HomeMy WebLinkAbout20052070 Ver 1_Approval Letter_20060310Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
March 10, 2006
DWQ Project #2005-2070
Wake County
Mr. Michael Whitehead
MacGregor Development Company
201 Sannon Oaks Circle, Suite 201
Cary, NC 27511
Subject Property: Weavers Pond Subdivision
Beaverdam Creek [030402, 27-27, C, NSW)
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions
Dear Mr. Whitehead: -
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.396 acres of wetland, 95 linear feet of stream, 0.030 acres of open water,
and 16,994 square feet of Zone 1 protected Neuse River basin riparian buffer and 8,986 square feet of
Zone 2 protected Neuse River basin riparian buffer to construct the proposed residential subdivision at the
subject property, as described within your application dated November 16, 2005, and received by the N.C.
Division of Water Quality (DWQ) on November 16, 2005. After reviewing your application, we have
decided that the impacts are covered by General Water Quality Certification Number(s) 3374 (GC3374)
and 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) NW 12 and NW39,
respectively, when issued by the US Army Corps of Engineers (USACE). This letter shall also act as
your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 213
.0233. In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts
or to conduct impacts to waters as depicted in your application shall expire upon expiration of the
404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 211.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
401 OversightlExpress Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http:/t%2o.enr.state.nc.us/ncwetlands
qhCarolina
Wura!!f
MacGregor Development Company
Page 2 of 6
March 10, 2006
The Additional Conditions of the Certification are:
1. Impacts Approved
The. following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount Approved nits Plan Location or Reference
404/Wetland 0.396 acres PCN page 4 of 10
Stream 95 linear feet PCN a e 4 of 10
Open Water 0.030 acres PCN page 5 of 10
Buffer -Zone 1 16,994 (square ft. PCN pages 8 and 9 of 10
Buffer - Zone 2 8,986 (square ft. PCN pages 8 and 9 of 10
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted-in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices .
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A
NCAC 2B .0233 and GC 3404;
Culverts required for this project shall be installed in such a manner that the original stream profiles
are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and
longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall
be designed and installed to allow for aquatic life movement as well as to prevent head cutting of
the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall
be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-
installed correctly.
Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the
stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section
dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each
culvert. Therefore, you must provide plans with adequate details that indicate that the current
stability of the stream will be maintained or enhanced. You must receive written approval from this
Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according
to approved plans.
Placement of culverts and other structures in waters, streams, and wetlands must be placed below
the elevation of` he streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result in
dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the
above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
The establishment of native, woody vegetation and other soft stream bank stabilization techniques
must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is
necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of
Water Quality.
Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of
Completion" form to notify NCDWQ when all work included in the §401 Certification has been
completed. The responsible party shall complete the attached form and return it to the
401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please
send photographs upstream and downstream of each culvert site to document correct installation
along with the Certificate of Completion form.
7. Proposed Stream Riparian Buffer Planting Plan
In a correspondence to the DWQ, dated March 3, 2006, MacGregor Development Company
proposes to restore/enhance the riparian buffer along the stream channel associated with Road
Crossing No. 3, on the site plan. The planting plan proposes at least two native hardwood tree
species be planted at a density sufficient to provide 320 trees per acre at maturity. This density
can be achieved by planting approximately 436 (10x10 feet spacing) to 681 (8x8 feet spacing)
bare root seedlings per acre. After reviewing the restoration/enhancement plan submitted by
MacGregor Development Company, the DWQ has determined it would be covered under
GC3374.
MacGregor Development Company
Page 4 of 6
March 10, 2006
8. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact.. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or
buffers approved for impact under this Certification Approval and Authorization Certificate. A
sample deed notification can be downloaded from the 401[Wetlands Unit web site at
http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified
as appropriate to suit to this project;
9. Written Stormwater Management Plan (Final Plan Needed)
A final, written stormwater management plan (including a signed and notarized Operation and
Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit
(2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401
Water Quality Certification. The stormwater management plans shall be approved in writing by
this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No.
3402. You have the option of using the Express Review Program for expedited approval of these
plans. If you propose to use the Express Review. Program, remember to include the appropriate
fee with the plan The stormwater management plan must include plans, specifications, and
worksheets for stormwater management facilities that are appropriate for the surface water
classification and designed to remove at least 85% TSS according to the most recent version of
the NC DENR Stormwater Best Management Practices Manual. These facilities must be
designed to treat the runoff from the entire project, unless otherwise explicitly approved by the
Division of Water Quality. Also, before any permanent building is occupied at the subject site,
the facilities (as approved by this Office) shall be constructed and operational, and the stormwater
management plan (as approved by this Office) shall be implemented. The structural' stormwater
practices as approved by this Office as well as drainage patterns must be maintained in perpetuity.
No changes to the structural stormwater practices shall be made without written authorization
from the Division of Water Quality.
10. Culvert Installation
Culverts required for this project shall be installed in such a manner that the original stream profiles
are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and
longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall
be designed and installed to allow for aquatic life movement as well as to prevent head cutting of
the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall
be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-
installed correctly.
Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the
stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section
dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each
culvert.
Placement of culverts and other structures in waters, streams, and wetlands must be placed below
the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result in
MacGregor Development Company
Page 5 of 6
March 10, 2006
disequilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the
above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
The establishment of native, woody vegetation and other soft stream bank stabilization'techniques
must be used where practicable instead of rip rap or other bank hardening methods. If riprap is
necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of
Water Quality.
Installation of culverts in wetlands must ensure continuity of water movement and be designed
to adequately accommodate high water or flood conditions.
Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of
Completion" form to notify NCDWQ when all work included in the §401 Certification has been'
completed. The responsible party shall complete the attached form and return it to the
401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please
send photographs upstream and downstream of each culvert site to document correct installation
along with the Certificate of Completion form.
11. Diffuse Flow (DWQ-Reviewed Plans)
All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected
stream buffers and will not re-concentrate before discharging into the stream as identified within
15A NCAC 2B .0233(5)
In an effort to comply with the diffuse flow provision of the Buffer Rule (15A NCAC 02B
.0233(5)), you have provided the DWQ with level spreader designs dated February 13, 2006. The
DWQ believes that if implemented, as per these plans, diffuse flow will be achieved. However, if
diffuse flow as per 15A NCAC 02B .0233(5) is not achieved, then the DWQ shall be notified and
corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of
erosion gullies. At no time shall stormwater from the proposed development be piped directly
through the buffer without prior DWQ written authorization.
The structural stormwater practices as approved by this Office as well as drainage patterns must
be maintained in perpetuity. No changes to the structural stormwater practices shall be made
without written authorization from the Division of Water Quality. Stormwater easements shall be
recorded for a distance of at least 10 feet on each side of all stormwater conveyances and on all
lots containing these structures including future access for maintenance. The stormwater
easements shall allow for the ability to maintain the structures, perform corrective actions as
described above and shall provide protection of the structures from potential alternations by
future property owners.
An Operation & Maintenance (O&M) agreement signed by the current landowner must be
approved by the DWQ. This O&M agreement must transfer with the sale of the land or transfer
of responsibility for the stormwater facilities and the DWQ must be notified of every transfer..
12. Construction Stormwater Permit NCG010000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
MacGregor Development Company
Page 6 of 6
March 10, 2006
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance
with permit conditions including the sedimentation control plan, self-monitoring, record keeping
and reporting requirements are required. A copy of this permit and monitoring report forms may
be found at htt ://h2o.enr.state.nc.us/su/Fonns Documents.htm.;
13. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any'df the conditions ofthis Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have
any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786.
Sincerely,
Alan W. Klimek, P.E.
AWK/Um
Enclosures: GC 3374 and GC 3402
Certificate of Completion
cc: Aaron Cooper, Soil and Environmental Consultants, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614
USACE Raleigh Regulatory Field Office
Eric Kulz, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Rename: 052070 WeaverPondSD(W ake)401 _NBR