Loading...
HomeMy WebLinkAbout20050732 Ver 31_Stormwater Info_201504244 44F TO NCDENR — Division of Water Resources 401 & Buffer Permitting Unit 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 ATTENTION Mr. Boyd Devane �a�Sa�3a vim/ LETTER OF TRANSMITTAL DATE April 17, 2015 PROJECT NO 2735 -0113 TASK NO EXP RE Briar Chapel — Boulder Point Extension TRANSMITTAL NO 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg No. Rev. Description Status 2 Stormwater Design Plans G 2 Narrative & Supporting Calculations G 2 BMP #20 Design Supplement G 2 BMP #20 O &M Agreement (1 Original, 1 copy) G Issue Status Code REMARKS: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Boyd, Please find the enclosed documents for your review. Please let us know if you have any questions or comments. Thank you. Cc: LR 10 APR 2 4 2015 ; 1730 Varsity Dnve, Suite 500 Raleigh, NC 27606 919/233 -8091 Fax 919/233 -8031 McKIM & CREED, INC. Signed Gareth Avant, PE Permit Number (to be provided by DWQ) O�O� wAT F9�G NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information 1. PROJECT INFORMATION' �� • ' "' `° Protect name Briar Chapel Development - Boulder Point Drive Extension Contact name Gareth Avant, PE Phone number 919 233 8091 Date April 17, 2015 Drainage area number 1 - BMP 420 II. DESIGN]NFORMATION_m, Site Characteristics 2 Drainage area 173,190 ft Impervious area 79,129 ft2 Percent Impervious 45.5% % Design rainfall depth 10 Inch Peak Flow Calculations Is pre /post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 3 In 1 -yr, 24 -hr intensity 013 in /hr Pre - development 1 -yr, 24 -hr peak flow ft3 /sec Post - development 1 -yr, 24 -hr peak flow ft3 /sec Pre /Post 1 -yr, 24 -hr peak control ft3 /sec Storage Volume: Non -SA Waters Minimum volume required 6,6590 ft3 Volume provided 6,891.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff ft 3 Post - development 1 -yr, 24 -hr runoff ft 3 Minimum volume required 0 ft, Volume provided ft, Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 100 ft Surface area of the top of the bioretention cell 7 453 0 ft2 OK Length 100 ft OK Width 60 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 12 hr OK Drawdown time, to 24 inches below surface 12 hr OK Drawdown time, total 24 hr In -situ soil Sod permeability in /hr Planting media soil Soil permeability 455 in /hr OK Soil composition % Sand (by volume) 87% OK % Fines (by volume) 10% OK Form SW401- Bioretention -Rev 8 June 25, 2010 I APR 4 015 L_ _ 13UF,' - - "t: hi 1=�E f2hFi f -I iiy.,� Parts I and II Design Summary, Page 1 of 3 % Organic (by volume) Phosphorus Index (P- Index) of media 3% OK Total 100% 10 (unitless) OK Permit Number (to be provided by DWQ) Form SW401- Bioretention -Rev B June 25, 2010 Parts I and 11 Design Summary, Page 2 of 3 Permit Number (to be provided by DWO) Basin Elevations Temporary pool elevation 522 00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions) OK Is this a grassed cell? Y (Y or N) OK Is this a cell with trees /shrubs? (Y or N) Planting elevation (top of the mulch or grass sod layer) 521 fmsl Depth of mulch Inches Bottom of the planting media soil 519 fmsl Planting media depth 2 ft Depth of washed sand below planting media soil 0 4 ft Are underdrains being installed? Y (Y or N) How many clean out pipes are being installed? 12 OK What factor of safety is used for sizing the underdrains? (See 2 OK BMP Manual Section 12 3 6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 517.6 fmsl SHWT elevation fmsl Distance from bottom to SHWT 517 6 ft OK Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 521 ft Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed N (Y or N) Excess volume must pass through filter. through a vegetated filter? What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? (Y or N) Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3 1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access Y (Y or N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) >2 ft/sec Insufficient inlet velocity unless energy dissipating devices are being used Is the area surrounding the cell likely to undergo development in the N (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20 %? