Loading...
HomeMy WebLinkAbout20210371 Ver 2_Emails regarding typo correction on final maps_20230419 Baker, Caroline D From:Thomas, Zachary T Sent:Wednesday, April 19, 2023 3:07 PM To:Kim Hamlin Subject:RE: \[External\] RE: Jake May (#20210371 V2) Hi Kim, Thank you! I will add this to the Laserfiche folder as an update due to a typo on the map, but no changes to permi?ed impacts or totals. Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@ncdenr.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kim Hamlin <KHamlin@SAGEECOLOGICAL.COM> Sent: Wednesday, April 19, 2023 2:13 PM To: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: \[External\] RE: Jake May (#20210371 V2) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Zach! A ?ny change on these maps – Impact Area 5, Zone 2 Roadway Crossing. The impact table and your permi?ed impact = 4,228 SF, however, the callout within the map s?ll listed is as 4,326 SF. I confirmed with the engineer that 4,228 SF is correct and had them update the map so that the callout matched. Addi?onally, the overall impact table on sheet E-3 was updated so that it matched the rest of the document. The revised map set is a?ached. This can replace the previous as the final final. The 401 approval was also checked and confirmed as correct. Thanks again for all your help! Please let me know if you have any ques?ons. Thanks, Kim 1 Kim Hamlin, PWS Sage Ecological Services, Inc. Cell: 919.622.7888 KHamlin@SageEcological.com From: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Sent: Monday, April 17, 2023 9:59 AM To: Kim Hamlin <KHamlin@SAGEECOLOGICAL.COM>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil>; Josh Lambert <josh@strongrockgroup.com>; Chris Stone <cstone@strongrockgroup.com> Subject: RE: \[External\] RE: Jake May (#20210371 V2) Hi Kim, I will add these to my review and hopefully get this finished up for signature soon. Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@ncdenr.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kim Hamlin <KHamlin@SAGEECOLOGICAL.COM> Sent: Friday, April 14, 2023 1:51 PM To: Thomas, Zachary T <zachary.thomas@ncdenr.gov>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil>; Josh Lambert <josh@strongrockgroup.com>; Chris Stone <cstone@strongrockgroup.com> Subject: RE: \[External\] RE: Jake May (#20210371 V2) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good a?ernoon, Zach (and Chris H.)! Please find the revised impact maps a?ached based on NCDWR comments. Details on the changes are below. Chris Hopper – only the second bullet should apply to you as the first is in reference to riparian buffers. Please let me know if you have any other ques?ons or require addi?onal informa?on. Since the revisions do not result in addi?onal permanent stream, riparian buffer, and wetland impacts which would require mi?ga?on, the mi?ga?on plan as originally proposed applies. 2 Thanks, Kim 1. SCM#3 (page 9 of the updated impact maps) shows impacts for a greenway that has been placed on top of the graded fill for an SCM. SCMs placed inside of Zone 1 of the buffer require mi?ga?on and there are currently no totals listed for these impacts or mi?ga?on proposed. Please provide clarifica?on on this impact area. o RESPONSE: SCM#3 on Impact Sheet E-9 (Map Loca?on Area 4), has been revised by incorpora?ng steeper side slopes to avoid Zone 1 impacts to the riparian buffer. No Zone 1 impacts are proposed in this area per the a?ached revised maps. Proposed Zone 2 impacts total 5,794 SF (0.1330 acre). 2. The new impact maps indicate temporary impacts to Wetland WA for riprap of 152 sq? and 106 sq?. Riprap is considered a permanent – no loss impact for us and I will refer to it in my le?er under the permanent impacts column. However, it is unclear if the impacts are for Wetland WA or Stream A when referring to the impact map itself. Please provide clarifica?on on where exactly the riprap is proposed to be installed. o RESPONSE: The rip rap impacts on Impact Sheet E-11 (Map Loca?on Area 5) have been revised to indicate that riprap will be placed within the stream channel. Riprap pads will be installed flush with the exis?ng bed eleva?on, and should be considered Permanent, No Loss impacts to the stream. Addi?onally, labels and rows have been added to the map and the impact table to indicate temporary stream and wetland impacts for dewatering and temporary sediment & erosion control measures to install the culvert and riprap pads. New impact totals as proposed in the revised plan are as follows:  Stream SA – Riprap – Permanent, No Loss – 15 LF (98 SF / 0.0022 acre)  Stream SA – Dewatering – Temporary – 5 LF (36 SF / 0.0008 ac)  Wetland WA – Dewatering – Temporary – 124 SF (0.0028 ac) Kim Hamlin, PWS Sage Ecological Services, Inc. Cell: 919.622.7888 KHamlin@SageEcological.com From: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Sent: Thursday, April 13, 2023 9:40 AM To: Kim Hamlin <KHamlin@SAGEECOLOGICAL.COM>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil>; Josh Lambert <josh@strongrockgroup.com>; Chris Stone <cstone@strongrockgroup.com> Subject: RE: \[External\] RE: Jake May (#20210371 V2) Hi Kim, Thank you for sending the a?achments (SOA, JD info, buffer le?er, SHPO, FWS) over a?er our conversa?on. I have two addi?onal items that I need clarifica?on on before I can issue my le?er:  SCM#3 (page 9 of the updated impact maps) shows impacts for a greenway that has been placed on top of the graded fill for an SCM. SCMs placed inside of Zone 1 of the buffer require mi?ga?on and there are currently no totals listed for these impacts or mi?ga?on proposed. Please provide clarifica?on on this impact area. 3 o  The new impact maps indicate temporary impacts to Wetland WA for riprap of 152 sq? and 106 sq?. Riprap is considered a permanent – no loss impact for us and I will refer to it in my le?er under the permanent impacts column. However, it is unclear if the impacts are for Wetland WA or Stream A when referring to the impact map itself. Please provide clarifica?on on where exactly the riprap is proposed to be installed. Please let me know if you have any questions. Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@ncdenr.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kim Hamlin <KHamlin@SAGEECOLOGICAL.COM> Sent: Wednesday, April 5, 2023 10:21 AM 4 To: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: \[External\] RE: Jake May (#20210371) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Kim Hamlin, PWS Sage Ecological Services, Inc. Cell: 919.622.7888 KHamlin@SageEcological.com From: Kim Hamlin Sent: Monday, April 3, 2023 2:17 PM To: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: RE: Jake May (#20210371) Hey Zach! I believe you’re in a mee?ng now, but just give me a shout when you are available. I’ve a?ached the items you men?oned in your voicemail. The impact maps dated 2-15-2023 are the most recent set. Thanks, Kim Kim Hamlin, PWS Sage Ecological Services, Inc. Cell: 919.622.7888 KHamlin@SageEcological.com From: Kim Hamlin Sent: Tuesday, March 28, 2023 10:09 AM To: Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: Jake May (#20210371) Hey Zach – happy Tuesday! Just checking in on the status of this one for the client. Thanks for pushing out those others recently. You’re doing a bang up job! Thanks, Kim Kim Hamlin, PWS Sage Ecological Services, Inc. Cell: 919.622.7888 KHamlin@SageEcological.com 5