HomeMy WebLinkAbout20071651 Ver 1_Triage Check List_20071023Triage Check List
Date: 10/23/2007
Kevin Barnett, Asheville Regional Office
To:
60-day Processing Time: 10/22/2007 to 12/21/07
From: Ian McMillan Telephone: (919) 715-4631
Project Name: Joseph Poats
DWQ #: 07-1651
County: McDowell
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
^ See Attached Questions
Comments: