Loading...
HomeMy WebLinkAboutPhase 1 & 2 Report_3-13-23 AMERICAN Engineering Business License C-3881 Supplemental Drainage Report Nelson's Creek Yadkinville Rd./U. S. 601 at Country Lane/SR 1461 Mocksville, North Carolina 27028 Prepared For C2C Land Development, LLC P. O. Box 4628 Mooresville, North Carolina 28117 Contact: Richard Denzler(800-369-0120) Prepared by American Engineering Associates Southeast 4020 Westchase Blvd., Suite 450 Raleigh, NC 27607 March 13, 2023 CAR O, L 8922 ,��'•.y N CH O05 �3b 1 Drainage Report Table of Contents 3 General 3 Effect at Nelson's Creek Discharge Point 3 Effect at Each Outlet Point 4 Structural Stability of Receiving Surface Waters 5 Appendix 2 Nelson's Creek Supplemental General This project is located in Mocksville, North Carolina on the east side of U. S. 601 between Country Lane on the north side and a property line approximately 2500' south of this. Most of the area fronting Yadkinville Rd. and Country Lane have already been developed though this project will access both of these roads when complete. The area along Yadkinville Rd. is mostly commercial property and the developed area along Country Lane is residential property. Nelson Creek goes through the middle of this project dividing the project between Phase 1 and Phase 2. Nelson Creek is in the Yadkin River Basin. When the project is complete, there will be a crossing over Nelson Creek connecting the two parts of the project. The purpose of the project is to provide for a single family subdivision. Phase 1 will have 198 lots while Phase 2 will have 185 lots for a total of 383 lots. The size of Phase 1 is 68.5 acres while Phase 2 is 91.74 acres. The purpose of this report is to provide additional information requested February 22, 2023 by the 401 & Buffer Permitting Branch of NC DEQ and any related requests which follow. Other reports for both Phase 1 and Phase 2 show the usually required data. Effect at Nelson's Creek Discharge Point The drainage area to the discharge point on Nelson's Creek is 225 ac. This includes a substantial portion of off-site area which has a lot of existing impervious area. Some single family homes exist along the northern boundary of this project and on the western side there are shopping centers and other businesses along U. S. 601. A dry retention pond has been added in the Phase 1 area. This pond is large enough to restrain the post-development flow to or below that of the pre-development flow while considering both phases of the project. Flow calculations by John Harman, P. E. #9810 are in the Appendix. A summary of the flows are shown below: Storm Pre-development Flow Post-development Flow 1 Year 171.94 cfs 167.90 cfs 2 Year 206.91 cfs 201.06 cfs 5 Year 251.74 cfs 241.75 cfs 10 Year 283.73 cfs 270.48 cfs 100 Year 376.50 cfs 354.80 cfs 3 As can be seen the peak flows for the post-development condition is less than the pre- development peak flows. This should not produce any adverse effects on the downstream environment. Effect at Each Outlet Point The calculations at each outlet point are shown in the Appendix. Each outlet has the outlet velocity calculated by using the width of the outlet end of the rip-rap, the slope of the ground at the outlet, Manning's n for rip-rap (0.045) and the flow shown for the ten year storm. If this produces an erosive velocity, then a plunge pool is considered. The calculations for these are in the Appendix. The results of the initial calculations show that three outlets have velocities that may be erosive (greater than 4 fps). If plunge pools are used at these outlets the length of the outlets will be not only the width of the rip-rap at its end but also including the sides of the rip-rap. This will spread the flow out and make it more of a sheet flow situation. Structural Stability of Receiving Surface Waters As the maximum flow is not increased, the stability of the downstream waters should not be affected. Y:Vobs\21-0004 Mocksville(R210004)\Documents\Reports\Supplemental Drainage Report.docx 4 Appendix USGS Map Drainage Area Maps Nelson's Creek Calculations Calculations at Each Outlet 5 USGS Map I lasral ioeie ori'vaw.e ys 4 e�p �� BZOLZ euilo.ieO yLloN m..oars-misowro a,wuwm,w°Z0ro' o�r� aY g°ye=;, ' A.LN[10031AtlQ'3'i'I[ASNOOW00 o Z 0 �uiaaaui�u3 3`< s ld; 0 NVDIZ13WV yoH �' ' any°y�g o W o' V 3 38� s ..pwPgns f € $ m €3ak8a.5a $ a111nsx�oy�le xaa��s,uosIaN 6sa$ IN € E_ e$ NOISIMN ON 'a .nor.r.yaw. OW ri I TVJS •is vs � .. .. N i ~3 �r 9"rr y� J y f d l �N _ > _ odolSQ-.rios� sms 3YJMetlGVfID]ilIASMJIM tlgY3lM13N1.iO 1NT'i1eYd30'S'� Drainage Area Maps •1 Ift MV _ 1~`* ����� �= Or a .w�, A II •1 lam x I _ r. Iz II�I�®' _ mix., ....►� � _'----- — -------_ sue �ri� �c�lJ �I� JNO 7�•• ', r.. ►���.�7���..A�=tea 59&tl r_�--���a. - - --- —J--•�• �_ ►a ♦ � all -� fOWN ,, _ cp ' `, 1 �4 /llllllii�h1II►y`1 r►iHi1� 1 �`N,�.�' �IN ���'©±; III' I� ►fir f �■ II* Jll/n� (II,� sJr lhi= J�J��J� ' u trl•V-rllrfrJ�L—it��Nlllll� 'Iy � I��l I1;LJ I MJ , - J ... IH NEW 11 — ► i �g i C ,IiLo \ P'll Will 1 ��� 'c►r�' ����////� 6♦�� ' Ii"I•, _ Jul �Il r ` ✓la_ 1,j 111� I Wk.Q� FOR INFORMATION.ONLY 4 /fig ,,.�l�l;• h11U�n'`' IF ON NW112-24 RNA o 0 1 IL WE _ ,� -� ��� :��. �►�� � � -;1� ,/� �®�� �,,� j�! �' � III III. s�� ♦ � I �\. '� VIA wa Me,AVE LU DRAINAGE MAP PHASE I SHEET NO, �- �• .tip# /�� r // pll i � c` Z bQ a i 40 41p / c ♦ ♦ j % GRAPHIC SCALE Q Lu dS ♦ ; j Tqo Ego g Q ♦ ♦ // / (1N FEET) .o f ♦ ♦ / 1hwN.SO E e K �• `�- / ;' _ I ENGINEERING°.T z ASSOCIATES ♦ o . \• � ♦ % / i SOUTHEAST p \• ��� // I %/ ; %/ / FOR INFORMATION,ONLY i I ���♦ , `'� .\ ##1� °ab/may/k ------------------------ 1 � ♦ \, �.--.____.—._ .. iY— _.-.—.. fE5 MpO1N 0101 , ;. - i l 01, ♦ / / � II, 1 ee USE ♦ STIPULATION FOR REUSE ♦ ' THI DRAWING'� l `� ,, Y. i CONTEM SPEUf01ASat,WDXPREPAREDITSR �p y�D�y�{C J OI01 ii ON TXE Si 1 SRf.MTH HEREON,ISSUE '� 1,1 \ '' ♦ /, /_. 