Loading...
HomeMy WebLinkAbout20071730 Ver 1_More Info Received_20071022LMG LAND MANAGEMENT GROUP irrc. Environmental Consultants October 18, 2007 TO: Mr. Ian McMillan NC Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 ~~Y 0'j - I ~ 3,0 RE: Additional Information for San Rio Ocean and River Club: Phases 2 and 3 Brunswick County, NC Action ID# 200600440 Dear Ian: We received your letter dated October 15, 2007 in which you note that Page 3 of the PCN application was missing. Enclosed please find Page 3. I apologize for the error. Please contact me if you have any questions or need any additional information. Thank you for your assistance with this project. Sincerely, ~~ Kim Williams Wetland Scientist Encl. C: Mr. Jim Green, Wakefield Development Co. Mr. Chad Coburn, DWQ Ms. Kim Garvey, ACOE Qr~~r~adc~~ OCT 2 2 2001 DENk - WAi tik ~i1AUTY VVE(1A110~ Allis >~UfiMlMhTfiR t www.lmgroup.net • info@Imgroup.net • Phone: 910.452.0001 Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 P.O. Box 2522, Wilmington, NC 28402 °~- i~3.o 10. Describe the overall project in detail, including the type of equipment to be used: The applicant proposes to create necessary infrastructure to access a residential subdivision. There will be a total of four wetland crossings and one wetland/stream crossing. Brides will be constructed at all four of the crossings. Temporary impacts are needed at the four crossings to install utilities. Additional material maybe trucked in if needed. A track hoe and bulldozer will be used to level fill material. Road construction will follow sedimentation and erosion control plans. Silt fences will be used to reduce erosion into adjacent wetlands. Lots will be sold for individual development. 11. Explain the purpose of the proposed work: To provide access and utilities for residential development. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. 404 wetlands were delineated by LMG and approved by Mr. Tom Farrell of the US Arm~rps of En:;ineers on 1/27/06 (Action ID# 200600440. The applicant obtained a `No Permit Required' letter from Ms. Kim Garvey on 7/12/07 for Phase 1 development. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No additional wetland or stream impacts are anticipated on this site. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs maybe included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Updated 11/1/2005 Page 3 of 8