Winston, Joey
From:Travis Gingras <travis@latitude35design.com>
Sent:Friday, April 7, 2023 9:26 AM
To:Heather Brockelbank
Cc:Winston, Joey; Darin Brockelbank
Subject:Re: [External] 8808 Island Point (DWR Proj #20221627)
Attachments:8808 Island Point Rd - Shoreline Stabilization App.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Morning Joey,
Again, apologies on the delay of this revised document for all parties. Please find attached corrected application
reflecting the changes of work performed that is below full pond and work that is performed above full pond (pages
2&3 of the application) and added multi-leader note on C200 noting the permanent work performed that is above full
pond.
Thank you all for your patience.
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email travis@latitude35design.com
"There are no solutions; There are only trade-offs" - Thomas Sowell
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Friday, April 7th, 2023 at 9:11 AM, Heather Brockelbank <heather@metrorealestatepros.com> wrote:
Great! Thank you so much!
Heather Brockelbank
704-451-7089
heather@metrorealestatepros.com
"Therefore I tell you, whatever you ask for in prayer, believe that you have received it, and it will be
yours." Mark 11:24
On Fri, Apr 7, 2023 at 8:49 AM Travis Gingras <travis@latitude35design.com> wrote:
Hello Heather,
2
I got tied up the other day, I am working on Joey's changes now as we speak and will have that
over to him today before noon.
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email travis@latitude35design.com
"There are no solutions; There are only trade-offs" - Thomas Sowell
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Friday, April 7th, 2023 at 8:21 AM, Heather Brockelbank <heather@metrorealestatepros.com>
wrote:
Good morning,
I'm following up on the status of the certificate. Any chance we can get this today?
Thank you.
Heather Brockelbank
704-451-7089
heather@metrorealestatepros.com
"Therefore I tell you, whatever you ask for in prayer, believe that you have received
it, and it will be yours." Mark 11:24
On Tue, Apr 4, 2023 at 9:25 AM Travis Gingras <travis@latitude35design.com> wrote:
I will get this turned around today for you sir!
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email travis@latitude35design.com
"There are no solutions; There are only trade‐offs" ‐ Thomas Sowell
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Tuesday, April 4th, 2023 at 9:10 AM, Winston, Joey <joey.winston@ncdenr.gov>
3
wrote:
Hi Heather and Travis,
The updated impact calculations (above and below pool) are all that I
need to issue. Thanks for checking up on it.
Joey
Joey Winston
Environmental Specialist I, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (828) 296‐4685 | Cell: (828) 785‐9171
joey.winston@ncdenr.gov
From: Travis Gingras <travis@latitude35design.com>
Sent: Tuesday, April 4, 2023 8:51 AM
To: Heather Brockelbank <heather@metrorealestatepros.com>
Cc: Winston, Joey <joey.winston@ncdenr.gov>; Darin Brockelbank
<darin@metrorealestatepros.com>
Subject: Re: [External] 8808 Island Point (DWR Proj #20221627)
CAUTION: External email. Do not click links or open attachments unless you
verify. Send all suspicious email as an attachment to Report Spam.
Thanks Heather,
Joey, let me know if any other changes are needed. I still have on
my list to correct the full pond/normal pond item that you shared the
other week.
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email travis@latitude35design.com
4
"There are no solutions; There are only trade-offs" - Thomas Sowell
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Tuesday, April 4th, 2023 at 8:45 AM, Heather Brockelbank
<heather@metrorealestatepros.com> wrote:
Hi Joey,
I am checking in to see what the review time frame
will be for the 1401 Certificate. Just trying to time the
application for the dock work we need to do. I need
this certificate first and Duke Lake Services has called
me checking on the status of my returned application.
I know you have been out of town, but I didn't want
to lose sight of this. Thank you!
Heather Brockelbank
704-451-7089
heather@metrorealestatepros.com
"Therefore I tell you, whatever you ask for in prayer,
believe that you have received it, and it will be
yours." Mark 11:24
On Fri, Mar 17, 2023 at 4:19 PM Winston, Joey
<joey.winston@ncdenr.gov> wrote:
Hi Travis,
I’ve received your updated plans. I’ll be out of the
office next week but will let you know if any
additional information is needed when I return. I did
notice that the application states no impacts are
proposed below the normal pool lake level but that
the drawings show structure placed below the full
pond level. The application wording could be a little
better here, but all structure below the full pond
level would be considered an impact below the
normal pool lake level. Could you provide a
calculation of the amount of impact proposed below
the full pond level and adjust the impact above that
level if needed?