1 � _ i� / / �•�` ,, Y\ _ �L4SQVIRL U-IVG--��_ 1 SHTE ESI FOR ATER ON nMf`16EOE ___ OATS AS t51ED,XEREOL AND IT 6 NOT FFW .\ \ �' ♦ 15� ERENT �- / I ��� y, / " I ON ONN"'NO CEaL F ixas THE % '• I / OS !%, CO— SEWIl O PROPERLYFRINIFE- LICENSED ANOMSHIIFR NiOECT Rf NOT AMEFOROOq � 0� iX1 DRAWING fOF M REIKF ON `\ C-`{� A 0108 � 1 AND NAY BE COMRARY TOTXf LAW. ,\ \ '' ♦ � s�. / I // , OS19 OS ♦ 0306 II \ ~ wo in / i 1 u o Q CN �`\, \ •♦ �4 aye / _/' / ■:�■ - ---- - \ #vS W!/•. i � s1R � Lc7 N o \ '\ ♦ �.! �• �, ` % ♦ T }+ •y W m'I to ♦♦ f ` ?C Z to IS in o r CR110 S 0 a I r • \ \ \ / / "'FFS INLFT SSA . , .2 I 1 3 I y En O N 40P All All am] AlF on sae - — — a 1 1 F ' 1 1 JOB NUMBER: 2LO2 'p :l/ e ■ . ■ I .Il em E CHECKED BY: _.•_ ! ■ owl L751 I 1 I 1 DRAWN BY: ALP/EDB/1 MAC DATE: 073 n ssA ! �'♦ 7 � 1 SHEETTITLEPOST DRAINAGE a ♦♦ 't - MAP - _ PHASE 1 it ji OW 'Amw lit WIN ►— !�?ii� i //. �. .►- r►i �c ►1r �.1 WIIA .�.� « � �„�'• �m -� s� ;� a; i-a== 007 — fl �,: . ,, �. ►Ir �� �:. � INC, RTAi \ i . /.. 2 - t �� '-o" �M uj r, m �� ►Ir is Ilr�c�.y �: \ ``\'v ;� ��,� /, • � -`�\��`�-�L.���1 %/�it I _ \��.rrc�. a '� y .�. � III • - _ I' .41, Im \\ /•yea y `�` ` ti II III !��,l SHEFTTlTUEooST ri opla IPA DRAINAGE GRAPHIC SCALI . �• ��.:� _ .�.�� ICI ;� . MAP d� Ili i p L(IN FEW) , III PHASE 1 �� , , • = ` LIM MIA Nvx" 1 7 ME, 4, L W1, \, � uwagII► . FOR INFORMA110%.ONLY F Am 1810 va CL JOB NUMBER: 21-004 SHEETnTIE \, � _ '� -!:- - - -=a—._jar. ►� ■ar. rc....✓ + . .� ►iE_ ® ==__=_� ,. � _ i III �� �: . ►, ' \\ I " w '• ST R / MAP PHASE 1 ,i e �� �� �. �!1 �•� ��,� ` � psi -. � ���� ,,Y. Y �. \;lam ` •• i�� I ,� •� M7FAI Wills ON 1p WPM, FOR[NFORMATION.ONLY co LLJ j's it :CHECKED BY •. DRAINAGE 1•Ir�ifil_�� ��_ ♦ ; �., .�. \�..'IVA _ �� a� IL� 1 �►7i �mm��y\\u� W f���G�� � ����//fit 'il II /��� •�. \ � �� ��1 �`✓ ,i�.. -� �'���:• _ �i---�ICI°'�i SO oo 14 .13 �" 4ryy'+1 � f11� 19�! JR, DRAWN BY: ALP/EDS/jMAC/lAR MEN op ji eq lw Rig gill IL ZI CL 40 ii� �� rK vo TV. I now emn r*� WHIAST lot, FOR INFORMATION ONLY M NalILL A f, W! IF -.7110 WIUMMI, pr., w Mul JigII/ ,/ �IIIIIIIIIII loar roll, AM Lu 4-1 In W !� .,�► t7 _ oZI SHFUTITLE POST DRAINAGE MAP PHASE 2 �9 a ,�I // � �► �•a�{�,,°�� .; \ � s��,_\��\� ®--ice I``�•-_� �\\`� � ��IF ill ,��!l!� � ����► 'ma's � ;: � r �.�. . /i — -- l�i r �+�a • . rgF II ► � � �ill � ♦� �-/i� r� . �� z,��► r 1 !{ JOB NUMBER: 1-004 ��� Ilk��j�, i ,� i =had, DRAWN BY: �r� ' ,�! III ►I ,1 II '��``�, i� � \\\ \\\ � � ,�\- .r � III ►I� �, \ �I � . �, :_ �IIIIIIIIIII '� ►'IrL�I•'f � 11,E j I\�' I�.�!\��' _ iliir -ail- ��.�II��— ,���,� _ i I II �� �`_. I ;.. II .._j _.. I�I �' �� �I , • I �•�r1� ( ! I � _ :: �IIII III Em FOR INFORMATION ONLY ;�o`•�L:�:��� �—���1.��1i�� � I� � III,-���1�� I 4'-lei► ► `���—��� ��� ���.r:*_ .. N. _ _ — r — uj a -�- -.erg :�1:�rLi■ WA JOB NUMBER: 21-004 I! I Dom:� �`�,���r��C�`l���l�le i �-�_ � ---=�.� ►_ 1�► 1:' • —_mil • - 4. DRAINAGE GRAPHIC SCALE r PHASE 2 MAP (IN FEET I , / 1W v,► �� ,,- ,l I ,�� �� ., FAM � Wo RAW FOR INFORMATION ONLY wo Aw GRAPHIC SCALE IN FEET) AAL , ,- ilfilll I !I �I �! \ � �\��� � � •%��� � ,� � �. � it I ;� , . Ik . � � . illir MO�L:7:f� �� I �� I W, � � mi ,� ���. • �� . , -�! POST Z a I I NN W q I _ W I ?5 W �m' qZ -=- I W ENGINEERING° I I I I _^° ASSOCIATES �o SOUTHEAST OF., FOR� I � I I I I FOR INFORMATION ONLY \ -- "Ell GRAPHIC SCALE SIP Sp IN PELTIs Y Z STIPULATION FOR REUSE _ L \ \ \ Y THIS TNREASPEICG WAS S.PREPARED ED HEREON, ' II` \ �Af _ _ /'\\— f f � r1 ONTHE CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS UR M,,HEREON AND R IS HOT SUITABLE FOR USE ON A DIFFERENT — PROJECT SITE OR AT A LATER TIME.USEOF S __ •I BU 6 _ —_ THIS�NA�G H1R REFENEa OR EWJANE • r , 1 \ I - \✓ 1 .L_ ` ON PROJECTREfN➢ES THE .� \` _ - SERVICES Of PROPERLY LICENSED 400 •• +�' \ -- _._` \ -- __ G " REUSE ON _. ANOT ER PROJEUCTION CV HIS �I5E NOT�AUTHORIZED \_rxb- ` ANDMAY Bf CON1RPRYTO TXEIPW. ro az co _ �/ W nt Z d JOB NUMBED: 21-004 CHECKED BY: DRAWN 8Y: ALP(EDS(jMACIIAR DATE: 2022 cB eox J — \\ SHEET TITIE`rOST 1 I / _\ DRAINAGE \ \ MAP PHASE 2 - - - 'minGREENWAY TEUR SHEET NO.: / � C1.5 — I B� / VALVOIKINAMS - OF A01 ter. AS ATU loppp- All 0 .� (( �hl ill-Irl rNm-ME FOR INFORMATION ONLY Ito `` �\\ AIV -41 SHEETTITLE ..ST DRAINAGE MAP PHASE 2 iC1.6 Z a�El Lu IN QLu / v " zo / „N"CAR.... ........,(��'�. ASSOCIATES 1 0 �1�.1f ?�SOUTHEAST 8� OIIUU\N,, t FOR INFORMATION ONLY e / " oe i \\ I 0 / - FOR REUSE /'/ ` _ iX15 DRAWING WAS PREPARED FOR VY ON THE SPECIFIC SITE.NAMED HEREON, CONTEMPORANEOUSLY WITH ITS ISSUE DATE AS USTED,HEREON.AND IT 5 NOT \• — - /��f—. SURABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME.USE aF ON ANOTHER FIRAM REQUI THE SERVICES OF PROPERLY UCENSEO NOIIfCC15 AND ENGINEERS AEPRODIILIK ELSE OF PNO MAY BE COINTRARYOTOTHE LAWON / ANOTHER PROJECT IS NCl AUTMA12ED GRAPHIC SCALE \ V r W w N W Q . (IN FEET) T NKN.s0 y CC In •.i _ Y CBBM FWBW CJ v~i cx,z r: z a ` JOB NUMBER 21004 CHECKED BY: DRAWN BY: ALP/EDS/IMAC/IAA DATE: }s 7033 SHEETTITLErOST / NW WS \ DRAINAGE \ v� j' i� �� �' = MAP PHASE 2 \ / FE - SHEET NO.: \ �_ �,�� C1.7 Nelson's Creek Calculations NELSON CREEK SUBDIVISION-PRE-DEVELOPMENT INFORMATION JR HARMAN,PE 5/19/2022 Rev 030123 POI @ CREEK;SOUTH PROPERTY LINE DA TO POI TOTAL AREA: 9829800 S.F. EXIST'G IMPERVIOUS 52275 S.F. Offices along Country Lane 9712 S.F. Offices Behind conv Store 13068 S.F. Conv.Store 188180 S.F. Aarons Shopping Area 6534 S.F. Residential-Country Lane 34850 S.F. East of Ivy Lane 113256 S.F. Residential-Ivy&Ferwood Lane 43740 S.F. Residential-Quail RidgeLane 11760 S.F. NC 601 Pvm't 60115 S.F. Ivy Lane-Pvm't 19602 S.F. Fernwood Lane-Pvm't 116305 S.F. Country Lane Rd-Pvmt 304920 S.F. Victory Arms Shopping Center Total Exist'g Impervious 669397 S.F. Estimated Composite"C": "C" Wtd"C" Impervious: 669397 0.9 0.06 Woods&Grass(Poor Conditon-Logged) 9160403 0.35 0.33 Totals: 9829800 0.39 %Impervious PreDev: 6.8% Use Conservative Value of: 0.40 Convert to CN: 70 Maximum thalweg Length,Ft.1 5245 Area,Ac.