HomeMy WebLinkAboutPhase 1 Drainage_Exhibit C1.1 Post Drainage Map Phase 1 0Z b.0<a
1 C
40
40 of
40
C
Z
40 o-6
<
GRAPHIC SCALE C
Lu
25 50 1 0 290
z
IN FEET♦ 1 inch So
E
S�
A
f ENGINEERING. S
ASSOCIATES '0=
SOUTHEAST
C-3881
0;*A
FOR INFORMATION,ONLY
-Al
*#60
---- ----------------- ---
FFS
FES INLET 301
— ---------
NLET
lk
Ih
solo 61 -LL
STIPULATION FOR REUSE
THIS DRAWING WAS PREPARED FOR USE
N, ON THE SPECIFIC SITE,NAMED HEREON,
CONTEMPORANEOUSLY WITH ITS ISSUE
x ----- - --- DATE AS LISTED,HEREON.AN IT IS NOT
SUITABLE
5 FOR USE ON A DIFFERENT
PROJECT SITE OR AT LATER TIME.USE OF
THIS DRAWING FOR REFERENCE OR D(AMPLE
ON ANOTHER PROJECT REQUIRES THE
'� ♦ 7 / / I, / /) CBS Y SERVICES OF PROPERLY LICENSED
ARCHITECTS AND ENGINEERS REPRODUCTON
OF THIS DRAWING FOR REUSE ON
ANOTHER PROJECT IS NOT AUTHORIZED
AND MAY BE CONTRARY TO THE LAW.
`FYI f it CB 519 CBS CB 106
Is's
C m
III, m Ir li AV,
IN LE ESI >
V)
00
ss o
Lu
sit
-x zCa
16 R
3:
FES INLET 534 A
03MO
0
ift an 0
V) 0
JB 533 on now CL
JOB NUMBER: 21-004
• CHECKED BY:
4tr 15 a DRAWN BY: AU`/EDS/jMAC
-—--—--—- DATE: 2022
5BY
SHEETTITLEPOST
DRAINAGE
or
1 " ;�L,�
#01, f4:)
IS14 MAP
! 1515
V11,\— PHASE I
SHEET NO.:
C1.1