HomeMy WebLinkAboutSW6221201_Supplement-EZ Form_20230404SUPPLEMENT-EZ COVER PAGE
FORMS LOADED 71
PROJECT INFORMATION
1 Project Name Ample Storage
2 1 Project Area ac 6.18
3 Coastal Wetland Area ac _
4 Surface Water Area ac 0
5 Is this project High or Low Density? High
6 Does this project use an off -site SCM? No
02H .
the
Is streambank stabilization
UMBER AND TYPEW SCMs:
11 lnfiltration System
12 Bioretention Cell
13 Wet Pond
es it meet NCAC 02H.1 C
on this project?
15 Permeable Pavement
16 Sand Filter
17 l Rainwater Harvesting (RWH)
18 Green Roof
19 Level S reader -Filter Strip (LS-FS)
20 Disconnected Impervious Surface (DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Ba !ter
26 Filterra —
FORMS LOADED
20
Yes
N/A
No
DESIGNER CERTIFICATION
27 Name and Title:
John F. Oglesby, PE - Sr. Project Manager
28 ,Organization:
CSD Engineering
29 Street address:
115 E. Third Street
30 City, State, Zip:
Wendell, NC 27591
31 'Phone number(s):
(919) 624-0997
32 !Email:
john@csd-engineering.com
0
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here
_ CL SEA!_ �.
032721
� � q.
Signa r of Designer
3 2—
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this oroiect have low densit areas?
No
4
If so number of low 4ify drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Wet Pond
5
Total drainage area (sq ft
269,201
202,525
6
Onsite drainage area (sq ft
269,201
202,525
7
Offsite drainage area (sq ft
0
0
8
Total BUA in project (sq ft
170952 sf
170952 sf
9
New BUA on subdivided lots (subject to
ermitting) (sq ft
n/a
n/a
10
New BUA not on subdivided lots (subject to
permitting) (sf)
170952 sf
170952 sf
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft
65074 sf
65074 sf
- Sidewalk (sq ft
925 sf
925 sf
- Roof (sq ft
104953 sf
104953 sf
- Roadway s ft
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15
Existing BUA that will remain (not subject to
ermitting) (sq ft
16
lExistina BUA that is already ermitted (sq ft
17
Existing BUA that will be removed (sq ft
13016 sf
13016 sf
18
Percent BUA
64%
84 0
19
IDesign storm inches
1.0 in
20
IDesign volume of SCM cu ft
21695 cf
21 lCalculation method for design volume
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
Simple Method
Drainage area for pre -post development analysis is the drainage area to the
proposed wet pond. The existing drainage patterns do not change with
respect to the site drainage outfall (lowest point on property). All new
impervious will drain to wetpond; remaining area on property that does not
WET POND
Drainage area number
ERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
Is there an O&M Agreement that complies with General MDC (11)?
N/A
14
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
183.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
185.00
221
Elevation of the bottom of the vegetated shelf (fmsl)
191.00
23
Elevation of the permanent pool (fmsl)
192.00
24
Elevation of the top of the vegetated shelf (fmsl)
193.00
25
Elevation of the temporary pool (fmsl)
193.70
26
Surface area of the main permanent pool (square feet)
7810
27
Volume of the main permanent pool (cubic feet)
21950 cf
28
Average depth of the main pool (feet)
4.00 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
560.1 ft
31
If using equation 3, width of submerged veg. shelf (feet)
6.0 ft
32
Volume of the forebay (cubic feet)
3987 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
54 in
35
Design volume of SCM (cu ft)
21695 cf
361
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
2.5 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
12 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
12 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
ermanent pooI?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Bermudagrass
54
Hasa plantinq plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Berm is used to direct inflow to shallow end of forebay, away from outlet.
Wet Pond 2 7:12 PM 3/20/2023