Thanks,
Joey
5
Joey Winston
Environmental Specialist I, Division of Water
Resources
North Carolina Department of Environmental Quality
Office: (828) 296‐4685 | Cell: (828) 785‐9171
joey.winston@ncdenr.gov
From: Travis Gingras <travis@latitude35design.com>
Sent: Wednesday, March 15, 2023 5:21 PM
To: Winston, Joey <joey.winston@ncdenr.gov>
Cc: Darin Brockelbank
<darin@metrorealestatepros.com>; Heather
Brockelbank <heather@metrorealestatepros.com>
Subject: RE: [External] 8808 Island Point (DWR Proj
#20221627)
CAUTION: External email. Do not click links or open
attachments unless you verify. Send all suspicious email as
an attachment to Report Spam.
Good Afternoon Joey,
Please find attached completed/updated
application and engineer's plan for Proj #
20221627 8808 Island Point.
Upon your review, please let me know if anything
needs to be adjusted or if additional items will be
needed. I will be able to turn around any
comments or corrections within short order.
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email
travis@latitude35design.com
"There are no solutions; There are only trade-offs" -
Thomas Sowell
6
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Wednesday, March 15th, 2023 at 11:20 AM,
Travis Gingras <travis@latitude35design.com>
wrote:
Hello Joey,
I hope you are doing well today. I
have the Shore Stabilization plans
completed for Proj. #20221627. I
had asked ownership to send me
over their original application, and
they mentioned that they
completed online and did not have
a copy of it on their end.
Would you like me to complete a
new/revised application or should
the old one still be applicable? I
wanted to confirm that questions
under B. were answered correctly.
Regards,
Travis Gingras, PE
President and CEO
Mobile 704.956.1862 ◦ Email
travis@latitude35design.com
"There are no solutions; There are only
trade-offs" - Thomas Sowell
‐‐‐‐‐‐‐ Original Message ‐‐‐‐‐‐‐
On Tuesday, February 28th, 2023 at
2:32 PM, Winston, Joey
<joey.winston@ncdenr.gov> wrote:
Hi Travis,
Thanks for the
update. We can
extend the response
deadline to March
15th. Please let me
know if you have
any questions about
the requested
information.
Thanks,
Joey
7
Joey Winston
Environmental
Specialist I, Division
of Water Resources
North Carolina
Department of
Environmental
Quality
Office: (828) 296‐
4685 | Cell: (828)
785‐9171
joey.winston@ncde
nr.gov
From: Travis Gingras
<travis@latitude35d
esign.com>
Sent: Tuesday,
February 28, 2023
9:53 AM
To: Winston, Joey
<joey.winston@ncd
enr.gov>
Cc: Darin
Brockelbank
<darin@metroreales
tatepros.com>;
Heather
Brockelbank
<heather@metrorea
lestatepros.com>
Subject: [External]
8808 Island Point
(DWR Proj
#20221627)
CAUTION: External
email. Do not click
links or open
attachments unless
you verify. Send all
suspicious email as an
8
attachment to Report
Spam.
Good Morning
Joey,
It was a pleasure
talking with you
over the phone
yesterday. I wanted
to give you notice
that Mr. and Mrs
Brockelbank have
contracted my
services to help
finalize 401 Water
Quality Certification
Documents that
were requested by
your office.
Due to the
timing/schedule I
am hoping that I will
be able to give a
small extension on
the current deadline
due March 6th. I
would like to
request a deadline
due March 15th.
I do want to assure
you that we are
diligently working
on the documents
that have been
requested and
appreciate any
flexibility that you
can allow.
Please let me know
if you have any
questions, and I
look forward to
working with you on
this project.
Regards,
Travis Gingras, PE
President and CEO
9
Mobile
704.956.1862 ◦
Email
travis@latitude35d
esign.com
"There are no
solutions; There are
only trade-offs" -
Thomas Sowell