Loading...
HomeMy WebLinkAbout20140513 Ver 2_DCM Permit_20150507����r ��,�" NCD�ETlR North Carolina Department af Environment and Natural Resources Pat McCrary Goverrtor May 7, 2015 Clay Willis Division One Environmental Supervisor NC Department of Transportation 113 Airport Drive, Suite 100 Edenton, NC 27932 Donald R. van der VaarE Secretary RE: Refinement of CAMA Major Development Permit No. '17-14, Replacement of Bridge #3 aver Deep Creek on US 264, Dare County. Dear Mr. Willis: This letter is in response to your request dated Apri127, 2015, including the attached drawings (3}: 2 dated April 16, 2015 and 1 dated April 17, 2015, requesting approval for changes in the design of Bridge #3 over Deep Creek in Dare Caunty. An error in the consti-uction benchmark elevation has resulted in ihe bridge structure and roadway approaches being set at an 8.5" higher elevation than the ariginal design. The increased roadway elevation will require more fill and result in a steeper slope of 1.5:1 at sections of the road shoulder. The newly designed road shoulder will be stabilized with 685 feet of rip rap. No additional surface water or wetland impacts are requested or anticipated with the request. � Please be advised that through this Letter of Refi�ement, the N.C. Division of Coastal Management (DCM) conveys its determination that t�e 1.5:1 slope and 685 feet of rip rap shoulder stabilization as described in your request dated Apri127, 2015 is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of CAMA Major Permit No. 77-14. This letter shall be attacheci to the original of CAMA Permit No. 77-14, which was issued on August 29, 2014, and both documents shall be readily available on site when a DCM representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force unless altered herein. This approval does not eliminate the need ta abtain any additional permits, approvals or authorizations that may be required. 400 Corr�roerce Ave., Morehead City, NC 28557 Phone: 252�48-28081 FAX: 252-247-3330 Internet: www.nccoastalmanagament.net M Equal Opporiunily 1 Aifirma6ve Action Employer CAMA Major Permit No. 77-14 Refinement Letter May 7, 2015 Page 2 of 2 Please contact Greg Daisey at (252} 264-390i ext. 249 if yau have any questions or cancerns. Sincerely, ��.G- �/H�� _ Daug Huggett Major Permits and Consistency Coardinator N.C. Division of Caastal Management cc: Greg Daisey, NCDCM Cathy Brittingham, NCDCM Tracey Wheeler, USACE Garcy Ward, DWR Mike Bryant, USFWS 400 Commerce Ave„ Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247�334 Intemel: www.nccoastalmanagement.net M Equal Opportunily 1 AffirmaGve Action Empbyer