Loading...
HomeMy WebLinkAboutWQ0003924_BIMS Report_20230404 Compliance Inspection Report Permit:WQ0003924 Effective: 03/26/19 Expiration: 07/31/24 Owner: Linco Partnership SOC: Effective: Expiration: Facility: Linco Partnership- Lincolnton WWTF County: Lincoln 288 Whitehouse Dr Region: Mooresville PO Box 916 Lincolnton NC 28093 Contact Person:Ronald Buck Title: Phone: 615-579-3815 Directions to Facility: From Hwy 150 in Pumpkin Center, travel west for approx. two miles and turn right onto Shuford Rd. Travel approx.five miles to its intersection with Old Hwy 321 (Maiden Rd). Turn left and travel approx. two miles to White House Rd on the right. System Classifications: SI, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 01/23/2023 Entry Time 10:OOAM Exit Time: 01:15PM Primary Inspector:Edward Watson Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wastewater Irrigation Facility Status: ❑ Compliant Not Compliant Question Areas: Miscellaneous Questions Record Keeping Treatment Lagoons (See attachment summary) Page 1 of 4 Permit: WQ0003924 Owner-Facility:Linco Partnership Inspection Date: 01/23/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On January 23, 2023, MRO staff performed a Compliance Inspection for the Linco Partnership Wastewater Treatment System under Permit WQ0003924. MRO staff was on-site at 10:00 AM. The MRO staff met with Mr. Tom Whitner, P.G. of CDG. Activities that have occurred to address ongoing issues at the facility are: 1. On December 7, 2022, MRO received photo documentation regarding the pressure washing of the 300,000-gallon surge tank, the sump pits, and the rinse pit. 2. Included in the December 7, 2022 communication, the MRO received electronic communication from Sheild Engineering,(now GDC)that the rinse pit was emptied, pressure cleaned, and the wastewater from the rinse pit was properly disposed of. The MRO staff was electronically provided with the Waste Manifests documents for the disposal of the wastewater from these activities. During the site visit, a sump pump was observed in the Southwest corner of the rinse pit. However, MRO staff was not able to identify where the pumped water was being sent to. The MRO is satisfied the wastewater in the front pit has been addressed properly. 3. The December 7, 2022, waste manifests include the disposal of the fluid that was in the 300,000-gallon surge tank and the sludge pits. Photo documentation was provided as part of this communication. During the site visit, the sludge pits were full of fluid. The fluid in the pit water displayed a sheen and the pits were near the top of their storage capacity. The presence of a sheen indicates that the water in the pits continues to be wastewater. Mr. Whitner offered to have the pit water sampled to determine if the water could be classified as stormwater. MRO staff has not received water sampling results to see if the water in the pits can be classified as other than wastewater. The high water level of the pits indicates that with a reasonable amount of precipitation, the pits could overflow and travel overland to the surface water feature on the South side of the property. A WWT System Closure Report was received from CDG on January 26, 2023. CDG report indicates the water that enters the sludge pits is stormwater coming off of the roof drains. It is also known that stormwater flows through an underground drain network that discharges into the same pits. During the site visit, we were able to locate a map that displays the underground drain network. Mr. Whitner agreed to have a copy of the map sent to the MRO. However, the MRO DWR is not aware of a separate Stormwater Permit being in place for this facility. Mr. Whitner also conveyed separately, that the treatment system tank inside the building is scheduled to be removed and sold. The presence of residual material from the treatment system may be present in the drain lines. The residual waste could be what was observed in the waste pits. However, the pits can no longer transfer fluid to the 300,000-gallon surge tank. The 300,000-gallon surge tank was also observed during the site visit. The tank had been emptied and cleaned. There was a small amount of rainwater observed in the 300,000-gallon tank. A square hole was cut into the south side of the tank about 2.5 feet above the bottom of the tank. According to the document provided by CDM, Linco is planning on having the tank dismantled and removed from the property. Page 2 of 4 Permit: WQ0003924 Owner-Facility:Linco Partnership Inspection Date: 01/23/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Reuse(Quality) ❑ Infiltration System ❑ Single Family Spray, LR ❑ Activated Sludge Spray, HR ❑ Activated Sludge Spray, LR ❑ Activated Sludge Drip, LR ❑ Recycle/Reuse ❑ Single Family Drip ❑ Lagoon Spray, LR Record Keeping Yes No NA NE Is a copy of current permit available? ❑ 0 ❑ ❑ Are monitoring reports present: NDMR? ❑ 0 ❑ ❑ NDAR? ❑ 0 ❑ ❑ Are flow rates less than of permitted flow? ❑ ❑ 0 ❑ Are flow rates less than of permitted flow? ❑ ❑ 0 ❑ Are application rates adhered to? ❑ ❑ ❑ Is GW monitoring being conducted, if required (GW-59s submitted)? ❑ ❑ ❑ Are all samples analyzed for all required parameters? ❑ ❑ ❑ Are there any 2L GW quality violations? ❑ ❑ ❑ Is GW-59A certification form completed for facility? ❑ ❑ ❑ Is effluent sampled for same parameters as GW? ❑ ❑ ❑ Do effluent concentrations exceed GW standards? ❑ ❑ ❑ Are annual soil reports available? ❑ ❑ ❑ #Are PAN records required? ❑ ❑ ❑ #Did last soil report indicate a need for lime? ❑ ❑ ❑ If so, has it been applied? ❑ ❑ ❑ Are operational logs present? ❑ 0 ❑ ❑ Are lab sheets available for review? ❑ 0 ❑ ❑ Do lab sheets support data reported on NDMR? ❑ ❑ ❑ Do lab sheets support data reported on GW-59s? ❑ ❑ ❑ Are Operational and Maintenance records present? ❑ ❑ ❑ Were Operational and Maintenance records complete? ❑ ❑ ❑ Has permittee been free of public complaints in last 12 months? 0 ❑ ❑ ❑ Is a copy of the SOC readily available? ❑ ❑ 0 ❑ Page 3 of 4 Permit: WQ0003924 Owner-Facility:Linco Partnership Inspection Date: 01/23/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine No treatment units bypassed since last inspection? ❑ 0 ❑ ❑ Comment: There is no ORC or backup ORC assigned to the facility. NDMR and NDAR-1 reports have not been submitted for over two years. O&M records for the facility are not being kept for the facility. Page 4 of 4