HomeMy WebLinkAboutNCC200822_Modification Review_20230420 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 4/17/2023 2:31:20 PM (ADD TO FILE Submittal)
Approve by bethany.georgoulias 4/20/2023 12:10:51 PM(Construction COC ADD TO FILE Review-NCC200822)
• The task was assigned to bethany.georgoulias.The due date is:April 20,2023 5:00 PM
4/17/2023 2:31:21 PM
Ago DEQMODIFICATION
Permit for Construction Activities 0itltl
0000
Certificate of NCC200822
Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters)
Information associated with this permit:
Project Name Asheville Steam Station E&SC Plan and Final Grading for Demolition
Address 200 CP&L Drive,Arden, NC
County Buncombe
Latitude 35.4603
Longitude -82.5475
Permittee Listed Duke Energy Progress, LLC
Legally Responsible Eric Szkolnyj
Individual At the time of Modification Request(not looked up again at review)
NC Reference No. NCG01-2020-0822
E&SC Plan ID BUNCO 2020-010
Original NOI Tracking 22556
No.*
Date COC Issued* 03/03/2020
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Modification*
Closed-Out Lots/Outparcels in E&SC Plan
Additional Lots/Outparcels Approved-E&SC Revised
Other Revision(s)to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons(List)
Addional Explanation
More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers.
Additional storm drainage area as approved by NC DEQ DEMLR ARO March 28,2023.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload
applicable sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Documentation
Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.)
D00033023-03302023082149.pdf 69.23KB
Must be PDF format
Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date.
North Carolina General Statute 143-215.6B(i)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true,complete and accurate.
Specify if you are:* The Legally Responsible Individual
Authorized Responsible Person'
"This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item
(6)of that permit.
Signature
Ste?o1""5z'&Y '
Type Name* Eric J. Szkolnyj
Title* GM CCP Regional Operations&Maintenance
Organization* Duke Energy Progress, LLC
Date* 04/17/2023
Email Address* Eric.Szkolnyj@duke-energy.com
Email for confirmation
Telephone Number* 9803737144
Contact number if we need to reach you
Note:Original permittee and site contact are copied on modification correspondence.
Additional Email don.safrit@duke-energy.com
(Optional) Additional email for confirmation
Original Permittee eric.szkolnyj@duke-energy.com
Email
Original Site Contact richard.massey@duke-energy.com
Email
Review Date 04/20/2023
Rescinded Since
Submitted?