Loading...
HomeMy WebLinkAboutPhase 1 Drainage_Exhibit C1.0 Pre Drainage Map Phase 1 GRAPHIC SCALE Z W 2c 01, i0 211,1 490 810 IN FEET M.1,¢00 mN 0-6 C -.0--09=0 Z. E /A ERI N".. ENGINEERING S I ES S HE S C-3881 eP --------------- ------- A- og of FOR SELECTION ONLY A 01 '59,7M.60 Ea�� n ;, 17AII 'F 1Z.1 10 A �24 RCP_- WE- 5 X 4A 7L714 11�,t �wxsa9 e LEGEND: Tsars 4 5,kd ------ IPF-IRON PIPE FOUND 41f ----------- IRF-IRON REBAR IRS-IRON REBAR SETFOUND 0 "P CMP-CORRUGATED METAL PIPE ui -REINFORCED CONCRETE PIPE P 4* RC R/W-RIGHT OF WAY 4 M:GASLINE MARKER [0 TELEPHONE PEDESTAL No WATER METER -:WATER VALVE -- ----- gg-CURB/DROP INLET q ---------- SHUTOFF VALVE-ABOVE -WELL POWER POLE 4 FOR REUSE -HYDRANT -HYDRANT GROUND k' -COMPUTED POINT "1 0 MANHOLE SEWER 4 THU DRAWING WAS PREPARED FOR USE jj SEWER CLFANOUT ON THE SPECIFIC SITE,NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE TRAFFIC SIGNAL BOX DATE AS LISTED,HEREON.AND IT IS NOT o A SUITABLE FOR USE ON A DIFFERENT D. 0 LINETYPES PROJECT SITE OR AT A LATER TIME.USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE t' 0 100 Year FEMA Floodplain ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED �^''l i q9'� 5 �� �\ s`m \� ARCHITECTS AND ENGINEERS REPRDDUCDON 69 1q. OF THIS DRAWING FOR REUSE ON AANOTHER PROJECT IS NOT AUTHORIZED WEILAND AND MAY BE CONTRARY TO THE LAW. CREEK iaawF e t. 1 11 EXISTING PL PROPOSED PL ROW EXISTING SS J co c) Lu (D UJ Lu (1) u uj cz 1a1ilIM"Idth —1 j 4II� 34 < 4� I= z En 1­11-11 A- 0 0 —————————————————— 2 — �.j Lu_"w L.T ­Tl Z., Lll.1pl.l,jl JOB NUMBER: 21-004 NOT A_T_ CHECKED BY: DRAWN BY: ALP/EDS/jMAC/IAR DATE: 2022 ---------- SHEET TITLE: ------------ PRE DRAINAGE MAP ----------------- PHASE SHEET NO.: c 1.0t]