND A3 Max. Storage = 19,721 cuft Storage Indication method used WET POND A3 Q (cfs) Hyd. No. 8 -- 5 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 7 ® Total storage used = 19,721 cult Hydrograph Report 43 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 5 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 4.58 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 5 Year Tuesday, 07 / 26 / 2022 = 153.91 cfs = 732 min = 621,559 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 1 1 1 1 �.�..- I I I I I I I� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 183.64 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,028,324 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 210.00 180.00 150.00 120.00 • M It It 30.00 Q (cfs) 210.00 180.00 150.00 120.00 • It It 1 30.00 Mraa 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 8 Hydrograph Summary Report 45 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 519.33 2 734 2,267,366 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 269.94 2 734 1,175,622 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 156.86 2 716 323,454 ------ ------ ------ POST DEV Al 4 Reservoir 19.62 2 734 325,524 3 515.13 170,709 WET POND Al 5 SCS Runoff 60.33 2 716 124,405 ------ ------ ------ POST DEV A2 6 Reservoir 9.399 2 726 122,797 5 517.22 59,736 WET POND A2 7 SCS Runoff 29.15 2 716 59,643 ------ ------ ------ POST DEV A3 8 Reservoir 8.360 2 724 58,679 7 534.72 24,665 WET POND A3 9 SCS Runoff 197.92 2 730 793,719 ------ ------ ------ PHASE 1 BYPASS 10 Combine 234.97 2 730 1,300,719 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 159.83 2 730 639,939 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 10 Year Tuesday, 07 / 26 / 2022 Hydrograph Report 46 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 10 Year Tuesday, 07 / 26 / 2022 = 519.33 cfs = 734 min = 2,267,366 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 1 1 1 1 �,.- I I I I I I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 47 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 10 Year Tuesday, 07 / 26 / 2022 = 269.94 cfs = 734 min = 1,175,622 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 '1 1 1 1„ "' ' ' ' ' ' ' ' '%- ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Peak discharge = 156.86 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 323,454 cuft Drainage area = 27.430 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 160.00 140.00 120.00 100.00 40.00 POST DEV Al Hyd. No. 3 -- 10 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 3 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 19.62 cfs Storm frequency = 10 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 325,524 cuft Inflow hyd. No. = 3 - POST DEV Al Max. Elevation = 515.13 ft Reservoir name = WET POND Al Max. Storage = 170,709 cuft Storage Indication method used. WET POND Al Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) — Hyd No. 4 Hyd No. 3 ® Total storage used = 170,709 cult 50 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 60.33 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 124,405 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(4.010 x 98) + (6.540 x 74)] / 10.550 Q (cfs) 70.00 50.00 40.00 30.00 10.00 Q (cfs) 70.00 •1 01 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 5 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 9.399 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 122,797 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 517.22 ft Reservoir name = WET POND A2 Max. Storage = 59,736 cuft Storage Indication method used. Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 240 — Hyd No. 6 WET POND A2 Hyd. No. 6 -- 10 Year Q (cfs) 480 720 Hyd No. 5 52 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 29.15 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 59,643 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 30.00 25.00 15.00 10.00 5.00 POST DEV A3 Hyd. No. 7 -- 10 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' —'— ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 7 Time (min) Hydrograph Report 53 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 8.360 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 58,679 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 534.72 ft Reservoir name = WET POND A3 Max. Storage = 24,665 cuft Storage Indication method used Q (cfs) 30.00 25.00 15.00 10.00 5.00 WET POND A3 Hyd. No. 8 -- 10 Year 0.00 0 120 240 360 480 600 720 — Hyd No. 8 — Hyd No. 7 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 840 960 1080 1200 1320 1440 1560 Time (min) ® Total storage used = 24,665 cult Hydrograph Report 54 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 5.32 in Storm duration = 24 hrs Q (cfs) 210.00 180.00 150.00 120.00 30.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 10 Year Tuesday, 07 / 26 / 2022 = 197.92 cfs = 730 min = 793,719 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' 1 1 1'- ' ' ' ' ' ' '- ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 234.97 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,300,719 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydrograph Summary Report 56 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 699.35 2 732 3,032,927 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 361.36 2 732 1,564,718 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 198.04 2 716 413,218 ------ ------ ------ POST DEV Al 4 Reservoir 24.54 2 734 418,248 3 515.94 220,755 WET POND Al 5 SCS Runoff 76.17 2 716 158,930 ------ ------ ------ POST DEV A2 6 Reservoir 10.84 2 728 157,375 5 518.03 77,347 WET POND A2 7 SCS Runoff 37.17 2 716 76,852 ------ ------ ------ POST DEV A3 8 Reservoir 9.685 2 724 75,724 7 535.37 31,881 WET POND A3 9 SCS Runoff 261.80 2 730 1,046,231 ------ ------ ------ PHASE 1 BYPASS 10 Combine 306.64 2 730 1,697,580 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 210.12 2 730 839,570 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 25 Year Tuesday, 07 / 26 / 2022 Hydrograph Report 57 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.36 in Storm duration = 24 hrs Q (cfs) 700.00 400.00 200.00 100.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 25 Year Tuesday, 07 / 26 / 2022 = 699.35 cfs = 732 min = 3,032,927 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 700.00 500.00 400.00 300.00 200.00 100.00 0.00 ' 1 1 1Tr ' ' ' ' ' ' ' — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 58 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.36 in Storm duration = 24 hrs Q (cfs) 400.00 350.00 250.00 200.00 150.00 100.00 50.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 25 Year Tuesday, 07 / 26 / 2022 = 361.36 cfs = 732 min = 1,564,718 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' ' ' ' ' ' ' ' -*, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Peak discharge = 198.04 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 413,218 cuft Drainage area = 27.430 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 210.00 180.00 150.00 120.00 30.00 POST DEV Al Hyd. No. 3 -- 25 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 24.54 cfs Storm frequency = 25 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 418,248 cuft Inflow hyd. No. = 3 - POST DEV Al Max. Elevation = 515.94 ft Reservoir name = WET POND Al Max. Storage = 220,755 cuft Storage Indication method used. Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 0 240 480 — Hyd No. 4 WET POND Al Hyd. No. 4 -- 25 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 3 ® Total storage used = 220,755 cult 61 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 76.17 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 158,930 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.010 x 98) + (6.540 x 74)] / 10.550 Q (cfs) 80.00 70.00 50.00 40.00 30.00 10.00 POST DEV A2 Hyd. No. 5 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 5 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 10.84 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 157,375 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 518.03 ft Reservoir name = WET POND A2 Max. Storage = 77,347 cuft Storage Indication method used. WET POND A2 1 11 ----- ------ 1 11 1 1 1 •1 :1 •11 1 1 •.1 1:1 11 N1 1 •1 .:1 63 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 37.17 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 76,852 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 40.00 30.00 10.00 0.00 0 120 240 — Hyd No. 7 POST DEV A3 Hyd. No. 7 -- 25 Year 360 480 600 720 840 960 Q (cfs) 40.00 30.00 20.00 10.00 0.00 1080 1200 1320 Time (min) Hydrograph Report 64 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 9.685 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 75,724 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 535.37 ft Reservoir name = WET POND A3 Max. Storage = 31,881 cuft Storage Indication method used WET POND A3 Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 7 ® Total storage used = 31,881 cult Hydrograph Report 65 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.36 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 25 Year Tuesday, 07 / 26 / 2022 = 261.80 cfs = 730 min = 1,046,231 cuft = 76 = Oft = 29.00 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 1 ' ' ' ' ' ' '— ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 306.64 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,697,580 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 COMBINED Hyd. No. 10 -- 25 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ffill---- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydrograph Summary Report 67 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 850.20 2 732 3,675,923 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 437.55 2 732 1,890,698 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 231.31 2 716 486,977 ------ ------ ------ POST DEV Al 4 Reservoir 28.30 2 734 494,453 3 516.57 261,541 WET POND Al 5 SCS Runoff 88.97 2 716 187,299 ------ ------ ------ POST DEV A2 6 Reservoir 11.74 2 728 185,790 5 518.61 91,266 WET POND A2 7 SCS Runoff 43.67 2 716 91,047 ------ ------ ------ POST DEV A3 8 Reservoir 10.56 2 724 89,784 7 535.86 37,630 WET POND A3 9 SCS Runoff 314.44 2 730 1,256,762 ------ ------ ------ PHASE 1 BYPASS 10 Combine 364.84 2 730 2,026,790 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 251.45 2 730 1,005,629 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 50 Year Tuesday, 07 / 26 / 2022 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.20 in Storm duration = 24 hrs Q (cfs) 854.00 732.00 610.00 488.00 244.00 122.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 50 Year Tuesday, 07 / 26 / 2022 = 850.20 cfs = 732 min = 3,675,923 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 854.00 732.00 610.00 488.00 366.00 244.00 122.00 0.00 ' ' ' ' ' ' ' I '% ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.20 in Storm duration = 24 hrs Q (cfs) 480.00 420.00 240.00 180.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 50 Year Tuesday, 07 / 26 / 2022 = 437.55 cfs = 732 min = 1,890,698 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' 1 1 1 ' ' ' ' ' ' ' -*, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 70 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Peak discharge = 231.31 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 486,977 cuft Drainage area = 27.430 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 POST DEV Al Hyd. No. 3 -- 50 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 ' 1 1 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 3 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 28.30 cfs Storm frequency = 50 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 494,453 cuft Inflow hyd. No. = 3 - POST DEV Al Max. Elevation = 516.57 ft Reservoir name = WET POND Al Max. Storage = 261,541 cuft Storage Indication method used. Q (cfs) WET POND Al Hyd. No. 4 -- 50 Year Q (cfs) 0 240 — Hyd No. 4 480 720 Hyd No. 3 960 1200 1440 1680 1920 Time (min) ® Total storage used = 261,541 cult 72 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge = 88.97 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 187,299 cuft Drainage area = 10.550 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.010 x 98) + (6.540 x 74)] / 10.550 POST DEV A2 Q (cfs) Hyd. No. 5 -- 50 Year Q (cfs) 90.00 90.00 11 I111I1=������ 9111I1=�� :I ►Z111I1=�� Mi 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 — Hyd No. 5 Time (min) 73 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 11.74 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 185,790 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 518.61 ft Reservoir name = WET POND A2 Max. Storage = 91,266 cuft Storage Indication method used. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 WET POND A2 Hyd. No. 6 -- 50 Year 1 1 �1 •1 �:1 •11 1 :�1 •.1 1:1 11 1 ��1 •1 .:1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 74 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 43.67 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 91,047 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 50.00 40.00 30.00 10.00 POST DEV A3 Hyd. No. 7 -- 50 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 7 Time (min) Hydrograph Report 75 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 10.56 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 89,784 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 535.86 ft Reservoir name = WET POND A3 Max. Storage = 37,630 cuft Storage Indication method used WET POND A3 Q (cfs) Hyd. No. 8 -- 50 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 7 ® Total storage used = 37,630 cult Hydrograph Report 76 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 7.20 in Storm duration = 24 hrs Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 50 Year Tuesday, 07 / 26 / 2022 = 314.44 cfs = 730 min = 1,256,762 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' ' ' ' ' ' ' '� ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) 77 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 364.84 cfs Storm frequency = 50 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 2,026,790 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 400.00 350.00 250.00 200.00 150.00 100.00 50.00 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydrograph Summary Report 78 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1010.95 2 732 4,367,266 ------ ------ ------ TOTAL PRE-DEV 2 SCS Runoff 518.58 2 732 2,240,579 ------ ------ ------ PRE-DEV PHASE 1 3 SCS Runoff 266.10 2 716 565,111 ------ ------ ------ POST DEVA1 4 Reservoir 35.96 2 730 575,188 3 517.18 302,074 WET POND Al 5 SCS Runoff 102.35 2 716 217,350 ------ ------ ------ POST DEV A2 6 Reservoir 14.92 2 728 215,891 5 519.17 104,759 WET POND A2 7 SCS Runoff 50.48 2 716 106,121 ------ ------ ------ POST DEVA3 8 Reservoir 11.34 2 724 104,717 7 536.33 43,501 WET POND A3 9 SCS Runoff 370.18 2 730 1,481,983 ------ ------ ------ PHASE 1 BYPASS 10 Combine 432.11 2 730 2,377,781 4, 6, 8, ------ ------ COMBINED 9 12 SCS Runoff 295.13 2 730 1,182,997 ------ ------ ------ STREAM CULVERT 7516 - Wingate Hydrographs.gpw Return Period: 100 Year Tuesday, 07 / 26 / 2022 Hydrograph Report 79 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 1 TOTAL PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 243.450 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.08 in Storm duration = 24 hrs Q (cfs) 1015.00 870.00 725.00 435.00 290.00 145.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor TOTAL PRE-DEV Hyd. No. 1 -- 100 Year Tuesday, 07 / 26 / 2022 = 1010.95 cfs = 732 min = 4,367,266 cuft = 73 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 1015.00 870.00 725.00 580.00 435.00 290.00 145.00 0.00 ' ' ' ' ' ' ' '— ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 2 PRE-DEV PHASE 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 121.990 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.08 in Storm duration = 24 hrs Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE-DEV PHASE 1 Hyd. No. 2 -- 100 Year Tuesday, 07 / 26 / 2022 = 518.58 cfs = 732 min = 2,240,579 cuft = 74 = 0 ft = 30.30 min = Type II = 484 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 ' 1 1 1. -. ' ' ' ' ' ' '-*, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) 81 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 3 POST DEV Al Hydrograph type = SCS Runoff Peak discharge = 266.10 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 565,111 cuft Drainage area = 27.430 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.640 x 98) + (16.790 x 74)] / 27.430 Q (cfs) 280.00 240.00 200.00 160.00 120.00 0.00 0 120 240 — Hyd No. 3 POST DEV Al Hyd. No. 3 -- 100 Year 360 480 600 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 720 840 960 1080 1200 Time (min) 82 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 4 WET POND Al Hydrograph type = Reservoir Peak discharge = 35.96 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 575,188 cuft Inflow hyd. No. = 3 - POST DEV Al Max. Elevation = 517.18 ft Reservoir name = WET POND Al Max. Storage = 302,074 cuft Storage Indication method used. Q (cfs) 0 WET POND Al Hyd. No. 4 -- 100 Year Q (cfs) 0 240 — Hyd No. 4 480 720 Hyd No. 3 960 1200 1440 1680 1920 Time (min) ® Total storage used = 302,074 cult Hydrograph Report 83 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 5 POST DEV A2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 10.550 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 8.08 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 07 / 26 / 2022 = 102.35 cfs = 716 min = 217,350 cuft = 83* = 0 ft = 5.00 min = Type II = 484 Composite (Area/CN) _ [(4.010 Q (cfs) x 98) + (6.540 x 74)] / 10.550 POST DEV A2 Hyd. No. 5 -- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0 120 — Hyd No. 0.00 240 360 480 600 720 840 960 1080 1200 5 Time (min) Hydrograph Report 84 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 6 WET POND A2 Hydrograph type = Reservoir Peak discharge = 14.92 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 215,891 cuft Inflow hyd. No. = 5 - POST DEV A2 Max. Elevation = 519.17 ft Reservoir name = WET POND A2 Max. Storage = 104,759 cuft Storage Indication method used Q (cfs) 120.00 100.00 40.00 rIt ee WET POND A2 Hyd. No. 6 -- 100 Year Q (cfs) 120.00 100.00 40.00 20.00 J 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 6 Hyd No. 5 ® Total storage used = 104,759 cult 85 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 7 POST DEV A3 Hydrograph type = SCS Runoff Peak discharge = 50.48 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 106,121 cuft Drainage area = 5.360 ac Curve number = 81 * Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.08 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.510 x 98) + (3.850 x 74)] / 5.360 Q (cfs) 60.00 50.00 40.00 30.00 10.00 POST DEV A3 Hyd. No. 7 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 7 Time (min) Hydrograph Report 86 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 8 WET POND A3 Hydrograph type = Reservoir Peak discharge = 11.34 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 104,717 cuft Inflow hyd. No. = 7 - POST DEV A3 Max. Elevation = 536.33 ft Reservoir name = WET POND A3 Max. Storage = 43,501 cuft Storage Indication method used WET POND A3 Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 — Hyd No. 7 ® Total storage used = 43,501 cult Hydrograph Report 87 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Hyd. No. 9 PHASE 1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 78.050 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.08 in Storm duration = 24 hrs Q (cfs) 400.00 350.00 250.00 200.00 150.00 100.00 50.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PHASE 1 BYPASS Hyd. No. 9 -- 100 Year Tuesday, 07 / 26 / 2022 = 370.18 cfs = 730 min = 1,481,983 cuft = 76 = 0 ft = 29.00 min = Type II = 484 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' 1 1 1 ' ' ' ' ' ' r1w, ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Tuesday, 07 / 26 / 2022 Hyd. No. 10 COMBINED Hydrograph type = Combine Peak discharge = 432.11 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 2,377,781 cuft Inflow hyds. = 4, 6, 8, 9 Contrib. drain. area = 78.050 ac Q (cfs) 480.00 420.00 240.00 180.00 120.00 Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Hyd No. 4 Hyd No. 6 Hyd No. 8 Time (min) Hyd No. 9 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2023 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 69.1983 13.0000 0.8993 -------- 2 76.6030 12.9000 0.8784 -------- 3 0.0000 0.0000 0.0000 -------- 5 81.3501 13.1000 0.8444 -------- 10 78.2019 12.5000 0.8066 -------- 25 67.4210 11.1000 0.7419 -------- 50 60.5607 10.1000 0.6971 -------- 100 54.5298 9.1000 0.6545 -------- File name: Wingate Intensity.IDF Intensity = B / (Tc + D)^E Tuesday, 07 / 26 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.14 4.13 3.46 2.98 2.63 2.35 2.13 1.95 1.80 1.67 1.56 1.46 2 6.08 4.89 4.12 3.56 3.14 2.82 2.56 2.35 2.17 2.01 1.88 1.77 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.05 5.74 4.86 4.24 3.76 3.39 3.09 2.84 2.63 2.46 2.30 2.17 10 7.77 6.35 5.40 4.72 4.20 3.80 3.47 3.20 2.98 2.78 2.62 2.47 25 8.58 7.02 5.99 5.26 4.71 4.28 3.93 3.64 3.40 3.19 3.01 2.85 50 9.13 7.48 6.40 5.64 5.07 4.62 4.26 3.96 3.70 3.48 3.30 3.13 100 9.65 7.91 6.79 6.01 5.41 4.95 4.58 4.26 4.00 3.78 3.58 3.41 Tc = time in minutes. Values may exceed 60. Precip. He name: X:\Land Projects R2\7516 - Mae St Pro pert \Calculations\Stormwater\Re o rt\Wi ng ate Precip.pc Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.02 3.64 0.00 4.58 5.32 6.36 7.20 8.08 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 The Cottages at Wingate Stormwater Management Report Appendix C Storm Drain Calculations 7516-C-NC June 7, 2022 / 11 \ , , \ I i i i / \ / \ ' \ - / \ \ I / / I .- - — / \ \ \ /� J - ` \ 1 / - — \ \ / \ / / \ �' / \ - / / / \ / I f \ \ / / i ) \ �\ I \ , \ 1--------_ \ ". \ - i / / - r v I - - 1 1' - / / I 1 I- i / _ 1 \ / / - \ \ / i . \> I � \ , I — . 1 . / �\ _ _ - - -\� '- _ I . — �. �_ r I , - �� / I \ / _ �% / I / \ - / - / I \' I / / I / \ i�' -.- / / \ / / '� \ / / I / -9y , I I / / / — — I i / F �' - / 1 I '� T' I I \ / i I / \ I ;I : _ / / / f 1 I T 1 i / I / / I I l I - I �\ �. I I / _ - / , 1 /' \ / / / / ' % I 1 - ' i /I - I I - / i' I / / \ / \ \ I / / \ ' / i /' - - / f -- - \ ' / / / I 1 I '\ \ I - \ _ / \ \ / / / / ) I ..- / I I — iI ;I I �' / - .% r ' / I I - \ I cds `:. 1 \ �. / / - I / \ I I /' �— II ---- -�. I �. i \ _ \ I /r - \ / i I _/ i \ i \/ `- ', - \ . \ .I /� , - /. /. - '/ i II 1 / ' J•' — r — DI 307 : _ _ _ \ i I l / r— �� A I — _ ,.•.. / / __. - \' :j /' \ _- I ram- \. / / j i \ ', 1 I / i� '/ i . l _ r / '� .-. �j> /.i.' 1 i. 1 ''/'.• '�� -FES 306 i JI / / P I \ / i' rF 1 _ •ram '/ •R 1 6 \t / I I I \ - / I -- •60- • I i .1 / �I 1 - - I I - 1'" i I I :; / \ I / J 1 - 'FE V ,I / S+C . WET POND A3 . r: A .- -----_ FES 300 / i I:: n \ / I/ / •l: i •i - O _ \ i I / - 1 :: _ , I t / .j \ C /i t 1 - - i CB 304 ', i. ,I - 'Q \ %.. j. / / 1 I - �� - I - \ / _ - II _ / / % �= Q �I /.' �• / / l /.' i ,I I 'i - 1 _ / — _ \ / I I _ i / \ � 1 �-= • i. i .j � I I /. a .j i /. t_ l , P U // i/ I l A I CB-219 /' I /' / ii . / '/ I n 1 / /I r r I \ i. 1 =� 55� \ /: I 1 1 v-' / _ i 1 I ( CB-218 .- _ II 1 / t ) / •\ f: I '•� � ' CB 214 -� • DI 301 - I i -i. 1 - ' 1' /. i I 1 a 54 :i 4" l /• :y - R CB-2 A /' I - :� l 4„ i i 5" �_ o _ P \. :Y: I ", 'FES-B� J.\' 7 I ]• I /. i' _ I I 1 \' :/' 2 / I -I- I I 1 — _ -I_- I 1 I'. :':.� — I r' " , I 1 r 1 :+� 1 I f \ 7 - . I• A h - - 'i I 52 8-212 s. j'. I / /.' _ 7 / \ \� Po 6 I :" `\:' -I - _ 1 \ / i - I i' / :% C� CB-208 . j. / I f \ A / 5 1 /. �;;' I' B-2 1 I S-200 C 0 ,1 I ,/ 1 i� / • WET P ND A2 / O �C I 5' i• / :/ D I 1 II l '- i .'l�' I I I 1 _ 1 /. \ l / CB 154 / /CB-202 •I� l" / i G / / / r :� I - • / . DI-217 GB 207 I I / /. '•I' t y \ ;'ram • �, �. ''1 I { / lam— 1. , . \ .. i.' :%� : l t :'f , . �, I , , f 1:,• / / J� I .'� : / / , ''/.'�.•.':':•' •',✓ / •./`/.''.''.''.'� .•ram - �- .Q' - — � I. � \ �� / /..,. /. ' FES 121 j( — / �� / . 1 - / \ /. _� f.'. \ / 1 - - �•" ' is CB-2o3 c — �( / /.' t:: 1 / 1 / A Z :I, Q �� i. • I .i �" 'I / G l / ', / "/ — — / E / /: N 1 %%' - AKL i ,� I h 8-211 / C / - ir" . C 153 /�/ c J A / — -- I \ --- % / �•'' / CB-123 / --- i \ \ / r. - / - /, _ DI-2 \ I — — — - I L �I :.> i _ %'•% /. I : :: ; . J. = / / \ //.. • ::/: / ems. L I, , . - \ \ / . CB 124 C' -. / :r! / I , . /, :: •j WET POND Al �. / \ / _ _ 4 `' \ - r / I I -'- • . . \ DI 206 iI 0- • G r G I I /• I \'. FE� -A ' II / '% %" s .l 1 , L - =:f=�' CB125 .i h I• 81 1 _ C 5 i I. I / / 1 i �9 r- - "�4 / \ / _ /. • . / 24" RCP % . \ !' (' \ ;I: \r — �' :'� /, /. j. /: 8 / /. 4 Q / / l CB 131 ,' :\ V I %' / I \ \ I / FES 100 Q• _ ;r•' I 1 I _ r \ � / CB 119 O :. \' J�'' / / i x ' •%• / - 'I e i. / \ R• / 1 Q :� \' / \ C i \ / �. �'� / /.'. \� Q 8, 1 1 /' �� 1•' CB 107 - \ CB 1 ' �'. I '•'' C 11 / 'i A '\ o /' _l . .' \ 1 \.. 7� �'. CB 110 '\ C� r \. \ /'. \ i. / / /—ram ', \ \. j / / \ I: �� \ '\ . �� \ . ,� j. - \ \• •0 : P \ i' i / / 1 - -- 129- �' 1 SITE OUTFACE 1'D2' u� \ 11' / I 'Q \ : / • 7' / �''' / ' / I I \ �> � 1 � 3B-114 - r .- / 1- - \ _ - _ '�1 POINT OF ANALYSIS A' - •• I �' CB-115' l I T-7, �, O , I / \ \ . 12$. - I \ s\ / I :1 1 - o C8 103 I / / I o :/ -------- \ \t \•\. �.' / �•.1' \ r 1Z� 1 I� l �' :_•' I R F' IC SCALE \ _ \' \ ' / ,'% �. I i — \ 9 ;� _ I / — / _ \. ) \ - _ --._- �. : l - �125 :'/: : I \ %' N FEET'. - \ \ \ �� - - fi4. \ ! / / \ \:::: '' 1 \ :\ inch 80' it. '. I \ \'.' _ — l` \ \' /.• ✓ 15,872sgft. \ ce ��� W W I\ UQNNc z QUA'= Czz� M z' wm' cob U o w I J Q �_ � a _j O - (� LL N W w Q) >_ m W 0 O z MI w ICU U Q J 2 J U � z 1 WW1' ' N W LL L W f� f Q �U 0� ``�z zzW C) J J I— W �U� LL — LL U Q rr^^ \\ \\ z vJ T T O m LLI I— J � U w z Q 1 — _ / a- O M_ry\ co U N U°) r" > � m w C 0 m z x U m O � z Q . N Q � � N QL Z m N \ v V O z < I—^ z � o Q 0 (+ ) z p O Z 2 � m o z 2 Q) o co Sheet POST-DEV Gotta es at Win ate Project Number: 7516 Description Original Date: 6/7/22 DB: MDP Revision Date: N/A PM: MDP Location I Inlet I i Areas i Storm Runoff I I Pipe Sizing Calculations I I Pipe In ut Cover Calculations I I I I I I From 1 1 1 Percent I Percent I Composite I Structure I To Structure I (acres) I Pervious) Impervios I Runoff I I Coeff. Cc I I I I I I I I (in/hr) I I I I I I I I Inlet I Combined I I Pipe 1 Pipe I Dtheo I I Discharge QI Discharge I Material nl Slope I Length) (in) I S¢e (in) I (cfs) I Qpipe (cfs) I I (%) I (k) I I I I I I I I I I I Pipe I I I I Vfull I Capacity I Q-full 1 d/dm I I ( . I full I (°O/a) 1 ratio I I I I I I I I() I I I I I ipe I Actual I I I Structure I I I Actual I Time I Pipe I Pope I Pipe I Rim I Depth Of I Pipe v/V-full I Vpipe I (min) - I Time I Inv. 1 Inv. In 1 Elevation 1 Cover (Based I Material I (fps) I Full I I Out I I I on Rim) I I I I (min) I I I (RoWine) I I I I Pipe I Material I Class I Storm Network 100 CB-116 Cff115 0.92 40% 60% 0.71 7.78 5.10 5.10 0.013 0.65% 76 1 14.9 1 15 1 4.2 5.19 98% 0.88 1.15 4.86 0.30 1 0.26 1 542.21 1 541.72 545.68 1 1.97 RCP CB-115 I CB-114 1 0.07 1 55% 1 45% 1 0.62 1 7.78 1 0.32 1 5.42 I 0.013 1 0.50% 1 57 1 16.0 1 18 1 4.2 1 7.45 1 73% 1 0.62 1 1.07 1 4.51 1 0.23 1 0.21 1 541.471541.181 546.46 1 3.20 1 RCP C&114 CB-113 0.15 32% 68% 0.76 7.78 0.86 6.28 0.013 0.50% 107 16.9 18 4.2 7.39 85% 0.68 1.12 4.68 0.43 0.38 541.08 540.55 547.68 4.81 RCP C1113 CB-112 0.00 60% 40% 0.59 7.78 0.02 6.30 0.013 1.00% 170 14.8 18 5.9 10.49 60% 0.56 1.05 6.23 0.48 0.45 540.44 538.74 548.99 0 6.76 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I 2I-118 DI-117 1.46 91% 9% 0.40 7.78 4.58 4.58 0.013 0.50% 228 15.0 15 3.7 4.57 100% 0.82 1.16 4.32 1.02 0.88 540.60 539.46 543.50 1.40 RCP DI-117 CB-112 1.48 85% 15% 0.44 7.78 5.04 9.62 0.013 0.50% 142 19.8 24 5.1 16.00 60% 0.56 1.05 5.35 m 0.46 m 0.44 m 538.95 m 538.24m 542.94 m 1 1 1 1 1.68 i RCP CB-112 I CB-111 1 0.25 1 34% 1 66% 1 0.75 1 7.78 1 1.46 1 17.38 I 0.013 1 1.00% 1 103 1 21.7 1 24 1 7.2 1 22.61 1 77% 1 0.65 1 1.12 1 8.06 1 0.24 1 0.21 1 538.15 1537.121 546.19 1 5.73 1 RCP CB-119 CB-111 0.35 37% 63% 0.73 7.78 1.99 1.99 0.013 3.50% 36 7.6 1 15 1 9.8 1 12.07 1 17% 1 0.27 1 0.66 1 6.49 1 0.06 1 0.09 1 539.141 537.871 544.90 1 4.26 1 RCP CB-111 I CB-110 I 0.10 I 41% I 59% I 0.70 I 7.78 I 0.54 I 19.91 I 0.013 I 0.50% I 28 126.0 1 30 1 5.9 1 28.96 1 69% 1 0.58 1 1.05 1 6.20 1 0.08 1 0.08 1 536.621536.481 544.13 1 4.66 1 RCP C6110 CB-109 0.35 36% 64% 0.74 7.78 1.99 21.90 0.013 0.50% 36 27.0 30 5.9 28.86 76% 0.65 1.12 6.59 0.10 0.09 536.28 536.10 544.13 5.00 RCP C6109 Cff108 0.08 28% 72% 0.78 7.78 0.51 22.41 0.013 0.50% 28 27.2 30 5.9 28.96 m 77% 0.65 1.12 m 6.61 0.08 0.07 m 535.90 m 535.76 543.08 m 4.33 RCP CB-108 I Cff107 I 0.36 I 34% I 66% I 0.75 I 7.78 I 2.12 I 24.53 I 0.013 12.00% I 128 121.7 1 30 1 11.8 1 57.89 1 42% 1 0.44 1 0.87 1 10.261 0.18 1 0.21 1 535.561533.001 543.08 1 4.67 1 RCP CB-107 CB-101 0.20 38% 62% 0.72 7.78 1.11 25.64 0.013 2.00% 137 22.1 1 30 1 11.8 1 57.89 1 44% 1 0.44 1 0.87 1 10.26 1 0.19 1 0.22 1 532.80 1530.061 540.75 1 5.10 1 RCP DI-106 I DI-105 1 0.67 1 81% 1 19% 1 0.46 1 7.78 1 2.43 1 2.43 1 0.013 1 2.00% 1 244 1 9.1 1 15 1 7.4 1 9.13 1 27% 1 0.35 1 0.82 1 6.10 1 0.55 1 0.67 1 534.371529.481 539.50 1 3.63 1 RCP DI-1 CB-104 1.32 82% 18°/a 0.46 7.78 4.74 7.17 0.013 0.50%142 17.7 18 4.2 7.43 96°/a 0.88 1.15 4.84 0.56 0.49 529.23 528.52 532.08 1.06 RCP C'104 CB-101 0.81 33% 67% 0.75 7.78 4.75 11.92 0.013 0.50% 28 21.5 24 5.1 15.98 75% 0.62 1.07 5.44 0.09 m 0.09 m 528.02 m 527.88 538.58 m 8.25 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I CB-103 CB-102 0.54 39% 61% 0.72 7.78 3.01 3.01 0.013 2.00% 28 9.9 15 7.4 9.12 33% 0.37 0.82 6.10 1 0.06 1 0.08 1 536.481 535.921 540.16 1 2.18 RCP CB-102 CB-101 0.55 40% 60% 0.71 7.78 3.04 6.06 0.013 1.00% 174 14.6 15 5.3 6.45 94% 0.74 1.14 5.99 0.55 0.48 535.72 533.98 540.16 2.94 RCP CB-101 I FES-100 I 0.58 I 35% I 65% I 0.74 I 7.78 I 3.31 I 46.92 I 0.013 I 2.00% I 158 127.7 I 30 I 11.8 I 57.87 I 81% I 0.68 I 1.12 113.20 1 0.22 1 0.20 1 527.381524.231 538.58 1 8.35 1 RCP CB-142 CB-141 0.48 29% 71% 0.77 7.78 2.92 2.92 0.013 1 1.00% 28 11.1 15 5.3 6.45 