Loading...
HomeMy WebLinkAboutBridge 3 on SR 1102Pat McCrory Governor �.... _ ., , �_., � ( �— �� _. � � 1\,� � i ( --- ' ,,i; � � o ��-'>�.l�i;' J U North Carolina Department of Environment and Natural Resources Division of Water Quality Charles Wakild Director April 10, 2013 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection-Bridge No. 3 TIP No. BD-5114M NCSR 1102 Pearson Falls Road Polk County Dear Mr. Setzer: John E. Skvar�a, ill Secretary On April 8, 2013, I inspected the construction work on Bridge No. 3 on NCSR 1102 in Polk County. �Most of the work on the first phase of the project has been completed. Sediment and erosion control structures appeared to be working properly. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Attachment cc: Aaron Powell, P.E. Mark Davis, Division 14, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Setzer) Bridge No. 3 NCSR 1102 Inspection Letter Apri12013 SURFACE WATER PROTECTION SECTION —Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX : 828-299-7043 Internet: www.ncwaterpualitv.orq An Equal Opportunity ; Affirmative Action Employer Sincerely, " �?� ���.� Michael R. Parker Environmental Senior Specialist NorthCarolina �Lttl��'���1� Site @nspection Repo�i � Site Number: WT000958 } Site Name: Bridge #3 NCSR 1102 Pearson Fails Road t � Site Address: NCDOT Division 14 i , .. :- - -- ----.__County.;__.P_olk__ _-____ _-- -- _ -------- i' Directions: � �atitude: l � Site Owner Plame: NCDOT Division 14 ' Inspection Date: 04/08/13 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): _.__. _ _____.____._Region:__Asheville___. Longitude: Facility compliance Status: � Compliant ❑ Not Compliant Program Area: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Inspected site with NCDOT inspectors. Contractor has almost completed first phase of new brige construction. Contractor was installing drainage cross pipe at time of inspection. Sediment and erosion control measures appeared to be operating properly. Seed and mulch areas as required. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Phone: Phone: 828-296-4500 Yes No NA NE �nnn �nnn �nnn Page: 1