Loading...
HomeMy WebLinkAbout20071651 Ver 1_Triage Check List_20071023Triage Check List Date: 10/23/2007 Kevin Barnett, Asheville Regional Office To: 60-day Processing Time: 10/22/2007 to 12/21/07 From: Ian McMillan Telephone: (919) 715-4631 Project Name: Joseph Poats DWQ #: 07-1651 County: McDowell The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization/avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy ^ Is the application consistent with pre-application meetings? ^ Cumulative impact concern ^ See Attached Questions Comments: