Loading...
HomeMy WebLinkAboutNC0026565_2022 PAR Review_20230413Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes Did they send any other submissions with it? Included? Narrative 0 Yes ❑ No PPS Form 0 Yes ❑ No SNCR ® Yes ❑ No No ❑ Yes 10 No ❑ 'STMP Data Summary; PFAS monitoring; EL/MR Corrections Adequate? ❑ NA ® Yes ❑ No JR Yes ❑ No 0 Yes ❑ No D E Regional Office: Winston Salem NA POTW: Ramseur NPDES Permit # NC 0026565 Report Period: 1/1/22 to 12/31/22 IDSF ® Yes ❑ No 9 Yes LL No ❑ Full Allocation Table 0 Yes ❑ No 0 Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No NA ❑ Yes ❑ No [6 NA Public Notice ❑ Yes ❑ No ®NA ❑ Yes ❑ No ® NA POTW noted Corrections? Program Information ® Yes ❑ No 0 Yes ❑ No I * Yes ❑ No Historical SNC ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ® No ❑ NA If Wo ; check recommendation below: ® Modified* 1. Have at least 90% of SIU permits been issued with 180 days ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ IP ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: -The facility (WWTP) is on a 3-year compliance schedule for copper. -STMP: The contract lab has not met the requested PQL of 1 ug/I for 1,4 dioxane and has not provided a data qualifier on the reports for the higher LOD. -PPID: An extension was granted for HWA to 5/15/23. The Database states 5/12/22. Reviewed by: %4zcl.�GVQi�y Date: 4/13/2023