Loading...
HomeMy WebLinkAbout20230513 Ver 1_Site Plan_20230417b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Fuli Pond/ Normal Water Level Shoreline r -9 NM%IT M-.1 Lake (At Full Pond/ Normal Water Le el) C9� 1 -4=11 MIR Em IME am 0 C Full Pond/ Normal Water Lei I tL x 156 ft. .1d,ton.1 cl ... iuz if necessary E Plan View La ke (At Fill 11—di N-1 water L-el) Existing Dock Z 30ftx7ft Riprap 31 ft X 150 ft ©claw f.4 pond/ NWL wxvwt no — — A ft X I Ab., full p ',AMPLE Noith C'mohna Dqladllwm A EIIN Ilmunental Quahla � Dvmaion of watel Resourcus 5 12 Noilh Slflisburp Sizeet I 1617 Mail Sci % lce Cenler ' Ralei,,�h, North CaTolina 2?699-1 (d 7 91Q 707 Ol)(H)