HomeMy WebLinkAboutNCC231076_Site Plan or Location Map_20230418 iit•:,. ■.rr. e_ 't _ r V e •.I ak1 F '''+,�.`. ♦• 't�,,�.EEO ,,�,1a ff Tf�p\ ``/���� CONSTRUCTION SCHEDULE WATTLE CONSTRUCTION EROSION CONTROL CONSTRUCTION SEQUENCE(REVISE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) SEEDING SCHEDULE i a mat.Of=Sj�°•\ �j / „,rd,' I`,•��„�� SODDING 1. Obtain all necessary permits and plan approvals 1. Use a hand tool easeseepmusolitmmexcavatingthetrencneaewnbeglaresontheupnlleornowsae� I, INSTALL TEMPORARYCINJSTRUCTION ENTRANCE. I �� �I� W� 2. Install gravel construction entrances first,and then reinforced Sill fence outlets. ^f tnetre^^nbbe used during installation.For soft,loamy oils eige33 into trench For hem, 2, INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. "TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN WE WEEK AND SUBJECT TO FURTHER DISTURBANCE. `` L•\\�' rooky soils dig a2J Teo trend,. ADEQUACY ON JULY I5. 1 ' • / 1� 4` .III - wattles antl sift fences. areas z 3. CALL FOR ON-SITE INSPECTION BY TOWN OF SOUTHERN PINES CONBiRUCTION INSPEC TOR. AN SEED MIX BE E SO o FOR 1 IiI,� 3. Finish clearing and grubbing any necessary on the lots as they are started. . Lay the first straw wattle anuggly in thetrenm.No daylightaheule be seen under the wata. 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF THE SITE. ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. / l� 1i \�1// �' - 4. Begin lot grading and excavation activities 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN PER \ }� I .rr///�/ We tlgMy against the NOT ADEOUA TE EROSION CONTROL. TEMPORARY SEEDING RECOMMENDATION for SUMMER(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) �. 1� 5. Begin continue with house house activities. 6. GROIN]CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN.3:1, \ O. i/ �'ity.i;'�-4, ,t/ swewom�v..,o.«s. g. Finish all rough grading and house construction. sake me straw wattles at each ens and murm^t^n nenar. Q- \jGROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PRONGED SPECIES RATE(LB/aMILL QOP'A� �1. is",/�*f1l11rt11S 7. Begin Install driveways,walksof and patios. 3 FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR APR. 5-AUG.I5 GERMAN MILBTaO ■ \� i_•s�I w A B. Begin foe grading of lot areas DEVELOPMENT. SOIL AMENDMENTS �• It will beanaceeserylto mexeaholeondn° 7 CONTINUE WITH FINE GRADING OF SITE. P I F-Q • 11\Y I r/ ,,.....ora•�,,.. 9. Final grassing,mulching and stabilizing of lot In most cases this will involve theAPPLY 2 0W LB ACRE GROUND AGRICULTURAL LIMESTONE and]50 LB ACRE 10-10-10 FERTILIZER OR FOLLOW RECOMMENDATIONS �►/ \✓� \ 9 9 9 Me gckrind of your mat.In o.rtl q the stake through ue straw.When straw / / .` ? r`�/ \� w s installation of sod on the lot.The sill fence will remain in place until the lots are u ,when installing B INSPECTION BYHEN UTOWN OF SOUTHERNCTION ACTIVITIES APINES ONSTRUCPON INSPECTOR.RE COMPLETE AND ALL IAREAS STABILIZED, CALL FOR ON-SITE OF SOL•TESTS. i \� sodded or grassing is stabilized and takes hold. wattles on copes arve me stakesperpendicular to me slope. 9. IF SITE IS APPROVED,REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED,FERTILIZE AND MULCH _J / W N 0 Inspection and foal acceptance letters MULCH RESULTING DISTURBED AREAS CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION ESTABLISH PERMANENTAPPLY A000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. -�y-�/� / ,`• U ` • < r.help�hut ap ti ba togeDrive the first end or the stake or ther.If you have difficulty driving to stake ntoe he second wattle at an angle toward the first wattle In order STABILIZING VEGETATION DURING THE APPROPRIATE TIME OF YEAR ANCHOR STRAW BY ROVING,NETTING OR BY TACKING Wm ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE 1 b w stale M1de xtremeN hard or TO..UPON ESTABLISHED AND STABILIZED VEGETATION, CALL FOR FINAL INSPECTION BY TOWN OF SOUTHERN PINES T eAs rmay berneededro ego a e MAINTENANCE `,.11•r,t\ CONSTRUCTION INSPECTOR. ■. ..1.111.1 �011' �%•..-_� Jr STRAW WATTLE CROSS SECTION RE-FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE RESEED,RE FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER T �=I C+rk� ` ;,��.,yry Wfir I t, U II I(N A"SELF NSPECTON REPORT FOR LAND DSTURB NG ACTV TY AS REQU RED BT NCGS 113A 54.1"IS S w'W' 1'^ E TEMPORARY SEEDING RECOMMENDATION far FALL(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) 1 k"�kgI WR1 1 !N NI fI IN' AVAILABLE FOR USE T CAN BE COMPLETED Err HAND OR COMPLETED AS AN EXCEL SPREADSHEET. NCH ITYlvm WOOD STAKE ,� R ■. N ALTERNATIVE S TO MAKE NOTATIONS S ON THE COPY OF THE APPROVED EROSION AND r ♦ +���♦ _ _ © m.. :o. ,wo ,r.:oo: Fe „owEa SEDIMENTATION ON CONTROL PLAN THAT S KEPT ON THE PROJECT SITE.RULE 15A NCAC 04B 0131 MM ' p� AUG.SPECIES5-DEC 15 WINTER RYE(GRAIN). _ 11 (+�� I A u'EEu�:�i:. STATES THAT".DOCUMEMATON SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR �j I �•.� •�`'� PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN OR BY 1. SEED BED PREPARATION SOW AMENDMENTS . \1 �\, - .� _ APPEARANCE OF G000 SOD COMPLETING,DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,PRACTICE OR 2a APPLY 2,000 B/ACRE GROUND AGRICULTURAL LIMESTONE and 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED sac '�/ DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN: l� +�Al 2. RIP THE ENTIRE AREA TO 6 INCH DEPTH. TESTS. STRAW WATTLE SHOWN IN 2-DEEP TRENCH ,_,,....„;,,,,,,,A, fA. ■ �/ r IIIII �'I - 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND A r�� GI I �� M .rrM v„ UNIFORM. MULOJ ■ ' I 4' 4' 4' 4' APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ■ � - / 4. APPLY AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH"SEEDING SCHEDULE"AND O ■� , , IIII G L IIIII `III III J o.w‘ Pi - OD STAKE MIX WITH SOIL. MAINTENANCENCHO4 STRAW BY ROVING.NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RAZE OF 400 GAL/ACRE y\ o[mexm.i>. 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6 mwsccw«a.µo / rs Ks,:tr.ooa.,.ouoo� �I �114•�1� �4Af INCHES DEEP. REPAIR AND RE FERTILIZE DAMAGED AREAS IMMEDIATELY TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH.IF IT ISR NECESSARY �,I *fa 111�,111 6 AFTER SEEDING.SEED ON A ESHLY SEED ACCORDIENG STOED BED SEEDING AND SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK TEMPORARY COVER BEYOND DUNE 15,OVERSEER WITH 50 B/ACRE 0111 • • .I J . �`' oncs1 ---'------..--.-. --__ swm._---_ _ \\\\ \\ '24 AIM ]. MULCH IN ACCORDANCE WITH"SEEDING SCHEDULE"IMMEDIATELY AFTER SEEDING. TEMPORARY SEEDING RECOMMENDATION for LATE WINTER one EARLY SPRING(TO BE FOLLOWED BPY PERMANENT FALL BSEEORMIx) EARLY - - \ \ y•. a INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE"SEEDING SCHEDULE...MAKE NECESSARY TO EXTEND 3 • REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. OR THE DAMAGED AREA SHALL BE SPECIES RATE(LB/ACRE) _ \\4 \ REESTABLISHED FOLLOWING THE ORIGINAL LIME,FERTILIZER AND SEEDING REQUIREMENTS. DEC 1-APR.15 TER RYE(GRAIN)120 1 ANNUAL KOBE LESPEDEZA 50 VICINITY MAP \ 2 -- - \/ I OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. \ \ I SOIL AMENDMENTS (N.T.S.) \ ) I OF SOL2,�S00 SLB/ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB/ACRE 10-10-10 FERTILIZE OR FOLLOW RECOMMENDATIONS MULCH-\ \ -\ \ \ / I \ APPLY M000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. \ \ \ / I / \ ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE \ \ \ \ I / I MAINTENANCE --,\ \ \ \ \ \ ' / / I DAMAGE. IF GROWTH.NOT FULLY ADEQUATE RESEED,RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER \ \ \ E{ll \ / / / / I ( / PERMANENT SPRING SEED MIX General Erosion Control Notes \\ \ In0., i / / i M �BM�N"`RRM DA 30 1.Only the areas shown shall be disturbed. '� / ;D' Ve I /1// // l SERICEA LESPEDEZA 3D BERMUDA 2.All disturbed areas shall be grassed and mulched as soon as / P SEED IX possible and maintained until permanent cover is established. / I h ' / / / SPECIES SEPT. CO COMMON BERMUDA / /I-') / / / _ PT SERICEA LESPEDEZA(UNSCARIFIED)30 - / I / / KOBE LESPEDEZA IC ^01 CAROPINE/VENTURES,LLC WATER 32 Q/ I 1 D.B.4198,PG.260`\ NOT To SCALE NOTTO o0E 1 INCH OF RAINFALL A WEEK OF NOT SUPPLIED NATURALLY,CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL \\ �/ / I I t�s \�lS MINIMUM GROUND LOVER HAS BEEN ESTABLISHED. ,7, 31 , jiff M A a ( \�, \ TOWN OF SOUTHERN PINES TOWN OF SOUTHERN PINES EROSION CONTROL L s'Max I \\�� l IA" \ \\sue \ EROSION C-4 SEEDING NOTES E-� 17 COISTRUCJ1ON / -v \ DATE. JANUARY NON C DATE JANUARY., LIM TS '6 \ \ MIN.12-1 2 GA. 1/',�f/ INTERMEDIATE \\ \\ o" 3W / - \\ \ - / MIN.10 GA. MORES 374 Lo Plan e I \ 8 346 /� LINE WIRES ��-- � I \ �\��� \ / / 11FIt //� \\ \ / -\ /� // GRADE l• ��\ - / 16 / \ or ' - - '/ 29 41, �� \ CAROPINE VENTURES,LLC'--____ / 15 6 ) D.B.4198,PG.260 /' A 36 / FRONT VIEW Q ���/ / �'�/ a 28 I �O \ �toD, __ /// STEEL POST NOTE * `' "' �: "'"" I \ _ USE SILT FENCE ONLY WHEN ¢s�" / 36? ' ""'" \\ 1 WOVEN WIRE FABRIC DRAINAGE AREA DOES NOT V / O "" ""' \ \ IIIII EXCEED I/4 ACRE AND / 0 �1'4"' _ ' 27 \ Provisions ground cover on exposed slopes must be SILT FENCE FABRIC NEVER IN AREAS OF CONCENTRATED FLOW. .=�__ -_-- 3Sa __--- 11\ 1 --" / accomplished within 21 calendar days following completion of any // �13\ '�� - 354_- \I // / phase of grading. I FILL SLOPE J __-- l, I ) \ / GRADE 35_4 Y \ \ _- "�/" / Provisions for permanent ground cover sufficient to restrain i'S IIIII {g! \ - l' / 1`2 1 \ r �" erosion must be accomplished for all disturbed areas within 15 • FOR REPAIR OF SILT To j 6'MIN.COVER \\�� _-- // I \ / / working days or 90 calendar days following completion of FENCE FAILURES,USE <I I OVER SKIRT• - 26 _" of / \ / construction or development,whichever is shorter. N.57 WASHED STONE. -PI / JJ,, / \ FOR ANCHOR WHEN SILT ANCHOR SKIRT AS \ 350-- .0 J / \ \ /// FENCE IS PROTECTING t DIRECTED BY ENGINEER• /6' �-- G V / \ \ CACATCH BASIN. .'4 I 27 l /�C 2J 4fi _"- Cj / 13 \\ For HOW ZONES,ground cover shall be provided within 15 MIN, J i ) \ / working days or 60 calendar days following completion of oe "'' "i ; �/ construction or development,whichever is shorter. �J,♦� -- I \ / SITE GROUND AREA TASTABILIZATION ABIL ZATION ON NOTES&MAINTENANCE \ / / -- --_ �L`� " -� I \ / EXCEPTIONS 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS R / --- --- �- 24 _-_- I I DESCRIPTION TIME FRAME IMMEDIATELY 2H / / " _--- - ) / PERIMETER DIKES, J DAYS NONE 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE,TEAR,DECOMPOSE OR BECOME INEFFECTIVE,REPLACE IT \ / 'B _---- 1 / ROOLES,DITCHES PROMPTLY / / --- 1 / &SLOPES 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND "\ / -' • / \ / HIGH QUALITY T DAYS NONE REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. / / �- _ _-__338 """'" /' _ / I 1 / WATER ZONES 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE ANDN / " ` _ --- _ (HOW) STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I / "' __ --- �j - __ i SLOPES STEEPER 7 DAYS IF SLOPES ARE 5. REMOVE SEDIMENT DEEPER THAN I2 ( I 23 " f lI / THAN 3:1 10'OR LESS IN f t a�ei DRAIN_ ✓''...0,., l / LENGTH AND ARE AYS ARE xor,OSDUE \�9 / zz __ 334" tG11ff Y _330 _--- EASEMENT- � I I THAN STEEPER TEMPORARY SILT FENCE \ II / s+.!' Ra " \' ��� \ __ / O ALLOWED QSE TOWN OF SOUTHERN PINES 40\ L 0 1_- E-6 I (� 326_ _- -- I \ SLOPES FLTTER OR DA SLOPES GREATER DATE. JANDaarawa 7 DAYS FOR DETAIL \) \I I ,iq i ---- / / THAN 50'IN / ro / \ LENGTH / ---- / / / ALL OTHER AREAS 14 DAYS NONE(EXCEPT J 1 / 22 / / B\ I ' WITH SLOPES FOR PERIMETERS 1 / 322 \-. / / FLATTER THAN 4:1 AND HOW ZONES) \ �49 1421 23 \Y/ A PAGE 1 of 2 j 11 I " '"' 3 / / \ 22 -1g / \ / TOTAL DISTURBED ACREAGE:0.28 ACRES 43 / PHASE-1 "� / �* I I -- /0 LOT EROSION CONTROL PLAN \ 48_ FOR LOT 30 44' - CAROPINES PHASE 12 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION \ �� A. ( FLOW TO THE REAR ) B. ( FLOW TO THE FRONT ) C.( FLOW TO THE LEFT) D. ( FLOW TO THE RIGHT) E. ( FLOW TO THE FRONT& REAR ) / Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic lopdressing PROPERTY NEPROPERTY PROPER,UNEPROPERTY PE NE LINE FOR with 2-Inch stone.After each rainfall,Inspect any structure used to trap sediment and clean it Rd as necessary. Immediately remove all objectionable materials spilled,washed, r x s FffNCE rFx SILT FENCE siu rtrv�t� x SILTr Nce or tracked onto public roadways. rum Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric . LOT f LOT + « LOT LOT LOT t DREAM FINDERS HOMES, LLC should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not FLOW wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanoul operations. w MOORE COUNTY,N.C. McNEILL TOWNSHIP Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate C w x a a a a moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth and stabilization of the root bed.The ' ' APRIL 2023 SCALE: 1"=60' sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. LOUSE cHLOE OOLNE 00010 AtUSE Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has _ _ _ _ been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired,and reseeded as soon as possible.tithe - - a E. 'w^r• - GRAPHIC SCALE time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ENTwwcE ENTRANCE, CONSTRUCTION 0 CENTRANCE wTRn uC ENmM+CE 60 0 30 60 120 240 General-All measures will be Inspectetl and corrections mate after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction m f N u m y w a activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated on the lotto insure that the FLOW n ja ♦ js.!, +W- I. �(y potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. R !,; R R L x fp� R R/w x LLEV.^' R/w R L 5E= -J'• R R w x-2L'k`L,_i:':i R Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. •..•• ... 000. •••-. N FEET Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the l inch = 60 ft. filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the STREET STREET STREET STREET STREET project in such a way that the sediment is not subject to erosion by wind or water. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305 Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence duringogradut.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials and unstable R/w R R RnT R/w PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106 sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. EROSION CONTROL DETAIL FOR SINGLE FAMILY LOTS -( N.T.S.) ) UST SAVED:4/6/2023 2:41 PM LAST PLOTTED:4/6/2023 2:4e PM PLOTTED BY.Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\I6-136]-01 CAROPINES-EC\PLANS\CAROPINES PH-12 LOT 30.DWG