45% 0.47 0.94 1 4.94 0.09 0.09 560.62 1560.341 565.29 1 3.17 RCP CB-141 I Cff140 I 0.42 I 31% I 69% I 0.76 I 7.78 I 2.46 I 5.38 I 0.013 1 1.00% I 111 114.0 I 15 I 5.3 I 6.45 I 83% I 0.68 I 1.12 1 5.88 1 0.35 1 0.31 1 560.141559.031 565.29 1 3.65 1 RCP CB-140 Cff139 0.17 33% 67% 0.75 7.78 1.01 6.39 0.013 1.00% 89 14.9 15 5.3 6.45 99% 0.88 1.15 6.04 0.28 1 0.25 1 558.83 1 557.941 564.18 1 3.85 i RCP CB-139 Cff138 0.15 31% 69% 0.76 7.78 0.91 7.30 0.013 2.00% 110 13.8 15 7.4 9.13 80% 0.65 1.12 8.34 1 0.25 1 0.22 1 557.741555.541 563.13 1 3.89 1 RCP CB-138 I CB-137 I 0.19 I 33% I 67% I 0.75 I 7.78 I 1.11 I 8.41 I 0.013 I 2.25% I 92 114.2 I 18 I 8.9 I 15.72 I 53% I 0.50 I 0.99 I 8.81 I 0.17 1 0.17 1 555.291553.231 561.04 1 3.96 1 RCP DI-145 CB-146 2.28 1 87% 1 13% 1 0.43 1 5.24 5.15 5.15 1 0.013 1.00% 1 21 1 13.8 1 15 5.3 6.45 1 80% 1 0.65 1 1.12 5.89 1 0.07 1 0.06 1 555.05 554.84 557.50 1 0.95 RCP CB-146 I CB-137 I 0.54 I 36% I 64% I 0.73 I 7.78 I 3.07 I 8.22 I 0.013 1 1.00% I 28 I 16.4 I 18 I 5.9 I 10.49 I 78% I 0.65 I 1.12 I 6.65 1 0.08 1 0.07 1 554.591554.311 559.29 1 2.91 1 RCP I DI-143 CB-137 1.61 81% 19% 0.46 5.24 3.89 3.89 0.013 0.50% 141 14.1 15 3.7 4.57 85% 0.70 1.14 1 4.25 1 0.63 1 0.55 1 554.191553.481 556.78 1 1.09 1 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I CB-137 Cff136 0.15 31% 69% 0.76 7.78 0.91 21.43 0.013 0.90% 195 24.0 24 6.8 21.44 100% 0.88 1.15 7.85 0.48 1 0.42 1 552.73 1 550.971 559.29 1 4.25 RCP DI-144 I Cff147 I 1.17 I 87% I 13% I 0.43 I 7.78 I 3.88 I 3.88 I 0.013 I 0.50% I 140 114.1 I 15 I 3.7 I 4.56 I 85% I 0.70 I 1.14 I 4.24 I 0.63 I 0.55 1 551.861551.161 554.36 I 1.00 I RCP CB-147 Cff136 0.50 30% 70% 0.77 7.78 3.02 3.02 0.013 0.50% 28 12.8 15 3.7 4.56 66% 0.58 1.05 3.90 1 0.13 1 0.12 1 550.961 550.821 556.09 1 3.63 i RCP CB.136 I CB-135 I 0.60 I 39% I 61% I 0.72 I 7.78 I 3.36 I 27.81 I 0.013 I 0.50% I 67 129.5 I 30 I 5.9 I 28.85 I 96% I 0.88 I 1.15 I 6.76 1 0.19 1 0.16 1 549.571549.241 556.09 1 3.67 1 RCP I CB-135 Cff134 0.06 36% 64% 0.73 7.78 0.34 28.15 0.013 0.50% 78 29.6 30 5.9 28.98 97% 0.88 1.15 6.79 1 0.22 1 0.19 1 549.041548.651 556.74 1 4.85 RCP C&134 Cff133 0.01 47% 53% 0.67 7.78 0.05 28.20 0.013 0.49% 61 29.7 30 5.9 28.79 98% 0.88 1.15 6.75 0.17 0.15 548.45 548.15 557.40 6.10 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I C&148 Cff149 0.27 48% 52% 0.66 7.78 1.41 1.41 0.013 0.99% 37 8.5 15 5.2 6.41 22% 0.30 0.74 3.87 0.12 0.16 552.85 552.48 555.84 1.49 RCP C1149 CB-133 0.13 30% 70% 0.77 7.78 0.76 2.17 0.013 1.00% 28 9.9 15 5.3 6.45 34% 0.37 0.82 4.31 0.09 0.11 552.28 552.00 556.61 2.83 RCP CB-133 I CB-132 1 0.12 1 33% 1 67% 1 0.75 1 7.78 1 0.71 1 31.08 I 0.013 1 0.59% 1 37 1 29.8 1 30 1 6.4 1 31.38 1 99% 1 0.88 1 1.15 1 7.35 1 0.10 1 0.08 1 547.951547.731 556.61 1 5.81 1 RCP C6132 CB-131 0.05 27% 73% 0.79 7.78 0.28 31.36 0.013 0.70% 95 29.0 30 7.0 34.21 92% 0.74 1.14 7.94 0.23 0.20 547.53 546.87 555.27 4.89 RCP C1131 CB-130 0.09 39% 61% 0.71 7.78 0.50 31.86 0.013 0.75% 77 28.8 30 7.2 35.52 90% 0.70 1.14 8.25 0.18 0 0.16 0 546.67 546.09 554.32 0 4.80 RCP CB-130 I CB-129 1 0.32 1 79% 1 21% 1 0.48 1 7.78 1 1.17 1 33.03 I 0.013 1 0.80% 1 81 1 28.8 1 30 1 7.5 1 36.64 1 90% 1 0.74 1 1.14 1 8.51 1 0.18 1 0.16 1 545.891545.241 553.61 1 4.87 1 RCP CB-129 CB-128 1 0.22 1 32% 1 68% 1 0.76 1 7.78 1 1.29 1 34.32 1 0.013 1 0.84% 1 51 1 28.9 1 30 1 7.7 1 37.62 1 91% 1 0.74 1 1.14 1 8.74 1 0.11 1 0.10 1 545.041544.611 552.86 1 4.97 1 RCP Gotta es at Win ate Project Number: 7516 Description Original Date: 6/7/22 DB: MDP Revision Date: N/A PM: MDP Location I Inlet i Areas I i Storm Runoff I I Pipe Sizing Calculations I I Pipe In ut Cover Calculations I I I I I I From I I I Percent I Percent I Composite I Structure I To Stmclure I (acres) I Pervious) Impervios I Runoff I I Coeff. Co I I I I I I I I (in/hr) I I I I I I I 1 Inlet 1 Combined 1 1 Pipe 1 Pipe I Dtheo 1 I Discharge QI Discharge I Material nl Slope I Length) (in) I S¢e (in) I (cfs) I Qpipe (cfs) I I I I I I I I I I Pipe I 1 I 1 Vfull 1 Capacity 1 Q-full 1 d/dm 1 I ( . I full I (°O/a) 1 ratio I I I I I I I() I I I I IPipe I Actual I I I Structure I I I Actual 1 Time I Pipe 1 Pope 1 Pipe 1 Rim I Depth Of I Pipe v/V-full I Vpipe I (min) - I Time I Inv. I Inv. In 1 Elevation 1 Cover (Based I Material I (fps) I Full I I Out I I I on Rim) I I I I (min) I I I (HoWine) I I I I Pipe I Material I Class I CB-150 CB-128 1 0.56 1 36% 1 64% 1 0.73 1 7.78 1 3.20 1 3.20 1 0.013 1 1.00% 1 28 11.5 1 15 1 5.3 6.45 1 50% 1 0.47 0.94 1 4.94 0.09 1 0.09 1 549.28 1549.001 552.64 1 1.86 RCP CB-128 CB-127 1 0.10 1 33% 1 67% 0.75 7.78 0.57 38.09 0.013 0.51% 47 33.1 36 6.7 47.55 80% 0.68 1.12 7.53 0.12 1 0.10 1 544.11 543.87 552.64 1 5.13 RCP CB-127 I CB-126 1 0.18 1 31% 1 69% 1 0.76 1 7.78 1 1.08 1 39.17 1 0.013 1 0.50% 1 79 I 33.5 1 36 1 6.7 1 47.28 1 83% 1 0.68 I 1.12 1 7.49 1 0.20 1 0.18 1 543.671 543.271 553.14 1 6.07 1 RCP CB-126 CB-125 1 0.18 32% 68% 0.76 7.78 1.07 40.24 0.013 0.50% 300 33.9 36 6.7 47.11 85% 0.70 1.14 1 7.60 1 0.75 1 0.66 1 543.071 541.571 554.15 1 7.68 i RCP CB-151 I CB-125 1 0.22 I 8% I 92% I 0.90 I 7.78 I 1.53 I 1.53 I 0.013 I 1.00% I 19 I 8.7 I 15 I 5.3 I 6.45 I 24% I 0.30 I 0.74 1 3.89 1 0.06 1 0.08 1 548.191548.001 552.48 1 2.79 1 RCP CB-152 I CB-125 1 0.26 31% 69% 0.76 7.78 1.53 1.53 0.013 1.00% 28 8.7 15 5.3 6.45 24% 0.30 0.74 1 3.89 1 0.09 1 0.12 1 548.281548.001 551.59 1 1.81 1 RCP CB-125 I CB-124 1 0.17 I 24% I 76% I 0.81 I 7.78 1 1.05 I 44.35 I 0.013 I 1.51% I 189 1 28.6 I 36 1 11.6 1 81.85 I 54% I 0.50 I 0.99 1 11.46 1 0.27 1 0.28 1 541.371538.511 551.59 1 6.82 1 RCP I CB-153 CB-124 0.32 32% 6811, 0.76 7.78 1.87 1.87 0.013 0.89°/a 28 9.6 15 5.0 6.10 31°/a 0.37 0.82 4.07 0.09 0.11 541.91 541.66 545.91 2.50 RCP C,124 C,123 0.37 16% 84°/a 0.86 7.78 2.43 48.65 0.013 0.60°/a 81 35.1 36 7.3 51.81 94°/a 0.74 1.14 8.36 0.18 0.16 537.71 537.22 545.91 4.80 RCP CB-123 CB-122 0.56 28% 72% 0.78 7.78 1 3.37 52.02 0.013 5.00% 226 1 24.2 36 1 21.1 1 148.94 1 35% 0.37 1 0.82 1 17.28 0.18 1 0.22 1 535.32 1 524.001 543.78 1 5.06 i RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I CB-154 CB-122 0.18 25% 75% 0.80 7.78 1.13 1.13 0.013 0.50% 28 8.9 15 3.7 4.56 25% 0.30 0.74 2.75 0.13 1 0.17 1 525.89 1525.751 529.35 1 1.96 1 RCP CB-122 FES-121 0.15 32% 68°/a 0.76 7.78 0.88 54.03 0.013 5.00% 32 24.6 36 21.1 148.87 36% 0.41 0.87 18.32 0.03 0.03 522.80 521.21 529.35 3.15 RCP DI-206 DI-205 0.87 1 84% 16% 0.44 7.78 3.01 3.01 0.013 2.55% Storm Network 200 200 1 9.4 1 15 1 8.4 10.30 29% 0.35 0.82 6.88 0.40 1 0.48 1 547.39 1542.291 550.32 1 1.43 1 RCP DI-205 DI-204 0.73 75% 25% 0.50 7.78 2.86 5.87 0.013 3.00% 190 11.8 15 9.1 11.17 53% 0.50 0.99 9.01 0.35 1 0.35 1 542.09 1 536.391 546.32 1 2.73 i RCP DI-204 I CB-203 I 0.71 I 74% I 26% I 0.51 I 7.78 I 2.79 I 8.66 I 0.013 I 2.10% I 21 I 14.6 I 18 I 8.6 I 15.18 I 57% I 0.54 I 0.99 I 8.51 1 0.04 1 0.04 1 535.941 535.501 540.50 1 2.77 1 RCP I CB-203 SHE 0.12 36% 64% 0.73 7.78 0.71 9.36 0.013 1 0.81% 30 17.9 18 5.3 9.45 99% 0.88 1.15 6.15 1 0.09 1 0.08 1 534.10 1533.861 541.67 1 5.78 1 RCP C1202 C1201 0.19 27% 73% 0.79 7.78 1.15 10.51 0.013 1.25% 73 17.3 18 6.6 11.71 90% 0.70 1.14 7.56 0.18 0.16 533.660 532.750 541.50 6.05 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I CB-211 CB-210 0.49 38% 62% 0.72 7.78 2.76 2.76 0.013 2.00% 28 9.6 15 7.4 9.12 30% 0.37 0.82 6.10 0.06 0.08 546.34 545.78 549.91 2.07 RCP C1216 CB-209 0.45 38% 62% 0.72 7.78 2.52 5.27 0.013 3.50% 291 11.0 15 9.8 12.07 44% 0.44 0.87 8.56 0.49 0.57 545.68 535.49 549.91 0 2.73 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I CB-212 CB-209 0.47 31% 69% 0.76 7.78 2.80 2.80 0.013 1.00% 28 11.0 15 5.3 6.45 43% 0.44 0.87 4.57 0.09 0.10 535.77 535.49 541.99 4.72 RCP C1209 CB-208 0.47 31% 69% 0.76 7.78 2.80 10.87 0.013 2.75% 37 15.1 18 9.8 17.39 63% 0.56 1.05 10.33 m 0.06 m 0.06 m 535.24 m 534.21 m 541.99 M 1 1 1 1 4.96 ERCP 1 CB-208 I CB-207 1 0.17 1 34% 1 66% 1 0.74 1 7.78 1 0.99 1 11.86 1 0.013 1 2.74% 1 27 1 15.6 1 18 1 9.8 1 17.37 1 68% 1 0.58 1 1.05 1 10.32 1 0.05 1 0.04 1 534.111533.371 541.19 1 5.29 1 RCP CB-207 CB-201 1 0.09 1 34% 1 66% 1 0.74 1 7.78 1 0.54 1 12.40 1 0.013 1 1.50% 1 28 1 17.7 1 18 1 7.3 1 12.85 1 96% 1 0.88 1 1.15 1 8.36 1 0.06 1 0.06 1 533.171532.751 540.78 1 5.82 1 RCP DI-217 I DI-216 1 0.79 1 81% 1 19% 1 0.46 1 7.78 1 2.85 1 2.85 I 0.013 1 2.45% 1 203 1 9.3 1 15 1 8.2 1 10.09 1 28% 1 0.35 1 0.82 1 6.75 1 0.41 1 0.50 1 545.161540.191 549.27 1 2.61 1 RCP CB-219 CB-218 0.46 1 37% 1 63% 1 0.73 1 7.78 1 2.61 1 2.61 1 0.013 1 3.50% 1 42 1 8.4 1 15 1 9.8 1 12.07 1 22% 1 0.30 1 0.74 1 7.28 1 0.07 1 0.10 1 545.711544.251 549.06 1 1.85 1 RCP CB-218 I DI-216 1 0.66 1 31% 1 69% 1 0.76 1 7.78 1 3.90 1 6.52 1 0.013 1 1.75% 1 133 1 13.5 1 15 1 7.0 1 8.54 1 76% 1 0.65 1 1.12 1 7.79 1 0.32 1 0.28 1 542.521540.191 548.51 1 4.49 1 RCP DI-216 DI-215 0.73 75% 25% 0.50 7.78 2.85 12.21 0.013 3.75% 87 14.9 15 10.2 12.49 98% 0.88 1.15 11.70 0.14 0.12 539.99 536.73 543.68 2.19 RCP DI-211 CB-214 0.36 87% 13% 0.43 7.78 1.20 13.41 0.013 3.00% 21 16.0 18 10.3 18.17 74% 0.62 1.07 11.00 0.03 m 0.03 m 536.48 m 535.85 m 541.00 2.73 RCP CB-214 I CB-213 1 0.15 1 39% 1 61% 1 0.71 1 7.78 1 0.83 1 14.24 1 0.013 1 1.00% 1 28 1 20.2 1 24 1 7.2 1 22.59 1 63% 1 0.56 1 1.05 1 7.55 1 0.06 1 0.06 1 535.35 1535.071 544.38 1 6.72 1 RCP Ct 13 CB_ 0.47 33% 67°/a 0.75 7.78 2.72 16.96 0.013 1.25°/a 218 20.6 24 8.0 25.26 67°/a 0.58 1.05 8.44 0.45 0.43 534.97 532.25 594.38 7.10 RCP CB-201 -I FES-200 0.50 36% 64°/a 0.73 7.78 2.83 42.69 0.013 3.99°/a 147 23.5 24 14.4 45.13 95°/a 0.74 1.14 16.38 0.17 0.15 532.25 526.39 540.78 6.22 RCP Storm Network 300 CB-305 CB-304 0.95 35% 65% 0.74 7.78 5.45 5.45 0.013 1.50% 85 13.0 18 7.3 12.85 42% 0.44 0.87 6.33 1 0.20 1 0.22 1 547.311 546.03 551.41 2.31 RCP CB-304 CB-303 0.43 28% 72% 0.78 7.78 2.60 8.04 0.013 1.50% 191 15.1 18 7.3 12.85 63% 0.56 1.05 7.63 0.44 0.42 545.93 543.071 552.26 1 4.54 RCP CB-303 I CB-302 I 0.68 1 29% I 71% 1 0.78 1 7.78 1 4.10 1 12.14 1 0.013 1 0.50% 1 28 I 21.6 I 24 I 5.1 I 15.98 I 76% I 0.65 I 1.12 I 5.70 1 0.09 1 0.08 1 542.571 542.431 554.19 1 9.31 1 RCP CB-302 DI-301 0.09 1 26% 74% 1 0.79 1 7.78 1 0.52 1 12.67 1 0.013 1 0.50% 1 91 21.9 24 5.1 16.02 79% 0.65 1.12 5.71 1 0.30 1 0.27 1 542.33 1541.871 554.19 1 9.55 1 RCP DI-301 FES-300 0.38 88% 12% 0.42 7.78 1.24 13.91 0.013 4.90% 199 14.8 24 15.9 50.02 28% 0.35 0.82 13.06 0.21 0.25 541.77 532.00 548.15 4.07 RCP I I I I I I I I I I I I I I I I I I I I I I I I I I I DI-307 FES-306 1.16 100% 0% 0.35 7.78 3.17 3.17 0.013 3.00% 245 9.3 15 9.1 11.17 28% 0.35 0.82 7.47 0.45 0.55 539.36 532.00 545.00 4.14 RCP Bypass Network DI-BP-4 I MU-BP-3 1 7.16 I 84% I 16% I 0.44 I 5.24 I 16.68 I 16.68 I 0.013 I 0.60% I 70 123.5 1 24 1 5.6 I 17.50 I 95% I 0.88 I 1.15 I 6.41 I 0.21 1 0.18 1 551.141550.721 554.39 1 0.94 1 RCP MH-BP-3 MH-BP-2 7.16 84% 16% 0.44 5.24 16.68 0.013 0.60%82 23.5 24 5.6 17.49 95% 0.88 1.15 6.40 0.24 0.21 550.52 550.03 559.33 6.50 RCP MH-BP-2 FES-BP-1 1 7.16 1 84% 16% 0.44 5.24 16.68 0.013 0.60% 325 23.5 24 5.6 1 17.50 1 95% 1 0.88 1.15 1 6.41 1 0.97 1 0.85 1 549.83 547.88 580.94 128.80 RCP The Ridge at 601 - 2-Year Gutter Spread Calculations Project Number: 7516 Description Original Date: 7/25/22 DB: MDP Gutter Spread - 2-Year Storm Revision Date: N/A PM: I MDP Intensity: 4.00 in/hr Proposed Lane Width:1 Ift I Proposed Gutter Width: 1 Ift Inlet (from Storm Drainage) Inlet Area (acres) Runoff Coeff. C Runoff "Q" Sub. Total Qs (cfs) Qt (cfs) Slope Parameters S Ion S cross ( 9) ( ) K M) M) Capacity ca p Q p Qcap (cfs) Inlet Calculations Spread Spread p p Tact (ft) Tallowed (ft) Depth Dactual (ft) Depth Dtheo (ft) Q b (cfs) Bypass Calculations To Inlet Basin Type (Column A) Sump Condition? * Storm Network 100 CB-101 1 0.58 1 0.74 1.70 2.01 LP 2.080/0 ------- 2.01 3.6 8.0 0.07 0.17 0.00 Single CB-102 I 0.55 I 0.71 1.57 I 1.57 1.00% 12.08% I 18 1.27 I 7.0 I 8.0 I 0.15 I 0.17 0.30 I CB-101 I Single CB-103 0.54 0.72 1.55 1.55 1.00% 2.08% 18 1.25 7.0 8.0 0.14 0.17 0.30 CB-104 Single CB-104 0.81 0.75 2.44 2.74 LP 2.08% ------- 2.74 5.8 8.0 0.12 0.17 0.00 Single CB-107 I 0.20 I 0.72 0.57 I 0.65 2.00% 12.08% I 23.5 0.64 I 3.0 I 8.0 I 0.06 I 0.17 0.01 I CB-101 I Single CB-108 0.36 0.75 1.09 1.09 2.00% 2.08% 23.5 1.01 4.6 8.0 0.10 0.17 0.08 CB-107 Single CB-109 0.08 0.78 0.26 0.39 2.00% 2.08% 23.5 0.39 1.9 8.0 0.04 0.17 0.00 CB-104 Single CB-110 I 0.35 I 0.74 1.02 I 1.02 2.00% 12.08% I 23.5 0.96 I 4.4 I 8.0 I 0.09 I 0.17 0.06 I CB-109 I Single CB-111 0.10 0.70 0.28 0.30 LP 2.08% ------- 0.30 1.0 8.0 0.02 0.17 0.00 Single CB-112 0.25 0.75 0.75 0.75 2.00% 2.08% 23.5 0.73 3.4 8.0 0.07 0.17 0.02 CB-111 Single CB-113 I 0.00 I 0.59 0.01 I 0.01 0.10% 12.08% I 0 0.01 I 0.8 I 8.0 I 0.02 I 0.17 0.00 I CB-112 I Single CB-114 0.15 0.76 0.44 0.44 2.00% 2.080/0 23.5 0.44 2.0 8.0 0.04 0.17 0.00 CB-115 Single CB-115 0.07 0.62 0.17 0.17 1.90% 2.08% 18 0.17 1.4 8.0 0.03 0.17 0.00 CB-116 Single CB-116 I 0.92 I 0.71 2.62 I 2.62 LP 12.08% I ------- 2.62 I 5.5 I 8.0 I 0.11 I 0.17 0.00 I I Single CB-119 0.35 0.73 1.03 1 1.03 1.90% 1 2.08% 1 18 0.96 4.5 8.0 0.09 0.17 0.07 CB-109 Single CB-122 0.15 0.76 0.45 1 0.70 8.00% 1 2.080 32 0.70 1.8 8.0 0.04 1 0.17 1 0.00 1 Single CB-123 I 0.56 I 0.78 1.73 I 1.81 3.30% 12.08% I 26 1 1.57 I 5.4 I 8.0 I 0.11 I 0.17 0.24 I CB-122 I Single CB-124 0.37 0.86 1.25 1.25 3.00% 2.08% 26 1.17 4.4 8.0 0.09 0.17 0.08 CB-123 Single CB-125 0.17 0.81 0.54 0.54 3.00% 2.08% 26 0.54 2.0 8.0 0.04 0.17 0.00 CB-124 Single CB-126 I 0.18 I 0.76 0.55 I 0.55 1.50% 12.08% I 18 0.55 I 2.9 I 8.0 I 0.06 I 0.17 0.00 I CB-127 I Single CB-127 0.18 0.76 0.56 0.56 0.70% 2.080/6 16 0.54 4.1 8.0 0.09 0.17 0.02 CB-128 Single CB-128 0.10 0.75 0.29 0.36 LP 2.08% ------- 0.36 1.1 8.0 0.02 0.17 0.00 Single CB-129 I 0.22 I 0.76 0.66 I 0.68 0.90% 12.08% I 16 0.64 I 4.4 I 8.0 I 0.09 I 0.17 0.04 I CB-128 I Single CB-130 0.32 0.48 0.60 0.60 1.000/0 2.080/0 18 0.58 3.8 8.0 0.08 0.17 0.02 CB-129 Single CB-131 0.09 0.71 0.26 0.26 1.10% 2.08% 18 0.26 1.8 8.0 0.04 0.17 0.00 1 CB-130 I Single CB-132 I 0.05 I 0.79 0.15 I 0.15 1.00% 12.08% I 18 0.15 I 1.5 I 8.0 I 0.03 I 0.17 0.00 I CB-131 I Single CB-133 0.12 0.75 0.37 0.37 2.00% 2.08% 23.5 0.37 1.8 8.0 0.04 0.17 0.00 05-132 Single CB-134 I 0.01 I 0.67 0.03 I 0.03 0.30% 12.08% I 0 0.03 I 1.0 I 8.0 I 0.02 I 0.17 0.00 I CB-133 I Single CB-135 I 0.06 I 0.73 0.18 I 0.18 1.60% 12.08% I 18 0.18 I 1.5 I 8.0 I 0.03 I 0.17 0.00 I CB-136 I Single CB-136 0.60 0.72 1.73 1.73 LP 2.080/0 ------- 1.73 2.6 8.0 0.05 0.17 0.00 Single CB-137 I 0.15 I 0.76 0.47 I 0.47 2.00% 12.08% I 23.5 0.47 I 2.0 I 8.0 I 0.04 I 0.17 0.00 I CB-136 I Single CB-138 0.19 0.75 0.57 0.57 1.90% 2.08% 18 0.57 2.7 8.0 0.06 0.17 0.00 CB-137 Single CB-139 0.15 0.76 0.47 0.51 1 1.80% 2.08% 18 0.51 2.4 8.0 0.05 0.17 0.00 CB-138 Single CB-140 I 0.17 I 0.75 0.52 I 0.70 1 1.00% 12.08% I 18 0.66 I 4.3 I 8.0 I 0.09 I 0.17 0.04 I CB-139 I Single The Ridge at 601 - 2-Year Gutter Spread Calculations Project Number: 7516 Description Original Date: 7/25/22 DB: MDP Gutter Spread - 2-Year Storm Revision Date: N/A PM: I MDP Intensity: 4.00 in/hr Proposed Lane Width:1 12 Ift I Proposed Gutter Width: 1 2 Ift Inlet (from Storm Drainage) Inlet Area (acres) Runoff Coeff. C Runoff "Q" Sub. Total Qs (cfs) Qt (cfs) Slope Parameters S Ion S cross (long) (cross) o o K (/o) (/o) Capacity ca p tY "Q p� Qcap (cfs) Inlet Calculations Spread Spread p P Tact (ft) Tallowed (ft) Depth pt Dactual (ft) Depth Pt Dtheo (ft) Q b (cfs) Bypass Calculations To Inlet Column A Basin Type ( ) Sump Condition? * CB-141 1 0.42 1 0.76 1.27 1.27 1.00% 1 2.08% 18 1.08 6.3 1 8.0 1 0.13 0.17 0.19 CB-140 Single CB-142 1 0.48 1 0.77 1.50 1.50 1.00% 1 2.080/0 18 1.22 6.8 8.0 0.14 0.17 0.28 1 CB-146 I Single CB-146 I 0.54 I 0.73 1.58 I 1.86 2.00% 12.08% I 23.5 1.52 I 6.4 I 8.0 I 0.13 I 0.17 0.34 I CB-147 I Single CB-147 0.50 0.77 1.55 1.8903.00% 8% ------- 1.89 3.2 8.0 0.07 0.17 0.00 Single CB-148 0.27 0.66 0.72 0.728% ------- 0.72 1.6 8.0 0.03 0.17 0.00 Single CB-149 I 0.13 I 0.77 0.39 I 0.39 8% I 23.5 0.39 I 1.9 I 8.0 I 0.04 I 0.17 0.00 I CB-148 I Single CB-150 0.56 0.73 1.64 1.648% ------- 1.64 2.3 8.0 0.05 0.17 0.00 Single CB-151 0.22 0.90 0.79 0.798% ------- 0.79 1.7 8.0 0.03 0.17 0.00 Single CB-152 I 0.26 I 0.76 0.79 I 0.79 8% I 26 0.78 I 3.0 I 8.0 I 0.06 I 0.17 0.01 I CB-153 I Single CB-153 0.32 0.76 0.96 0.97 8% 26 0.94 3.6 8.0 0.07 0.17 0.03 CB-154 Single CB-154 0.18 0.80 0.58 0.61 ..8% 32 0.61 1 1.7 8.0 0.04 1 0.17 0.00 1 1 Single CB-201 I 0.50 I 0.73 1.45 I 1.69gOO/b 08% I ------- 1.69 I 2.5 I 8.0 I 0.05 I 0.17 0.00 I I Single CB-202 0.19 0.79 0.59 0.59 08% 18 0.59 2.8 8.0 0.06 0.17 0.00 CB-201 Single CB-203 0.12 0.73 0.36 0.36 08% 23.5 0.36 1.8 8.0 0.04 0.17 0.00 CB-207 Single CB-207 I 0.09 I 0.74 0.28 I 0.3308% ------- 0.33 I 1.0 I 8.0 I 0.02 I 0.17 0.00 1 -- I Single CB-208 0.17 0.74 0.51 0.69 08% 16 0.64 4.8 8.0 0.10 0.17 0.05 CB-207 Single CB-209 1 0.47 1 0.76 1.44 1 1.58 .1.08% 1 26 1.40 1 5.1 1 8.0 1 0.11 1 0.17 0.18 1 CB-208 1 Single 1 CB-210 I 0.45 1 0.72 1.29 1 1.29 2.00% 1 2.08% 1 23.5 1.15 1 5.1 1 8.0 1 0.11 1 0.17 0.14 1 CB-209 1 Single 1 CB-211 0.49 0.72 1.42 1.42 2.00% 2.080 23.5 1.24 5.5 8.0 0.11 0.17 0.18 CB-212 Single CB-212 1 0.47 1 0.76 1.44 1 1.64 LP 1 2.08% 1 ------- 1.64 1 2.3 1 8.0 1 0.05 1 0.17 0.00 1 1 Single 1 CB-213 0.47 0.75 1.40 1.55 1.80% 2.08% 18 1.32 5.9 8.0 0.12 0.17 0.23 CB-201 Single CB-214 0.15 0.71 0.43 0.80 2.10% 2.08% 23.5 0.78 3.5 8.0 0.07 0.17 0.02 CB-212 Single CB-218 1 0.66 1 0.76 2.01 1 2.01 2.20% 1 2.08% 1 23.5 1.63 1 6.5 1 8.0 1 0.13 1 0.17 0.38 1 CB-214 1 Single 1 CB-219 0.46 0.73 1.34 1.34 2.00% 2.08% 23.5 1.19 5.3 8.0 0.11 0.17 0.15 CB-213 Single CB-302 0.09 0.79 0.27 0.27 1.10% 2.080/0 18 0.27 1.8 8.0 0.04 0.17 0.00 CB-305 Single CB-303 1 0.68 1 0.78 2.11 1 2.11 1.10% 1 2.08% 1 18 1.59 1 7.9 1 8.0 I 0.17 I 0.17 0.52 I CB-304 1 Single CB-304 0.43 0.78 1.34 1.85 1.20% 2.08% 18 1.45 7.3 8.0 0.15 0.17 0.40 CB-305 Single CB-305 0.95 0.74 2.80 3.20 LP 2.08% ------- 3.20 7.2 8.0 0.15 0.17 1 0.00 Single Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-101 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 2.01 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 2.01 Grate Length (ft) = 3.00 Q Capt (cfs) = 2.01 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 4.63 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.55 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA 0.39 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-102 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.57 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.57 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.27 Q Bypass (cfs) = 0.30 Gutter Depth at Inlet (in) = 5.50 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 81 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 7.00 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.48 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.94 Gutter Slope (%) = 1.00 Bypass Depth (in) = 1.86 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-103 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.55 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.55 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.25 Q Bypass (cfs) = 0.30 Gutter Depth at Inlet (in) = 5.49 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 81 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 6.96 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.48 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.92 Gutter Slope (%) = 1.00 Bypass Depth (in) = 1.85 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-104 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 2.74 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 2.74 Grate Length (ft) = 3.00 Q Capt (cfs) = 2.74 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 5.21 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.84 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-107 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.65 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.65 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.64 Q Bypass (cfs) = 0.01 Gutter Depth at Inlet (in) = 4.49 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 99 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.98 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.08 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.39 Gutter Slope (%) = 2.00 Bypass Depth (in) = 0.37 Gutter n-value = 0.016 All dimensions in faA DEN Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-108 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.09 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.09 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.01 Q Bypass (cfs) = 0.08 Gutter Depth at Inlet (in) = 4.89 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 93 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.59 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.22 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.04 Gutter Slope (%) = 2.00 Bypass Depth (in) = 1.00 Gutter n-value = 0.016 All dimensions in faA M Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-109 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.39 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.39 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.39 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.12 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.87 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.79 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 2.00 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-110 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.02 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.02 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.96 Q Bypass (cfs) = 0.06 Gutter Depth at Inlet (in) = 4.84 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 94 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.38 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.20 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.95 Gutter Slope (%) = 2.00 Bypass Depth (in) = 0.91 Gutter n-value = 0.016 All dimensions in faA NE Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-111 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.30 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.30 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.30 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 2.06 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 0.97 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-112 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.75 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.75 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.73 Q Bypass (cfs) = 0.02 Gutter Depth at Inlet (in) = 4.60 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 98 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.42 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.12 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.56 Gutter Slope (%) = 2.00 Bypass Depth (in) = 0.54 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-113 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 0.10 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Tuesday, Jul 26 2022 Known Q = 0.01 = 0.01 = 0.01 _ -0- = 3.12 = 100 = 0.83 = 0.36 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-114 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 2.00 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Tuesday, Jul 26 2022 Known Q = 0.44 = 0.44 = 0.44 _ -0- = 4.20 = 100 = 1.96 = 2.87 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-115 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 1.90 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Tuesday, Jul 26 2022 Known Q = 0.17 = 0.17 = 0.17 _ -0- = 3.65 = 100 = 1.38 = 2.22 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-116 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 2.62 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 2.62 Grate Length (ft) = 3.00 Q Capt (cfs) = 2.62 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 5.12 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.48 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA MW Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-122 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 8.00 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Tuesday, Jul 26 2022 Known Q = 0.70 = 0.70 = 0.70 _ -0- = 4.04 = 100 = 1.80 = 5.42 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-123 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.81 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.81 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.57 Q Bypass (cfs) = 0.24 Gutter Depth at Inlet (in) = 5.10 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 87 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.42 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 4.25 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.42 Gutter Slope (%) = 3.30 Bypass Depth (in) = 1.36 Gutter n-value = 0.016 All dimensions in faA MW Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-124 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.25 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.25 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.17 Q Bypass (cfs) = 0.08 Gutter Depth at Inlet (in) = 4.84 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 93 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.38 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.92 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.97 Gutter Slope (%) = 3.00 Bypass Depth (in) = 0.93 Gutter n-value = 0.016 All dimensions in faA NE Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-125 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.54 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.54 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.54 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.20 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.96 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.52 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 3.00 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-126 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.55 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.55 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.55 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.47 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 99 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.91 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.66 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.36 Gutter Slope (%) = 1.50 Bypass Depth (in) = 0.34 Gutter n-value = 0.016 All dimensions in faA Dim Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-127 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.56 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.56 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.54 Q Bypass (cfs) = 0.02 Gutter Depth at Inlet (in) = 4.78 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 96 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.14 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 1.88 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.78 Gutter Slope (%) = 0.70 Bypass Depth (in) = 0.75 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-128 Combination Inlet Calculations Location = Sag Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = -0- Bypass Depth (in) Gutter n-value = -0- All dimensions in faA Tuesday, Jul 26 2022 Known Q = 0.36 = 0.36 = 0.36 _ -0- = 2.29 = 100 = 1.08 = 2.75 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-129 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.68 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.68 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.64 Q Bypass (cfs) = 0.04 Gutter Depth at Inlet (in) = 4.83 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 95 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.35 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.15 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.89 Gutter Slope (%) = 0.90 Bypass Depth (in) = 0.85 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-130 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.60 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.60 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.58 Q Bypass (cfs) = 0.02 Gutter Depth at Inlet (in) = 4.69 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 97 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.80 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.23 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.68 Gutter Slope (%) = 1.00 Bypass Depth (in) = 0.65 Gutter n-value = 0.016 All dimensions in faA 0.39 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-131 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.26 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.26 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.26 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.05 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.80 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.01 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 1.10 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-132 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 1.00 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Monday, Jul 25 2022 Known Q = 0.15 = 0.15 = 0.15 _ -0- = 3.75 = 100 = 1.49 = 1.69 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-133 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 2.00 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Monday, Jul 25 2022 Known Q = 0.37 = 0.37 = 0.37 _ -0- = 4.08 = 100 = 1.83 = 2.75 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-134 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 0.30 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Monday, Jul 25 2022 Known Q = 0.03 = 0.03 = 0.03 _ -0- = 3.30 = 100 = 1.02 = 0.72 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-135 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 1.60 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Monday, Jul 25 2022 Known Q = 0.18 = 0.18 = 0.18 _ -0- = 3.72 = 100 = 1.46 = 2.11 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. CB-137 Combination Inlet Calculations Location = On grade Compute by: Curb Length (ft) = 3.00 Q (cfs) Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.080 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = 2.32 Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = 2.00 Bypass Depth (in) Gutter n-value = 0.016 All dimensions in faA Monday, Jul 25 2022 Known Q = 0.47 = 0.47 = 0.47 _ -0- = 4.25 = 100 = 2.02 = 2.92 _ -0- _ -0- Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-138 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.57 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.57 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.57 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.41 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.66 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.96 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.26 Gutter Slope (%) = 1.90 Bypass Depth (in) = 0.25 Gutter n-value = 0.016 All dimensions in faA 0.3 F Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-139 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.51 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.51 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.51 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.34 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.41 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.85 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.10 Gutter Slope (%) = 1.80 Bypass Depth (in) = 0.09 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-140 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.70 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.70 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.66 Q Bypass (cfs) = 0.04 Gutter Depth at Inlet (in) = 4.81 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 95 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.28 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.25 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.87 Gutter Slope (%) = 1.00 Bypass Depth (in) = 0.83 Gutter n-value = 0.016 All dimensions in faA NE Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-141 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.27 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.27 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.08 Q Bypass (cfs) = 0.19 Gutter Depth at Inlet (in) = 5.31 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 85 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 6.25 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.41 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.64 Gutter Slope (%) = 1.00 Bypass Depth (in) = 1.57 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-142 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.50 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.50 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.22 Q Bypass (cfs) = 0.28 Gutter Depth at Inlet (in) = 5.46 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 81 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 6.84 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.46 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.88 Gutter Slope (%) = 1.00 Bypass Depth (in) = 1.80 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-146 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.86 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.86 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.52 Q Bypass (cfs) = 0.34 Gutter Depth at Inlet (in) = 5.34 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 82 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 6.37 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.42 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.77 Gutter Slope (%) = 2.00 Bypass Depth (in) = 1.70 Gutter n-value = 0.016 All dimensions in FaA MIR Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-147 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.89 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.89 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.89 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 4.53 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.15 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA DM Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-148 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.72 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.72 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.72 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 3.36 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.58 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA ❑20 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Monday, Jul 25 2022 CB-149 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.39 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.39 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.39 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.12 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.87 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.79 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 2.00 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-150 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.64 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.64 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.64 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 4.31 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.29 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA 9.36 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-151 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.79 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.79 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.79 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 3.53 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.67 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA 929 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-152 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.79 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.79 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.78 Q Bypass (cfs) = 0.01 Gutter Depth at Inlet (in) = 4.48 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 99 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.96 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.77 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.39 Gutter Slope (%) = 3.00 Bypass Depth (in) = 0.37 Gutter n-value = 0.016 All dimensions in faA DEN Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-153 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.97 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.97 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.94 Q Bypass (cfs) = 0.03 Gutter Depth at Inlet (in) = 4.64 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 97 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.59 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.83 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.64 Gutter Slope (%) = 3.00 Bypass Depth (in) = 0.62 Gutter n-value = 0.016 All dimensions in faA HE Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-201 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.69 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.69 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.69 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 4.36 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.46 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-202 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.59 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.59 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.59 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.43 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.77 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.97 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.30 Gutter Slope (%) = 1.90 Bypass Depth (in) = 0.28 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-203 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.36 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.36 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.36 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.06 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.82 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.73 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 2.00 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA 9 34 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-207 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.33 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.33 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.33 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 2.18 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.03 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA UM Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-208 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.69 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.69 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.64 Q Bypass (cfs) = 0.05 Gutter Depth at Inlet (in) = 4.95 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 93 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 4.80 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 1.92 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.03 Gutter Slope (%) = 0.70 Bypass Depth (in) = 0.99 Gutter n-value = 0.016 All dimensions in faA M Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-209 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.58 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.58 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.40 Q Bypass (cfs) = 0.18 Gutter Depth at Inlet (in) = 5.03 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 89 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.13 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 4.01 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.29 Gutter Slope (%) = 3.00 Bypass Depth (in) = 1.24 Gutter n-value = 0.016 All dimensions in faA MM Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-210 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.29 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.29 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.15 Q Bypass (cfs) = 0.14 Gutter Depth at Inlet (in) = 5.03 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 89 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.13 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.27 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.26 Gutter Slope (%) = 2.00 Bypass Depth (in) = 1.21 Gutter n-value = 0.016 All dimensions in faA MM Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-211 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.42 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.42 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.24 Q Bypass (cfs) = 0.18 Gutter Depth at Inlet (in) = 5.11 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 88 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.45 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.31 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.39 Gutter Slope (%) = 2.00 Bypass Depth (in) = 1.34 Gutter n-value = 0.016 All dimensions in faA MW Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-212 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.64 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.64 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.64 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 4.31 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 2.29 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in faA 9.36 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-213 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.55 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.55 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.32 Q Bypass (cfs) = 0.23 Gutter Depth at Inlet (in) = 5.23 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 85 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.92 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.19 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.58 Gutter Slope (%) = 1.80 Bypass Depth (in) = 1.51 Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-214 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.80 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.80 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.78 Q Bypass (cfs) = 0.02 Gutter Depth at Inlet (in) = 4.63 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 97 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 3.54 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.20 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 0.61 Gutter Slope (%) = 2.10 Bypass Depth (in) = 0.59 Gutter n-value = 0.016 All dimensions in faA 0.39 Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-218 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 2.01 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 2.01 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.63 Q Bypass (cfs) = 0.38 Gutter Depth at Inlet (in) = 5.37 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 81 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 6.48 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.60 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.82 Gutter Slope (%) = 2.20 Bypass Depth (in) = 1.75 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-219 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.34 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.34 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.19 Q Bypass (cfs) = 0.15 Gutter Depth at Inlet (in) = 5.06 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 89 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 5.25 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 3.29 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 1.32 Gutter Slope (%) = 2.00 Bypass Depth (in) = 1.26 Gutter n-value = 0.016 All dimensions in faA MM Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-302 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 0.27 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.27 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.27 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 4.07 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 1.82 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.03 Gutter Width (ft) = 2.00 Bypass Spread (ft) _ -0- Gutter Slope (%) = 1.10 Bypass Depth (in) _ -0- Gutter n-value = 0.016 All dimensions in faA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-303 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 2.11 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 2.11 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.59 Q Bypass (cfs) = 0.52 Gutter Depth at Inlet (in) = 5.74 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 75 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 7.94 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.70 