Loading...
HomeMy WebLinkAboutSWA000190_Response Letter to Comments_20230405Civil - Geotechnical - Surveying Attn: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 Re: Fairview Fire and Rescue in Monroe, Union County Response to NCDEQ Stormwater Comments dated 3/29/2023 Enclosed, please find 1. Two (2) Sets of Plans @ 24" X 36" (signed and sealed) 2. One (1) Site Report 3. One (1) Existing Storm Exhibit From the attached site report, you will see there is evidence of an existing storm network. This network approximately has 635 LF of storm pipe on site. Our proposed design has 526 LF of storm pipe. This site should be deemed a redevelopment as it has no net increase of BUA and it has greater stormwater control than it did previously. Therefore, with this definition of redevelopment, the site should be exempt from needing a stormwater permit per 15 NCAC 02H .1001(1)(f). In addition, please refer to the flowing responses to comments: 1. As designed, this project will not meet the requirements to be considered a low - density project. Per 15A NCAC 02H .1003(2)@, "stormwater that cannot be released as dispersed flow shall be transported by vegetated conveyances." This does rule does allow a minimal amount of piping for culverts under driveways/roads (such as the proposed pipe located underneath the driveway entrance on US 601), and in certain cases, erosion protection, however the roof drains discharging to and being transported via pipe network are not allowed for low -density projects. Roof drains are expected to be allowed to sheet flow from the downspout (ideally this dispersed flow would be directed to a vegetated receiving area per 15A NCAC 02H .1003(2)(b), but it can also be directed to a vegetated conveyance). Please either revise the design to remove the piping network or redesign the project to meet the high - density requirements. Response: This comment is invalid as we are applying for the redevelopment exemption. 2. Removing the proposed pipe network would make this project meet the definition of redevelopment (since there is no net increase in BUA and greater or equal stormwater control will be provided from the existing conditions) and redevelopment projects are not subject to the State post -construction program in accordance with 15A NCAC 02H .1001(1)(f). If you demonstrate that the project meets the definition of redevelopment, we can issue you a letter confirming that this project meets the definition of redevelopment and stating that no permit is required from our office for the proposed project. Response: A site report has been conducted to show the amount of existing storm pipe on site. This report shows that there is less storm proposed than there is existing. This site also has no net increase of BUA. Since these two criteria have been met, this meets the requirements for redevelopment. Please upload the electronic files for this project to the following link: httgs://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload. Typically, an email is sent from our office once the project is accepted for review instructing you to do this, however it appears as though we never sent this email. We apologize for the oversight and inconvenience. Response: The files will be uploaded to the online portal. 4. Provide PDFs of all revisions, 2 hard copies of revised plan sheets, 1 hard copy of other documents and a response to comments letter briefly describing how the comments have been addressed. Pdfs uploaded to the link in the prior comment. Hard copies to be mailed or delivered. Response: Hard copies and digital copies will be submitted appropriately. Please contact me if you have any questions or concerns. Very Respectfully, Garrett Kraus, EI Engineering Intern 980-777-3266 garrettkraus@cesicgs.com CEOI Civil - Ceotechnical- Surveying