HomeMy WebLinkAboutSite Inspection 4.19.23 A9Wetland Inspection Report
Project Num: 20201371 Version: 1 Status: Issued
Project Name: TPB NCDOT -Improvements to NC 129 and NC Project Type: New Road/Highway
County: Graham43 (A-0009C) Region: Asheville
Location: TPB NCDOT - Improvements to NC 129 and NC 143 (A-0009C)
Latitude: Longitude:
SW Plan Location:
Site Owner Name: NC DOT Division 14 - Sylva
Inspection Date: 4/19/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Robert K Mitchell Phone:
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted on April 19, 2023 by Kevin Mitchell with the Asheville Regional Office. Crystal
Amschler, Dave McHenry, Reid Whitehead, and Mark Davis were present during the inspection. The following are
items that need attention:
Section A
- Station 46+92 RT (Site 11) - Stabilize stream banks.
Section C
- Station 13+00 LT (Site 4) - Stablize stream banks between silt fence and JS.
- Station 67+50 RT (Site 14/15) - Repair silt fence adjacent to JS.
page: 1
Site Number: 20201371 Owner: Blazer, Keith
Inspection Date: 4/19/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
page: 2