Loading...
HomeMy WebLinkAboutNCC211438_NOT Signed Certification (Orig Signed)_20230417 NCG01 Notice of Termination (NOT) Certification Form Directions: Print this form,complete, scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program S12 N.Salisbury Street,61h Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.. NCC211438 Name of Project. Chatham Park ThompsonSt. Subdivision I nt 6 Per NC General Statute 143-215.6B(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief, such information is true,complete, and accurate. Legally Responsible Organizational Entity: PreWltt Custom Homes *Legally Responsible Person: James PreWltt - Title of Legally Responsible Person: President * Date:—4/1 7/2023 Signature: 1/7 Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person): * IMPORTANT NOTE. This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCGO10000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCGO10000 permit.