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 3.24 Gutter Slope (%) = 1.10 Bypass Depth (in) = 2.23 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-304 Combination Inlet Calculations Location = On grade Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 1.85 Throat Height (in) = 6.00 Grate Area (sqft) _ -0- Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.85 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.45 Q Bypass (cfs) = 0.40 Gutter Depth at Inlet (in) = 5.57 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 78 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 7.27 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = 2.31 Gutter Slope (%) = 1.20 Bypass Depth (in) = 2.00 Gutter n-value = 0.016 All dimensions in FaA Inlet Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Jul 26 2022 CB-305 Combination Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = 3.00 Q (cfs) = 3.20 Throat Height (in) = 6.00 Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 3.20 Grate Length (ft) = 3.00 Q Capt (cfs) = 3.20 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 5.54 Slope, Sw (ft/ft) = 0.080 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 7.17 Local Depr (in) = 2.32 Gutter Vel (ft/s) = 2.75 Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in FaA The Cottages at Wingate Stormwater Management Report Appendix D Erosion Control Calculations (Temporary sediment basins) 7516-C-NC June 7, 2022 ENGINEERING SEDIMENT BASIN Al Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A1 PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 7.21 Acres 314,126 Square Feet Total Disturbed Area 7.21 Acres 314,126 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 512 49,839 0 0 Q10 28.02 CFS 513 53,152 51,496 51,496 514 56,522 54,837 106,333 Required Volume 12,980 Cubic Feet (1800 CF*DA) 515 59,948 58,235 164,568 Required Surface Area I 12,187 Square Feet (435 SF*Q10) 516 63,432 61,690 226,258 5171 66,9711 65,2021 291,459 Provided Volume 106,333 Cubic Feet OK 5181 70,5671 68,7691 360,228 Provided Surface Area I 56,522 Square Feet OK Length 464 Feet Minimum Spillway Design Width 114 Feet Q10 28.02 CFS H 1 Feet Spillway Elevation 517 C 3.367 Surface Area at Spillway 66,971 L 8.32 Feet Top of Berm Elevation 518 Spillway & Skimmer Design Spillway Length 35 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2.5 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 1.0 Inches Max Flow 17.8 CFS I OK Orifice Diamter 2.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN Al Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A1 PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 24.97 Acres 1,087,582 Square Feet Total Disturbed Area 24.10 Acres 1,050,005 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 512 49,839 0 0 Q10 97.00 CFS 513 53,152 51,496 51,496 514 56,522 54,837 106,333 Required Volume 43,389 Cubic Feet (1800 CF*DA) 515 59,948 58,235 164,568 Required Surface Area I 42,194 Square Feet (435 SF*Q10) 516 63,432 61,690 226,258 5171 66,9711 65,2021 291,459 Provided Volume 106,333 Cubic Feet OK 5181 70,5671 68,7691 360,228 Provided Surface Area I 56,522 Square Feet OK Length 464 Feet Minimum Spillway Design Width 114 Feet Q10 97.00 CFS H 1 Feet Spillway Elevation 517 C 3.367 Surface Area at Spillway 66,971 L 28.81 Feet Top of Berm Elevation 518 Spillway & Skimmer Design Spillway Length 35 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 1.4 Inches Max Flow 17.8 CFS OK Orifice Diamter 2.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN Al Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A1 PH-3 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 27.35 Acres 1,191,196 Square Feet Total Disturbed Area 27.35 Acres 1,191,196 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 512 49,839 0 0 Q10 106.24 CFS 513 53,152 51,496 51,496 514 56,522 54,837 106,333 Required Volume 49,223 Cubic Feet (1800 CF*DA) 515 59,948 58,235 164,568 Required Surface Area I 46,214 Square Feet (435 SF*Q10) 516 63,432 61,690 226,258 5171 66,9711 65,2021 291,459 Provided Volume 106,333 Cubic Feet OK 5181 70,5671 68,7691 360,228 Provided Surface Area I 56,522 Square Feet OK Length 464 Feet Minimum Spillway Design Width 114 Feet Q10 106.24 CFS H 1 Feet Spillway Elevation 517 C 3.367 Surface Area at Spillway 66,971 L 31.55 Feet Top of Berm Elevation 518 Spillway & Skimmer Design Spillway Length 35 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 1.4 Inches Max Flow 17.8 CFS OK Orifice Diamter 2.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A2 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A2 PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 10.88 Acres 473,918 Square Feet Total Disturbed Area 10.88 Acres 473,918 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 514 16,125 0 0 Q10 42.27 CFS 515 17,709 16,917 16,917 516 19,425 18,567 35,484 Required Volume 19,583 Cubic Feet (1800 CF*DA) 517 21,047 20,236 55,720 Required Surface Area I 18,386 Square Feet (435 SF*Q10) 518 22,800 21,924 77,644 5191 24,6101 23,7051 101,349 Provided Volume 35,484 Cubic Feet OK 5201 26,4771 25,5441 126,892 Provided Surface Area I 19,425 Square Feet OK Length 173 Feet Minimum Spillway Design Width 125 Feet Q10 42.27 CFS H 1 Feet Spillway Elevation _ 519 C 3.367 Surface Area at Spillway 24,610 L 12.55 Feet Top of Berm Elevation 520 Spillway & Skimmer Design Spillway Length 15 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient ff3367 *Cipoletti Weir Orifice Radius 1.2 Inches Max Flow 50.5 CFS OK Orifice Diamter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A2 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A2 PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 11.48 Acres 500,157 Square Feet Total Disturbed Area 11.48 Acres 500,157 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 514 16,125 0 0 Q10 44.61 CFS 515 17,709 16,917 16,917 516 19,425 18,567 35,484 Required Volume 20,668 Cubic Feet (1800 CF*DA) 517 21,047 20,236 55,720 Required Surface Area I 19,404 Square Feet (435 SF*Q10) 518 22,800 21,924 77,644 5191 24,6101 23,7051 101,349 Provided Volume 35,484 Cubic Feet OK 5201 26,4771 25,5441 126,892 Provided Surface Area I 19,425 Square Feet OK Length 173 Feet Minimum Spillway Design Width 125 Feet Q10 44.61 CFS H 1 Feet Spillway Elevation _ 519 C 3.367 Surface Area at Spillway 24,610 L 13.25 Feet Top of Berm Elevation 520 Spillway & Skimmer Design Spillway Length 15 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient ff3367 *Cipoletti Weir Orifice Radius 1.3 Inches Max Flow 50.5 CFS OK Orifice Diamter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A2 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A2 PH-3 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 11.48 Acres 500,157 Square Feet Total Disturbed Area 11.48 Acres 500,157 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 514 16,125 0 0 Q10 44.61 CFS 515 17,709 16,917 16,917 516 19,425 18,567 35,484 Required Volume 20,668 Cubic Feet (1800 CF*DA) 517 21,047 20,236 55,720 Required Surface Area I 19,404 Square Feet (435 SF*Q10) 518 22,800 21,924 77,644 5191 24,6101 23,7051 101,349 Provided Volume 35,484 Cubic Feet OK 5201 26,4771 25,5441 126,892 Provided Surface Area I 19,425 Square Feet OK Length 150 Feet Minimum Spillway Design Width 80 Feet Q10 44.61 CFS H 1 Feet Spillway Elevation 519 C 3.367 Surface Area at Spillway 24,610 L 13.25 Feet Top of Berm Elevation 520 Spillway & Skimmer Design Spillway Length 15 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient ff3367 *Cipoletti Weir Orifice Radius 1.3 Inches Max Flow 50.5 CFS I OK Orifice Diamter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A3 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A3 PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.32 Acres 57,659 Square Feet Total Disturbed Area 1.32 Acres 57,659 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume 110 7.77 Inches per Hour 532 12,861 0 0 Q10 5.14 CFS 533 14,254 13,558 13,558 534 15,713 14,984 28,541 Required Volume 2,383 Cubic Feet (1800 CF*DA) 535 17,235 16,474 45,015 Required Surface Area I 2,237 Square Feet (435 SF*Q10) 536 18,821 18,028 63,043 5371 20,4721 19,6471 82,690 Provided Volume 28,541 Cubic Feet OK 5381 22,1871 21,3301 104,019 Provided Surface Area I 15,713 Square Feet OK Length 162 Feet Minimum Spillway Design Width 96 Feet Q10 5.14 CFS H 1 Feet Spillway Elevation 537 C 3.367 Surface Area at Spillway 20,472 L 1.53 Feet Top of Berm Elevation 538 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain _ 3 Days Head over Spillway 1 Feet Skimmer Size 1.5 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.5 Inches Max Flow 33.7 CFS I OK Orifice Diamter 1.0 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A3 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A3 PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 4.04 Acres 176,169 Square Feet Total Disturbed Area 4.04 Acres 176,169 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 532 7,770 0 0 Q10 15.71 CFS 533 8,812 8,291 8,291 534 9,909 9,361 17,652 Required Volume 7,280 Cubic Feet (1800 CF*DA) 535 11,064 10,487 28,138 Required Surface Area I 6,835 Square Feet (435 SF*Q10) 536 12,275 11,670 39,808 5371 13,5421 12,9091 52,716 Provided Volume 17,652 Cubic Feet OK 5381 14,8661 14,2041 66,920 Provided Surface Area I 9,909 Square Feet OK Length 93 Feet Minimum Spillway Design Width 88 Feet Q10 15.71 CFS H 1 Feet Spillway Elevation 537 C 3.367 Surface Area at Spillway 13,542 L 4.67 Feet Top of Berm Elevation 538 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.8 Inches Max Flow 33.7 CFS I OK Orifice Diamter 1.7 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A3 Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-A3 PH-3 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 5.48 Acres 238,804 Square Feet Total Disturbed Area 5.48 Acres 238,804 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 532 7,770 0 0 Q10 21.30 CFS 533 8,812 8,291 8,291 534 9,909 9,361 17,652 Required Volume 9,868 Cubic Feet (1800 CF*DA) 535 11,064 10,487 28,138 Required Surface Area I 9,265 Square Feet (435 SF*Q10) 536 12,275 11,670 39,808 5371 13,5421 12,9091 52,716 Provided Volume 17,652 Cubic Feet OK 5381 14,8661 14,2041 66,920 Provided Surface Area I 9,909 Square Feet OK Length 90 Feet Minimum Spillway Design Width 70 Feet Q10 21.30 CFS H 1 Feet Spillway Elevation 537 C 3.367 Surface Area at Spillway 13,542 L 6.33 Feet Top of Berm Elevation 538 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain _ 5 Days Head over Spillway 1 Feet Skimmer Size 2 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.7 Inches Max Flow 33.7 CFS I OK Orifice Diamter 1.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN B Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-B PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.44 Acres 149,967 Square Feet Total Disturbed Area 3.39 Acres 147,836 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 548 6,780 0 0 Q10 13.38 CFS 549 7,462 7,121 7,121 550 8,170 7,816 14,937 Required Volume 6,109 Cubic Feet (1800 CF*DA) 550.5 8,533 4,176 19,113 Required Surface Area I 4,347 Square Feet (325 SF*Q10) 551 8,903 4,359 23,472 552 9,6611 9,2821 32,754 Provided Volume 19,113 Cubic Feet OK Provided Surface Area I 8,533 Square Feet OK Length 102 Feet Minimum Spillway Design Width 94 Feet Q10 13.38 CFS H 1.5 Feet Spillway Elevation 550.5 C 3.367 Surface Area at Spillway 8,533 L 2.16 Feet Top of Berm Elevation 552 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.6 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.3 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN B Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-B PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.68 Acres 73,194 Square Feet Total Disturbed Area 1.68 Acres 73,194 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 548 6,780 0 0 Q10 6.53 CFS 549 7,462 7,121 7,121 550 8,170 7,816 14,937 Required Volume 3,025 Cubic Feet (1800 CF*DA) 550.5 8,533 4,176 19,113 Required Surface Area I 2,122 Square Feet (325 SF*Q10) 551 8,903 4,359 23,472 552 9,6611 9,2821 32,754 Provided Volume 19,113 Cubic Feet OK Provided Surface Area I 8,533 Square Feet OK Length 102 Feet Minimum Spillway Design Width 94 Feet Q10 6.53 CFS H 1.5 Feet Spillway Elevation 550.5 C 3.367 Surface Area at Spillway 8,533 L 1.06 Feet Top of Berm Elevation 552 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain _ 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.6 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.2 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN B Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-B PH-3 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.48 Acres 21,114 Square Feet Total Disturbed Area 0.48 Acres 21,114 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 548 8,350 0 0 Q10 1.88 CFS 549 9,218 8,784 8,784 550 10,111 9,665 18,449 Required Volume 872 Cubic Feet (1800 CF*DA) 551 11,029 10,570 29,019 Required Surface Area I 612 Square Feet (325 SF*Q10) 552 11,972 11,501 40,519 Provided Volume 29,019 Cubic Feet OK Provided Surface Area I 11,029 Square Feet OK Length 300 Feet Minimum Spillway Design Width 150 Feet Q10 1.88 CFS H 1 Feet Spillway Elevation 551 C 3.367 Surface Area at Spillway 11,029 L 0.56 Feet Top of Berm Elevation 552 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain _ 3 Days Head over Spillway 1 Feet Skimmer Size 1.5 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.3 Inches Max Flow 33.7 CFS OK Orifice Diamter 0.6 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN C Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-C PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 2.52 Acres 109,840 Square Feet Total Disturbed Area 2.52 Acres 109,840 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 503 11,537 0 0 Q10 9.80 CFS 504 12,510 12,024 12,024 505 13,514 13,012 25,036 Required Volume 4,539 Cubic Feet (1800 CF*DA) 505.5 14,029 6,886 31,921 Required Surface Area I 3,184 Square Feet (325 SF*Q10) 506 14,552 7,145 39,067 5071 15,6201 15,0861 54,153 Provided Volume 31,921 Cubic Feet OK Provided Surface Area I 14,029 Square Feet OK Length 172 Feet Minimum Spillway Design Width 67 Feet Q10 9.80 CFS H 1.5 Feet Spillway Elevation 505.5 C 3.367 Surface Area at Spillway 14,0291 L 1.58 Feet Top of Berm Elevation 507 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.5 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN C Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-C PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.46 Acres 63,381 Square Feet Total Disturbed Area 1.46 Acres 63,381 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 503 11,537 0 0 Q10 5.65 CFS 504 12,510 12,024 12,024 505 13,514 13,012 25,036 Required Volume 2,619 Cubic Feet (1800 CF*DA) 505.5 14,029 6,886 31,921 Required Surface Area I 1,837 Square Feet (325 SF*Q10) 506 14,552 7,145 39,067 5071 15,6201 15,0861 54,153 Provided Volume 31,921 Cubic Feet OK Provided Surface Area I 14,029 Square Feet OK Length 172 Feet Minimum Spillway Design Width 67 Feet Q10 5.65 CFS H 1.5 Feet Spillway Elevation 505.5 C 3.367 Surface Area at Spillway 14,0291 L 0.91 Feet Top of Berm Elevation 507 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.5 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN D Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-D PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.21 Acres 52,688 Square Feet Total Disturbed Area 1.21 Acres 52,688 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 511 2,440 0 0 Q10 4.70 CFS 512 3,024 2,732 2,732 513 3,640 3,332 6,064 Required Volume 2,177 Cubic Feet (1800 CF*DA) 513.5 3,960 1,900 7,964 Required Surface Area I 1,527 Square Feet (325 SF*Q10) 514 4,288 2,062 10,026 5151 4,9681 4,6281 14,654 Provided Volume 7,964 Cubic Feet OK Provided Surface Area I 3,960 Square Feet OK Length 122 Feet Minimum Spillway Design Width 20 Feet Q10 4.70 CFS H 1.5 Feet Spillway Elevation 513.5 C 3.367 Surface Area at Spillway 3,9601 L 0.76 Feet Top of Berm Elevation 515 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 4 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.4 Inches Max Flow 61.9 CFS OK Orifice Diamter 0.