April 10, 2013
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection-Bridge No. 3
TIP No. BD-5114M
NCSR 1102 Pearson Falls Road
Polk County
Dear Mr. Setzer:
John E. Skvar�a, ill
Secretary
On April 8, 2013, I inspected the construction work on Bridge No. 3 on NCSR 1102 in Polk County. �Most of
the work on the first phase of the project has been completed. Sediment and erosion control structures
appeared to be working properly.
Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter.
If you have questions, please call me at 828-296-4500.
Attachment
cc: Aaron Powell, P.E.
Mark Davis, Division 14, DEO
Ben DeWit, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Setzer) Bridge No. 3 NCSR 1102 Inspection Letter Apri12013
SURFACE WATER PROTECTION SECTION —Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX : 828-299-7043
Internet: www.ncwaterpualitv.orq
An Equal Opportunity ; Affirmative Action Employer
Sincerely,
" �?� ���.�
Michael R. Parker
Environmental Senior Specialist
NorthCarolina
�Lttl��'���1�
Site @nspection Repo�i
� Site Number: WT000958
} Site Name: Bridge #3 NCSR 1102 Pearson Fails Road
t
� Site Address: NCDOT Division 14
i
, .. :- - -- ----.__County.;__.P_olk__ _-____ _-- -- _ --------
i' Directions:
� �atitude:
l
� Site Owner Plame: NCDOT Division 14
' Inspection Date: 04/08/13
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
_.__. _ _____.____._Region:__Asheville___.
Longitude:
Facility compliance Status: � Compliant ❑ Not Compliant
Program Area: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Inspected site with NCDOT inspectors.
Contractor has almost completed first phase of new brige construction.
Contractor was installing drainage cross pipe at time of inspection.
Sediment and erosion control measures appeared to be operating properly.
Seed and mulch areas as required.
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Phone:
Phone: 828-296-4500
Yes No NA NE
�nnn
�nnn
�nnn
Page: 1