Loading...
HomeMy WebLinkAbout20060895 Ver 1_DCM Correspondence_20230120 (3)P : 3 C i ►'3 �' i i �r Cr+'. 1: fir+ �' r ,T C-Wli'et.Heafth Care r►ngestt 0 ID N W N391500 1 North River I iy flaatworks 1 tl East Caril-ler H14h 3C11001 %-s9 I tie Beaufofi Club iqa�s-Fresh Shrimp y I ced�TVille Pine r E� rS ar��#� ,ay:�catl�al,lse ef�y�R�#{��I $t�rr• LOCATION MAP �-. _ii,'• - . �'�,,•'';�� _ it-� N.T.S. N3 1 808t haf t� -.- •`sue DREDGE AREA " t-*tk LO � ?. CN IUD �O - W - N3911909- < ♦ \ �. i } ` y> r SITE PLAN N.T.S. ORIGINAL DRAWINGS FROM TI COASTAL SERVICES, INC. DATED APRIL 25, 2022. SPECIAL INSPECTIONS STATEMENT OF SPECIAL INSPECTIONS PROJECT: 100TTRAVEL LIFT PIER LOCATION: MOREHEAD CITY, INC OWNER: BANKS BOATWORKS DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE: E.B. PANNKUK, PE THIS STATEMENT OF SPECIAL INSPECTIONS IS SUBMITTED IN ACCORDANCE WITH THE 2018 NC BUILDING CODE PARAGRAPH 1704.3.1. IT INCLUDES: 1. THE MATERIALS, SYSTEMS, COMPONENTS AND WORK REQUIRED TO HAVE SPECIAL INSPECTIONS OR TESTS BY THE BUILDING OFFICIAL OR BY THE REGISTERED DESIGN PROFESSIONAL RESPONSIBLE FOR EACH PORTION OF THE WORK. 2. THE TYPE AND EXTENT OF EACH SPECIAL INSPECTION. 3. THE TYPE AND EXTENT OF EACH TEST. 4. ADDITIONAL REQUIREMENTS FOR SPECIAL INSPECTIONS OR TESTS FOR SEISMIC OR WIND RESISTANCE AS SPECIFIED IN SECTIONS 1705.11, 1705.12, AND 1705.13. 5. FOR EACH TYPE OF SPECIAL INSPECTION, IDENTIFICATION AS TO WHETHER IT WILL BE CONTINUOUS, PERIODIC, OR PERFORMED IN ACCORDANCE WITH THE NOTATION USED IN THE REFERENCED STANDARD WHERE THE INSPECTIONS ARE DEFINED. ARE SEISMIC REQUIREMENTS IN THE STATEMENT OF SPECIAL INSPECTIONS - 1704.3.2. - NO ARE WIND REQUIREMENTS IN THE STATEMENT OF SPECIAL INSPECTIONS - 1704.3.3. - NO THE SPECIAL INSPECTOR OF RECORD AND THE SPECIAL INSPECTIONS MATERIAL TESTING AGENCY WILL KEEP DAILY RECORDS OF SITE OBSERVATIONS AND TESTS. THESE OBSERVATIONS WILL BE PROVIDED TO THE BUILDING INSPECTOR AND THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. DAILY REPORTS WILL BE PROVIDED TO THE GENERAL CONTRACTOR ON THE DAY THAT THE OBSERVATION IS PERFORMED. INTERIM REPORTS WILL BE PROVIDED TO THE BUILDING INSPECTOR AND THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE ON A WEEKLY BASIS. DISCREPANCIES WILL BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR ON THE DAY THAT THEY ARE OBSERVED. ANY DISCREPANCIES THAT ARE THAT ARE NOT CORRECTED IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS WILL BE BROUGHT TO THE ATTENTION OF THE BUILDING INSPECTOR AND DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. THE SPECIAL INSPECTOR OF RECORD WILL PROVIDE A STATEMENT OF SPECIAL INSPECTIONS TO THE BUILDING INSPECTOR AND THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE AT THE COMPLETION OF THE PROJECT. THE GENERAL CONTRACTOR IS TO MAKE THEMSELVES FAMILIAR WITH CHAPTER 17 OF THE 2018 INC BUILDING CODE. NOTE: THE GENERAL CONTRACTOR IS NOT PERMITTED TO CONTRACT WITH THE SPECIAL INSPECTOR OF RECORD OR THE SPECIAL INSPECTIONS MATERIAL TESTING AGENCY. SCHEDULE OF SPECIAL INSPECTIONS 1705.3 REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION CONTINUOUS PERIODIC TYPE SPECIAL INSPECTIONS SPECIAL INSPECTION 1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND X VERIFY PLACEMENT. 2. REINFORCING BAR WELDING: a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM X A706. b. INSPECT SINGLE -PASS FILLET WELDS, MAXIMUM 5/16"; AND X c. INSPECT ALL OTHER WELDS. X 3. INSPECT ANCHORS CAST IN CONCRETE. X 4. INSPECT ANCHORS POST -INSTALLED IN HARDENED CONCRETE MEMBERS. a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS. X X b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.a. 5. VERIFY USE OF REQUIRED DESIGN MIX. X 6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND X DETERMINE THE TEMPERATURE OF THE CONCRETE. 7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. X 8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. X 9. INSPECT PRESTRESSED CONCRETE FOR: a. APPLICATION OF PRESTRESSING FORCES; AND X b. GROUTING OF BONDED PRESTRESSING TENDONS. X 10.INSPECT ERECTION OF PRECAST CONCRETE MEMBERS. X 11. VERIFY IN -SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENDONS IN POST -TENSIONED CONCRETE AND PRIOR TO REMOVAL OF X SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS. 12.INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE X CONCRETE MEMBER BEING FORMED. TABLE 1705.7 REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN FOUNDATION ELEMENTS - STEEL PILE CONTINUOUS PERIODIC TYPE SPECIAL INSPECTIONS SPECIAL INSPECTION 1. VERIFY ELEMENT MATERIALS, SIZES, AND LENGTHS COMPLY WITH THE X REQUIREMENTS. 2. DETERMINE CAPACITIES OF TEST ELEMENTS AND CONDUCT X ADDITIONAL LOAD TESTS, AS REQUIRED. 3. INSPECT DRIVING OPERATIONS AND MAINTAIN COMPLETE AND X ACCURATE RECORDS FOR EACH ELEMENT. 4. VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND SIZE OF HAMMER, DETERMINE REQUIRED PENETRATIONS TO ACHIEVE X DESIGN CAPACITY, RECORD TIP AND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TO FOUNDATION ELEMENT. TABLE 1705.7 REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN FOUNDATION ELEMENTS - TIMBER PILE CONTINUOUS PERIODIC TYPE SPECIAL INSPECTIONS SPECIAL INSPECTION 1. VERIFY ELEMENT MATERIALS, SIZES, AND LENGTHS COMPLY WITH THE X REQUIREMENTS. 2. DETERMINE CAPACITIES OF TEST ELEMENTS AND CONDUCT ADDITIONAL X LOAD TESTS, AS REQUIRED. 3. INSPECT DRIVING OPERATIONS AND MAINTAIN COMPLETE AND X ACCURATE RECORDS FOR EACH ELEMENT. 4. VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND X SIZE OF HAMMER, DETERMINE REQUIRED PENETRATIONS TO ACHIEVE DESIGN CAPACITY, RECORD TIP AND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TO FOUNDATION ELEMENT. STRUCTURAL NOTES GENERAL NOTES: 1. THE STRUCTURAL NOTES SHALL BE USED IN CONJUNCTION WITH THE STRUCTURAL DRAWINGS. 2. THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE PROVISIONS OF THE 2018 INC BUILDING CODE. 3. DESIGN LOADS: a. 100 BFMII BY MARINE TRAVELIFT b. 300 plf WAVE LOAD ON FLOATING DOCK - TRANSIENT VESSELS ONLY (NO VESSELS ALLOWED WITHIN 48 HOURS OF A NAMED STORM) C. 5 FPS CURRENT d. GANGWAY - 100 psf e. WALKWAY LIVE LOAD - 100 psf 4. THE CONTRACTOR SHALL FIELD VERIFY THE DIMENSIONS, ELEVATIONS, AND OTHER REQUIREMENTS NECESSARY FOR THE PROPER CONSTRUCTION AND ALIGNMENT OF THE STRUCTURE. 5. THE CONTRACTOR SHALL MAKE ALL MEASUREMENTS NECESSARY FOR FABRICATION AND ERECTION OF STRUCTURAL MEMBERS. 6. ALL SPECIFICATIONS REFER TO LATEST EDITION. STRUCTURAL STEEL: 1. ALL STRUCTURAL STEEL TO BE HOT DIPPED GALVANIZED UNLESS NOTED OTHERWISE. 2. STRUCTURAL STEEL: PIPE: ASTM 252 GRADE 4 (50 ksi MINIMUM) HP: ASTM A572 GRADE 50 EPDXY COATED TO BE APPLIED TO 10' BELOW THE DREDGE ELEVATION. C: ASTM A36 3. WELDING TO COMPLY WITH AWS RECOMMENDATIONS FOR EACH SPECIFIC WELD AND THE WELDER TO BE CERTIFIED FOR EACH SPECIFIC WELD THEY ARE PERFORMING. USE E70 SERIES ONLY. CONCRETE: 1. REINFORCED CONCRETE TO CONFORM WITH ACI 301 LATEST EDITION. THE CONTRACTOR WILL COMPLY WITH ACI 301 AND ACI 318. CONCRETE TO BE PLACED PER ACI 304R (ACI 305R DURING HOT WEATHER / ACIR DURING COLD WEATHER - BELOW 40 DEGREES). CONTRACTOR TO PROVIDE MIX DESIGN FOR ENGINEER APPROVAL. THE MIX DESIGN MUST HAVE A MINIMUM OF 10 SAMPLE BREAKS SHOWING THE REQUIRED MINIMUM 28 DAY STRENGTH. SLUMP PER ACI RECOMMENDATIONS. 2. 28 DAY CONCRETE STRENGTH - 4,000 PSI 3. REINFORCING STEEL: a. REBAR: ASTM A615, GRADE 60 b. WELDED WIRE FABRIC: ASTM 185. 4. CONCRETE CLEAR: 2" 5. NO FLY ASH PERMITTED. 6. LAP SPLICE: SEE LAP SPLICE CHART. 