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN D Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-D PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.72 Acres 31,382 Square Feet Total Disturbed Area 0.72 Acres 31,382 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 511 2,440 0 0 Q10 2.80 CFS 512 3,024 2,732 2,732 513 3,640 3,332 6,064 Required Volume 1,297 Cubic Feet (1800 CF*DA) 513.5 3,960 1,900 7,964 Required Surface Area I 910 Square Feet (325 SF*Q10) 514 4,288 2,062 10,026 5151 4,9681 4,6281 14,654 Provided Volume 7,964 Cubic Feet OK Provided Surface Area I 3,960 Square Feet OK Length 122 Feet Minimum Spillway Design Width 20 Feet Q10 2.80 CFS H 1.5 Feet Spillway Elevation 513.5 C 3.367 Surface Area at Spillway 3,9601 L 0.45 Feet Top of Berm Elevation 515 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.4 Inches Max Flow 61.9 CFS I OK Orifice Diamter 0.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN E Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-E PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 4.35 Acres 189,304 Square Feet Total Disturbed Area 4.35 Acres 189,304 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 522 5,000 0 0 Q10 16.88 CFS 523 5,616 5,308 5,308 524 6,264 5,940 11,248 Required Volume 7,822 Cubic Feet (1800 CF*DA) 524.5 6,600 3,216 14,464 Required Surface Area I 5,487 Square Feet (325 SF*Q10) 525 6,944 3,386 17,850 5261 7,6561 7,3001 25,150 Provided Volume 14,464 Cubic Feet OK Provided Surface Area I 6,600 Square Feet OK Length 100 Feet Minimum Spillway Design Width 50 Feet Q10 16.88 CFS H 1.5 Feet Spillway Elevation 524.5 C 3.367 Surface Area at Spillway 6,6001 L 2.73 Feet Top of Berm Elevation 526 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.7 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN E Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-E PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.71 Acres 74,390 Square Feet Total Disturbed Area 1.71 Acres 74,390 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume 110 7.77 Inches per Hour 522 5,000 0 0 Q10 6.63 CFS 523 5,616 5,308 5,308 524 6,264 5,940 11,248 Required Volume 3,074 Cubic Feet (1800 CF*DA) 524.5 6,600 3,216 14,464 Required Surface Area I 2,156 Square Feet (325 SF*Q10) 525 6,944 3,386 17,850 5261 7,6561 7,3001 25,150 Provided Volume 14,464 Cubic Feet OK Provided Surface Area I 6,600 Square Feet OK Length 100 Feet Minimum Spillway Design Width 50 Feet Q10 6.63 CFS H 1.5 Feet Spillway Elevation 524.5 C 3.367 Surface Area at Spillway 6,6001 L 1.07 Feet Top of Berm Elevation 526 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.6 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.2 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN F Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-F PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 9.86 Acres 429,682 Square Feet Total Disturbed Area 3.91 Acres 170,509 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 534 9,573 0 0 Q10 38.32 CFS 535 10,554 10,064 10,064 536 11,568 11,061 21,125 Required Volume 7,046 Cubic Feet (1800 CF*DA) 536.5 12,583 6,038 27,162 Required Surface Area I 12,455 Square Feet (325 SF*Q10) 537 12,987 12,278 33,402 5381 13,6921 13,3401 46,742 Provided Volume 27,162 Cubic Feet OK Provided Surface Area I 12,583 Square Feet OK Length 191 Feet Minimum Spillway Design Width 50 Feet Q10 38.32 CFS H 1.5 Feet Spillway Elevation 536.5 C 3.367 Surface Area at Spillway 12,5831 L 6.20 Feet Top of Berm Elevation 538 Spillway & Skimmer Design Spillway Length 15 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.7 Inches Max Flow 92.8 CFS I OK Orifice Diamter 1.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN F Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-F PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 8.53 Acres 371,634 Square Feet Total Disturbed Area 2.52 Acres 109,780 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume 110 7.77 Inches per Hour 534 9,573 0 0 Q10 33.15 CFS 535 10,554 10,064 10,064 536 11,568 11,061 21,125 Required Volume 4,536 Cubic Feet (1800 CF*DA) 536.5 11,568 5,784 26,909 Required Surface Area I 10,772 Square Feet (325 SF*Q10) 537 12,614 6,046 32,954 5381 13,6921 13,1531 46,107 Provided Volume 26,909 Cubic Feet OK Provided Surface Area I 11,568 Square Feet OK Length 191 Feet Minimum Spillway Design Width 50 Feet Q10 33.15 CFS H 1.5 Feet Spillway Elevation C 3.367 Surface Area at Spillway 11 N53 L 5.36 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 15 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.7 Inches Max Flow 92.8 CFS I OK Orifice Diamter 1.4 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN G Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-G PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.34 Acres 276,293 Square Feet Total Disturbed Area 6.07 Acres 264,626 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 546 15,461 0 0 Q10 24.64 CFS 547 16,877 16,169 16,169 548 18,317 17,597 33,766 Required Volume 10,935 Cubic Feet (1800 CF*DA) 548.5 19,047 9,341 43,107 Required Surface Area I 8,009 Square Feet (325 SF*Q10) 549 19,782 9,707 52,814 5501 21,2731 20,5281 73,342 Provided Volume 43,107 Cubic Feet OK Provided Surface Area I 19,047 Square Feet OK Length 308 Feet Minimum Spillway Design Width 50 Feet Q10 24.64 CFS H 1.5 Feet Spillway Elevation C 3.367 Surface Area at Spillway 19 N55 L 3.98 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 2 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.8 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.6 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN G Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-G PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.79 Acres 34,480 Square Feet Total Disturbed Area 0.79 Acres 34,480 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 546 15,461 0 0 Q10 3.08 CFS 547 16,877 16,169 16,169 548 18,317 17,597 33,766 Required Volume 1,425 Cubic Feet (1800 CF*DA) 548.5 19,047 9,341 43,107 Required Surface Area I 999 Square Feet (325 SF*Q10) 549 19,782 9,707 52,814 5501 21,2731 20,5281 73,342 Provided Volume 43,107 Cubic Feet OK Provided Surface Area I 19,047 Square Feet OK Length 308 Feet Minimum Spillway Design Width 50 Feet Q10 3.08 CFS H 1.5 Feet Spillway Elevation C 3.367 Surface Area at Spillway 19 N55 L 0.50 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain _ 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.4 Inches Max Flow 61.9 CFS I OK Orifice Diamter 0.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN H Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-H PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 6.64 Acres 289,028 Square Feet Total Disturbed Area 6.54 Acres 284,883 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 506 9,600 0 0 Q10 25.78 CFS 507 10,736 10,168 10,168 508 11,904 11,320 21,488 Required Volume 11,772 Cubic Feet (1800 CF*DA) 508.5 12,500 6,101 27,589 Required Surface Area I 8,378 Square Feet (325 SF*Q10) 509 13,104 6,401 33,990 5101 14,3361 13,7201 47,710 Provided Volume 27,589 Cubic Feet OK Provided Surface Area I 12,500 Square Feet OK Length 240 Feet Minimum Spillway Design Width 40 Feet Q10 25.78 CFS H 1.5 Feet Spillway Elevation 508.5 C 3.367 Surface Area at Spillway 12,500 L 4.17 Feet Top of Berm Elevation 510 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 2 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.8 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.6 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN H Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-H PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.01 Acres 43,847 Square Feet Total Disturbed Area 0.91 Acres 39,703 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 506 9,600 0 0 Q10 3.91 CFS 507 10,736 10,168 10,168 508 11,904 11,320 21,488 Required Volume 1,641 Cubic Feet (1800 CF*DA) 508.5 12,500 6,101 27,589 Required Surface Area I 1,271 Square Feet (325 SF*Q10) 509 13,104 6,401 33,990 5101 14,3361 13,7201 47,710 Provided Volume 27,589 Cubic Feet OK Provided Surface Area I 12,500 Square Feet OK Length 240 Feet Minimum Spillway Design Width 40 Feet Q10 3.91 CFS H 1.5 Feet Spillway Elevation 508.5 C 3.367 Surface Area at Spillway 12,500 L 0.63 Feet Top of Berm Elevation 510 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.4 Inches Max Flow 61.9 CFS I OK Orifice Diamter 0.9 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN I Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-I PH-1 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.19 Acres 138,870 Square Feet Total Disturbed Area 2.62 Acres 114,254 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 556 4,000 0 0 Q10 12.39 CFS 557 4,576 4,288 4,288 558 5,184 4,880 9,168 Required Volume 4,721 Cubic Feet (1800 CF*DA) 558.5 5,500 2,671 11,839 Required Surface Area I 4,025 Square Feet (325 SF*Q10) 559 5,824 2,831 14,670 5601 6,4961 6,1601 20,830 Provided Volume 11,839 Cubic Feet OK Provided Surface Area I 5,500 Square Feet OK Length 100 Feet Minimum Spillway Design Width 40 Feet Q10 12.39 CFS H 1.5 Feet Spillway Elevation C 3.367 Surface Area at Spillway 5 N560 L 2.00 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.6 Inches Max Flow 61.9 CFS I OK Orifice Diamter 1.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SKIMMER BASIN I Project The Cottages at Wingate Client Moser Group Project # 7516 Date 7/17/2022 2013A Van Buren Ave. Designation SB-I PH-2 Designer MDP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.45 Acres 19,651 Square Feet Total Disturbed Area 0.45 Acres 19,651 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.77 Inches per Hour 556 4,000 0 0 Q10 1.75 CFS 557 4,576 4,288 4,288 558 5,184 4,880 9,168 Required Volume 812 Cubic Feet (1800 CF*DA) 558.5 5,500 2,671 11,839 Required Surface Area I 570 Square Feet (325 SF*Q10) 559 5,824 2,831 14,670 5601 6,4961 6,1601 20,830 Provided Volume 11,839 Cubic Feet OK Provided Surface Area I 5,500 Square Feet OK Length 100 Feet Minimum Spillway Design Width 40 Feet Q10 1.75 CFS H 1.5 Feet Spillway Elevation C 3.367 Surface Area at Spillway 5 N560 L 0.28 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1.5 Feet Skimmer Size 1.5 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 0.3 Inches Max Flow 61.9 CFS I OK Orifice Diamter 0.6 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-100 NCDENR Erosion and Sediment Control Planning and Design Manual Do= 30 in. d5o (611min.)= in. Q10 = 56.23 cfs dmax = 12 in. 3DO = 7.5 ft. th= 18 in. La = 24 ft. W = 26.50 ft. 3)0 Outlet w Do pipe t diameter (DO) La w �T'l 0, 511 • 60 ff� If� II� 3 4, �����III�Fi Lul III!IIi111i1i11H 11111111811111 iiliii i4l' i�i �fli�I�ililiilli'��i����IIilllliii. �—�s�s■l�=�i' �i��il���l iia jjx��IlJIgry�I 1 111 111111�II IIIIIIII_..illliliifii111l1��i.oi,v�����iil6l�ll��f�l�� �� IN 11 i11I1111I1�llll 141� � � �1 I I � �H��� � f � �� 90 80, 4 R ! 11OU 61 1:1111 Pill w, - I 1p-"'v HM" � 1 o or, !Ill 4;i�OIYNIN i., or --- tir nul • I Pill 11VIIIii 1111 1111111111 Hill, l�fiilliliiiiiiiiil� ill 110101 111111MH111 INN Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv. < 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-121 NCDENIR Erosion and Sediment Control Planning and Design Manual Do= 30 in. d5o (611min.)= in. Q10 = 58.69 cfs dmax = 12 in. 3DO = 7.5 ft. th= 18 in. La = 24 ft. W = 26.50 ft. 3)0 Outlet w Do pipe t diameter (DO) La w �T'l 0, 511 • 60 ff� If� II� 3 4, �����III�Fi Lul III!IIi111i1i11H 11111111811111 iiliii i4l' i�i �fli�I�ililiilli'��i����IIilllliii. �—�s�s■l�=�i' �i��il���l iia jjx��IlJIgry�I 1 111 111111�II IIIIIIII_..illliliifii111l1��i.oi,v�����iil6l�ll��f�l�� �� IN 11 i11I1111I1�llll 141� � � �1 I I � �H��� � f � �� 90 80, 4 R ! 11OU 61 1:1111 Pill w, - I 1p-"'v HM" � 1 o or, !Ill 4;i�OIYNIN i., or --- tir nul • I Pill 11VIIIii 1111 1111111111 Hill, l�fiilliliiiiiiiiil� ill 110101 111111MH111 INN Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv. < 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-200 NCDENR Erosion and Sediment Control Planning and Design Manual Do= 24 in. c150 (6"min.)= 10 in. Q10 = 42.95 cfs c1max = 15 i n. 3DO = 6 ft. th= 23 in. La = 24 ft. W = 26.00 ft. 3)0 Outlet w Do pipe t diameter (DO) La w gii �T'l 1 51• 60 5_? 3 II mmi4l'I ii 101011 INS . 0.10 RAI I I:IIII�iI�I;I�IIII!9'�iilil�IlPii#il!I � �i�l���li�l��i�i�i�! Illill fill 11 1 1 1 1 it!I!IIII!!II!II!llli�illll!!III I! I =111111NI 80, 4 mmmmmmommommone I I III fill. sell J11411111111 1. 2% , Z, if Vw. ol! N iii! flip," NMIOwill 1101311111 101 I 11 111 1111 111 11 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv. < 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-300 NCDENR Erosion and Sediment Control Planning and Design Manual Do = 24 in. d5o (6"min.)= in. Q10 = 13.91 cfs dmax = 9 in. 3Do = 6 ft. th= 14 in. La = 12 ft. W = 14.00 ft. 1, Outlet r• 9! ..- diameter ■. La 1:l 1.IIiM�lll ' "i11111M111111 6' ii �iiiillilll/ li�l�l�lEllll �i;ll�ff�l• i!p ' I 0;1'l�v,,4ori ITI-11- nnx.nnnrxnunmm�nuuwxnu i 0aw-`oA.n..m nrl mxm nnnnnw nc.n vm , • 1 ■ ■� ► 1 EI 111 I I III •� C�• ��JI �j�, ! III ��Il I�� 11 '' � 'ilk '�Eiil�id����f�l�llli�� ii,lll 'il I'=l 1 I I ■ ri i111FIlII■IIII IIIA� I S= II'" iN"NIN'�III/II;�:'r�!�jlli`llrllHAW s#II'llr��V"III!=I �� �� i I��11•I pill, ° 4il= _ {I Iliil.' �/ 5.I, +f'IQ 1QIfi��ii j'!''i�I�II !f I �1_II_ -I +:::,II!uil l �silhi�INlIlilllllHl��II���IEIIIIIIIIt1kI�I11I'������� ' ��1���11 F, II�i i�'1'"��'ll :r 1 Illllllllhllliliiri•-j lii:l•" ij'r'�' — •••w.nmxnrwnrinwx r rinxinl I ■ dlidll A E �VI nuns ••i ul 1 = ! liii={{III I ` u iul;lue•. ` •. !ler:n•i', n a it I Ili 19�=" _ {=�I �i� �I l li�l iiif ii ill i�ilnliiilli �s ,�� ,11- li Till 1 11 i+i1 I 1 ii 1llllil H r j 011? 1' 11P nr;,i 1,rii,i{ri• , A II 11:III II i I Ill I■I=hill tl � �` � nnu u l l In umnul x l l � � ,lli.ul a nih•, Hill 1 1111 111 I Illl I I I r� q���lr'� • i , rAl I:d11►11I�t�!11. Ilill =I f 11 l lIl l � /•� • • , ' + I1� Iil 11111.0:l1! q {111�{°�li' I..' , �i=i'!l�II�I i ! 