Loading...
HomeMy WebLinkAboutSW6221003_Supplement-EZ Form_20230418►UrrLC1VICIV I-CL VVVr—M rAVC FORMS -LOADED tOJECT INFORMATION 1 Project Name 1 Carolina Wildlife Conservation Park Parking Lot 45.85 2 Project Area ac 0 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 5 Is this ro'ect Hi h or Low Densi ? Low No 6 Does this project use an off -site SCM? OMPLIANCE WITH 02H .1003(4) .. _7 } Width of ve _etated setbacks provided (feed 30 _8 W ill the vegetated setback remain ve etated? N/A _ 9 If BUA is ro osed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No UMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell Pond 13 14 Wet Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvestin RWH Green Roof Level Spreader -Filter Strip LS-FS Disconnected Impervious Surface DIS Treatment Swale Dry Pond StormFilter Silva Cell Ba titer Ifilterra -- 15 16 17 18 19 20 21 22 23 24 25 2B FORMS -LOADED ESIGNER CERTIFICATIO_ N Zak Shipman PE -President 27 Name and Title: Shipman EngineerincPLLC 28 Or anization: 137 Middlegreen Place 29 Street address: Holly Springs, NC 27540 30 city, state, Zip: Phone number(s� k 919.900.0006 zak@shipmanengmeenng.com 31 32 Email: Certification Statement_ I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. \\�i CiAR04/'��/I, a SEAS 035027 . w. —A� lv� Signature of Designer ,2 Z -3 Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this roiect have low densit areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site LID 1 4 T pe of SCM n/a n/a 5 Total drainage area (sq ft 1997226 1997226 6 Onsite drainage area (sq ft 1997226 1997226 7 Offsite drainage area (sq ft 0 0 8 Total BUA in project (sq ft 180522 sf 180522 sf 9permitting) New BUA on subdivided lots (subject to s ft sf sf 10permitting) New BUA not on subdivided lots (subject to s 180522 sf 180522 sf 11 Offsite BUA (sq ft 12 1 Breakdown of new BUA not on subdivided lots: Parking (sq ft 32549 sf 32549 sf Sidewalk (sq ft 3156 sf 3156 sf Roof (sq ft 37874 sf 37874 sf Roadway s ft Future (sq ft Other, please specify in the comment box below (sq ft 106943 sf 106943 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft n/a 14 New infiltrating permeable pavement not on subdivided lots (sq ft n/a 15permitting) Existing BUA that will remain (not subject to s ft sf sf 16 Existina BUA that is already permitted (sq ft sf 17 Existing BUA that will be removed (sq ft sf 18 Percent BUA 9% 9 0 19 Design storm inches n/a n/a 20 Design volume of SCM cu ft n/a n/a 21 Calculation method for design volume n/a n/a ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Other impervious is for dumpster pad and concrete apron in parking lot area, plus gravel access paths in zoo area (previously constructed). LOW DENSITY DESIGN 1 REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per. 1 003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3H:1 V 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5.01 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Swale 1 exceeded the allowable velocity with simple vegetation, so we have indicated a TRIM liner which provides protection up to 12 psf sheer stress and 20 fps velocity.