7. CONCRETE MIX DESIGN TO INCLUDE 4.5 GAL/CY OF CORROSION INHIBITING ADMIXTURE. 8. CONCRETE TO INCLUDE 6-8% AIR ENTRAINMENT. 9. INCLUDE MASTER BUILDER UW450 ANTI -WASHOUT ADDITIVE. ALUMINUM: 1. GC TO PROVIDE GANGWAY SHOP DRAWINGS SEALED BY A PE. 2. STRUCTURAL MEMBERS: 6061 ALUMINUM ALLOY 3. ALUMINUM WELDS TO COMPLY WITH W59.2-18 RECOMMENDATIONS. WELDER TO BE CERTIFIED FOR EACH SPECIFIC WELD THEY ARE PERFORMING. PROVIDE DOCUMENTATION TO ENGINEER. 4. FASTENERS IN CONTACT WITH ALUMINUM TO BE ALUMINUM OR 304 STAINLESS STEEL. ENVIRONMENTAL: 1. THE CONTRACTOR IS RESPONSIBLE TO PREVENT CONTAMINATES, DEBRIS, POLLUTION, OR SEDIMENT FROM ENTERING THE WATERWAY. THE CONTRACTOR WILL NOT DIRECTLY RETURN WATER OR ALLOW STORM WATER TO DIRECTLY ENTER THE WATERWAY. 2. THE CONTRACTOR IS RESPONSIBLE TO USE SCREEN OR OTHER PROTECTIVE EQUIPMENT TO KEEP CONSTRUCTION DEBRIS FROM ENTERING THE WATERWAY. THE OWNER RETAINS THE THE AUTHORITY TO REQUIRE ADDITIONAL ENVIRONMENTAL PROTECTION IF THE CONTRACTOR HAS NOT INSTALLED ADEQUATE PROTECTION TO BE AFFECTIVE. GEOTECHNICAL: 1. SEE RFTS PROJECT NO. 2564-22 DATED MAY 8, 2022. SEE RFTS PROJECT NO. 2564-22 DATED JUNE 20, 2022. MISCELLANEOUS: 1. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY SHORING AND BRACING REQUIRED TO HOLD THE STRUCTURE IN PROPER ALIGNMENT UNTIL PERMANENT SUPPORTS ARE IN PLACE. 2. **THE STRUCTURAL DRAWINGS DO NOT ADDRESS SAFETY. SAFETY IS SOLELY THE GENERAL CONTRACTOR'S RESPONSIBILITY. SAFETY MUST BE THE MOST IMPORTANT FACTOR AT ALL TIMES DURING CONSTRUCTION. SAFETY CANNOT BE COMPROMISED AT ANY TIME. 100 BFMII BY MARINE TRAVELIFT 00 0 o a D q D o LOAD PER CORNER: VERTICAL MAX LOAD = 90,000 Ibs LATERAL MAX LOAD = 9,000 Ibs STATURE S' rz zz zu ENGINEERING STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE STRUCTURAL NOTES, SPECIAL INSPECTIONS, AND SITE PLAN ISSUE BLOCK MARK DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP SO.0 ti Q N392000 Q) - - 13*,50 Qj \Cq f M ri 13+0 Q ' 0 , 0� O o� rrc� '�� `�!� �� ����V Q, cv rn cb �v� �. NLO ,�� K n/� �� DREDGEAREA 0 �,00 � cr� ,Gr '�� - � - - is - .�, ' $►� `r •: - O Qj 0 5o 0 10 - o - - �, ��� njo� Q60 00�"�ti� �,(�� -�5� / OQ0 - Qj CO �,�� �,�� 5�� N �R%�O��Cb O OlLIJ Ll � - Qj cc Q Q "0 _ QD - nj �I�ti ti �D �/ Cb � Cy)�' R% � O _ �0+ Q ccaccco _ ��, � o���� w �_ =Q� _ _ / / � _ .._ ._ — Fko BANKS BDAT WORKS U'a?I,\ ���1� _ l' - c� - _ �, ,,_, _ _ _ , clr - ` `\I cc) - _ L/ l n - `v Qj -oLr) Qj o co ~ , Qj O n- - l `D 1 �Q0� cu o Color Contour Scale o / = ` 5 Qfl Qj (-�; / co 4 -- • 0-� 0' S Z Z=Z • 1 1 1 ( LU �{ 120 _ 1 6' L ` , OF r, r � CONTOUR PLAN ORIGINAL DRAWINGS FROM TI COASTAL SERVICES, INC. 1 N.T.S. DATED APRIL 25, 2022. A TU R E E s 01 NEERING [EN=G=l STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE CONTOUR PLAN ISSUE BLOCK MARK DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP SO-1 Q) 8 0) % 3-�. _ 13-1-0 0 APPROX. 