Loading...
HomeMy WebLinkAbout20230201 Ver 1_USACE Permit_20230417U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW-2022-01261 County: Henderson GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: D&H Company / Attn: Nat Leathers Address: 447 East Main Street Tupelo, Mississippi 38804 Telephone Number: (662)346-6114 Location description: The proposed project area is located at 4175 Hendersonville Road, in Fletcher, Henderson County, North Carolina. The approximate central coordinates are: 35.4286,-82.5034. Description of projects area and activity: The proposed project consists of the construction of a commercial property (Dodge's Store). The proposed development would permanently impact 0.24-acre of wetlands. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: Nationwide Permit 39 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions, above noted special conditions, and your submitted application and attached information dated February 6, 2023. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Brooke Davis at 828-271-7980, ext. 4232 or brooke.a.davis@usace.army.mil. YJ Corps Regulatory Official: Date: April 17, 2023 Brooke Davis Expiration Date of Verification: March 14, 2026 Copies Furnished (via email Alex Lowdermilk, McGill Associates Andrew Moore, NCDEQ-DWR Andrea Leslie, NCWRC The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey located at: hl!ps://re"latoly.ops.usace.LKmy.mil/customer-service-surve SPECIAL CONDITIONS: To offset the impacts to 0.24-acre of wetland, credits for at least 0.36-acre of wetlands (1.5:1 mitigation ratio) shall be purchased. Documentation of this credit purchase shall be provided to this office prior to commencement of any placement of fill material within jurisdictional waters of the U.S. DODGE'S STORE FLETCHER, NORTH CAROLINA PROJECT ADDRESS SCHEDULE OF DRAWINGS HENDERSONVILLE ROAD G-001 ..... COVER SHEET FLETCHER, NC 28732 G-002 ..... GENERAL NOTES PROPERTY OWNER/DEVELOPER CE-0 100.... EXISTING CONDITIONS AND DEMOLITION PLAN NAT LEATHERS C-100 ..... SITE LAYOUT PLAN D&H COMPANY C-101 ..... INITIAL EROSION AND SEDIMENT CONTROL PLAN 447 EAST MAIN STREET C-102 ..... FINAL EROSION AND SEDIMENT CONTROL PLAN TUPELO, MS 38804 C-103 ..... GRADING PLAN (662) 346-6114 C-104 ..... STORMWATER MANAGEMENT PLAN NLEATHERS@DBIMS.COM C-105 ..... STORMTECH DETAILS APPROXIMATE sirE C-106 ..... STORMTECH DETAILS PROJECT ENGINEER �°�AT�°N G107 ..... UNDERGROUND UTILITY PLAN C-108 ..... LANDSCAPE PLAN ROBERT WILL, PE C-109 ..... LANDSCAPE DETAILS MCGILL ASSOCIATES, PA G500 ..... STANDARD DETAILS 55 BROAD STREET - - G501 ..... STANDARD DETAILS ASHEVILLE, NC 28801 G502 ..... STANDARD DETAILS 828.252.0575 G503 ..... STANDARD DETAILS G504 ..... STANDARD DETAILS G505 ..... STANDARD DETAILS wooDHiLL DR. G506 ..... STANDARD DETAILS US HWY. 25 500 0 250 500 1000 REVISION BLOCK ry C I N I TY MAP NO. DATE BY DESCRIPTION GRAPHIC SCALE DIVISION VALUE = 500 FEET ® 55 Broad Street Q. Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com JANUARY 2023 GENERAL EROSION CONTROL NOTES UPDATED FEBRUARY, 2022 1. FINISH GRADE TOLERANCES SHALL BE AS NOTED IN THE SPECIFICATIONS. 2. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM THICKNESS, WITH WATER ADDED OR SOIL CONDITIONED TO WITHIN +/- 3% OF THE OPTIMUM MOISTURE CONTENT AS DETERMINED BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION EQUAL TO OR GREATER THAN 98% OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE -DENSITY RELATIONSHIP TEST, ASTM D698 OR AASHTO-99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. ELASTIC SILTS (MH) AND FAT CLAYS (CH) SHOULD ONLY BE USED WITHIN THE DEEPEST FILL SECTIONS AND SHOULD BE LOCATED AT A MINIMUM OF 2 FEET BELOW PAVEMENT SUBGRADES AND 4 FEET BELOW SLAB -ON -GRADES AND/OR FOOTING ELEMENTS. A GEOTECHNICAL ENGINEERING REPORT WAS PREPARED BY OTHERS UNDER DIRECTION OF THE OWNER AND IS AVAILABLE UPON REQUEST. 3. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE PLACED ON ANY AREA NOT CLEARED AND GRUBBED. EC NORTH CAROLINA LAND QUALITY SECTION EROSION CONTROL NOTES 44 J UPDATED MARCH, 2017 GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), LAND QUALITY SECTION. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES (DEMLR), DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. NOTE: ALL UTILITY INSTALLATION WITHIN 25' OF A RIVER OR STREAM BANK SHALL BE INSTALLED PER STREAM PROTECTION DURING EXCAVATION DETAIL. SEEDING AND MULCHING SHALL BE COMPLETED DAILY IN AREAS NOTED AS STREAM PROTECTION AREAS. SILT FENCE IN THESE AREAS SHALL NOT BE INSTALLED CLOSER THAN 5' FROM CREEK BANK UNLESS FIELD CONDITIONS PREVENT SUFFICIENT CLEARANCE. ALL SILT FENCES SHALL BE INSPECTED AND CLEANED AS NEEDED AFTER EACH RAIN. 3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NORTH CAROLINA 4. ALL SOIL EROSION CONTROL MEASURES REQUIRED BY THE GRADING PLAN SHALL BE PERFORMED DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. PRIOR TO GRADING, CLEARING OR GRUBBING. ALL EROSION CONTROL DEVICES SUCH AS SILT FENCES, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE ENGINEER'S 4. PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED APPROVAL. PAYMENT SHALL BE CONSIDERED INCIDENTAL TO CLEARING AND GRUBBING. IF DURING UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. THE LIFE OF THE PROJECT, A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR CREATES "GULLIES" AND "WASHED AREAS", THESE SHALL BE REPAIRED AT NO EXTRA COST, AND 5. ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS SEED AND PLACE EROSION CONTROL MATTING ON ALL CUT AND FILL SLOPES THAT ARE NOT ROCK IMMEDIATELY DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY UPON COMPLETION OF SLOPE STABILIZATION. APPROVED EROSION CONTROL PLANS WHETHER INDICATED IN THE CONSTRUCTION PLANS OR UNDER SEPARATE COVER. 6. SEED AND MULCH DENUDED AREA WITHIN TIME FRAME SPECIFIED (SEE TABLE). SEED AND SOIL 5. DISPOSABLE MATERIAL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. A. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERWISE. 7. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. B. SOLID WASTES TO BE REMOVED, SUCH AS SIDEWALKS, CURBS, PAVEMENT, ETC., MUST BE 8. REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY, DIVISION OF ENERGY, PLACED IN SPECIFIC DISPOSAL AREAS DELINEATED ON THE PLANS OR REMOVED FROM THE MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION. SITE AS REQUIRED BY THE SPECIFICATIONS. THIS MATERIAL SHALL HAVE A MINIMUM COVER OF 2'. THE CONTRACTOR SHALL MAINTAIN SPECIFIED COMPACTION REQUIREMENTS IN THESE 9. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. AREAS. WHEN DISPOSAL SITES ARE NOT PROVIDED, THE CONTRACTOR SHALL REMOVE THIS WASTE FROM THE SITE AND PROPERLY DISPOSE OF IT AT HIS EXPENSE. C. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE APPURTENANCES, UTILITY POLES, ETC., SHALL BE THE PROPERTY OF THE SPECIFIC UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, DESTROY, SALVAGE, REUSE, SELL OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. 6. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR EVALUATION AND INSTRUCTION ON HOW TO PROCEED. IN THE EVENT THAT DEWATERING OR LOWERING OF THE WATER TABLE IS NECESSARY, NCDEQ DWR SHALL BE CONTACTED PRIOR TO ANY WORK BEING PERFORMED. 7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 8. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREAS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS. THE FINISHED SURFACE SHALL BE TO GRADE AND SMOOTH, FREE OF ALL ROCKS LARGER THAN 3", EQUIPMENT TRACKS, DIRT CLODS, BUMPS, RIDGES AND GOUGES PRIOR TO SEEDING; THE SURFACE SHALL BE LOOSENED TO A DEPTH OF t4"-6" TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. ALL SEEDING SHALL BE PERFORMED BY A MECHANICAL "HYDRO -SEEDER". HAND SEEDING SHALL BE AUTHORIZED ON AN AREA BY AREA APPROVAL BY THE ENGINEER. 10. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE CLASS III REINFORCED CONCRETE PIPE (RCP) CONFORMING TO AASHTO M-170, AS CONTAINED IN NCDOT STANDARD SPECIFICATION 1032-9 FOR WALL "B" TYPE. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE HIGH DENSITY POLYETHYLENE (HDPE). SMOOTH WALL INTERIOR, WITH WATER TIGHT JOINTS, BACKFILLED WITH # 57 WASHED STONE UP TO MIN. 6" OVER THE TOP OF THE PIPE. HDPE PIPE USED FOR STORM DRAINAGE DETENTION SYSTEMS SHALL BE "RANCOR BLUE SEAL" OR APPROVED EQUAL. 11. CONTRACTOR SHALL VERIFY ALL ELEVATIONS BEFORE INSTALLATION OF FACILITIES. 12. CATCH BASINS CAST -IN -PLACE SHALL CONFORM TO THE REQUIREMENTS OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (LATEST EDITION) ARTICLES 840-1 THROUGH 840-3. CURB INLET CATCH BASIN SHALL CONFORM TO NCDOT STANDARD DETAILS 840.02 THROUGH 840.04. DROP INLETS SHALL CONFORM TO STANDARD DETAIL 840.14. JUNCTION BOXES SHALL CONFORM TO STANDARD DETAIL 840.31. 13. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 1000, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 1040, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND/OR 834. 15. TOPS OF PROPOSED FRAMES AND GRATES SHALL BE FLUSH WITH FINISHED GRADE. 16. TINDALL PRE CAST CONCRETE BOXES ARE ACCEPTABLE ALTERNATIVES FOR PROPOSED CATCH BASINS. ,BE FORE y � c ® 55 Broad StreetC9 �� Asheville, NC 28801 �� Q o 828.252.0575 !,� N INC Firm License # C-0459 �- 9'°F G A mcgillassociates.com Q �INPP NO. I DATE I BY CONSTRUCTION SEQUENCE: 1. OBTAIN THE EROSION CONTROL PERMIT FROM NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY. 2. PRIOR TO BEGINNING WORK ON THE PROJECT, THE CONTRACTOR SHALL OBTAIN FROM THE OWNER AND KEEP AT THE JOB SITE THE FOLLOWING: a. A POSTED COPY OF THE `EROSION AND SEDIMENT CONTROL APPROVAL" ISSUED BY HENDERSON COUNTY. b. A CERTIFICATE OF COVERAGE (COC) ISSUED BY NCDEQ FOR COVERAGE UNDER THE NCGO1 CONSTRUCTION STORMWATER GENERAL PERMIT, AND A COPY OF THE NCGO1 GENERAL PERMIT. c. A COPY OF THE APPROVED PLANS. 