Loading...
HomeMy WebLinkAboutNC0055786_2022 PAR Review_20230329Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Yes ® No ❑ Does it have two copies? Yes Did they send any other submissions with it? No ❑ Yes ® * No ❑ *Delegation of Signatory Authority for PT Program Included? Adequate? Narrative ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA PPS Form ® Yes ❑ No ® Yes ❑ No SNCR Yes ❑ No ® Yes ❑ No IDSF ® Yes ❑ No ® Yes ❑ No Allocation Table ❑ Yes Al No ❑ Yes ❑ No For modified programs, evaluate shaded items only. A Narrative is req'd for a modified program ONLY if there are SIUs in SNC Compliance Schedule ❑ Yes ❑ No NA ❑ Yes ❑ No ® NA Public Notice ❑ Yes ❑ No IF NA ❑ Yes ❑ No ® NA Program Information ® Yes ❑ No ® Yes ❑ No Historical SNC ❑ Yes 9 No ❑ NA ❑ Yes ❑ No ❑ NA Regional Office: Winston Salem POTW: Lexington Regional WWTP NPDES Permit # NC 0055786 Report Period: 1/1/22 to 12/31/22 ® Full ❑ Modified* POTW noted Corrections? ❑ Yes ® No ❑ Yes ❑ No ❑ NA If Wo ; check recommendation below: 1. Have at least 90% of SIU permits been issued with 180 days 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ of expiration? (See Allocation Table) Yes No Not Req'd NOD NOV QNCR NCP CPA IM ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not Req'd NOD NOV QNCR NCP CPA 3. Has effective enforcement been taken against industries in ❑ ❑ IN ❑ ❑ ❑ ❑ ❑ SNC, including those causing pass -through or interference? Yes No NA NOD NOV QNCR NCP CPA (See Narrartive and SNCR Form) ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP CPA Note: Exceptions should be explained in the comment section below: - No IDSF for Tier Rack (IUP #0045) is not enclosed in PAR. No discharge occured in 2022. Tier Rack is continuing to pump & haul to HAZMAT -Allocation Table and Historical SNC not included in PAR. Please submit as soon as possible. Reviewed by: %4zcl.�GVQi�y Date: 3/29/2023