= 225.66 Acres Elevational Difference,Ft.1 115 Basin Avg Slope,%1 2.19 Tc(Kirpich)=25.1 min Use FEMA 32 Min TC Reconcile FEMA Q100 Flows to HydroFlow Model: Flow,CFS Intinsity,In/hr. Coef C Area,Ac. Resultant,CFS PreDev A Q300,PreDevelopment(2008)From Regulatory Model 373 4.14 0.4 225 373 Q100 Co-relate Q25,PreDevlopment Conditions 3.57 0.4 225 321 Q25 Co-relate Q10,PreDevlopment Conditions 3.15 0.4 225 283 Q10 Co-relate Q2,PreDevlopment Conditions 2.31 0.4 225 208 Q2 FEMA Steady Flow Data;Reach Sta vs.Flow Q100 Relative Q25 Relative Q10 Sta.9054 373 321 283 Sta.7983 641 552 496 Sta.6443 944 812 716 Sta.4339 1054 907 800 Sta.3381 10851 9341 823 Sta.1939 10961 9431 832 Sta.485 11701 10071 888 NELSON CREEK SUBDIVISION-POST-DEVELOPMENT INFORMATION 1R HARMAN, PE 5/19/2022 Rev 030123 POI @ CREEK;SOUTH PROPERTY LINE DATO POI TOTAL AREA: 9829800 S.F. EXIST'G IMPERVIOUS 52275 S.F. Offices along Country Lane 9712 S.F. Offices Behind conv Store 13068 S.F. Conv.Store 188180 S.F. Aarons Shopping Area 6534 S.F. Residential-Country Lane 34850 S.F. East of Ivy Lane 113256 S.F. Residential-Ivy&Ferwood Lane 43740 S.F. Residential-Quail Ridgel-ane 11760 S.F. NC 601 Pvm't 60115 S.F. Ivy Lane-Pvm't 19602 S.F. Fernwood Lane-Pvm't 116305 S.F. Country Lane Rd-Pvmt 304920 S.F. Victory Arms Shopping Center Total Exist'g Impervious 669397 S.F. Total Tract Area(Phase 1&2): 6981202 S.F. New Development Areas: 526108 S.F. Roadways,C&G 14105 S.F. Mail Kiosk&Parking 50924 S.F. SIDEWALK 1149000 S.F. Impervious Allowance @ 3000 sf/Lot Total-New Development Impervious* 1740137 S.F. *Includes Roads,Sidewalks,etc. Balance as Grass or Woods: 5255170 S.F. %Impervious: 24.9% Total Estimated Composite"C": Offsite Impervious(From Above): 669397 Development Phase 1&2(From Above): 1740137 Total Impervious to POI (Onsite&Offsite): 2409534 Estimated Composite"C": "C" Wtd"C" Impervious: 2409534 0.9 0.29 Balance in Woods or Grass(Good Condition): 7420266 0.2 0.20 Totals: 9829800 0.49 Use Conservative Value of: 0.5 Convert to CN: 75 Maximum thalweg Length, Ft. 5330 jArea,Ac.= 225.66 Acres Elevational Difference, Ft. 112 Tc,min.=60*.000132*LA.77/SA.385 53301 24.18 Minutes Basin Avg Slope,% 2.10 Tc(Kirpich)=25.1 min Total Tract Area(Phase 1&2): 6981202 S.F. Total Impervious(Just Phase 1&2): 1740137 S.F. Percent Impervious: Total PostDev Impervious(Exist'g&Proposed): 2409534 Totsl D.A.to POI: 9829800 Total PostDev%Impervious(Exist'g&Proposed): 24.5% Nelson's Creek Sub'd Development-Phase One: Supplemental & Supporting Info for Hydrograph Generation; DA to SCM #1 Post Development to SCM#1 Total DA= Acres Land Use: 1301322 S.F. 29.87 Land Class/HSG Area,S.F. Rational"C" Wt'd CN Woods"B" 0 0.25 0.00 Impervious-Sreets,C&G,S/W 177625 0.9 0.12 Mail Kiosk-Rec Area 2500 0.9 0.00 Impervious-Lots:Effective 106 Lots 318000 0.9 0.22 Balance as Grass"B"soils 803197 0.25 0.15 1301322 Composite"C"= 0.50 Percent Impervious 38% Tc(Kirpich): Tc,min.=60*.000132*LA.77/SA.385 25001 75 11.77 Minutes Tc for Use: 12.00 Minutes SCM#iDesign Elements: VPP,c.f. Perimeter,ft. Vshelf,c.f. Abottom,s.f. D Avg,ft Davg=VPP-Vshelf/Abottom 61100 584 1 438 1 15415 3.94 (From Hydra Flow Attachment) Design Pond Depth,ft.= 4.50 Treatment Volume Requirement: DA to SCM: 29.874 Ac. Rv=0.05-.009*(%Impervious) Composite%Impervious(Above)= 38% Total Runoff for 1"Event=S in Ac-Ft: Rv=0.05+.009*(%Impervious) 0.39 inch/inch Treatment"S"in Cu.Ft.= Total Runoff for 1"Event=S in Ac-Ft: 0,98 S=1"*Rv*Drainage Area/12 Treatment Volume to Be Stored: Treatment"S"in Cu.Ft.= 42782 Treatment Volume Provided,Cu.Ft. Treatment Volume to Be Stored: 42782 Cu.FT Volume Achieved at Elev. 741.34 Orifice Dia 3.00 Inch Drawdown Pipe Drawdown Pipe Elev. 739.00 lev Diff,H.,ft. 2.34 Effective Operating Head(1/3 H) 0.7722 Ct=.62*8.02(H^- *A,sq.ft. Hours to Drawdown Treatm't Vol. 55.4 Hrs.,(48 Hr Min.) Lf) 00 LD r- r\ w m -1 t.0 Ln LD N O LD 00 lD 1p Ql +� rn ry) m O F- N Lrl Ln ill LD 00 LD Lrl O r� cI cI 00 LD rl r-i r-i rn 00 r- I, 00 O N N rV m ro N d' N 00 >. LD Lrl 00 ct (0 00 LD Lrl c-I m m O lyy m N 00 ill O ri 00 M I- LL N rrl Lrl 00 - N 00 O 0) a) m N m N LO rlj M � LLr) lD LL C O L a) > C C O O -4 N m -zt VIz V f0 > n n n n C a! LL W 0 Ill -4 L c-I aJ O 4t R C c 3 `� o° L00D o LM = io >- co 0 V) co v Q O O � r- r- I ^ l.D Ln LD N N 00 O m m � � tT �' N v N m � N rl '4 O 00 LD r� fu O � O O � 00 O m rr N N r-i Lf1 N m m m t LI) C fo m 4- C C O (v 'Z 00 Ol O c-I N m d' Lr) LD ro m m Ict Itt > r� =a a, cn w I Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk@Civil3D@byAutodesk, Inc.v2021 1 2 3 I 4 5 Legend Hvd• Origin Description 1 Dekalb PreDev @ POI-Nelsons Crk South Prop Line 2 Rational PostDev @ South Prop Line Less SCM#1 DA 3 Rational PostDev to SCM#1 4 Reservoir Route SCM#1 DA 5 Combine Combine-PostDev @ South Prop Line&Nelsons Crk Project: Z:\Jobs\21-004 Mocksville (R210004)\Documents\Reports\HydroFlow Stuff\N IsMareht plGgIbd t�2Bre & PostD v-R� 2 Hydrograph Return Period Ri ,cd afilR Hydrographs Extension forAutodesk@ Civil 3D@ by Autodesk, Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Dekalb ------ 171.94 206.91 ------- 251.74 283.73 322.01 350.04 375.50 PreDev @ POI-Nelsons Crk South 2 Rational ------ 167.59 200.73 ------- 241.40 270.12 303.70 327.65 349.18 PostDev @ South Prop Line Less S 3 Rational ------ 40.69 48.62 ------- 58.10 64.77 72.49 77.93 82.78 PostDev to SCM#1 4 Reservoir 3 0.337 0.357 ------- 1.629 6.406 11.05 11.78 12.23 Route SCM#1 DA 5 Combine 2,4 167.90 201.06 ------- 241.75 270.48 304.23 329.94 354.80 Combine-PostDev @ South Prop Li Proj. file: ZAJobs\21-004 Mocksville (R210004)\Documents\Reports\HydriD tj[ffiN0§0h1(3rbMMocksvi11e Pre & Post ev-F 3 Hydrograph Summary Re po gydraflow Hydrographs Extension for AutodeskO Civil 3D@ by Autodesk, Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type 'flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 171.94 1 165 711,509 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 167.59 1 22 j 221,223 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 40.69 1 17 41,502 ------ ------ ------ PostDev to SCM#1 4 Reservoir 0.337 1 34 39,843 3 741.29 41,039 Route SCM#1 DA 5 Combine 167.90 1 22 261,066 2,4 ------ ------ Combine-PostDev @ South Prop Li Z:\Jobs\21-004 Mocksville (R210004)\Doc rr RePO dHy YZRow Stuff\ eftAoncbWEO& baWE2"Pre & PostDev-Ratio al IV 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk. Inc.v2021 Monday,03/13/2023 Hyd, No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 171.94 cfs Storm frequency = 1 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 711,509 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 1.910 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.I D5ksc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 -- 1 Year 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time (min) Hyd No. 1 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 167.59 cfs Storm frequency = 1 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 221,223 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 2.443 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.ID64sc/Rec limb fact PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 -- 1 Year 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time(min) Hyd No. 2 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday,03/ 13/2023 Hyd. No. 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 40.69 cfs Storm frequency = 1 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 41,502 cuft Drainage area = 29.000 ac Runoff .coeff. = 0.5 Intensity = 2.806 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.IDIAsc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 1 Year 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time(min) Hyd No. 3 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk; Inc.v2021 Monday,03/13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 0.337 cfs Storm frequency = 1 yrs Time to peak = 34 min Time interval = 1 min Hyd. volume = 39,843 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 741.29 ft Reservoir name = SCM #1 Max. Storage = 41,039 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 -- 1 Year 5 50.00 0.00 4 40.00 0.00 3 30.00 0.00 2 20.00 0.00 10.00 - 10.00 0.00 0.00 - 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) Hyd No. 4 Hyd No. 3 ! ! ; Total storage used =41,039 cuft 8 Pond Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday,03/13/2023 Pond No. 1 - SCM #1 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=739.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cult) 0.00 739.00 3,620 0 0 1.00 740.00 14,600 9,110 9,110 2.00 741.00 30,800 22,700 31,810 3.00 742.00 33,600 32,200 64,010 4.00 743.00 36,650 35,125 99,135 5.00 744.00 39,900 38,275 137,410 6.00 745.00 43,000 41,450 178,860 7.00 746.00 45,750 44,375 223,235 8.00 747.00 48,550 47,150 270,385 9.00 748.00 51,450 50,000 320,385 10.00 749.00 54,400 52,925 373,310 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 3.00 Inactive 0.00 Crest Len(ft) = 16.00 12.00 0.00 0.00 Span(in) = 18.00 3.00 0.00 0.00 Crest El.(ft) = 741.75 744.00 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 739.00 739.00 741.50 0.00 Weir Type = 1 Rect --- --- Length(ft) = 80.00 0.50 0.50 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.50 0.50 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note.Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control Weir risers checked for orifice conditions(ic)and submergence(s) Stage(ft) Stage/ Discharge Elev(ft) 10.00 749.00 8.00 747.00 6.00 745.00 4.00 743.00 2.00 741.00 0.00 739.00 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 Discharge(cfs) Total Q 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday, 03/ 13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 167.90 cfs Storm frequency = 1 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 261,066 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 -- 1 Year 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 &00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (min) Hyd No. 5 Hyd No. 2 Hyd No. 4 10 Hydrograph Summary Re po rtydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cult) 1 Dekalb 206.91 1 165 856,255 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 200.73 1 22 264,964 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 48.62 1 17 49,587 ------ ------ ------ PostDev to SCM#1 4 Reservoir 0.357 1 34 45,890 3 741.54 49,093 Route SCM#1 DA 5 Combine 201.06 1 22 310,854 2,4 ------ ------ Combine-PostDev @ South Prop Li ZA,lobs\21-004 Mocksville (R210004)\Doc rrt W1 mwid8 F V YHriow Stuffl Moncfly��]]3MbakgORBPre & PostDev-Ratio IN IV 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc. v2021 Monday,03/13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 206.91 cfs Storm frequency = 2 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 856,255 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 2.299 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.ID6gsc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 --2 Year 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 00, 60.00 30.00 30.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time (min) Hyd No. 1 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 200.73 cfs Storm frequency = 2 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 264,964 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 2.926 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.IDRsc/Rec limb fact PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 --2 Year 210.00 210.00 1 180.00 80.00 150.00 150.00 /or 120.00 120.00 90.00 90.00 6 60.00 0.00 30.00 30.