Loading...
HomeMy WebLinkAbout20021259 Ver 1_Staff Comments_20021003[Fwd- Deep Creek Mitigation Bank] Subject: [Fwd: Deep Creek Mitigation Bank] Date: Thu, 03 Oct 2002 11:32:42 -0400 From: "Todd St. John" <todd.st.john @ncmail.net> Organization: DWQ Wetlands Unit To: Jennifer Frye <Jennifer.Frye @ncmail.net> Pete J brought in some plan to me today... the answers seem adequate and the rest seems good... i have attached a draft 401 if you want to issue... if not let me know and we'll issue Subject: RE: Deep Creek Mitigation Bank Date: Tue, 1 Oct 2002 13:27:26 -0400 From: "Peter" <Jelenevsky @sandec.com> To: "'Todd St. John "' <todd.st.john @ncmail.net> Todd, I can e -mail the drawing if you would like. But the files are fairly large, therefore; they may need to be sent individually. Peter - - - -- Original Message---- - From: Todd St. John [ mailto:todd.st.iohn @ncmail.net] Sent: Tuesday, October 01, 2002 1:14 PM To: Peter Subject: Re: Deep Creek Mitigation Bank weren't you gonna send me some plans, too? if so i have some free prog to read auto cad files... if that is helpfull... Peter wrote: > Todd, > This e -mail is in response to your questions regarding the stream > restoration plan proposed for the Deep Creek Mitigation Bank that we > visited last Wednesday, September 25, 2002. I have responded to the > question in the order in which they were received below. > 1) All of the shaded areas depicted on figure 4 of the proposed stream > mitigation plan, which highlights the wetland restoration and creation > areas that will be planted with bare root seedlings and available > transplants. Trees will be planted on an 8 -foot by 8 -foot spacing, > resulting in approximately 600 seedlings per acre. The wetland > restoration component of the mitigation plan was addressed in the > Mitigation Banking Instrument, therefore I did not elaborate on the > proposed wetland mitigation plan beyond the proposed footprint. > 2) The drawing has been modified and depicts the footers to be the > same size as the top rocks. I will be sending copies of the modified > figure to your office. > 3) Although no blocks are going to be constructed, proposed > impervious dikes will be utilized to facilitate the pump around of base > flow within the channel when work occurs within the current channel. 1 of 4 10/7/2002 9:40 AM [Fwd: Deep Creek Mitigation Bank] > Following the completion of the pumping procedures, the dikes will be > left in place and the old channel sections will be backfilled with the > borrow excavated from the new channel alignment. A detail depicting the > impervious dike structure will be sent to you. > 4) The proposed channel slope is 0.00289 from station 4 +88a to > 14 +55a (Reach 3) (riffle to riffle) and the proposed valley slope > following the construction of the bankfull bench will be .0038 from > station 4 +88a to 13 +65a. I have excluded the step -pool section located > between stations 14 +55a and 15 +87a from the slope calculation. If you > measure the proposed channel length and divide by the valley length the > sinuosity ends up being 1.35 if you divide the valley slope (bankfull > bench slope) by the stream slope the sinuosity is 1.31. Based on the > re- calculations the valley slope was incorrectly calculated for reach 3, > therefore; it should be 0.0038 versus 0.0030. > 5) I used the average values of all three reaches when determining > the sediment transport and entrainment for the existing and proposed > channels. > 6) Yes, American Wetlands will hold the easement until the > monitoring period is over and the agencies sign off on the success > criteria. Subsequently, the Piedmont Land Conservancy will retain the > easement. The acceptance letter from the Piedmont Land Conservancy is > located in Section 9 of the Stream Restoration Plan. > 7) The base flow pipe (center pipe) will be buried approximately 6 > to 12 inches below the proposed channel invert. The figure depicting > the crossing will be modified to show this adjustment and subsequently > forwarded to you. > I hope to have all of the figures and sheets modified by Wednesday and > will probably deliver them to your office myself on Thursday. If you > have any other questions or comments e -mail me or call me on my mobile > at 919 - 280 -0603. > Peter > - - - -- Original Message---- - > From: Todd St. John (mailto: todd. st. john @ncmail.net] __._._ , .. _ > Sent: Tuesday, September 03, 2002 12:52 PM > To: Jennifer Frye; jelenevsky@sandec.com > Cc: dave.penrose > Subject: Deep Creek Mitigation Bank > Jennifer, i guess it will just be you, me and Pete J. on the 6th > (Friday) for > the Deep Creek site only. He will email you our meeting location and > time as > i will just be a happless passenger in Pete's vehicle... Maybe we can > look at > the Wal -Mart Kernersville relocation site on the way back? > Anyway, Pete, I reveiwed the plan and have some questions... Jennifer > may > also have questions, but I don't think she has received a copy of the > plans 2 of 4 10/7/2002 9 40 AM