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3 -5 ft of grass) Grassed swale OK Forebay X Other Form SW401- Bioretention -Rev 8 June 25, 2010 Parts I and 11 Design Summary, Page 3 of 3 Permit No (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST, ` - >� <;,�._• Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to Indicate the following design requirements have been met If the applicant has designated an agent, the agent may Initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. GCA C3.0 1. Plans (1" 50' or larger) of the entire site showing. - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GCA D3.1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing. Outlet structure with trash rack or similar, Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip. GCA D3.1 3. Section view of the wet detention basin (1" = 20' or larger) showing. Side slopes, 3.1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. GCA N/A 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. GCA Calc Booklet 5 A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. GCA C3 0 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GCA Calc Booklet 7. The supporting calculations. GCA Included 8 A copy of the signed and notarized operation and maintenance (0 &M) agreement GCA N/A 9. A copy of the deed restrictions (if required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin -Rev 8- 9/17/09 Part III Required Items Checklist, Page 1 of 1 RD F J APR 2 4 2'015 DEW - Vv, TEt, RFSUUkG:_ S Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretenttron cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems: How I will remediate the problem: The entire BMP Trash /debris is present Remove the trash /debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. a licable ). Form SW401- Bioretention O &M -Rev.3 Page 1 of 4 BMP element: Potential problems: How I will remediate the problem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and /or flow to the pretreahnent area. ullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes /wires are present Remove tree stake/ wires (which six months after planting can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and /or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401- Bioretention O &M -Rev.3 Page 2 of 4 BMP element: Potential problems: How I will remediate the problem: The underdramn system Clogging has occurred. Wash out the underdram system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. 733 -1786. Form SW401- Bioretention O &M -Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Briar Chapel - Boulder Point Drive Extension BMP drainage area number:I - Bioretention Area #20 Print name:Laurie Ford Title: Vice President, Operations - Address: 16 Windy Knoll Circle, Chapel Hill, NC 27516 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president 1, Megom E. L; a Notary Public for the State of MIDOh .QO W4\Ck County of DULdArrt do hereby certify that - L Gttt.r -i a FOCC� - _ __ personally appeared before me this day of kbC it , 2.016. and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, e- UO; NpTAII V d PUBOG If coko G tuw SEAL M+yn c ate My commission expires 1161/m -- Form SW401- Bioretention I &M -Rev. 2 Page 4 of 4 401 NARRATIVE & SUPPORTING CALCULATIO Briar Chapel Development Boulder Point Drive Extension Chatham County, North Carolina April 17, 2015 Prepared for: BRIAR. ZCHAPEC Newland COMMUNITIES NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Prepared By: MCIQM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 02735 -0113 `�`"✓ DAN �� 7PR 4 20 15 I i acQ��4�ssra��� ���y�`' -r "kALw 0,30348 = 04/17/2015 PROJECT DESCRIPTON The purpose of the project is to construct stormwater management and roadway infrastructure to support future development within the western area of the Briar Chapel development. Based on the conditions of the approved 401 Water Quality Certification, NCDENR -DWQ will require runoff from the roads and impervious surfaces to be captured and treated for 85% TSS removal before being discharged into existing stream buffers. To meet this requirement, the runoff from the current and future development within the eastern portion of the project will be captured and directed into Bioretention #20. The western portion of the site, due to its relatively small impervious area will bypass all offsite drainage through the project area and direct runoff generated from the new proposed development into a scour hole, where it will be dissipated and directed offsite as diffuse flow. Future development from the extension of Boulder Point Drive will be captured and directed to approved BMPs to the maximum extent practicable Calculations for this new facility are included in this package. SITE DESCRIPTION The project area is approximately 3.59 acres of disturbed area located within Briar Chapel West development area, of which 2.24 acres have already been permitted. This extension will begin at the current intersection of Boulder Point Drive and Briar Chapel Parkway and extend Boulder Point Drive by approximately 1,250 feet. The site generally slopes away from 3 high areas; 1 located at the intersection of Briar Chapel Parkway and current Boulder Point Drive, where the site drains towards the west; 1 located about midway of the alignment, where the site drains in both directions; and another located at the western end of the extension which drains towards the east. Additionally, the western side of the project area has buffered streams that are tributary to Pokeberry Creek (WS -IV; NSW). SOILS According to the Chatham County Generalized Soil Survey, the soils located on the site are classified as Wedowee sandy loam, 2 to 35 percent slopes (WeB, WeC, and WeE). The following soil descriptions are associated with the soils found on the site: We(X) - Wedowee sandy loam soils are often found in piedmont uplands, along ridges and side slopes Permeability is moderate and the soils are well drained. Soils have a low shrink /swell potential. The seasonal high water is generally more than 6.0 feet below the surface. BIORETENTION DESIGN The goal of this bioretention area will be to remove 85% of the total suspended solids entering from the surrounding impervious drainage area before discharging into the adjacent stream. To obtain the goal of keeping the footprint as small as possible the temporary ponding depth for the design is 12 ", which is the maximum desired as stated in the BMP Manual. Any runoff exceeding the ponding depth will be discharged, via a riser structure and outlet pipe, directly into the adjacent stream buffer at non - erosive velocities. Engineered bioretention media will not be placed until the northern future development has been stabilized such that no damage to the media can occur. Runoff exceeding ponding depth will still be discharged Design parameters were taken from the BMP manual and from DWQ's design supplement forms. MAINTENANCE CONSIDERATIONS The property owner shall be responsible for periodic inspection and maintenance of all permanent stormwater management devices and shall adhere to conditions agreed upon by the executed Operation and Maintenance agreements. Any measure that fails to function as intended shall be repaired immediately. recipitation Frequency Data Server http: // hdsc. nws. noaa .gov /cgi- bin/hdsc /buiIdout.perl ?type =ldf &units =us &s. . POINT PRECIPITATION��"� FREQUENCY ESTIMATES 9 FROM NOAA ATLAS 14 wo CHAPEL HILL 2 W, NORTH CAROLINA (31 -1677) 35.9086 N 79.0794 W 462 feet from'Precrprtation- Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G M Bonnet, D Martin, B Lm, T Parzybok, M Yekta, and D Riley NOAA, National Weather Service, Saver Spring, Maryland, 2004 Extracted Wed Jan 202010 Confidence Limits Seasonality Location Maps Other Info. GIS data Maps r Docs Return to State Map Precipitation Intensity Estimates (in /hr) j ARI* ; 10 I 15 I 30 60 i 120 f3j j 10 [20 30 I t45 60 5 rmn I� hr �6 hrhr . 