Loading...
HomeMy WebLinkAbout20052070 Ver 2_Diffuse Flow Package with Final Application_05-08-15_20150511Strickland, Bev From: Deborah Shirley <dshirley @sandec.com> Sent: Friday, May 08, 2015 12:11 PM To: Strickland, Bev Subject: Weavers Pond Application 05 -08 -15 Attachments: FINAL PCN Application-Weavers Pond 2C_05- 08- 15.pdf, Diffuse Flow Package with Final Application_05- 08- 15.pdf Attached are the scanned PCN app package and the diffuse flow package, these are being couriered to your office today. Let me know if you need anything else!! Xoxoxox Deb Deborah Edwards Shirley Environmental Specialist Soil & Environmental Consultants, PA NEW ( "'P 11 11 CE U.',) A r i ,) N, North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 919 - 846 -5900 (office) 919 -673 -8793 (mobile) Iry Iry Iry . S a n d. E C. c o III. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review /quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e -mail and delete the original communication from your system. Thank you. THINK BEFORE YOU PRINT 0.4 —346 _ � 2, �C� / / J \ \I —341 �� -'/ \� i9 Ac. J If X' r ( J >/ / 1 351 0 �� I I .�so� \CI- -P.��; 352_.1 - \ .� / o \ t \ _ ` �( YI -GI ) / CI G / — \ � � � � \ .� ) ( \I 1.49 Ac. / � — / - - - -- - l — -0 -2� cc. �� \ _ �` ( l� ; \ _— 1\0.1 Ac. I / I � — J `. I _ _ _ AC. 11 / l ( r I ( l (-__ - -- i b.22Ac�1 I II Ir1\ 6 0.4 0 � c. YI - � L I ► II I\ \ � I �\ \ //r r 353• A 0.34 ' \ I — I — — 1 0.59 A r \I +�(� ,'�� \ I _j 10�01�0 A oll ! / // s / ( / / �'Yi�6 1- X117`' T — —1— 1 _ ! S r m 1'� `� 1(l 1 I� I 0.22/Ac. . — 0.31 Ac. l 1 '� - 1 ( f CI- 11CC= l000, .0000' �\ _j f \�( — / ,-� .� -_ — 1 �><' Awe-­-- ' �lrl1122 \ r/ /, — J /- / /�� — -- 356 o00,1 / / �� J_ - 1r_,7�,\ / f ( /l (�/ �, ��� l \ 0.xt8 � 1�111I .95 Ac. J /' �`3���. 'J � _ ` /� / / �/ \� 1 — f- _ -'��\ ,/ 1 / 1 / (\v-- 1\ �_— �0 2AC / r ( \ f /�� i J 359 r I / , — / r \� -� �? — r _ ��� -�, ,� 1 I 1 1 �- I .�9cs I — \ — \\ I �� 01 c f - 1 � / f �� _ s \ \ — \ / — �� �I I 1 ���I 1 1r 1) / / -1I o � ( /l�J— ri r / /iJ ✓ / l — % J �J^ r \ 1 ( \_ —r -- r \� Jf� r✓ \ I 1� CI JA o 0000 Y C) POO C OSSING #1 t I = \ _! / J s )� ( 1 \ ` �. I -- '�1 \ `� \ 1-7:47 -R0" \ rJ \ �J L \ I L� ! / \ \ \`�� 352 -- Ir r (fr /� ^� iil I S ° L ') (I 1 I I J lass r -3ss— \ \ r/ f r - / 0. — � / \ ILA _ 1 NONE - - - - - / S � V )1 (( N,�\ / \J -,. rJ / � C't � (— ) I T--- - - - - -- � �- I �� � ( c' ° � 1 ° 1\ a 1 / � � � / � I -/ A7- - �- = � I — iii Y J(VETLAKID� =TI�G ,i 347-- _ — (, / // h �z I 1 ) I r �' /� / c o r r ' ( r <� 1 358 J \ � o �• L1 ) o�G \J 35 9J �r 1 / --I ? JIr AC ^/y__ C I - - 2 C I -28 1 / — \` \� �\ // \ � 0.11 \ 14 \ \ \� / �- �/ )Pj f 341-- y _ — z / �( 1 C . '� �/ -342 _44—r /l ` � \`` , \ \` l - /- -'1".7 ^ - — \\ \ � � \ \ 1 \ ` •-� � � / �r....%'' X346 ON LZ 350 r —`` `\ 1�3y1\ c � \359 ��o� ,\ v \) 1 \ 1 1 I S< r �� r `` J 11 \( f \ 1 ) r /- -"_i - -- J_ —I ✓` \ `� \I (J (J ( 11 I `_j- / r ,te `_ _ o _ y`' / / v f sJ / �'` �I /' 1 ; \ A- NORTH f !