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time(min) Hyd No. 2 13 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No, 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 48.62 cfs Storm frequency = 2 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 49,587 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 3.353 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.I DV\sc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 2 Year 50.00 50.00 40.00 40.00 30.00 30.00 OF 2 20.00 0.00 1 10.00 0.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time (min) Hyd No. 3 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk. Inc.v2021 Monday, 03/13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 0.357 cfs Storm frequency = 2 yrs Time to peak = 34 min Time interval = 1 min Hyd. volume = 45,890 cult Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 741.54 ft Reservoir name = SCM #1 Max. Storage = 49,093 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 --2 Year 50.00 50.00 40.00 40.00 30.00 30.00 20.00 , 20.00 J 10.00 - 10.00 0.00 - 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) Hyd No. 4 Hyd No. 3 Total storage used = 49,093 cuft 15 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc. v2021 Monday,03/13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 201.06 cfs Storm frequency = 2 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 310,854 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 --2 Year 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 9 90.00 0.00 60.00 60.00 3 H- 30.00 0.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (min) Hyd No. 5 Hyd No. 2 - Hyd No. 4 16 Hydrograph Summary Re po rtydraflow Hydrographs Extension for AutodeskO Civil 3138 by Autodesk, Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 251.74 1 165 1,041,760 ----- ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 241.40 1 22 318,648 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 58.10 1 17 59,259 ------ ------ ------ PostDev to SCM#1 4 Reservoir 1.629 1 34 52,536 3 741.83 58,449 Route SCM#1 DA 5 Combine 241.75 1 22 371,184 2,4 ------ ------ Combine-PostDev @ South Prop Li ZAJobs\21-004 Mocksville (R210004)\Doc n%ffisW9*idSKFf/aYfflE6riow Stufffl erdoncQWO&WZWE3 Pre & PostDev-Ratio al IV! 17 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 251.74 cfs Storm frequency = 5 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 1,041,760 cuft Drainage area = 225.000 ac Runoff .coeff. = 0.4 Intensity = 2.797 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.ID64sc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 -- 5 Year 2 280.00 80.00 2 240.00 40.00 2 200.00 00.00 160.00 160.00 1 120.00 20.00 80.00 80.00 4 40.00 0.00 0.00 0.00 - 0 30 60 90 120 150 180 210 240 270 300 330 Time(min) Hyd No. 1 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/ 13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 241.40 cfs Storm frequency = 5 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 318,648 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 3.519 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.IDV\sc/Rec limb fact = 1/1 PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 -- 5 Year 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 0/ 80.00 40.00 40.00 LN 0.00 V 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (min) Hyd No. 2 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2021 Monday, 03/13/2023 Hyd. No. 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 58.10 cfs Storm frequency = 5 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 59,259 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 4.007 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.IDAsc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 5 Year 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time (min) Hyd No. 3 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/ 13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 1.629 cfs Storm frequency = 5 yrs Time to peak = 34 min Time interval = 1 min Hyd. volume = 52,536 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 741.83 ft Reservoir name = SCM #1 Max. Storage = 58,449 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4--5 Year 6 60.00 0.00 5 50.00 0.00 4 40.00 0.00 3 30.00 0.00 20.00 20.00 - 10.00 10.00 - 0.00 0.00 - 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 4 Hyd No. 3 Total storage used = 58,449 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 241.75 cfs Storm frequency = 5 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 371,184 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 -- 5 Year 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 OOOF 120.00 80.00 80.00 40.00 40.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (min) Hyd No. 5 Hyd No. 2 - Hyd No. 4 22 Hydrograph Summary Repo rtydraflow Hydrographs Extension for Autodesko Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Dekalb 283.73 1 165 1,174,123 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 270.12 1 22 356,565 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 64.77 1 17 66,061 ------ ------ ------ PostDev to SCM#1 4 Reservoir 6.406 1 32 59,071 3 741.99 63,538 Route SCM#1 DA 5 Combine 270.48 1 22 415,636 2,4 ------ ------ Combine-PostDev @ South Prop Li ZAJobs\21-004 Mocksville (R210004)\Doc n%FdS\R&Wild kFWh5FJVw Stuff\ eUondDWEO,&MtZWaaRBPre & PostDev-Ratio al M 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday, 03/ 13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 283.73 cfs Storm frequency = 10 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 1,174,123 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 3.153 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.IDV\sc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 -- 10 Year 320.00 320.00 280.00 280.00 240.00 240.00 2 200.00 00.