1���4�I��li i I � I�������,��� -�•. �� ��{./+'Ird IjI�11►.1,•:::�SiII���II,! 1=11 II� II 41 ' � ` d I � iiln; °i,r: lil'i ii!11 ,il 11 II nul !! .A!:Itil!ill �Illlil/illllllllll IIIIIII 11 I = 1 I III• .� p�.i�.:" r r r • 11{ { `" F µi ��� + ��=�!•i�li ='ll If i I'd 11 =1{IIllIIIIIIIIIIIII � {{{i�!illiiili!�iiii��I�Nlll iiI ll�l� ` ��,�„i�- g]l;� •��� ���ys��===.,�� =II I Ilse =+{IIIIIIIII} Il�ii!!!�l�llim=IIIIIiI ■■IIIIe ,I,:::::;�w.'�.� �. I1! Il�lsiisilll! ®l�IA9 Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-3 06 20 10 NCDENR Erosion and Sediment Control Planning and Design Manual Do = 15 in. d50 (6"min.)= 6 in. Q10 = 3.17 cfs dmax = 9 In. 3Do = 3.75 ft. th= 14 in. La = 8 ft. W = 9.25 ft. 3 0 Outlet W = oo 4-La pipe t diameter (DO) La --d 7 i Water 0, 50o 60 dwa 50 100 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). 99 Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-400 • 1 1 . • 11 • 1 I 11 �sY:Aiili III it ( R , , • t .I� li/,jii / 1 .eii•.r: t ' I • ` / III •,1 Ir.CI�. I rSil iI11K/5i1. -•1 •Yllllllx •fl 1' PI 119t�7 I IU 1111 I • III I i II .1 i) II 4P I .• IUII iI11' 1.•E l�f�l , ,��j'Eii li I�.li I11•1III11l1I //�ili 111�1Inl1I hI ' �i�ii!l�i��hl�l��!l�i���! ICE F/i.I �,�Ir' • 111 oil , �il� ��'�Iw��II� • li IIIIi111'll 1 1111�I11�Ik ' 1 III ■' ■I' • , , ' 1 EI 111 I I IIII 11 � E I :rlb:il , � �e�e' � .: �lii 1 1 III il'I 111 Iv '�� I ;1�� =ii • ��. ; I II 111x11 1 I I . ■. • i":;-II' ;. f 1 I11I � ■ � . i••i•r Iiii ii I S d'ii.+/Ir it II III lilili111�1 I ' I ill illi�l��a i " . ■ IIII iI �■�'����I ii'i�ii I�IIIB�.e Jiti IIIiI IIIIgI I11 Ui',Elil;! 11 M�"Isi II E1 �,elll I /d lillil"i � I li,111;•10111,1l I � AI I 111 Ix1 111 f11111lIIJUJIill,hflilEu1111111f1JL�'Ic fl 1 FU UI . r::ilrLidi:illN: r1iD: Ii�fll��l� i rl ill 1111 E I dui+•ill!'"Ilr•'�V• I '...�irll.d±.u�!idNntl�I�1Ir��Nlf�flll111If1�,l . I tl III � r uil� O•:;triippEII�IU;IIIi 11 1 1111' IIfP•'/1' 11! �y4•",ip 1 �I', i�r ,�►► 4,�11 iiif���Hliil�lllllui■i�1111I+ti�nnl t 111 111111 nmm�illuaw..:'i fr111Pr!'i8111lI13iI ■vs�s/�i II IIIIIII�_..i:�llll�lii � �■wi ��1111��II�IIII1M�iIlilllll[IIIIIIIIII�IV Old v" f' III 11 1 111 Illllii 1 I lilllii#iiiil I . 111 I I ` �► �IR' ii��oii�,1 �� �I I I�.• d,iidIIIINA E���VI Nip; Ilrr/1!•: rll!i .•;+'.'�• ti%� I!II n 11 11 I ,1;ii;;l li��lI f !I 1111 ! 11 I II 9� m umnu, x I l l� i � �li�l liif ii lii�ii�iin�iillii 1 � �-•• �S .' nau 11: •• `I' 1•' t' I':if! . 4,111 I '� I I r ul.ul a nits • m r:au►/Inr 1 u H ' 11111 I111 f11111 Ir11111 Illl I I I i1 II I I I e1it I iinu��a���il II � i � i � r� - � ,r-� q �•�ad- a1II��I�,ilu � mill r I' d r ills! r . r . l I IIIIr.O.tl. rr d I rd►in'•.. i - ° Ii 11i11 i. dill.,flll i •i,, ll�'�iiarn nul • IIIf11111111111ii1►Ili=i!!11lili 11 �������� .1[/i I i AiA� � L� �.IFi•i �� ! +u•: lii 111I111 .�tlay�l!�11 �Illlif/illllllllll IIIIIII li 11 If 1 ill I'd 11 f Iflllllllllllll! = II Ili1i1111 1 �••,a�ii�*`I�lll.r�li��r!�„i.�'i'i�i�xry;I-�i�°,�p�'�'�.a�firipl�l�l�il�lliiilillllill�l��l�lil�i1�111i�111111 it II 11 I1IIIn1111 I E _ N., �� �-•=•r�_--������r�i������1/I�IIW.IIfIIIIl1�1w111■ Mit ollie 1 I 1 /1 11 11 itl Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-A 1, 1 I 11 �sY:Alill R / 1 .eii•.r: t ' ':IIIIII! I • ` / III; f •,l Ir.CI�. s iialire/ y ,Sil iI11K/5ii. -•1 •Yllllllx •fl 1' PI 119t'7 I .1 IU I I 11 II ' • IIII il�f�l i) II 4P I ., IUII Mill �jlil Il.,�'1 i - ;1111111��lI Iil1' • I Ili /1.F11! Nlil ll 1 ! IIII 1RIli{'. In h1 �i�ii!l�i��hl�l��!l�i���! s ICE Fi1 E �I� I�iv!Ilflllllflfllillllllll , �il� ��'�Iw���1� • li IIIIi111111 f III I�Illlylk i � � tl u1 >�i if�•�s 1 IIII III f; i 11 !IIII, I II 1111111 1 1 •"'IIII! 'i 1 I I ■ 1. l L+�i" ill' I S j IN�iI/�/I/j'��, II �II III ������ �� ii ,'��i;:N,p1i1`/ ;,I. Ini iii�i!!iihi!�!!r • : 1 i• , I ii d���������i�����l1IIlI!III j I ■ it .� is i • ■ ■ I lii � �■����I�iili�!i IIIIIS�■■■fi II i11t11 J 1 I ;li;llir� III IIII IIIII I Ir Ur''iA{ ! � Ji 11 „ .,� II EI :,:,III I (/d �lillfl'J � I ii,!ii �1/111'J'-r,fill!1111 AI I xl 1 HI Mill II IIII 11 ffflllllll_I fl 1 FU UI r::ilri'dd�:i11N:IIiD: Iilfli��l� IIII! 11 FI 1 1 III E I d"�" Ir'"Ilr•' V" I I� 1 1I If 11111t y 'l s�rs�l•+�'� 1i�� �InnII fnt�lNu� 1N'�I I1_I'_�1 Illflllllll • �■i,illi!l�Iiff1ii1114NHlillll111lIIIIIIHiIIIl1! . ! tl III ■ I I�� 1111!:114111�!{iiiiiiiiiiiliiiiiii4...i:nlil�'; : ulll m:;niFl`IIlanalx 1 IIII: I fP+'/!' 11! 4•'Sip iy •I iil' nll moon ;llI U �� _���w/���., 1""""' '"'i ii�iii®liplliliiRIIINAIIIAINIIIilllllllllliillllgill�!��I����� :-i n1110111111. 111lII'�Ii 11; I 1 II I iis�l!!' lu�r. , tllr:n'i : illfi ;"'. 1' ii' I!il n 11 11 1 t nnu a 11 f !I IIII ! 11 f m umnu, x 1 1 � 1 � �-•• l/�. � lln.ue a hilt • x ++U UI 1:d11►1lIJI '1 . r ul!' . 11 u ' I IIII I111 fII111 I1111114j[111 Ill! II I I I I iytl�i�'i� II i I Ali i ! l ��I"" r q �•�miI/••• mid ` I � d r , 111111 ' rr '111�1r.��lllilljgd►in';;; iI�IIIII IIiill:fll'-�:� 1 ,1: 1i1(i11 II i.• •rl 11•�iia.niliiili Inul ldi • Illfll!illllllliilflli�i!!liliii 111 1 I��� I ` � �,'� ��� +■�'lia�ini •�1layii!�dllil/illllllllll IIIIIII I'll Il I I'd 11 f Iflll;lllllllllllll Ilse Illllnllll} �' 1 1���, .>,~■��-.r�.�spa��a��i�lli��l�I�Iffi!II!�� I !�1111�ii1lIII!i1�111111111ii „ " • ' ' 1 1 II .��I�.„�,�I� r!■�l' FR"oiiill�ll'►� I Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-B NCDENR Erosion and Sediment Control Planning and Design Manual Do = 15 in. d50 (6"min.)= 6 in. Q10 = 9.4 cfs dmax = 9 In. 3Do = 3.75 ft. th= 14 in. La = 12 ft. W = 13.25 ft. 3 0 Outlet W = Do + La 9 pipe diameter (DO) ; L8 a --•1 0 7 ilwater 0,5Dp 7 , 5 60 M i FI � 1�, i III i111�111 11111111111! IlIl i��Il�f , �II IIII{lil�lyyl�pll ! I �C��',■' �'' �� tl {Illll�i�ii!! I III , 1 IIII li f'�I I�ii! i I!1!II� iii�ii!iihi!�!!r 1 I I I I ■ U • : ii S d'ii�//I!j'�, , L+�i" ;• , . it "-•il�iliid����:��i�i�����11 ill' ii I� II j I i� •� • oil■�•■i1 III Ililll�,�l!`1���1,!11iir� ° i ■ ■ ■ i IIII 11 I NNNIIIII I /,d Ir Ur''iA{!! „ lillfl'J !,� II i Ji E�';:,111 r 1 1 HflIltll I II I III IlR11 I1 fl FI 'i 1 11111IIII 1 IIE FI! I I I I r,y r�:/•�#1!'"Ilr"�V" r::ilridfl?:IIII?? , Ii'•{i�i 111D: l�II����P` fi�j j�11IB�■e ■ ! tl r Ilil� ;,Ili lag 1111`I14IHillli I AI + 1111111�1if IS'!I s PRO a Sr R." 11� 1�- �� I III ! I ■ i 111 ! IIII: I!!' ll IIfP+'/1' ' i l li,�. IV A 4•'Sip 4 i li llll,I�J ��I�Ilii II�IJI11!! ;i Iae��� ■ '���li .IIII i,1jl/il, diI A Ir E VI t mmnuuu,mm�w� : nna"ril Aft■■aEt#�rl�nn1r11111111IIMNIII■IIIII[IIIIIIII#111111 I Illlllllliilltllu!!;"1 111111i11111111lO111111111111ii#iiiilIMIN IIIIPr!'fi II! 1 Iri"' 1 liii(IIII� F I i ! I I ii�� i111i�1Ur". IIS ' 111 ..tllril!':'. i,... P" r�, � 1' II' I!II !l 11 nnu II 1 u f I I In II IIII ! umml! 11 1 AIII1 ��iliilil ii9!i�iiil!fll�i� 11 9�S � 1 -•• ii�'.111A., "' ,lf l Rp t, '� a � 11 ��''�:' �i11 '1 u ' t 11111 I111 Illl II I 1 �� �•'I�'�•, r .' ���!tlI q,I U i 1:d11►1lIJl IIIII.OaIS U• . . rr II I � d r i./ •r, Ijrdtin•::: li•�iia.ni�iiili il�illli �nul � ,1,1� � '■�I�I�l,�llf � ��LI/ � .�llayil!�11 �Illlif/il1lllllllll I'd 11 IIIIIIII 11 � 1 1 11� "�- µil• ��� �'ll if { 11�111111111111f1111! ,, 1l''IIII �:Cowl Ills .>r::�::�Mrl���t ,. lil! I1011silll! ®l�IA9 Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-131 Do = Qio = 3Do = La = W= NCDENR Erosion and Sediment Control Planning and Design Manual 24 in. d5o (6"min.)= in. 16.68 cfs dmax = 12 in. 6 ft. th= 18 in. 12 ft. 14.00 ft. 99 ulscriarge (it"/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Cottages at Wingate - Phase 1 Structure: FES-C NCDENR Erosion and Sediment Control Planning and Design Manual Do= is in. d5o (611min.)= in. Q10 = 8.36 cfs dmax = 9 in. 3DO = 3.75 ft. th= 14 in. La = 12 ft. W = 13.25 ft. 3)0 Outlet w Do pipe t diameter (DO) La w �T'l �- 0, 51O •1 ����Ilull� . L3Q f4flll�� I l����91=� III, k I J116 i WIN 11 11 fill III I I i ........... N V IMIN III 1.1111 fill ill���ilillllli�I��i=�'�i���!I �E�I 11��4�I��II����'�� 90 80, 4 .4 JIM; I 1 111 11 11 �:lIPUI !URI 'dP II t I IR i1 miIIIIInul Or .11 Si��!!!�l�li�iiiiiiiiii} , III 1 UN Pr 11M 'jap: ow 11111ulmlIN11111Ift1IMH111 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv. < 0.5 diameter). Page 1 Rip Rap Apron Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'A1-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 530.00 Slope (%) = 1.40 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.17 Elev (ft) 532.00 531.50 531.00 530.50 530.00 529.50 0 1 2 Section Saturday, Jul 16 2022 Highlighted Depth (ft) = 0.25 Q (cfs) = 1.170 Area (sqft) = 0.63 Velocity (ft/s) = 1.87 Wetted Perim (ft) = 3.12 Crit Depth, Yc (ft) = 0.21 Top Width (ft) = 3.00 EGL (ft) = 0.30 3 4 5 6 Reach (ft) 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'A2-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 518.00 Slope (%) = 4.50 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 5.91 Elev (ft) 520.00 519.50 519.00 518.50 518.00 517.50 0 1 2 Section Sunday, Jul 17 2022 Highlighted Depth (ft) = 0.43 Q (cfs) = 5.910 Area (sqft) = 1.23 Velocity (ft/s) = 4.81 Wetted Perim (ft) = 3.92 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 3.72 EGL (ft) = 0.79 3 4 5 6 Reach (ft) 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH S-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 532.50 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.67 Elev (ft) 534.00 533.50 533.00 532.50 532.00 Section D 1 2 3 4 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 7 Sunday, Jul 17 2022 = 0.33 = 1.670 = 0.88 = 1.90 = 3.48 = 0.26 = 3.32 = 0.39 Depth (ft) 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'B-2' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 557.90 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.32 Elev (ft) 559.00 558.50 558.00 557.50 557.00 Section D 1 2 3 4 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 7 Saturday, Aug 20 2022 = 0.29 = 1.320 = 0.75 = 1.76 = 3.30 = 0.23 = 3.16 = 0.34 Depth (ft) 1.10 0.10 -0.40 L -0.90 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'C-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 522.00 Slope (%) = 2.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.67 Elev (ft) 524.00 523.50 523.00 522.50 522.00 521.50 0 1 2 Section Saturday, Jul 16 2022 Highlighted Depth (ft) = 0.26 Q (cfs) = 1.670 Area (sqft) = 0.66 Velocity (ft/s) = 2.55 Wetted Perim (ft) = 3.16 Crit Depth, Yc (ft) = 0.26 Top Width (ft) = 3.04 EGL (ft) = 0.36 3 4 5 6 Reach (ft) 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'C-2' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 510.10 Slope (%) = 3.10 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.38 Elev (ft) 512.00 511.50 511.00 510.50 510.00 509.50 0 1 2 Section Saturday, Aug 20 2022 Highlighted Depth (ft) = 0.22 Q (cfs) = 1.380 Area (sqft) = 0.54 Velocity (ft/s) = 2.57 Wetted Perim (ft) = 2.98 Crit Depth, Yc (ft) = 0.23 Top Width (ft) = 2.88 EGL (ft) = 0.32 3 4 5 6 Reach (ft) 7 Depth (ft) 1.90 1.40 0.40 -0.10 L -0.60 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'D-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 515.00 Slope (%) = 13.80 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 0.39 Elev (ft) 517.00 516.50 516.00 515.50 515.00 514.50 0 1 2 Section Saturday, Jul 16 2022 Highlighted Depth (ft) = 0.07 Q (cfs) = 0.390 Area (sqft) = 0.15 Velocity (ft/s) = 2.60 Wetted Perim (ft) = 2.31 Crit Depth, Yc (ft) = 0.11 Top Width (ft) = 2.28 EGL (ft) = 0.18 3 4 5 6 Reach (ft) 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'D-2' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 514.00 Slope (%) = 11.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.52 Elev (ft) 516.00 515.50 515.00 514.50 514.00 513.50 0 1 2 Section Saturday, Jul 16 2022 Highlighted Depth (ft) = 0.16 Q (cfs) = 1.520 Area (sqft) = 0.37 Velocity (ft/s) = 4.09 Wetted Perim (ft) = 2.72 Crit Depth, Yc (ft) = 0.25 Top Width (ft) = 2.64 EGL (ft) = 0.42 3 4 5 6 Reach (ft) 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'E-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 527.80 Slope (%) = 4.10 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.86 Elev (ft) 529.00 528.50 528.00 527.50 527.00 Section D 1 2 3 4 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 7 Saturday, Jul 16 2022 = 0.24 = 1.860 = 0.60 = 3.12 = 3.07 = 0.28 = 2.96 = 0.39 Depth (ft) 1.20 0.70 0.20 -0.30 L -0.80 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'E-2' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 526.40 Slope (%) = 3.90 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 10.84 Elev (ft) 528.00 527.50 527.00 526.50 526.00 525.50 0 1 2 Section Saturday, Aug 20 2022 Highlighted Depth (ft) = 0.62 Q (cfs) = 10.84 Area (sqft) = 2.01 Velocity (ft/s) = 5.40 Wetted Perim (ft) = 4.77 Crit Depth, Yc (ft) = 0.76 Top Width (ft) = 4.48 EGL (ft) = 1.07 3 4 5 6 Reach (ft) 7 Depth (ft) 1.60 1.10 0.10 -0.40 L -0.90 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. TEMP. DITCH 'F-1' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 540.80 Slope (%) = 4.30 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 0.29 Elev (ft) 542.00 541.50 541.00 540.50 540.00 Section D 1 2 3 4 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 7 Sunday, Jul 17 2022 = 0.08 = 0.290 = 0.17 = 1.68 = 2.36 = 0.09 = 2.32 = 0.12 Depth (ft) 1.20 0.70 0.20 -0.30 L -0.80 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. PERM. DITCH'A' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 560.00 Slope (%) = 1.60 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 5.55 Elev (ft) Section 562.00 561.50 561.00 560.50 560.00 559.50 1 2 3 4 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 Reach (ft) Sunday, Aug 21 2022 = 0.52 = 5.550 = 1.85 = 3.00 = 5.29 = 0.49 = 5.12 = 0.66 7 8 9 10 Depth (ft) 2.00 1.50 1.00 0.50 MI _n r1n Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. PERM. DITCH S' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 557.30 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 4.38 Elev (ft) Section 559.00 558.50 558.00 557.50 557.00 556.50 1 2 3 4 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 Reach (ft) Sunday, Aug 21 2022 = 0.51 = 4.380 = 1.80 = 2.43 = 5.23 = 0.43 = 5.06 = 0.60 7 8 9 10 Depth (ft) 1.70 1.20 0.70 0.20 -0.30 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. PERM. DITCH'C' Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 545.00 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 4.91 Elev (ft) Section 547.00 546.50 546.00 545.50 545.00 544.50 1 2 3 4 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 5 6 Reach (ft) Sunday, Aug 21 2022 = 0.55 = 4.910 = 2.01 = 2.45 = 5.48 = 0.46 = 5.30 = 0.64 7 8 9 10 Depth (ft) 2.00 1.50 1.00 0.50 MI _n r1n Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. PERM. DITCH BYPASS Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 545.50 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 20.60 Elev (ft) Section 548.00 547.50 547.00 546.50 546.00 545.50 545.00 2 4 6 Sunday, Aug 21 2022 Highlighted Depth (ft) = 1.08 Q (cfs) = 20.60 Area (sqft) = 5.66 Velocity (ft/s) = 3.64 Wetted Perim (ft) = 8.83 Crit Depth, Yc (ft) = 0.96 Top Width (ft) = 8.48 EGL (ft) = 1.29 8 10 12 14 16 18 Reach (ft) Depth (ft) 2.50 2.00 1.50 1.00 0.50 _n r1n