25% 1 S3 1 ^1* 50 WIDTH CHANNEL40 1 1 1 1 2*00 1 1 1 0 1 1 1 1 1 11�5 0 1 0 1 1 1 1 0 1 1 1 11�.0 0 1 1 1 86 1 _ _ 1 _ 1 10 80 APPROX. DREDGE AREA = 5o 1 TO -2.71' MLW _ 1 = _ _ _ = ....... 1 __ 0 �J 1 0 1 1 1 1 0 1 1 1 1 1 1 1 1 PROJECT AREA PLAN ORIGINAL DRAWINGS FROM TI COASTAL SERVICES, INC. 1 DATED APRIL 25, 2022. N.T.S. ol STATURE S' ENGINEERING STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE PROJECT AREA PLAN ISSUE BLOCK MARK DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP SO.2 ADD ALTERNATE 42 ADD ALTERNATE #2 : 2 1 s1.o 1 0 1 1 1 1 1 1 1 1 1 1 1 I I 1 z- FLOATING DOCK 8' WIDE 1 I 1 I 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 � � 2 -----------'� S1.0 FRENCH )RAIN I 0 0 8'-0'1 14" 0 CLASS B PILES - 20' EMBEDMENT CUT OFF ELEVATION 14.0 NAVD 2 ENLARGED FLOATING DOCK SCALE: 1 /8 = 1 — 0 ol STATURE ENGINEERING _j 00 STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE NEW PIER PLAN & SECTION ISSUE BLOCK MARK I DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP si-0 HDG L6x6xl/2 W/ 3/4" 0 HEADED STUD @12" O.C. (8) #6 PT 2x6 DECKING HEADED STUDS @ 16" O.C. STUDS 1/2" 0 - 6" LONG PT 2x8@ 16" O.C. W/ 1" 0 HEADS SECTION DETAIL 2 SCALE: 1 1/2" = 1' - 0" PVC SLEEVE, INSIDE 1-1/4" 0 (9) #6 (2) PT 2x12 (2) #4 STIRRUPS @ 6" O.C. i i <`� ° \�� D D ° ° . P _ PL. 3/4" END PLATE - HDG (9) #6 NOTE: HOT DIP FULL CONNECTION AFTER FABRICATION AND WELDING IS COMPLETE ELEVATION 8.0' NAVD 88 SECTION MC10x28.5 SEE G' 3/4" 0 316 SS CABLE 7 FULL WRAPS FASTEN TO PILES W/ "U" SHAPED 3/8" 316 SS STAPLES EMBED INTO TIMBER PILE 21/2" DEEP (MIN) PILES TO BE EMBEDDED 25'. 12" 0 CLASS B PILE SECTION BATTER TIMBER PILES 0 @ 1:12 SLOPE 00 • W 4'-1" e .e DETAIL (8) #6 W/ 90° HOOK " . e . • .P . D (3)#6 - 3'-6" LONG SECTION (8) #6 W/ 90° HOOK ATE -HDG P 12x53 HDG 1" 0 THREADED ROD - HDG DOUBLE NUTS AT END PLATE DETAIL #6 @ 5" O.C. W/ 90' HOOKS D . D D A D. P, •D°D .p D D D .o ° D D ° o ° P „ °. p• ° ' °° O O .. V. D• '. D C. .. o 9 to. D 4" CLR. 8" - EMBED. 