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time (min) Hyd No. 1 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd, No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 270.12 cfs Storm frequency = 10 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 356,565 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 3.938 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.ID5ksc/Rec limb fact PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 -- 10 Year 2 280.00 80.00 240.00 240.00 2 200.00 00.00 160.00 160.00 1 120.00 20.00 80.00 80.00 :F 40.00 0.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time(min) Hyd No. 2 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 64.77 cfs Storm frequency = 10 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 66,061 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 4.467 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.ID64sc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 10 Year 70.00 70.00 60.00 60.00 50.00 50.00 40.00 OF 40.00 30.00 30.00 20.00 20.00 10.00 1 ft-\L 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time(min) Hyd No. 3 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 6.406 cfs Storm frequency = 10 yrs Time to peak = 32 min Time interval = 1 min Hyd. volume = 59,071 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 741.99 ft Reservoir name = SCM #1 Max. Storage = 63,538 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 -- 10 Year 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 - 20.00 10.00 - 10.00 0.00 - 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) Hyd No. 4 Hyd No. 3 Total storage used = 63,538 cuft 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 270.48 cfs Storm frequency = 10 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 415,636 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 -- 10 Year 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 000( / I i I I I I I I , --I- 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (min) Hyd No. 5 Hyd No. 2 - Hyd No. 4 28 Hydrograph Summary Re p o r�Iydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc.v2021 Hyd. Hydrograph Peak Time ;Time to Hyd. Inflow iMaximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 322.01 1 165 1,332,557 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 303.70 1 22 400,883 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 72.49 1 17 73,939 ------ ------ ------ PostDev to SCM#1 4 Reservoir 11.05 1 31 66,850 3 742.13 68,594 Route SCM#1 DA 5 Combine 304.23 1 22 467,733 2,4 ------ ------ Combine-PostDev @ South Prop Li ZAJIobs\21-004 Mocksville (R210004)\DOCL r PWild HVAMM w Stuff\ eMoncQWEEUMME� �Pre & PostDev-Ratio al M i L 29 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 322.01 cfs Storm frequency = 25 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 1,332,557 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 3.578 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.IDPksc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 --25 Year 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time(min) Hyd No. 1 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 303.70 cfs Storm frequency = 25 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 400,883 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 4.427 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.IDlAsc/Rec limb fact Q (cfs) PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Hyd. No. 2 --25 Year 320.00 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time(min) Hyd No. 2 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd, No. 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 72.49 cfs Storm frequency = 25 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 73,939 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 4.999 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.IDRsc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 25 Year 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time(min) Hyd No. 3 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd, No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 11.05 cfs Storm frequency = 25 yrs Time to peak = 31 min Time interval = 1 min Hyd. volume = 66,850 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 742.13 ft Reservoir name = SCM #1 Max. Storage = 68,594 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 --25 Year 8 80.00 0.00 7 70.00 0.00 6 60.00 0.00 5 50.00 0.00 4 40.00 0.00 30.00 30.00 20.00 - 20.00 1 10.00 0.00 0.00 - 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) Hyd No. 4 Hyd No. 3 Total storage used =68,594 cuft 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 304.23 cfs Storm frequency = 25 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 467,733 cult Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 --25 Year 3 320.00 20.00 280.00 280.00 2 240.00 40.00 2 200.00 00.00 160.00 160.00 120.00 120.00 80.00 80.00 4 40.00 0.00 0.00 - 0.00 0 10 20 30 40 50 60 Time(min) Hyd No. 5 Hyd No. 2 -- Hyd No. 4 34 Hydrograph Summary Re po Mydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Dekalb 350.04 1 165 1,448,530 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 327.65 1 22 432,501 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 77.93 1 17 79,485 ------ ------ ------ PostDev to SCM#1 4 Reservoir 11.78 1 31 72,332 3 742.25 72,644 Route SCM#1 DA 5 Combine 329.94 1 22 504,833 2,4 ------ ------ Combine-PostDev @ South Prop Li ZAJobs\21-004 Mocksville (R210004)\Doc r1feeri$\RpWidsRFWMEF-Jow Stuff\ eMond! yW& bak9aRBPre & PostDev-Ratio r ial IV 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 350.04 cfs Storm frequency = 50 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 1,448,530 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 3.889 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.ID9\sc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) 0 (cfs) Hyd. No. 1 -- 50 Year 4 400.00 00.00 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 1 150.00 50.00 100.00 100.00 50.00 50.