/ (( 80' 0 80' 160' SCALE: 1" = 80' wl Q 0 z 0 w Cz O b CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919 - 367 -8790 FAX 919 - 322 -0032 www.cegroupinc.com License # C -1739 Date: JANUARY 2015 Scale: I " = 100' Drawn: RJ H Checked: AJF Project No. 280 -03 Computer Dwcg. Name 280 -03 drainage area map.dwg U N I_ O_ W U) < z z LL] Q cc G Q = J J O Q map C W C) Z LJJ N ry o w Q 0 H z W z w (D C� z 3: O U Q 7 W O Lu Q Q C/) LIJ O � Q Date: JANUARY 2015 Scale: I " = 100' Drawn: RJ H Checked: AJF Project No. 280 -03 Computer Dwcg. Name 280 -03 drainage area map.dwg N N 0 0 N 0 N r 359 60 i90 4R FLQOD � \ \� •,.. ,:........353 352 60 LAI lipalllg SIB 340 i p o \ so n TIG 344.5„ 552 I w a GENERAL CONSTRUCTION NOTE 1. EXISTING UNDERGROUND STRUCTURES AND UTILITIES SHOWN ARE BASED ON FIELD SURVEY. THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS PRIOR TO STARTING CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES IMMEDIATELY. 2. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA ONE CALL AT 1- 800 - 632 -4949 FOR ASSISTANCE IN LOCATING UTILITIES. THE CONTRACTOR SHALL CALL AT LEAST 48 HOURS PRIOR TO DIGGING. 3. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF ZEBULON STANDARDS AND SPECIFICATIONS. 4. ALL WATER AND SEWER IMPROVEMENTS SHALL CONFORM TO THE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT STANDARD AND SPECIFICATIONS. SEE SHEETS 14 & 15 FOR UTILITY CONSTRUCTION DETAILS. 5. CONTRACTOR TO CALL JASON BROWN AT 919 - 795 -5640 WITH THE TOWN OF ZEBULON TO SCHEDULE PRE - CONSTRUCTION MEETING PRIOR TO BEGINNING CONSTRUCTION. 6. ALL ROADWAY, SIDEWALK AND STORM DRAINAGE IMPROVEMENTS IN RIGHT -OF -WAY WILL BE REQUIRED TO BE DEDICATED TO THE TOWN OF ZEBULON AT COMPLETION OF PROJECT. 7. AS -BUILT SITE PLANS FOR ROADWAY AND UTILITY WORKS MUST BE SUBMITTED AND APPROVED PRIOR TO FINAL ACCEPTANCE. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING RED LINE DRAWINGS. 8. DEVELOPER /OWNER IS RESPONSIBLE FOR CONTRACTING WITH THIRD PARTY NCDOT CERTIFIED TESTING FIRM. FIRM MUST BE APPROVED BY THE TOWN OF ZEBULON. MATERIAL TESTING IS REQUIRED AT FOR ALL ROADWAY WORK. FINAL REPORTING AND CERTIFICATION (SEALED) IS REQUIRED AT COMPLETION OF PROJECT BY THE GEOTECHNICAL TESTING ENGINEER. TESTING IS REQUIRED FOR SUBGRADE, ROADWAY STONE, ASPHALT AND CURB AND GUTTER PER TOWN SPECIFICATIONS. 9. DELINEATED WETLANDS SHOWN HEREON ARE PERFORMED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA AND PERTAIN ONLY TO PORTIONS WITHIN PROPERTY LIMITS. 10. THE SUBJECT PROPERTY IS NOT LOCATED IN A FLOOD HAZARD AREA PER FEMA FIRM PANEL 3720179600J EFFECTIVE MAY 2, 2006. STOP! BEFORE YOU DIG CALL THE NC ONE CALL CENTER 1- 800 - 632 -4949 ITS THE LAW! LC I Q cf� z O cf� W Cz O C"T GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE: 919 - 367 -8790 FAX 919 - 322 -0032 www.cegroupinc.com License # C -1739 Date: JANUARY 201 5 Scale: 1" =G0' Drawn: RJ h Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 overall grading.dwg Shy eet NO: 6 Of 15 •' °:, U N S:...A W U) Z z Q J QOJLj_ 1 J ::) v Date: JANUARY 201 5 Scale: 1" =G0' Drawn: RJ h Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 overall grading.dwg Shy eet NO: 6 Of 15 U N z W U) Z z Q J QOJLj_ 1 J ::) v � m U Z C) w = Q Z N O Q O LL z O >- 0 U) Z Z p J J W O U w Q QQ w W O Date: JANUARY 201 5 Scale: 1" =G0' Drawn: RJ h Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 overall grading.dwg Shy eet NO: 6 Of 15 0_ LO 0 CV O N PIPE DIA. \� V�RIg111E La JJJJJJJJJJ /� \� JJJJJJJJJJ �✓ TYPICAL CONC. FLARED END SECTION i do =F La =A W = APRON WIDTH 3 X PIPE O MIN d = APRON DEPTH ISOMETRIC VIEW IJ:AN PLAN I Ilter blanket SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN G" 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE KIPKAP AND SOIL FOUNDATION. PIPE OUTLET TO FLAT AREA - WELL DEFINED CHANNEL TYPICAL OF FE5 D -5 AND FE5 D- NOT TO SCALE START -UP FERTILIZER APPLICATION TO THE ENGINEERED FILTER 5TRIP TOP501L APPLY THE FOLLOWING FOR GRASSES OTHER THAN CETIPEDE: 75 LBS Of GROUND LIMESTONE PER 1 ,000 SQ. FT. A STARTER TYPE FERTILIZER ( ONE THAT IS HIGH IN PHOSPHOROUS) BASED ON THE TYPE OF GRASS AND THE PLANTING METHOD. EERTILIA\ZEK BAGS HAVE A THREE - NUMBER SYSTEM INDICATING THE PRIMARY NUTRIENTS, SUCH AS 8 -8 -8 OR 5-10-10. THESE NUMBERS DENOTE THE N -P -K RATIO - THE PERCENTAGE OF EACH NUTRIENT IN A FERTILIZER. HTE PERCENTAGES ARE NOTED IN THE FOLLOWING ORDER: N NITROGEN FOR GREEN COLOR AND GROWTH P205 PHOSPHOROUS FOR GOOD ROOTING K20 POTASSIUM TO ENHANCE PEST AND ENVIRONMENTAL STRESS TOLERANCE. - TO BE COMMON BERMUDA GROWN IN NON - CLAYEY SOILS OR WASHED SOD. - AFTER THE SOD IS PLANTED, KEEP THE TOP 1.5 INCHES Of THE SOIL MOIST. THIS MAY REQUIRED LIGHT WATERING SEVERAL TIMES A WEEK FOR 7 TO 21 DAYS. 4'x4' INSIDE DIM. CONCRETE SPUTTER A`A� BOX MH D -4 0 w0,5 �O F�5 Ge ZA„ S�G�\ON coo Ce��P 5tt LEVEL 5PREADER FOR FE5 D -5 NOT TO SCALE 4'x4' INSIDE DIM. O� CONCRETE SPUTTER BOX MH D- 10 e o��Qa \Q e " GNPNN ��C \SON A' K 2 21- F\V #5 Gv GIN LEVEL SPREADER FOR FE5 D- MANHOLE FRAME AND COVER PER NCDOT STD 840.54 JUSTED IN ACCORDANCE NCDOT STD 840.25 SECTION A - A NOT TO SCALE NON -CLAY SOD ON TOP OF G" TOP SOIL ENGINEERING BRICKS (TYP.) OF WEIR NOT TO SCALE �r 1511 RCP < OUTFLOW TO EES D- .:i INV. ELEV.-,344.90' Al NOTES: I . ALL CONCRETE SHALL BE 4,000 PSI. 2. ALL JOINTS ARE TO BE SEALED WATER TIGHT. 3. WEIR IS TO BE POURED- IN -PLACE CONCRETE. 4. CONSTRUCTION OF SPLITTER BOX TO BE IN ACCORDANCE WITH CURRENT ISSUE NCDOT STANDARD DRAWINGS. 5. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL. SPUTTER BOX DETAIL NOT TO SCALE 10 LF 24" CONCRETE SPILL CURB (AIR ENTRAINED 3,000 PSI @ 28 DAYS) @ 0% HORIZONTAL GRADE SLOPE 1 2"(W)x3 "(D) #57 STONE 2% M1N 8� 30' ENGINEERED FILTERED STRIP NOTES: I . LEVEL SPKEADE IS NOT TO BE INSTALLED UNTIL ALL UPSTREAM DRAINAGE AREA HAS BEEN STABILIZED. 2. 101 WIDE LINEAR WETLAND TO BE PLANTED WITH STOKMWATEK POND MIX AS PROVIDED BY MELOW MARSH FARM NURSERY OR APPROVED EQUAL. 1211 TYPICAL SECTION LEVEL SPREADER WITH ENGINEERED FILTER 5TRI P NOT TO SCALE 6" 24" 1 RIM ELEV.= 349.27 SECTION B - B NOT TO SCALE 112" 5" 1 5' ,; 151, RCP INFLOW FROM CI D -9 10 LF 1O'(W)xG 12 "(D) CHANNEL G" TO 12" MAX. SLOPE TIE TO EX5TING GRADE 5' E I 1 1/2" R. a. 1 -2 ASPHALT 1" N a: a. • . a a :> 4".: 5" a . 3000 PSI CONC. ®28 DAYS CABC 6" COMPACTED CABC STONE SPILL NOTES: 1. SCORE CURB / VALLEY GUTTER AT 15' O.C. 2. PROVIDE 1/2" EXPANSION JOINTS AT 90' O.C. 3. FOR TRANSITION OF CURB TO CURB OPENING INLET, SEE STANDARD DETAIL 33. TOWN OF ZEBULON SCALE- DETAIL # STD. CURB * G UTTE K NOT TO SCALE 3 VALLEY GUTTER, DETAIL DATE, SHEET #- _ ..._„ _.... _ ._.._... „ JULY 2010 1 OF 1 VARIES 11/2 I EX CURB u. EX PAVEMEN .a 1. PROVIDE 3/4" DEEP TOOLED SCORE AT 5-0" O.C. 2. EXPANSION JOINTS TO BE PLACED 30' -0" O.C. LONGITUDINALLY, ADJACENT TO CURBS, AND WHEN BUTTING EXISTING STRUCTURES, CONCRETE, OR BUILDINGS. 3. CONCRETE TO BE 3000 P.S.I. AT 28 DAYS, AIR - ENTRAINED. 4. SUBGRADE SHOULD NOT CONTAIN ORGANIC MATTER OR PLASTIC CLAYS. WHEN FOUND, REFER TO SPECS OR CONTACT ENGINEER FOR DIRECTIONS. 5. AREAS OF FILL ARE TO BE COMPACTED TO 95% STANDARD PROCTOR USING NCDOT CLASS III BORROW OR BETTER. REMOVE TOPSOIL BEFORE PLACING BORROW. 6. SIDEWALK TRANSVERSE SLOPE MAY INCREASE TO 1/2 IN 12 WITH TOWN'S ENGINEER APPROVAL. TOWN OF ZEBULON TYP SIDEWALK IN SCALE DETAIL # CUT OR FILL SECTIONS NOT TO SCALE 3 DATES SHEET # - USE WITH STANDARD SPECIFICATIONS ONLY JULY 2010 1 OF 1 5. BEGINNING RADIUS SHALL NOT ENCROACH ON ADJACENT PROPERTIES BASED ON A PROJECTION OF PROPERTY LINE FROM THE RIGHT -OF -WAY TO THE CURB LINE. 6. SIDEWALK SECTION SHALL NOT BE REQUIRED ALONG STREETS WHICH ARE NOT PLANNED FOR SIDEWALK. CONCRETE APRON FILLER :WALK 42" MIN. re NEW 4" THICK CONCRETE SIDEWALK 1/2" EXP. JOINT CONCRETE FILLER APRON & W/S (INTEGRAL POUR) SCORE A EXISTING CONCRETE D/W RAMP 1/2" EXP. JOINT FACE EXISTING CURB TOWN OF ZEBULON 51 DEWALK DETAIL X -I NG NOTE- TO SCALE DETAIL I4 EX. D I, I V E WAYS DATE- SHEET #- USE WITH STANDARD SPECIFICATIONS ONLY JULY 2010 1 OF 1 NN 1( 41 Inlet for Roll Type Curt - - FOR REGULATORY REVIEW ONLY i- eavy 1)uty NOT RELEASED Pkva. ibn -4th 4 firinge frame, order as -501- FOR CONSTRUCTION } ........._........_. I ._.._. .., a f tea:. -t3 _. _4 ------------------- ------ ' all I --- -. -------------------- . f1- - --- -- _.._. 2? °~...._..W.....­ ROLL CURB INLET DETAIL NOT TO SCALE STOP! BEFORE YOU DIG CALL THE NC ONE CALL CENTER 1- 800 - 632 -4949 IT'S THE LAW! I PLACE 1/2" EXP. JOINT HERE WHEN X Lu CROSSING EXISTING CONCRETE DRIVES W Q Q III SEAL w n THICKNESS = 6" z :5. '#ARIESW 0 w Y cf� J O a SCORE a ^ z JOINT a m C) " J D/W PLACE 1/2" EXP. JOINT HE DRIVEWAY BY OTHERS ;: �'•; ':.; w RAMP 5' BACK FROM EDGE OF DRIVE - PAVEMENT 0- 0 U w COMPACTED SUBGRADE " "' + Z •.: XXXXXXXXXXXXX 0 PLACE 1/2" EXP. JOINT HERE WHEN i is Z CROSSING EXISTING CONCRETE DRIVES W � W SECTION A —A 6" MIN. THICKNESS W TOWN OF ZEBULON auk FLARED DRIVEWAY ENTRANCE > SCALE- NOT TO SCALE DETAIL # 9 TO VALLEY GUTTER W DATE- SHEET #- JULY 2010 1 OF 1 USE WITH STANDARD SPECIFICATIONS ONLY NEW 4" THICK CONCRETE SIDEWALK 1/2" EXP. JOINT CONCRETE FILLER APRON & W/S (INTEGRAL POUR) SCORE A EXISTING CONCRETE D/W RAMP 1/2" EXP. JOINT FACE EXISTING CURB TOWN OF ZEBULON 51 DEWALK DETAIL X -I NG NOTE- TO SCALE DETAIL I4 EX. D I, I V E WAYS DATE- SHEET #- USE WITH STANDARD SPECIFICATIONS ONLY JULY 2010 1 OF 1 NN 1( 41 Inlet for Roll Type Curt - - FOR REGULATORY REVIEW ONLY i- eavy 1)uty NOT RELEASED Pkva. ibn -4th 4 firinge frame, order as -501- FOR CONSTRUCTION } ........._........_. I ._.._. .., a f tea:. -t3 _. _4 ------------------- ------ ' all I --- -. -------------------- . f1- - --- -- _.._. 2? °~...._..W.....­ ROLL CURB INLET DETAIL NOT TO SCALE STOP! BEFORE YOU DIG CALL THE NC ONE CALL CENTER 1- 800 - 632 -4949 IT'S THE LAW! U N Lu M o N rn N O W Q Q III SEAL � 1889, Z z :5. '#ARIESW cf� J O Z J ^ z C) W J Z THICKEN S/W APPROACH TO 6 ", 0 O ;: �'•; ':.; w i 5' BACK FROM EDGE OF DRIVE - 0- 0 U w BOTH SIDES Z 0 Z LO W � W :e W W Z > 3: W W AS SHOWN ON PLAN BUT 12" MN-. ILI VERTICAL TRANSITION SECTION. PLACE CONCRETE AT CONCRETE DRIVES OR ASPHALT AT ASPHALT DRIVES U W PLACE 1/2" EXP. JOINT HE •'. >' •'.: ::.: ,.;'.:..t.;: A WHEN CROSSING EXISTING W CONCRETE DRIVES # IX SAWED EDGE Of ~ EXISTING ASPHALT U OR CONCRETE D/W THICKEN S/W AP ROACH TO 6 ', 5' BACK FROM EDGE OF DRIVE - BOTH SIDES w w w .v ..v .v o_ w %77- % w w U) AC W Y W Y PLAN VIEW NEW 4" THICK CONCRETE SIDEWALK 1/2" EXP. JOINT CONCRETE FILLER APRON & W/S (INTEGRAL POUR) SCORE A EXISTING CONCRETE D/W RAMP 1/2" EXP. JOINT FACE EXISTING CURB TOWN OF ZEBULON 51 DEWALK DETAIL X -I NG NOTE- TO SCALE DETAIL I4 EX. D I, I V E WAYS DATE- SHEET #- USE WITH STANDARD SPECIFICATIONS ONLY JULY 2010 1 OF 1 NN 1( 41 Inlet for Roll Type Curt - - FOR REGULATORY REVIEW ONLY i- eavy 1)uty NOT RELEASED Pkva. ibn -4th 4 firinge frame, order as -501- FOR CONSTRUCTION } ........._........_. I ._.._. .., a f tea:. -t3 _. _4 ------------------- ------ ' all I --- -. -------------------- . f1- - --- -- _.._. 2? °~...._..W.....­ ROLL CURB INLET DETAIL NOT TO SCALE STOP! BEFORE YOU DIG CALL THE NC ONE CALL CENTER 1- 800 - 632 -4949 IT'S THE LAW! www.cegroupinc.com License # C -1739 U N Lu M o N rn N O W Q Q III SEAL � 1889, Z z Q \ \\\ cf� J O Z J ^ z C) W J Z N 0 O Q OL.L�Z 0- 0 U w U) Z 0 Z W � w QZ-�a Z > 3: W W ILI O U W W Of U H w o_ 0 w U) w -O z www.cegroupinc.com License # C -1739 Date: JANUARY 201 5 Scale: N/A Drawn: P111 Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 detaiI5.dwj 5h� eet NO: 12 Of 15 U N Lu III SEAL � 1889, Z z Q \ \\\ J O Z Date: JANUARY 201 5 Scale: N/A Drawn: P111 Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 detaiI5.dwj 5h� eet NO: 12 Of 15 U N Lu � W Z z Q J O Z J ^ U C) W J Z N 0 Q OL.L�Z 0- 0 w U) Z 0 Z W � w QZ-�a W 3: Date: JANUARY 201 5 Scale: N/A Drawn: P111 Checked: AJ F Project No. 280 -03 Computer Dwg. Name 280 -03 detaiI5.dwj 5h� eet NO: 12 Of 15 AN"A o`'oF wnrF9ac � Y r NCDENR Pick one: STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION Peak flow directed to the LS -VFS Project name Weavers Pond Phase 2C Contact name Joe Faulkner, RLA CE Group, Inc. Phone number 919 - 367 -8790 Date May 4, 2014 Drainage area number LS For FES D -5 II. DESIGN INFORMATION The purpose of the LS -VFS Other: Explained below Stormwater enters LS -VFS from The drainage area Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area 52,708 fe Impervious surface area 26,354 fe Percent impervious 50.00 % Rational C coefficient 0.50 Peak flow from the 1 in /hr storm 0.61 cfs Time of concentration 5.00 min Rainfall intensity, 10 -yr storm 7.22 in /hr Peak flow from the 10 -yr storm 4.37 cfs Design storm 1 inch /hour storm Maximum amount of flow directed to the LS -VFS 0.61 cfs Is a flow bypass system going to be used? Y (Y or N) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Do not complete this section of the form. Type of BMP Pick one: Peak discharge from the BMP during the design storm cfs Peak discharge from the BMP during the 10 -year storm cfs Do not complete this section of the form. Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Explanation of any "Other" responses above Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 1 of 3 LS -VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. ft ft ft ft ft 4.37 fUsec Rip -rap Y (Y or N) Redesign channel to discharge to a dissipator pad adjacent to the wetlan y (Y or N) W i F 1 Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 2 of 3 sq ft in in 10 furls 6 ft Ten feet is the minimum level spreader length. 10 ft 30 ft 340.47 fmsl 339.50 fmsl 3.23 % N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. ft ft ft ft ft 4.37 fUsec Rip -rap Y (Y or N) Redesign channel to discharge to a dissipator pad adjacent to the wetlan y (Y or N) W i F 1 Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 2 of 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. Initials Page or plan sheet number and any notes: For Drainage Area see Drainage Area Map - See Sht 6 for Overall Grading Plan and Layout See Sht 12 See Sht 12 See Sht 12 See Sht 12 nla see attached see attached Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 3 of 3 AN"A o`'oF wnrF9ac � Y r NCDENR Pick one: STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION Peak flow directed to the LS -VFS Project name Weavers Pond Phase 2C Contact name Joe Faulkner, RLA CE Group, Inc. Phone number 919 - 367 -8790 Date May 4, 2014 Drainage area number LS For FES D -11 II. DESIGN INFORMATION The purpose of the LS -VFS Other: Explained below Stormwater enters LS -VFS from The drainage area Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area 62,726 fe Impervious surface area 31,363 fe Percent impervious 50.00 % Rational C coefficient 0.50 Peak flow from the 1 in /hr storm 0.72 cfs Time of concentration 5.00 min Rainfall intensity, 10 -yr storm 7.22 in /hr Peak flow from the 10 -yr storm 5.20 cfs Design storm 1 inch /hour storm Maximum amount of flow directed to the LS -VFS 0.72 cfs Is a flow bypass system going to be used? Y (Y or N) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Do not complete this section of the form. Type of BMP Pick one: Peak discharge from the BMP during the design storm cfs Peak discharge from the BMP during the 10 -year storm cfs Do not complete this section of the form. Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Explanation of any "Other" responses above Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 1 of 3 LS -VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. ft ft ft ft ft 4.37 fUsec Rip -rap Y (Y or N) Redesign channel to discharge to a dissipator pad adjacent to the wetlan y (Y or N) W i F 1 Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 2 of 3 sq ft in in 10 furls 7 ft Ten feet is the minimum level spreader length. 10 ft 30 ft 345.02 fmsl 344.40 fmsl 2.07 % N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. ft ft ft ft ft 4.37 fUsec Rip -rap Y (Y or N) Redesign channel to discharge to a dissipator pad adjacent to the wetlan y (Y or N) W i F 1 Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 2 of 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. Initials Page or plan sheet number and any notes: For Drainage Area see Drainage Area Map - See Sht 6 for Overall Grading Plan and Layout See Sht 12 See Sht 12 See Sht 12 See Sht 12 N/a see attached see attached Form SW401 - LS -VFS - 29June2012 -Rev. 10 page 3 of 3 LEVEL SPREADER FOR FES #D -5 Drainage Area = 1.21 ac C -value = 0.5 Intensity = 1.0 in /hr 1" / hr storm event Q -1" Storm 0.61 cfs Level Spreader Length 10 ft / cfs 10 foot length Level Spreader SPLITTER BOX ROUTING Objective: No more than 0.61 cfs to flow to level spreader druing event. Q -1" FLOW = 0.61 CFS Flow to Level Spreader via 6" HDPE Level Spreader Orifice Calculator Given Input Data Solving for ..................... Headwater Flowrate ........................ 0.6100 cfs Coefficient ..................... 0.6000 Diameter ........................ 6.0000 in Tailwater ....................... 1.0000 ft Computed Results: Headwater ....................... 1.42 ft Set weir in Splitter Box at 1.42' above invert out LEVEL SPREADER FOR FES #D -11 Drainage Area = 1.44 ac C -value = 0.5 Intensity = 1.0 in /hr 1" / hr storm event Q -1" Storm 0.72 cfs Level Spreader Length 10 ft / cfs 10 foot length Level Spreader SPLITTER BOX ROUTING Objective: No more than 0.72 cfs to flow to level spreader druing event. Q -1" FLOW = 0.72 CFS Flow to Level Spreader via 6" HDPE Level Spreader Orifice Calculator Given Input Data: Solving for ..................... Headwater Flowrate ........................ 0.720 cfs Coefficient ..................... 0.6000 Diameter ........................ 6.0000 in Tailwater ....................... 0.5000 ft Computed Results: Headwater ....................... 