3" C R. SECTION (2) #4 TIES - 22" 0 PL. l'-0"x0'-11 3/4 STATURE[ENu::G:= sol ll INEERING STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE NEW PIER PLAN & SECTION ISSUE BLOCK MARK I DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP S1.1 500 DREDGE -- — — — -- ELEVATION 6.5' NAVD 88 rev 1z�i SECTION A SCALE: 3/4"= 1' - 0" .5% SLOPE TO DRAIN \ A. d d• ° ° a d d °CD 1 .. _.. nT C.•C 6x6 SPLICE E)-n SCALE: 1 1/2"= 1' - 0" NOTE: STAGGER PT 6x6 SPLICE CONNECTIONS. 167'-6" ol 75' DROP ZONE 92'-6" 550 600 — — — -- — — — — -- 650 — — — — --- — — — — — d d. NEW PIER ELEVATION SCALE: 1 /16"= 1' - 0" NOTE: MSL DATUM IS 1.44' ABOVE MLW. VVIVIFAV 1 Vrr LI\ V VI L/%IJI IIVV JVIL I V JV /0 VIVIV SECTION 20'-0" r-------------------------------- 1 1 TRENCH DRAIN .5% SLOPE 1 #4 @12" O.C. BW 1 TO DRAIN 1 CPZ882 HDPE CHANNEL Z882 SERIES BY ZURN 1 1 d d A. 1 1 d d 1 1 d ° 1 1 1 1 N I 1 I I 1 I I SEE ENLARGED SECTION I 1 L-------------------------------J G/S1.2 ° COMPACT UPPER 6" OF EXISTING SOIL TO 98% OMC GEOGRID SECTION 6-0" I V I IVV 1111\Ll1VLV 1\VL/ W/OGEE WASHERS SECTION PT 6x6 EVERCOMP 26.1 �W" O.C. BW HOOK AT END & HOOK #4@12" O.C. BW #6 REBAR - REQUIRED LAP SPLICE f'c = 4,000 psi BAR SIZE DEVELOPMENT LENGTH (in) 3 12" 4 15" 5 18" 6 24" 7 30" 8 40" 800 —15 MSL —10 —5 0 5 — 6 MLW =to--8MLW 15 20 SECTION Z8882 TRENCH DRAIN ON N `I EVERCOMP 26.1 PT 6x6 12" 0 CLASS B PILE W/15'EMBEDMENT L ol STATURE ENGINEERING STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE NEW PIER ELEVATION, AND SECTIONS ISSUE BLOCK MARK I DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP S1.2 0 -U PT 2x8 @ 16" O.C. GUARDRAIL DETAIL SCALE: 3/4" = 1' - 0" GC TO PROVIDE GANGWAY AND GANGWAY PLATFORM DESIGN PT 6x6 PT 2x8 ATACH TO POST WI (2) 41/2" S/S SCREWS ATTACH TO RAIL W/ 3" SCREWS @ 16" O.C. PT 6x6 PT 2x6 PT 2x8 1" 0 HDG THRU BOLT PT 2xl2 PT 2x8 - CUT DOWN TO 3 3/4" 3/4" 0 S/S THREADED ROD (1) BELOW EACH PT 2x12 OTHERWISE 2'-0" O.C. PT 6x6 PT 2x8 - CUT DOWN TO 3 314" 3/4" 0 S/S THREADED ROD @ 16" O.C. EPDXY WI HILTI HIT HY200 (2) H2.5A - S/S BY SIMPSON TIE GUARDRAIL DETAIL SCALE: 3/4" = 1' - 0" WALKWAY DETAIL PT 2x6 DECKING PT 2x8 N8 - CUT DOWN TO 3 3/4" 0 S/S THREADED ROD @ 16" O.C. )XY W/ HILTI HIT HY 200 SCALE: 3/4" = 1' - 0" TOP RAIL SPLICE SCALE: 3/4" = 1' - 0" CARRIAGE BOLTS TOP RAIL SPLICE BOLT SPACING SCALE: 1 1/2" = 1' - 0" S TA TU R E ENGINEERING STRUCTURAL ENGINEERING & PROJECT MANAGEMENT PO BOX 100 CAROLINA BEACH, NC 28466 P: 910-622-5261 PROJECT TITLE BANKS BOAT WORKS MOREHEAD CITY, NC SHEET TITLE GUARDRAIL AND GANGWAY SECTIONS AND DETAILS ISSUE BLOCK MARK I DATE DESCRIPTION PROJECT NO: 22028 DATE: 11 /22/2022 SCALE: AS NOTED DRAWN BY: SSW PROJ MGR: EBP S1-3