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time(min) Hyd No. 1 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 327.65 cfs Storm frequency = 50 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 432,501 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 4.776 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.ID9\sc/Rec limb fact PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 -- 50 Year 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time(min) Hyd No. 2 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd. No. 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 77.93 cfs Storm frequency = 50 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 79,485 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 5.374 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.ID64sc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs) Hyd. No. 3 -- 50 Year 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 00, 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time(min) -- Hyd No. 3 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 11.78 cfs Storm frequency = 50 yrs Time to peak = 31 min Time interval = 1 min Hyd. volume = 72,332 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 742.25 ft Reservoir name = SCM #1 Max. Storage = 72,644 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 -- 50 Year 8 80.00 0.00 70.00 70.00 6 60.00 0.00 5 50.00 0.00 4 40.00 0.00 3 30.00 0.00 20.00 20.00 - 10.00 10.00 - 0.00 0.00 - 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) - Hyd No. 4 Hyd No. 3 Total storage used = 72,644 cuft 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk. Inc.v2021 Monday, 03/13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 329.94 cfs Storm frequency = 50 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 504,833 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Q (cfs) Hyd. No. 5 -- 50 Year 350.00 350.00 300.00 300.00 2 250.00 50.00 2 200.00 00.00 1 150.00 50.00 1 100.00 00.00 5 50.00 0.00 0.00 - 0 10 20 30 40 50 60 0.00 Time(min) Hyd No. 5 Hyd No. 2 Hyd No. 4 40 Hydrograph Summary Repo gydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time ,Time to ,Hyd. Inflow Maximum Total Hydrograph No. type flow interval 'Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Dekalb 375.50 1 165 1,553,897 ------ ------ ------ PreDev @ POI-Nelsons Crk South 2 Rational 349.18 1 22 460,917 ------ ------ ------ PostDev @ South Prop Line Less S 3 Rational 82.78 1 17 84,436 ------ ------ ------ PostDev to SCM#1 4 Reservoir 12.23 1 31 77,222 3 742.36 76,523 Route SCM#1 DA 5 Combine 354.80 1 22 538,140 2,4 ------ ------ Combine-PostDev @ South Prop Li I ZAJobs\21-004 Mocksville (R210004)\Doc Stuffl eMondOWO&MtZW9"Pre & PostDev-Ratio al N 41 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 31DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 1 PreDev @ POI-Nelsons Crk South Prop Line Hydrograph type = Dekalb Peak discharge = 375.50 cfs Storm frequency = 100 yrs Time to peak = 165 min Time interval = 1 min Hyd. volume = 1,553,897 cuft Drainage area = 225.000 ac Runoff coeff. = 0.4 Intensity = 4.172 in/hr Tc by User = 33.00 min OF Curve = Mocksville-Nelsons Creek.IDAsc/Rec limb fact = n/a PreDev @ POI-Nelsons Crk South Prop Line Q (cfs) Q (cfs) Hyd. No. 1 -- 100 Year 4 400.00 00.00 350.00 350.00 300.00 300.00 2 250.00 50.00 200.00 200.00 150.00 150.00 1 100.00 00.00 5 50.00 0.00 0.00 - 0.00 0 30 60 90 120 150 180 210 240 270 300 330 Time(min) -- Hyd No. 1 42 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3DO by Autodesk, Inc.v2021 Monday,03/13/2023 Hyd. No. 2 PostDev @ South Prop Line Less SCM#1 DA Hydrograph type = Rational Peak discharge = 349.18 cfs Storm frequency = 100 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 460,917 cuft Drainage area = 196.000 ac Runoff coeff. = 0.35 Intensity = 5.090 in/hr Tc by User = 22.00 min OF Curve = Mocksville-Nelsons Creek.ID64sc/Rec limb fact PostDev @ South Prop Line Less SCM#1 DA Q (cfs) Q (cfs) Hyd. No. 2 -- 100 Year 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 1 100.00 00.00 50.00 50.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (min) Hyd No. 2 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Hyd, No, 3 PostDev to SCM #1 Hydrograph type = Rational Peak discharge = 82.78 cfs Storm frequency = 100 yrs Time to peak = 17 min Time interval = 1 min Hyd. volume = 84,436 cuft Drainage area = 29.000 ac Runoff coeff. = 0.5 Intensity = 5.709 in/hr Tc by User = 17.00 min OF Curve = Mocksville-Nelsons Creek.IDV\sc/Rec limb fact = 1/1 PostDev to SCM #1 Q (cfs) Q (cfs Hyd. No. 3 -- 100 Year 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time(min) Hyd No. 3 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday,03/ 13/2023 Hyd. No. 4 Route SCM #1 DA Hydrograph type = Reservoir Peak discharge = 12.23 cfs Storm frequency = 100 yrs Time to peak = 31 min Time interval = 1 min Hyd. volume = 77,222 cuft Inflow hyd. No. = 3 - PostDev to SCM #1 Max. Elevation = 742.36 ft Reservoir name = SCM #1 Max. Storage = 76,523 cuft Storage Indication method used. Route SCM #1 DA Q (cfs) Q (cfs) Hyd. No. 4 -- 100 Year 90.00 90.00 80.00 80.00 7 70.00 0.