1.08 ft Set weir in Splitter Box at 1.08' above invert out Operation & Maintenance Agreement Project Name: Project Location: Weavers Pond Phase 2C Zebulon, NC Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level Spreader /VFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: �rres onai 2 0 No No -ig O &M tables will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): De aaaea auiomaucaii FES D -5 & FES D -11 1 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O &M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Glenn Futrell member - manager Weavers Pond Development Co LLC 9407 Bartons Creek Rd Raleigh, NC 27615 919 - 530 -9399 Glenn@futreliproperty.com , a Notary Public for the State of , do hearby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Seal STORM -EZ My commission expires Version 1.4 Date: and 4/30/2015 Page 1 of 4 STORM -EZ 4/30/2015 Version 1.4 O &M Manual Page 2 of 4 Level Spreader- Vegetated Filter Strip / Restored Riparian Buffer Maintenance Requirements Important maintenance procedures: _ Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of _ thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash /debris is present. Remove the trash /debris. The perimeter of the BMP Areas of bare soil and /or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The flow splitter device (if The flow splitter device is Unclog the conveyance and dispose of any sediment off -site. applicable) clogged. The flow splitter device is Make any necessary repairs or replace if damage is too large for damaged. repair. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). STORM -EZ 4/30/2015 Version 1.4 O &M Manual Page 3 of 4 LS -VFS / Restored Riparian Buffer Maintenance Requirements (Continued) The swale and the level lip The swale is clogged with Remove the sediment and dispose of it off -site. sediment. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm that is higher than the level lip, and end of the level spreader that then plant a ground cover and water until it is established. Provide shows stormwater has lime and a one -time fertilizer application. bypassed it. Trees or shrubs have begun Remove them. to grow on the swale or just downslope of the level lip. The bypass channel Areas of bare soil and /or Regrade the soil if necessary to remove the gully, and then reestablish erosive gullies have formed. proper erosion control. Turf reinforcement is Study the site to see if a larger bypass channel is needed (enlarge if damaged or ripap is rolling necessary). After this, reestablish the erosion control material. downhill. The filter strip Grass is too short or too long Maintain grass at a height of approximately three to six inches. (if applicable). Areas of bare soil and /or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Sediment is building up on the Remove the sediment and restabilize the soil with vegetation if filter strip. necessary. Provide lime and a one -time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one -time fertilizer application. Nuisance vegetation is Remove vegetation by hand if possible. If pesticide is used, do not choking out desirable species. allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NCDENR local Regional Office, or the 401 Oversight Unit damage have occurred at the at 919 - 733 -1786. outlet. STORM -EZ 4/30/2015 Version 1.4 O &M Manual Page 4 of 4