12 hr 24 hr 48 hr 44 day 7 dav� years)i� min I' min min min II "�" l����F�� - j 4.93 ! 3 94 13.28 ! 2.25 1.40 0.84 0.60 0.36 0.21 10.12 i 0.07 ' 0.04 0.03 ! 0.02 0.01 j 0.01 O.OI 0.01 j ;5.81 4.64 ,3.89 J2.69 1.69 11.01 ;0.72 !0.43 j0_25 J015 0.09 ;005 10.03 ;OA3 10.02 �OAI 0.01 10.01 j ;6.70 15.36 452_3.21 2.06 j 1.25 !089_0.53 �0.32�0.19 Ir X0.06 004 ;0.03 0.02 �0.02�0.01 0.01 10 7.38 ; 5.90 4.98 13.61 2.35 1.43 1.03 0.62 ( 0.37 0.22 10.12 ; 0.07 0.04 0.03 10.02 0.02 10.01 10.01 _25 8.1 l F6:476 5.46 j 4 04 2_69 L66 1.20 0.73 j 0_44 ! 0.25 0.15 0.08 O:OS 0.04 0.03 0_02 0:02 0.01 50 8.62 6.86 t 5 79 4.36 2.95 L85 1 34 u 0.82 0 `50 0.29 j 0.16 1009 0.06 ! 0.04 0_03 0.02 0_02 0.02 100 9 07 7 21 ' 6.07 .4.65 3.20 ! 2.02 148 10.91 0.56 0.0.18 1 0.10 10.06 10.05 0.03 (OA2 0.02 10.02 j 200 v 9.44 7 49 j 6.30 ` 4 90 7 3.44 2.20 , 1.63 1.01 1 0162 j 0.35 0_20 411_ 0.07 OAS l 0.03 0.03 1 0.02 J O 2 ji 500 9.85 7.79:6.54 5.21 3.73 2.43 1 82 L 14 ; 0 71 1[!.4O J 0 22 1 0_12 0 08 0.06 ' Oy04 11 0.03 i [070i]0.02 1000 10.19 8.02 6.71 5.43 3 96 262 1.98 1.24 0.78 0 43 0.24 0.13 j 0.08 0.06 ; 0.04 11 0.03 0.02 0 02 * These precipitation kequencyesbmates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAAflas 14 Document for more information NOTE Formatting forces estimates near zero to appear as zero * Upper bound of the 90% confidence interval E5, Precipitation Intensity Estimates (in /hr) _ ARI ** 10 15 30 60 120 3 6 12 24 48 4 7 10 ' 20 30 I 45 60 (yea[s)i min �� mini min hr - hr hr -� hr daY �Y [day �Y �Y �Y �Y �' 5_39 1 4.31 : 3.59 2.46 1 53 KY-, 0_65- 0.39 , 0.23 0 13_, 0.08 0.04 O. K0.0 0.01 i 0.011 0.01 10 O l 6.36 5. 88J4.26'2.94 L85iL11 0.79 047 10.28 10.16 ;0.09_0.05 0.03 '003 ;002 ;0.01 10.01 ;001 7.31 5.86 4.94 3 51 2.25 1 1 37 0 97 0.58 .0 - 3 4 0.20 0 12 0.06 0.04 0.03 0.02 10 02 O.OI 110.01 1 10 ; 8.06 6.44 5.43 3.94 2.56 1.57 1.12 0.68 0.40 0.23 0.13 , 0.07 0.05 0.04 0.02 0.02 j 0.02 0.01 i 25 8.83 7.04 5.95 ; 4.41_ 2.93 1 1.82 1.31 0.79 10.48 0.27 ' 0.16 0.09 ! 0.05 0.04 0.03 0.02 ' 0.�2 11 0.01 ! 50 9.38 7.48 ; 6.31 4.75 3.22 2.02 1.47 0.89 10.54 1 0.31 0.17 0.10 0.06 0.05 0.03 0.02 0.02 0.02 100 ' 9 89 ! 7.85 6.62 5.07 3.49 ; 2.22 1.62 0.99 0.60 j 0.34 0.19 0.11 0.07 , 0.05 .0.03 i 0.02 0.02 00 02 ii 200 10.32 8_18 6.88 5.35 3.75 2.41 1.78 1.09 � 0_67 0_3� 0.21 0.12 0.07 0_06_ 0_04 I 0 03 0.02 0 �2 500 1 0.78 ' 8.52 7.15 F-- .69 F-- .08 F-- .66 1.99 ; 1.23 F-- .76 0 43 0.24 0.13 0.08 0 06 0 04 i 0 03 I 0 02 10 02 1000 11.14 8.77 7.34 ; 5.94 4.34 2.87 12.16 1.36 0.85 0.46 ! 0.26 0.14 _09 0.07 i 0 04 1 0.03 I 0 02 l 0 02 i *The upper bound ofthe confidence interval at 90% confidence level is the value which 5% of the simulated quantle values for a given frequencyare greater than **These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAA las 14 Document for more information NOTE Formatting prevents estimates near zero to appear as zero * Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in /hr) ARI ** 5 10 60 120 3 6 12 24 i 48 4 77 10 20 30 II 4�5 fvears)I min min min I min ' min min hr hr hr hr i hr I day {Fd ay I day I day I day I day II day of 4 1/20/2010 8.55 AM 'recipitation Frequency Data Server http://hdsc.nws noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&Lmits=us&se .. POINT PRECIPITATION �FREQUENCY ESTIMATES &N 9 FROM NOAA ATLAS 14 410 CHAPEL HILL 2 W, NORTH CAROLINA (31-1677) 35.9086 N 79.0794 W 462 feet from'? rec ilmitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 GM BonnmD Martm,B Linj ParzybokMYckta, and D Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted Tue Jan 19 2010 Confidence LirnitS nal=kyLocation Maps I Other Info I GIS data I Maps I Docs Return to State Map P_ recipitation Frequency Estimates (inches) F- F- F8 It r] F4*,F YF 24 hr 10 20 30 1 45 60 ARI* 1 30 60 [j'o [3�hr hr ( 2 hr 24 hr '0 1� rnin nun _a _day day tin 1[ nun; [j-- F in F, 5 years nun [11n fj�i�j [0-41 10-66 46 IF A::4 � EE 6.76] KE [10H [12.8:4:,' K7 1 T:K-1 OF48 10 77 1 E3 4 j 1.69 [2:0: �16 �59 ff, :0T K5:8: 4 17 1 K6�4� EO: [7 97 9 88 2 52:F1 7 - K��] - [� - F - PE :::] F E��FO 89 1 F11 3 1 IF60 i F2O6 112.49 2.66 K270[3 78F4 47 F5 17 IF5 71 K�T]7. EIF9 41 ITI 477 14.32 FI�789 - - E�] E3:4::E 12.72 E57:2: 18.37 [0 61 Fo98 ;[1�j F235 tKEal,71 F4 44 ff]F5 95 15:, F1056 :�5::-��] Fl- - 1 F-F-F-F-F-F-11-3�EF-- 0 68 3 6 1 [�0:2:j FO: 3 3 3 [331E 4 3 7 5 2 8 6 11 6 99 17 68 8 57 9 42 1 14 36 K7 5:5� 20=28 _F L '[:::: - - OF72- - E8: 2 9 5 :4:�[�O �43 I IF 14 E45: 4 04 F972E99: FC5 7 F5 F5:�62:: E893: 2 72 100 j - P�:F ff�K F-1--j 1 FO 76 �33 IF320 4.05 14.46 4=7 K:71f: 619.49 4 1 0=5 3 11.44 4 57 6=87 0.79 1 2 [1.57 ] 2.45:JF344 14=40 4.89 6_03 F7 47 g=41 12 21.67 124.46: E500 0.82: [1:30 1.64 2.60 3.73 5.46 6.80 8 53 9.50 10.66 1 1 73 12.96 [13.87 ] 17 55 19.80 133.461126.21 - - F--F- =oo o Fo-8-5 34 68 � 72 3 9=6 5 23 � 93 44 �43 1 10=35 1=5 8 2=7 6 1 4=0 6 14.97 1 18.89 2 1 0=9 24.83 2 7=5 3 , FL- FL- F L * These precipitation fireq uency esti mates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAAdas 14 Documentfor more information NOTE Formattmg forces estimates near zero to appearas 2ero Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) 30 45 41 [ 4y 7y 1a) 0 30 60 IF�O 3 6 F7T24 day day d ARI** �F5 h 12 h4 min hr hr ini. 1� I * y Y nun mint r r y y day (years) F.n [n.un nun nun j hr hr y day 24'113.44' day F 4 72 ��[IT3 1.84 F, 96 F2 35 2�7P 16 F3 7o 14.14 4.73 8.87 7 i7i 4 - ��T F28 3 33 3 6 49 F=6 38 F 3 0 � 5 'F�O � 1 �4� 4 4 IF 6 1 _=2F�5 �F_ 222 4 F6 8 :4 [IT 2 FF75 F�6 F4 =53 - 6 86 766 9.95 1 � 2=1 0 1 5=0 4 K7 6=9 Fo-61 �1 2=3 Ff75 2�P 3 50 �=15F4 77 'IF6 09 IF F 7=3 9=2 F �K Ff - 1 4.05 3 [JO= EIK7 36 �=97 F576 r,4:[3�7 4 =8 5 51 636 =8 F� 67 11.17 11�31 16.51 � �92 F _j -F - 25 0.74 - 7 'F� 272 1 02 g��]T5 �5 F� 1 1.17 2 2 0 [��T F3 674 Fl 974 F(776F5 733 6 54 � =4 7 E47��O 474 2 26 TT9 F _8 F I F-- F-- F- F- 10.19 - F- �� F- 19 - 22 80 OF78 F1 25 1.58 F404 F4 41 E35 6 47 7 34 8 35 19 19 11 11 1650 92 28 1785 2:1399j24.28 F o-1 9- Fl- 1221 [t�]F F8 F927 1 26 F Fo-82 1.3 -1 1[] 6=6 IF253 P9� F443 F48 7 F594 7=25 17 F- K-- [K F 86 jF L3 6 _[I 77 68 3.75 4.82 534 56 8 6 903 J 10.19 1 12 27 1 :2T8 13=33 1=686'1=921 22.85 5 FH773 - - - - - 10.21 - - - 8=1 Fo -90 F, 4-2 E��]F2 84 jq��]F5 32 F596 F7 39 F9 2 0 EE 2=6 5 3=9 1 F14 86 ��F21 04 �4 6.50 -- I!-- IL-1-1 1 2 49 �=3 14 �=6 0 20 i[L2 =4 26.31 29=07 1000 FL-K11146 83 9 7 4.34 5.74 11 0 9 �=5 =1 79 �=5 07 6 -jF�l The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quanule values for a given firequencyare greater than These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval Please refer to NOAAAllas 14 Document for more information NOTE Formatting prevents estimates near zero to appear as zero * Lower bound of the 90% confidence interval F_ -- nn-uuFPn recnip ita- t- io- n 1 F re AR'**[ 510 ' � j F3��" l20 ' 3 6 (yas) min ! min nun _n_;I_m� F um r [ h Estimates One hr 1 hr hr _, ] _day day _j day] day-1-da3 45 ;1 60 dayj�j of 1/19/2010 9:12 AM MAPS CD CO LLI 'C 0 co a_ O O LO m w VAMP ' /Aa ujnuAS p jaaqs W 'V LAJ CC ca W Ln _TAYLOR RD Z Q: LMXd lqdVnl �.�'_s 400- t.37 cji iNIA lu'sLM4D 0 5 U lr AV >) it cm: :3 C) -6 LLI ma BIORETENTION #20 DESIGN BMP#20 SIZING CALCS Project Name Briar Chapel - Boulder Point Drive Extension Project Number 02735 -0113 Date April 17, 2015 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Briar Chapel - Boulder Point Drive Extension Project No. 02735 -0113 Date April 17, 2015 Total site area 173,790 square feet = 3.99 acres Impervious areas Drama a area to and Other Drainage Area Existing sf Proposed Change [sf] Existing [sf ] Proposed sf On -site buildings 0 0 0 0 0 On -site streets/ parking 0 75,361 75,361 0 0 On -site alleys 0 0 0 0 0 On -site sidewalks 0 0 0 0 0 On -site future (open space) 0 0 0 0 0 Off -site future development 0 0 0 0 0 5% Contin ncy 0 3,768 3,768 0 0 Total Impervious 0 1 79,129 1 79,129 0 0 Non-impervious areas Drainage area to and Other Drainage Area Existing Isf] Proposed [sf ] Change [sf ] Existing [sf ] Proposed sf On -site grass/landscape 0 98,429 98,429 0 0 On -site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off -site non-impervious 0 0 0 0 0 Total non-impervious 0 98,429 98,429 0 0 Total Drainage Area 173,790 173,790 0 0 0 Percent Impervious 0.0 45.5 45.5 n/a n/a Notes: 2015.04.10.Wetland Sizing.xls Site Drainage Area Data Page 2 of 13 Printed 4/17/2015 1:19 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Project No Date Drainage area Impervious area Rainfall depth Percent Impervious Briar Chapel - Boulder Point Drive Extensic 02735 -0113 April 17, 2015 173,790 square feet 79,129 square feet 1.00 inches 45.5 percent R(v) =0.05 +0.009 "(Percent impervious) Runoff coefficient - R(v) 0.46 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 6,658.8 cubic feet Notes: 2015.04.10.Wetland Sizing.xls Runoff Volume Calcs Page 3 of 13 Printed 4/17/2015 1:19 PM Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Temporary Pool Project Briar Chapel - Boulder Point Drive Extension Project No 02735 -0113 Date April 17, 2015 Contour ID Stage Area [sq ft Area acres ] Incremental Area [sq ft Incremental Area acres Incremental volume cu ft Incremental volume acre -ft Cumulative volume cu ft Cumulative volume acre -ft 521 0 6,3290 0 145 6,3290 01 00 00 00 0.0 522 1 7,4530 0 171 7,4530 00 6,891 0 02 6,891 0 02 523 2 8,6300 0 198 8,6300 00 8,041 5 02 14,9325 03 524 3 9,8960 0 227 9,8960 00 9,2630 02 24,195 5 04 525 4 11,2530 0 258 11,2530 00 10,5745 02 34,7700 05 526 5 12,7060 0 292 12,7060 00 11,9795 03 46,7495 0.5 2015 04 10 Wetland Sizing.xls Stage Storage (Temp Pool) Page 4 of 13 Printed 4/17/2015 1 19 PM 2015.04.14.Bioretention Type 1124 -hr 1 -Yr Rainfall = 2.96" Prepared by McKim & Creed Printed 4/17/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1S: Pre - Development Runoff = 3.15 cfs @ 12.09 hrs, Volume= 0.203 af, Depth> 0.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" Area (sf) CN Description 173,790 70 173,790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre - Development Hydrograph ■ Runotf 3 Type II 24 -hr 1 -Yr Rainfall- 2.96" Runoff Area = 173,790 sf Runoff Volume =0.203 of 2 Runoff Depth >0.61" 0 LL Tc =15.0 min ,1 A CN_70 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.04.14.13ioretention Type 1124 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 4/17/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 2S: Post - Development Runoff = 8.97 cfs @ 12.02 hrs, Volume= 0.453 af, Depth> 1.36" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" Area (sf) CN Description 98,429 74 >75% Grass cover, Good, HSG C 75,361 98 Paved parking, HSG C 173,790 84 Weighted Average 98,429 56.64% Pervious Area 75,361 43.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 1011 I ■Runoff Type 11 24-hr 1 -Yr Rainfall- 2.96" 7 Runoff Area = 173,790 sf 6 - Runoff Volume =0.453 of Runoff DepthA .36" 5- Tc =10.0 min U. 41 1 ® CN =84 K 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.04.14.Bioretention Type 1124 -hr 1- YrRainfall= 2.96" Prepared by McKim & Creed Printed 4/17/2015 HydroCADS 10 00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 3 Summary for Pond 3P: Biorention Pond Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 1.36" for 1 -Yr event Inflow = 8.97 cfs @ 12.02 hrs, Volume= 0.453 of Outflow = 2.22 cfs 9 12.24 hrs, Volume= 0.287 af, Atten= 75 %, Lag= 13.6 min Primary = 2.22 cfs @ 12.24 hrs, Volume= 0.287 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 522.34'@ 12.24 hrs Surf.Area= 7,858 sf Storage= 9,522 cf . Plug -Flow detention time= 136.9 min calculated for 0.286 of (63% of inflow) Center -of -Mass det. time= 63.9 min ( 854.7 - 790.8 ) Volume Invert Avail.Storage Storage Description #1 521.00' 46,750 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 521.00 6,329 0 0 522.00 7,453 6,891 6,891 523.00 8,630 8,042 14,933 524.00 9,896 9,263 24,196 525.00 11,253 10,575 34,770 526.00 12,706 11,980 46,750 Device Routing Invert Outlet Devices #1 Primary 517.23' 18.0" Round Pond Outlet L= 110.4' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 517.23'/ 515.90' S=0.0120'/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.00' 24.0" W x 3.0" H Vert. Water Quality X 2.00 C= 0.600 #3 Device 1 522.40' 24.0" W x 4.0" H Vert. Orifice /Grate X 2.00 C=0.600 #4 Device 1 523.50' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =2.22 cfs @ 12.24 hrs HW= 522.34' (Free Discharge) L1 =Pond Outlet (Passes 2.22 cfs of 16.81 cfs potential flow) 2 =Water Quality (Orifice Controls 2.22 cfs @ 2.22 fps) 3 =Orifice /Grate ( Controls 0.00 cfs) =Riser ( Controls 0.00 cfs) 2015.04.14.Bioretention Type 1124 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 4/17/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 4 N V 3 O U- Pond 3P: Biorention Pond Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ■ Primary 2015.04.14.Bioretention Type Il 24 -hr 10 -Yr Rainfall= 5.17" Prepared by McKim & Creed Printed 4/17/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1 S: Pre - Development Runoff = 10.96 cfs @ 12.08 hrs, Volume= 0.654 af, Depth> 1.97" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall= 5.17" Area (sf) CN Description 173,790 70 173,790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre - Development Hydrograph W Type II 24 -hr 10- 10 -Yr Rainfall= 5.17" 9- Runoff Area= 173,790 sf 8 Runoff Volume =0.654 of Runoff DepthA .97" U. 6 Tc =15.0 min 5 CN =70 4 3 2 w 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2015.04.14.13ioretention Type 1124 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 4/17/2015 HydroCADOO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 2S: Post - Development Runoff = 20.32 cfs @ 12.01 hrs, Volume= 1.061 af, Depth> 3.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall = 5.17" Area (sf) CN Descriotion 98,429 74 >75% Grass cover, Good, HSG C 75,361 98 Paved parking, HSG C 173,790 84 Weighted Average 98,429 56.64% Pervious Area 75,361 43.36% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 21 zoar as 20 Type II 24 -hr 18 10 -Yr Rainfall- 5.17" 1s Runoff Area = 173,790 sf 15 14 Runoff Volume =1.061 of 1Z Runoff DepthA.19" 3 1 Tc =10.0 min LL ,0 8 CN =84 7 6 5 9 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.04.14.Bioretention Type 11 24 -hr 10 -Yr Rainfall =5.17" Prepared by McKim & Creed Printed 4/17/2015 HydroCADG 10 00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 7 Summary for Pond 3P: Biorention Pond Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 3.19" for 10 -Yr event Inflow = 20.32 cfs @ 12.01 hrs, Volume= 1.061 of Outflow = 10.71 cfs @ 12.13 hrs, Volume= 0.890 af, Atten= 47 %, Lag= 7.3 min Primary = 10.71 cfs @ 12.13 hrs, Volume= 0.890 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 523.30'@ 12.13 hrs Surf.Area= 9,012 sf Storage= 17,591 cf Plug -Flow detention time= 84.8 min calculated for 0.887 of (84% of inflow) Center -of -Mass det. time= 38.2 min ( 810.3 - 772.1 ) Volume Invert Avail.Storage Storage Description #1 521.00' 46,750 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 521.00 6,329 0 0 52200 7,453 6,891 6,891 523.00 8,630 8,042 14,933 524.00 9,896 9,263 24,196 525.00 11,253 10,575 34,770 526.00 12,706 11,980 46,750 Device Routing Invert Outlet Devices #1 Primary 517.23' 18.0" Round Pond Outlet L= 110.4' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 517.23'/ 515.90' S=0.0120'/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.00' 24.0" W x 3.0" H Vert. Water Quality X 2.00 C= 0.600 #3 Device 1 522.40' 24.0" W x 4.0" H Vert. Orifice /Grate X 2.00 C= 0.600 #4 Device 1 523.50' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =10.66 cfs @ 12.13 hrs HW= 523.29' (Free Discharge) t-1 =Pond Outlet (Passes 10.66 cfs of 18.35 cfs potential flow) 2 =Water Quality (Orifice Controls 5.20 cfs @ 5.20 fps) 3= Orifice /Grate (Orifice Controls 5.46 cfs @ 4.09 fps) =Riser ( Controls 0.00 cfs) 2015.04.14.Bioretention Type Il 24 -hr 10 -Yr Rainfall =5.17' Prepared by McKim & Creed Printed 4/17/2015 HydroCADO 10.00 s/n 04927 0 2011 HydroCAD Software Solutions LLC Page 8 m Z 3 0 LL Pond 3P: Biorention Pond Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) FE-1 nflow ■ Primary 2015.04.14.Bioretention Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 4/17/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 1 S: Pre - Development Runoff = 21.20 cfs @ 12.07 hrs, Volume= 1.268 af, Depth> 3.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" Area (sf) CN Description 173,790 70 173,790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre - Development Hydrograph 23 22 zi.zo as 20 Type 11 24-hr 19 100 -Yr Rainfall= 7.62" 17. Runoff Area = 173,790 sf 16 15 Runoff Volume =1.268 of 14 12 Runoff DepthA.81" 11 u. 10 Tc =15.0 min 8 CN =70 7 4 3 2 %mom= 1 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2015.04.14.13ioretention Type 1124 -hr 100 -Yr Rainfall = 7.62" Prepared by McKim & Creed Printed 4/17/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Paoe 10 Summary for Subcatchment 2S: Post - Development Runoff = 33.15 cfs @ 12.01 hrs, Volume= 1.784 af, Depth> 5.37" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" Area lsfl CN Descriotion 98,429 74 >75% Grass cover, Good, HSG C 75,361 98 Paved parking, HSG C 173,790 84 Weighted Average 98,429 56.64% Pervious Area 75,361 43.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 32- Type II 24-hr 30: 100 -Yr Rainfall= 7.62" 26 Runoff Area = 173,790 sf 2z' Runoff Volume =1.784 of 20 Runoff Depth >5.37" 0 18 LL 16 Tc =10.0 min 14- CN =84 8 6 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Runoff 2015.04.14.Bioretention Type// 24 -hr 100 -Yr Rainfall = 762" Prepared by McKim & Creed Printed 4/17/2015 HydroCAD® 10 00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Paoe 11 Summary for Pond 3P: Biorention Pond [82] Warning: Early inflow requires earlier time span Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 5.37" for 100 -Yr event Inflow = 33.15 cfs @ 12.01 hrs, Volume= 1.784 of Outflow = 19.51 cfs @ 12.12 hrs, Volume= 1.609 af, Atten= 41 %, Lag= 6 4 min Primary = 19.51 cfs @ 12.12 hrs, Volume= 1.609 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 524.06'@ 12.12 hrs Surf.Area= 9,974 sf Storage= 24,764 cf Plug -Flow detention time= 69.0 min calculated for 1.608 of (90% of inflow) Center -of -Mass det. time= 35.0 min ( 795.1 - 760.1 ) Volume Invert Avail.Storage Storage Description #1 521.00' 46,750 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 521.00 6,329 0 0 522.00 7,453 6,891 6,891 523.00 8,630 8,042 14,933 524.00 9,896 9,263 24,196 525.00 11,253 10,575 34,770 526.00 12,706 11,980 46,750 Device Routing Invert Outlet Devices #1 Primary 517.23' 18.0" Round Pond Outlet L= 110.4' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 517.23'/ 515.90' S=0.0120'/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.00' 24.0" W x 3.0" H Vert. Water Quality X 2.00 C= 0.600 #3 Device 1 522.40' 24.0" W x 4.0" H Vert. Orifice /Grate X 2.00 C= 0.600 #4 Device 1 523.50' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max =19.48 cfs @ 12.12 hrs HW= 524.04' (Free Discharge) L1 =Pond Outlet (Barrel Controls 19.48 cfs @ 11.02 fps) 2 =Water Quality (Passes < 6.66 cfs potential flow) 3 =Orifice /Grate (Passes < 7.79 cfs potential flow) =Riser (Passes < 15.57 cfs potential flow) 2015.04.14.Bioretention Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 4/17/2015 HydroCAD@ 10.00 s/n 04927 @2011 HydroCAD Software Solutions LLC Page 12 N V 3 O LL Pond 3P: Biorention Pond Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) FE-1 n-f I —ow ■ Primary M riar hapel Boulder oint Extension FPROJEC,T LOCATION: Chatham County, NC TE: 04/17/2015 PR JE T N 02735 -0113 DESIGNED BY: BSS HE KED BY GCA Sorm Outlet Structure Structure= HW -BPD -6 Q10/ Qfull = 0.62 Size= 18 in V/Vfull = 1.05 Dia = 5.92 cfs V = 5.6 fps Qfull = 9.55 cfs Vfull = 5.41 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in Apron Length = 9.0 ft Apron Width = 3 x Dia = 5.0 ft Storm Outlet Structure Structure= HW- BPD -11 BMP #20 Outlet Q10/ Qfull = 0.93 Size= 18 in V /Vfull = 1.14 Qio = 10.71 cfs V = 7.4 fps Qfull = 11.54 cfs Vfull = 6.53 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in Apron Length = 9.0 ft Apron Width = 3 x Dia = 5.0 ft