HomeMy WebLinkAboutNCC217186_NOT Closeout Documents_20230403 Sedimentation/Constiruction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Columbus Project: Beckwith Solar River basin: Lumber
Person financially responsible:United Renewable Energy,LLC-Amber Penland, Project#: COLLM-2022-006
Director of Operations
Address: 5895 Shiloh Road,Suite 104,Alpharetta,GA 30005
1. Project Location: Carolina Road,Tabor City
Pictures: No
2. Weather and soil conditions: 70's,clear,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Onsite Personnel Title:
Inspection report: Sent Report Date given/sent: March 27,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities(NCGO1)must be requested by the permittee
via a Notice of Termination(NOT).The NOT is available at degnc.gov/NCGOI.Please note
that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Garrett Elmo Others present:
Date of inspection: March 23,2023 Time arriving on site: 10:30 AM Time leaving site: 10:45 AM
cc: