Loading...
HomeMy WebLinkAboutNCC217186_NOT Closeout Documents_20230403 Sedimentation/Constiruction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Columbus Project: Beckwith Solar River basin: Lumber Person financially responsible:United Renewable Energy,LLC-Amber Penland, Project#: COLLM-2022-006 Director of Operations Address: 5895 Shiloh Road,Suite 104,Alpharetta,GA 30005 1. Project Location: Carolina Road,Tabor City Pictures: No 2. Weather and soil conditions: 70's,clear,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Onsite Personnel Title: Inspection report: Sent Report Date given/sent: March 27,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO1)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at degnc.gov/NCGOI.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Garrett Elmo Others present: Date of inspection: March 23,2023 Time arriving on site: 10:30 AM Time leaving site: 10:45 AM cc: