Loading...
HomeMy WebLinkAbout310036_Compliance Evaluation Inspection_20230323 Division of Water Resources Facility Number - ® O Division of Soil and Water Conservation O Other Agency Type of Visit: 10,Compliance Inspection O Operation Review p Structure Evaluation p Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: `0II0rv\ I Departure Time: !rU")a County: t\ r Qd O�region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer I Dairy Cow Wean to Feeder I jNon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other iTurkey Poults Other Discharecs and Stream Impacts 1. Is any discharge observed from any part of the operation? [] Yes E0 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (1f yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? &0 Yes ❑ No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes P No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facilit Number: jDate of Inspection: Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ® No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 3- Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5. Are there any immediate threats to the integrity of any of the structures observed'? ❑ Yes Q No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA ED NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes ❑ No [] NA NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ❑ No ❑ NA �j] NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA GONE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ® NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0 No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA So NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA [�] NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA [ ] NE Reguired Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ❑ No ❑ NA `C'" NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. [:) Yes ❑ No ❑ NA NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis [:]Soil Analysis ❑Waste Transfers [:)Weather Code []Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA Q NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ,9NE Page 2 of 3 511212020 Continued f Facilit Number: - j Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA [?NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [:] No ❑ NA [P NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No [] NA ONE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No [Q NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA EPNE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 0 No [] NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes rn No DNA ❑ NE permit?(i.e., discharge, freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA EDNE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ED No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ® No [] NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes EQ No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). P�_ W r<) TkA '�(AXJVIIK i alt L."Ame L/06L� L L-�c Pb() )q r,51C — V-vos'T Ci G,,. y�C �� c�•� fien Reviewer/Inspector Name: V ( on(6'on Phone: Reviewer/Inspector Signature: Date: Page 3 of 3 511212020