Loading...
HomeMy WebLinkAboutSite Inspection Sugar Hill Road 4.21.23Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20181302 NCDOT - SR 1001 Improvements (U-5818) McDowell NCDOT - SR 1001 Improvements (U-5818) NC DOT Division 13 4/21/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 02' 08''+35° 38' 47'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on April 21, 2023 by Kevin Mitchell with the Asheville Regional Office. I spoke with James Hutchins during the inspection. Ensure NPDES cover requirements are being met. Slopes at Station Y 480+00 - 484+00 RT are bare. Site is compliant with the 401 Water Quality Certification. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20181302 4/21/2023 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2