Loading...
HomeMy WebLinkAboutOverall Drainage MapOFFSP 36190 (0.83 A TOTAL OF OFF TO POI #1 =293 ESTIMATED IMI OFFSITE AREA OR 22.8% iMPE IMPERVIOUS: 2 OF 7 LOTS @ 3000 SF EA =10500 SF + MAIL KIOSK @ 4500 SF =15000 SF; NO STREET DRAINAGE; IMPERVIOUS: 15000/162865=9.2% TOTAL OFFSITE + ONSITE TO POI #1=9671365 SF (222.0 Ac.) TOTAL OFFSITE + ONSITE BYPASSING SCM #1=9671365-1263240 SF= 8408125 SF (193.02 Ac.) JUST ONSITE BYPASSING SCM #1= 8408125-2933120 SF= 5475005 SF (125.7 Ac.) PROPOSED ONSITE IMPERVIOUS BYPASSING SCM #1= 1740137-498125 SF=1242012 SF (28.51 Ac) .I*..A f.. »...$*. NELSONS CREEK SUBDIVISION M CKSVILLE, N REFERENCE EXHIBIT FOR STATE STORMWATER PERMIT APPLICATION APRIL 1, 2023