HomeMy WebLinkAbout820301_30 day plan of action_20230401PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
82-301
County: Sampson
Facility Name: Tommie Naylor Farm 1 & 2
Certified Operator Name: James Earl Naylor Operator Number: 22404
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
2. Check all applicable items
2
N N
18 18
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 4/13/2023
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Tommie L. Naylor Phone
Facility Owner/Manager (print)
Date
Facility Owner/Manager (signature)
910-564-2679
4/11 /2023
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m =
lb PAN
2.
Structure ID: 2
line m =
142.6 lb PAN
3.
Structure ID: 3
line m =
219.3 lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
In. lines 1 +2+3+4+5+6=
362.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
^ ~584.5
u. application window'
10678
18
corn
4.54
128.75
Mar -Jun
10678
19
corn
4.59
128.75
591.0
Mar -Jun
10678
20
corn
4.59
128.75
591.0
Mar -Jun
10678
21
corn
4.59
128.75
591.0
Mar -Jun
10678
22
corn
3.86
128.75
497.0
Mar -Jun
10678
23
corn
2.47
128.75
318.0
Mar -Jun
10678
24
corn
1.32
128.75
170.0
Mar -Jun
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3342.4 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 362.0 lb. PAN
PoA (30 Day) 2/21 /00
x. Crop's remaining PAN balance (line v from section III) = 3342.4 lb. PAN
y. Overall PAN balance (w - x) _ -2980 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2/21 /00
PoA (30 Day) 2/21 /00
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker I inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 19.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 92125 ft2
e. line c/12 x line d x 7.48 gallons/ft3 1091067 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116329 ft3
h. current herd # �0 certified herd # 2900
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ft3
01 ft3
53740 ft3
66996 gallons
1 —1lbs/1000 gal.
0 lbs. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 31250 ft2
e. line c/12 x line d x 7.48 gallons/ft3 19479 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 29012 ft3
h. current herd # 1000 certified herd # 1000
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 4/5/2023
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
29012 ft3
�ft3
18229 ft3
58894 gallons
1.82 Ibs/1000 gal.
142.6 Ibs. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 51975 ft2
e. line c/12 x line d x 7.48 gallons/ft3 32398 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 40353 ft3
h. current herd # 1224 certified herd # 1224
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 4/5/2023
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
40353 ft3
I ft3
30319 ft3
88104 gallons
1.82 Ibs/1000 gal.
219.3 Ibs. PAN
PoA (30 Day) 2/21 /00