Loading...
HomeMy WebLinkAboutBPDP Approval -EMH Farm.docx North Carolina Department of Environmental Quality Division of Water Resources 512 North Salisbury Street 1611 Mail Service Center Raleigh, North Carolina 27699-1611 919.707.9000 April 21, 2023 Clearwater Mitigation Solutions, LLC Attn: Kevin Yates (via electronic mail: clearwatermitigation@gmail.com ) Re: BPDP Approval Dear Mr. Yates, The Division of Water Resources (DWR) received a draft Bank Parcel Development Package (BPDP) for the EMH Farm (Site) in 2022, for review and approval under the terms and conditions of the EMH Farm Mitigation Banking Instrument for Riparian Buffer Mitigation (MBI) received on October 20, 2022. Effective April 21, 2023, the MBI was made and entered into by Clearwater Mitigation Solutions, LLC (Eco Terra) acting as the Bank Sponsor, and the DWR. DWR reviewed the BPDP and MBI documents and provided comments and recommendations. DWR received a revised BPDP and MBI that addressed all comments and recommendations. The table below summarizes the timeline of the BPDP and MBI: Project Site Name DWR Project ID # Initial Draft Received Revised Draft Received (Final Draft) Public Notice Date EMH Farm MBI 2022-1493v1 October 20, 2022 March 31, 2023 March 31, 2023 EMH Farm BPDP 2022-1493v1 October 20, 2022 March 31, 2023 March 31, 2023 The closing date for the public notice was April 14, 2023. DWR received no comments regarding the subject BPDP and MBI. These documents are now approved and can be found online at the following links: EMH Farm MBI: https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2761996&dbid=0&repo=WaterResources EMH Farm BPDP: https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2741810&dbid=0&repo=WaterResources EMH Farm Site Clearwater Solutions, LLC April 21, 2023 Page 2 of 2 Please feel free to call me at (919) 500-0683 if you have any questions regarding this correspondence. Sincerely, Katie Merritt 401 & Buffer Permitting Branch cc: DWR File Copy (Blake Hartshorn)