Loading...
HomeMy WebLinkAboutSite Inspection 4.21.23 US 221 Ruth BypassWetland Inspection Report Project Num: 20200362 Version: 2 Status: Issued Project Name: NCDOT -Improvements to US 221 - Rutherfordton Project Type: Road Coun • ass (R-2233BB BA) me ce/repair/improveme h • Ruthero ns Region: sheviW Location: NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA) Latitude: +350 22' 43" Longitude: -810 56' 60" SW Plan Location: Site Owner Name: NC DOT Division 13 Inspection Date: 4/21/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Robert K Mitchell Phone: Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on April 21, 2023 by Kevin Mitchell with the Asheville Regional Office. Jon Osopovitch, Ross Straup, and Jesse Martinez were present during the inspection. The following are items that need attention: - 964+00 RT - Clean up and identify solution observed at outlet of stonnwater drainage. - 969+00 RT Site 11 - Sediment cleanup is complete. - Y6 30" Outlet to JS. Remove any sediment in box. Cover slopes at junction box. Recommend priortizing completion of this site in order to prevent any sediment loss into the adjacent JS. - Continue to meet NPDES ground cover requirements. page: 1 Site Number: 20200362 Owner: Bryan, Roger D Inspection Date: 4/21/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ page: 2