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 - 30.00 20.00 - 20.00 10.00 10.00 0.00 - 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time(min) Hyd No. 4 Hyd No. 3 Total storage used = 76,523 cult 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Monday, 03/ 13/2023 Hyd. No. 5 Combine-PostDev @ South Prop Line & Nelsons Crk Hydrograph type = Combine Peak discharge = 354.80 cfs Storm frequency = 100 yrs Time to peak = 22 min Time interval = 1 min Hyd. volume = 538,140 cuft Inflow hyds. = 2, 4 Contrib. drain. area = 196.000 ac Q (cfs) Combine-PostDev @ South Prop Line & Nelsons Crk Q (cfs) Hyd. No. 5 100 Year-- 400.00 400.00 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 - 0.00 0 10 20 30 40 50 60 70 Time(min) Hyd No. 5 Hyd No. 2 - Hyd No. 4 46 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2021 Monday, 03/13/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period -----F - - (Yrs) B D E (N/A) 1 61.1757 13.2000 0.9044 - I 2 1 66.7394 12.9000 0.8803 3 0.0000 0.0000 0.0000 ------ 5 67.0365 12.6000 0.8316 -------- 10 65.8484 12.2000 0.7974 25 59A509 11.1000 0.7422 -------- 50 54,0916 10.2000 0.6990 -------- 100 50.2830 9.5000 0.6639 ------ I I File name:Mocksville-Nelsons Creek.lDF Intensity = B/ (Tc + D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.44 3.56 2.99 2.58 2.27 2.03 1.84 1.68 1.55 1.44 1.34 1.26 2 5.27 4.24 3.56 3.08 2.72 2.44 2.21 2.03 1.87 1.74 1.63 1.53 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.17 5.01 1 1 4.25 3.70 3.28 2.96 2.70 2.48 2.30 2.15 2.02 1.90 10 6.81 5.56 4.73 4.13 3.68 3.33 3.05 2.81 2.61 2.44 2.30 2.17 25 7.56 6.18 5.28 4.64 4.15 3.77 3.46 3.21 2.99 2.81 2.65 2.51 50 8.07 6.62 5.67 5.00 4.49 4.09 3.77 3.50 3.28 3.08 2.92 2.77 100 8.52 7.00 6.01 5.32 4.79 4.38 4.05 3.77 3.54 3.34 3.16 3.01 Tc=time in minutes.Values may exceed 60. ville(R210004)\Documents\Re orts\H droFlow Stuff\Preci Runoff-Nelson Creek Mocksville NOAA 24Hr Rain.pc Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.82 3.40 0.00 4.29 4.97 5.92 6.67 7.44 SCS 6-Hr 1.94 2.34 0.00 2.94 3.40 4.02 4.51 5.01 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Calculations at Each Outlet 9 RIP-RAP PADS Phases 1 & 2 Date: 3/13/23 Y:\Jobs\21-004 Mocksville(R210004)\documents\Schedules\Rip-Rap Pads.xlsx Using NYSDOT Method OUTLET PIPE DIA. VELOCITY ZONE STONE STONE WIDTH LENGTH DEPTH NO. (IN.) (FPS) SIZE CLASS (FT.)* (FT.) (IN.) A 72" & 60" 9.06 4 13" 1 35.5 48 36 B C 48" 5.01 2 6" B 16 24 18 A- Nelson Creek Dr. B- Murphy Meadow Rd. (Crossing eliminated) C- Frontiersman Dr. *Downstream width, use 3 x pipe diameter upstream (single pipe), 3 x pipe diameter+center to center distance between pipes upstream (multiple pipes). FES 100 18" 5.98 1 3" A 5.5 6 12 FES 102 18" 8.8 2 6" B 6 9 18 FES 200 42" 9.29 3 13" 1 15.5 28 24 FES 400 15" 6.8 1 3" A 5 5 12 FES 450 18" 12.46 2 6" B 6 9 18 FES 500 42" 11.9 3 13" 1 15.5 28 24 FES 601 15" 6.5 1 3" A 5 5 12 FES 10 15" 16.38 3 13" 1 5.5 10 24 EW 11 54" 16.78 5 23" 2 21 45 36 FES 610 15" 4.65 1 3" A 5 5 12 FES 615 15" 5.99 1 3" A 5 5 12 FES 630 24" 11.53 3 13" 1 9 16 24 FES 700 24" 8.7 2 6" B 8 12 18 #t; FES 750 18" 5.07 1 3" A 8 20 12 FES 760 15" 6.52 1 3" A 5 5 12 FES 800 24" 11.66 2 6" B 8 12 18 FES 820 36" 9.46 3** 13" 1 13 24 24 FES 810 18" 7.84 j 2 6" B 6 9 18 FES OS1 18" 3.1 1 1 13" A 5.5 6 12 **Next higher zone due to >10%grade on slope #Plunge Pool, see detail for lowered bottom +�+ W D_ w w - - w - - - - - W w w D W D_ W w w w W W O Z D Z Z Z Z Z Z Z Z Z Z Z Z Z Z o Z Z Z Z Z Z Z v N N N t a LD N O ('n `� O O O O O O Ln 0 -1 O o C' 0 0 0 0 0 M M r r � 0 0 0 0 0 0 r 0 DD O O m 0 I- O O rvl lD 0 0 0 0 0 0 N O lD O O 1� O L n 1-0.., O O r» N O m m 0 0 0 0 0 0 o r- 0 00 O M O Ln m o rn m 0 0 00 > Q N LD lD n T 0 0 0 OO O c-i O m 00 O Ql M O O rV O O Qj N c-I I� N 0 0 0 0 0 0 u'1 O c-1 0 O) O N M O tT Ln O CD a) 1- 0 0 0 n 0 O O O 0 o O O O o O 0 O 0 O O O O O 0 O O O 0 O.. m 00 LD LT 00 0 0 0 0 0 0 -4 0 0 0 o M LD O m 0 O a m o o O o O o O m O I� O LD O N I� o l0 0 0 ri r- o 0 0 0 0 0 Ln 0 Ln 0 W 0 � Ln 0 LD o o Cl—Ln 0 0 0 0 0 0 00 O Ln O LD O N rI O 0 00 O O 0J `~ N N c-i to N 0 0 0 0 0 0 I- O r- 0 0 0 Ol O Ol 0 0 Q v N -1 c 1 r-1 O O O O O O O O r4 o r�l O N r O � r 0 0 !Z o 0 0 0 CD 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 o 0 O 6 Ln . CDLn . 0 0 0 0 0 0 0 0 0 0 0 0 Ln 0 0 0 0 0 F- Lr1 LrI Ln Ln � 0 0 0 0 0 0 Ln o Ln o 00 o Ln Ln O LD 0 0 j Ln O OCL L a+ N 41 O � � O O O O O O O O O O O O O O O O O O O O O O O O � u N CD 0 O 0 O O O 0 o O O O O O CD CD O O O O CDZ f6 N x O O O O O O O O O O O O O O O O O O O O O O O O U O w Ln Z _O x LL z C o C CD -- O p 0 O O o 0 0 OO ++ Ln O Ln O O O Ln o O @ m O "6 Ln Ln Ln Ln Ln 00 Ln Ln lD O ra U m j ro 3 � O u Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln O O E O O O O O 0 O O O O O O O �^ m O O O O O O O O O O O O = `o a a � v i Ln m r-i zt Ln Ln v *' '• .--1 00 re) Ql Ol Ln Ln O lD 00 � N N ^ M m M M 00 p v O O O O O O O cu o 0 O O 0 o 0 i Y o v o +� a� o — v o m iD m r- rn r\ M r- 00 Ln 0 V C 1l 0 " LD -4 O lD m 110 00 m Ln V) — S= m m Ln 1\ N cn lD 00 LD Ln r1 i v O O O O o O o O r 0 O O L C - a) + O N CJ Q 0 0 0 0 0 O CD CD CD O a)O O Y O N o Vl Z � v r a o v 0 0 0 0 0 o Ln 0 0 0 O o -O } r 0 0 0 Ln O c- c-1 O Ln LD r1 N v u E c 1 N 'tlzt Ln LD LD r- r- 00 00 N (� Ln N Ln N N Ln Ln Ln Ln In Ln Ln o LL uo w w w w w Lu w w w Lu w w L % (, LnL.L. Li- Ll w L.L. w w L- w L- L- LL D_ } v LA m —4 N N L a rr) CD o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 09 o 0 o o o o O o o o o o 0 o O o o 0 o ID o 0 o � 0 0 0 0 0 0 0 0 0 0 o o 0 o 0 0 0 0 0 cn m olzzr O 1,D O o O o O o O o O O O O o O o O O O O rn > n Ln o � O C, o O O O o O o 0 o O o 0 0 0 o O O o 0 N O N O M O O O O O O O O O O O O O O O O O O O ro v o o M o �.D O O O O O O o O O O O O O O O 0 O o 0 + `~ m o o - O O O O O O O O O O O O O O O O O O O V O O O O O O O O O O O O O O O O o O O O O O O O O O N CD O O O O O O O O O O O O O O O O O a �! o `'"! o " O O O O o 0 o O O o O o 0 0 0 o o O O o m o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n o r- O M O O O o o O O O O O O O O O O O O O O Q N O O m O O O O O O CD CD O O O O O O O CD Q a.Z Ln O O 0 0 0 0 O O O O O O O O O O O O O O O O O CDO O CDO O O O O CDO O O O O O CDO O O � F- ^ O m O N O O O O O O O O O O O O O O O O O O O O O to v 3 Q v O O O O m N O O O _V N x O O O O � O Ln a x 0o X 7 O O L UI O O an d `m O N CD M N cr u r 0 O U a _vi 7 m Ln 111 Ln fD i O O O O Q N i cr O N v Q a O M lD m ,- u u 0 0 a 1' O O v Q O M lD M 00 lD L- v a N O O v O Y U o O O O U _ O N L z v C 0 41 O O O O O Ln N u N n r y N cm Ln Ln un 'O 0 _� LU LJ.J III L i u N Li- L.L Ll