HomeMy WebLinkAboutBPDP Approval -EMH Farm.docx
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611
919.707.9000
April 21, 2023
Clearwater Mitigation Solutions, LLC
Attn: Kevin Yates
(via electronic mail: clearwatermitigation@gmail.com )
Re: BPDP Approval
Dear Mr. Yates,
The Division of Water Resources (DWR) received a draft Bank Parcel Development Package
(BPDP) for the EMH Farm (Site) in 2022, for review and approval under the terms and conditions of
the EMH Farm Mitigation Banking Instrument for Riparian Buffer Mitigation (MBI) received on
October 20, 2022. Effective April 21, 2023, the MBI was made and entered into by Clearwater
Mitigation Solutions, LLC (Eco Terra) acting as the Bank Sponsor, and the DWR. DWR reviewed
the BPDP and MBI documents and provided comments and recommendations. DWR received a
revised BPDP and MBI that addressed all comments and recommendations. The table below
summarizes the timeline of the BPDP and MBI:
Project Site
Name
DWR Project
ID #
Initial Draft
Received
Revised Draft Received
(Final Draft)
Public Notice
Date
EMH Farm
MBI
2022-1493v1 October 20, 2022 March 31, 2023 March 31, 2023
EMH Farm
BPDP
2022-1493v1 October 20, 2022 March 31, 2023 March 31, 2023
The closing date for the public notice was April 14, 2023. DWR received no comments regarding
the subject BPDP and MBI. These documents are now approved and can be found online at the
following links:
EMH Farm MBI:
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2761996&dbid=0&repo=WaterResources
EMH Farm BPDP:
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2741810&dbid=0&repo=WaterResources
EMH Farm Site
Clearwater Solutions, LLC
April 21, 2023
Page 2 of 2
Please feel free to call me at (919) 500-0683 if you have any questions regarding this
correspondence.
Sincerely,
Katie Merritt
401 & Buffer Permitting Branch
cc: DWR File Copy (Blake Hartshorn)