Loading...
HomeMy WebLinkAbout20140045 Ver 2_Corps e-mail_20150506 Ward, Garcy From:Wheeler, Tracey L SAW <Tracey.L.Wheeler@usace.army.mil> Sent:Wednesday, May 06, 2015 9:45 AM To:Williams, Paul C; Ward, Garcy Cc:Willis, Thomas C Subject:RE: Permit modification request for Pasquotank #55 (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Paul, The project as described does not require authorization from the US Army Corps of Engineers. I have included a copy of your email in the project file. Please notify this office of any changes to the project, as authorization may be required. Tracey L. Wheeler Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West 5th Street Washington, North Carolina 27889 (910) 251-4627 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://regulatory.usacesurvey.com/. -----Original Message----- From: Williams, Paul C \[mailto:pcwilliams2@ncdot.gov\] Sent: Tuesday, May 05, 2015 8:50 AM To: Wheeler, Tracey L SAW; Ward, Garcy Cc: Willis, Thomas C Subject: \[EXTERNAL\] Permit modification request for Pasquotank #55 Tracey and Garcy, Albemarle Electric has recently notified NCDOT that the power line would need to be relocated at the Pasquotank Bridge #55 project site. Two temporary poles would need to be installed, and each pole will require a guy wire. The installation of the guy wires will impact wetlands, resulting in a total of 300 sq. ft. of temporary hand clearing. Each guy wire will require hand clearing an area 6' wide by 25' long in the understory of the wetlands. The areas are shown in the attached photos. The guy wires will be placed in a manner that will not impact any mature trees in the wetlands, only impacting the understory of the flooded swamp. Mats will be used in the wetland area of the maintained utility corridor to move the auger truck into position for pole and guy wire installation. The auger arm of the truck will reach into the hand cleared areas from the maintained corridor to install the anchors for the guy wires. After bridge 1 construction, the power line will be relocated to its original alignment and the temporary poles and guy wires will be removed. The hand cleared areas for the guy wires will not be maintained. The attached revised permit drawing includes the 300 sq. ft. of temporary hand clearing for the guy wires and the temporary poles. Please let me know if there is any additional information you need, or any questions you may have about the request. USACE SAW-2014-00392 NCDWR Project #20140045 Thanks, Paul C. Williams, Jr. Environmental Specialist NCDOT Division One 113 Airport Dr., Suite 100 Edenton, NC 27932 252-482-1861 office 252-482-8722 fax 252-333-9812 mobile ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ________________________________ 2 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE 3