3. CONTACT THE HENDERSON COUNTY SITE DEVELOPMENT AT (828) 694-6521 FOR A PRE -CONSTRUCTION MEETING. 4. FLAG WORK LIMITS BEFORE CONSTRUCTION ACTIVITY BEGINS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL RECORDS REQUIRED BY NCDEQ FOR THE INSTALLATION AND MAINTENANCE OF THE SITE EROSION CONTROL. 6. PRE -DISTURBANCE NOTIFICATION TO NCDEQ INSPECTOR. 7. CONSTRUCT TEMPORARY STABILIZED CONSTRUCTION ENTRANCES AS SHOWN ON PLANS. 8. INSTALL SILT FENCE AS SHOWN ON PLANS, CLEARING ONLY WHAT IS NECESSARY TO INSTALL THE SILT FENCE. 9. UPON APPROVAL, BEGIN CLEARING AND GRUBBING. 10. CONTINUE GRADING OF SITE AS SHOWN ON PLANS. MAINTAIN TEMPORARY DITCHES BASED UPON GRADING SUCH THAT RUNOFF IS DIRECTED TO FIRST BAY OF BASINS. 11. INSTALL INLET PROTECTION AND ROCK PIPE INLET PROTECTION AS STATED ON THE PLANS. 12. SEED/GRASS FOR STABILIZATION ON ALL NEW CUT AND FILL SLOPES WITHIN 7 DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. 13. UPON COMPLETION OF GRADING AND SITE STABILIZATION, THE CONTRACTOR SHALL NOTIFY HENDERSON COUNTY FOR POST DISTURBANCE INSPECTION OF EROSION CONTROL MEASURES WITH THE INSPECTOR. ALL EROSION CONTROL MEASURES LISTED ON THE PLANS ARE TO REMAIN IN PLACE, NO MEASURE SHALL BE REMOVED WITHOUT PRIOR APPROVAL. A SEPARATE REPORT DESCRIBING FINAL EROSION CONTROL AND STORMWATER MEASURES WILL BE SUBMITTED TO HENDERSON COUNTY AT THE REQUEST OF THE OWNER. 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN CO CASE NOT LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES APPROX. 0.5 FEET DEEP AT THE SILT FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. ALL SEEDED AREA SHALL BE FERTILIZED, RESEED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE SEEDING SPECIFICATION TO MAINTAIN A VIGOROUS AND DENSE VEGETATIVE COVER. 4. MAINTAIN ALL MATTING THAT HAS BEEN PLACE ON SLOPES AND IN DITCHES. CHECK FOR GOOD GROUND CONTACT AND FOR THE OCCURRENCE OF ANY EROSION UNDER THE MATTING. MONITOR AND REPAIR OR REPLACE AS NECESSARY. 5. THE CONTRACTOR SHALL MAINTAIN SELF INSPECTION REPORTS AS REQUIRED BY NCDEQ AND THE NPDES CONSTRUCTION STORMWATER PERMIT. SELF INSPECTIONS ARE TO BE CONDUCTED AFTER EACH PHASE OF THE PROJECT FOR THE RECORD OF THE INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL MEASURERS. 6. SEDIMENT SHALL BE REMOVED FROM THE TEMPORARY SKIMMER AND SEDIMENT BASINS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. CLEAN OUT AND RESHAPE BASIN BACK TO THEIR ORIGINAL DIMENSIONS. SKIMMERS SHALL BE CHECK FOR CLOGGING AND CLEANED OUT. REPAIR OR REPLACE ANY DAMAGED BAFFLES. EC MAINTENANCE PLAN 45 UPDATED MARCH, 2017 DESCRIPTION DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA TEMPORARY SEEDING SPECIFICATION 0aa1v.10ILM VA01 21 SPECIES RATE (lb/acre) RYE (grain) 120 SEEDING DATES: AUG 15 TO DEC 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 IYac GROUND AGRICULTURAL LIMESTONE AND 750 Ib ac 10-10-10 FERTILIZER. MULCH: APPLY 4000lb/ac STRAW. ANCHOR STRAW BY TACKING w/ ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK w/ BLADES SER NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. CUT/FILL SLOPES SEEDING SPECIFICATIONS - STEEPER THAN 3:1 SEEDING MIXTURE: SPECIES RATE (lb/acre) TALL FESCUE 100 SWITCHGRASS AND PARTRIDGE PEA MIX 30 KOBE LESPENDEZA 10 NURSE PLANTS: BETWEEN MAY 1 AND AUG 15, ADD 10Ib/ac GERMAN MILLET OR 15 Ib/ac SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 Ib/ac RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE LESPENDEZAS IN MARCH. SEEDING DATES: BEST POSSIBLE AUG 25 - SEPT 15 AUG 20 - OCT 25 FEB 15 - MAR 20 FEB 1 - APRIL 15 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 4000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: APPLY 4000 Ib/ac GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL, ANCHOR MULCH BY TACKING w/ ASPHALT, ROVING OR NETTING, NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR, RE -FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RE -SEED, RE -FERTILIZE, RE -MULCH DAMAGED AREAS IMMEDIATELY. DITCH/OPEN AREA PERMANENT SEEDING SPECIFICATION SEEDING MIXTURE: SPECIES RATE (Ib/ac) TALL FESCUE 250 (6 Ib/1000 sq ft) NURSE PLANTS: BETWEEN MAY 1 AND AU 15, ADD 10 Ib/ac GERMAN MILLET OR 15 Ib/ac SUDANGRASS, PRIOR TO MAY 1 OR AFTER AUG 15, ADD 40 Ib/ac RYE (GRAIN). SOIL AMENDMENTS: APPLY LIME AND FERTILIZE ACCORDING TO SOIL TEST, OR APPLY 4000 Ib/ac GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ac 10-10-10 FERTILIZER. MULCH: USE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THE HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4000 Ib/ac GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: INSPECT AND REPAIR MULCH FREQUENTLY. RE -FERTILIZE IN LATE WINTER ACCORDING TO SOIL TESTS OR APPLY 150 Ib/ac 10-10-10 FERTILIZER (3 Ib/1000 sq ft). MOW REGULARLY TO A HEIGHT OF 2" TO 4". NOT TO SCALE OFFICE MANAGER M. CATHEY PROJECT MANAGER R.WILL DESIGNER G.ORR REVIEWER S. BURWELL DATE JANUARY 2023 GENERAL NOTES PROJECT # FUNDING # 22.00108 N/A SHEET G=002 U) w O z J Q w z w 00 0 0 0 (V N U) w O z J Q w z w 0 I Fri® 55 Broad Street Asheville, NC 28801 828.252.0575 Mcgill NC Firm License # C-0459 mcgillassociates.com S GENERAL SEWER NOTES �/�/ GENERAL WATER NOTES 34 UPDATED MARCH, 2017 49UPDATED MARCH, 2017 1. ALL CONSTRUCTION OUTSIDE RIGHTS -OF -WAY SHALL TAKE PLACE WITHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. BEFORE YOU DIG CALL 1-e00-e32-4949 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE STATE OF N.C.ONEB-CAAILTHE ��NTER NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. WATER LINES SHALL HAVE 3'-0" MINIMUM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. WATER AND STORM SEWER LINES SHALL HAVE A MINIMUM 18" SEPARATION EXCEPT UNDER NCDOT STORM DRAINS WHICH SHALL HAVE 24" VERTICAL SEPARATION. IF SEPARATION IS NOT OBTAINABLE, DUCTILE IRON PIPE SHALL BE USED FOR THE WATER LINE OR A SUPPORTING MATERIAL SUCH AS FLOWABLE FILL SHALL BE INSTALLED BETWEEN THE PIPES. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 12. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERGENCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 13. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 14. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 15. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED WATER LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED WATER LINE AND RE-LAID AT NO ADDITIONAL COST TO THE OWNER. 16. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURFACE TO FACILITATE CLEANUP. 1. ALL CONSTRUCTION OUTSIDE RIGHTS -OF -WAY SHALL TAKE PLACE WITHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE STATE OF NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. SEWER FORCE MAINS AND WATER LINES SHALL HAVE 3'-0" MINIMUM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. SEWER AND STORM SEWER LINES SHALL HAVE A MINIMUM 24" SEPARATION. IF 24" SEPARATION IS NOT OBTAINABLE, DUCTILE IRON PIPE SHALL BE USED FOR THE SEWER LINE OR A SUPPORTING MATERIAL SUCH AS FLOWABLE FILL SHALL BE INSTALLED BETWEEN THE PIPES. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. UNLESS OTHERWISE NOTED, ALL BURIED PIPE SHALL BE INSTALLED WITH PUSH -ON JOINTS AND EXPOSED PIPING SHALL BE FLANGED JOINT. 12. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 13. SITE TOPOGRAPHIC AND BOUNDARY SURVEY PROVIDED BY SURVEYOR NOTED ON PLANS. 14. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERGENCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 15. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 16. LOCATIONS SHOWN FOR SANITARY SEWER SERVICES ARE ASSUMED. COORDINATE LOCATIONS OF ALL PROPOSED SEWER SERVICE CONNECTIONS WITH PROPERTY OWNER PRIOR TO CONSTRUCTION. 17. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED MANHOLE TOP ELEVATIONS AND EXISTING MANHOLE INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL ADJUST ALL PROPOSED SEWER STRUCTURES TO MATCH FINISHED PAVEMENT ELEVATIONS. COSTS OF RAISING STRUCTURES SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK ON THE PROJECT. 18. MANHOLES AND CASTINGS SHALL MEET THE REQUIREMENTS OF OWNER AS WELL AS THE PROJECT SPECIFICATIONS. 19. 4" SANITARY SEWER SERVICE LINES SHALL BE INSTALLED AT 2.0% MINIMUM SLOPE AND SHALL BE DUCTILE IRON IN PAVED AREAS. 20. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 21. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED UTILITY LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED UTILITY LINE AND RE-LAID AT NO ADDITIONAL COST TO THE OWNER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURFACE TO FACILITATE CLEANUP. 23. CONTRACTOR SHALL MAINTAIN SEWAGE FLOW IN SEWER SYSTEM AT ALL TIMES AND SHALL PROVIDE BYPASS PUMPING AND/OR PIPING AS REQUIRED. NO SANITARY SEWER OVERFLOWS ARE PERMITTED. yo SHEET �' Go�� DODGE'S STORE NOT TO SCALE ��Q' • GENERAL NOTES o PERFECTION OIL COMPANY OFFICE MANAGER DESIGNER INC. M. CATHEY G.ORR G=003 Q� GING pFLETCHER NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION R.WILL S. BURWELL JANUARY 2023 22.00108 N/A 00 O_ O O N N spa•. IN, PLAN N/F / \�Q \ / John Robert Greaves & ' Sheila E. Akina—Greaves I / N/F / Lot 209, Southchase Section 7—A ' \ \ \ India L. DB 1462 PG 690 Cheryl Redmon, Alvis Downs , Jr., and / Downs Plat Slide 2646 I Lot / 187, Southchase Section IV PIN 9652682011 ' N/F \ \ \ \ DB 1462 PG 690 / Justin M. Speer I / IN, \ Plat 2 Slide 649 ' \ Lot 211, Southchase Section 7 PIN 96Slide 79 — i \ \ D1 PIatlSde 26469 I \ PIN 9652682142 \kb SIN, I ' \\ �r�o EXISTING WETLANDS / „\ \ 30 Stream Buffer per Slide 2646 IIN, \ \\ (N0.24 ACRES) ___ L��----------------------\ ' EXISTING 6" PVC \\ �� \ \\ 3 ' WATER LINE \ �' \ % _ _ — _ �_� \ \ \ \ \ I \ — \\ IN, \ \ \ 2066 i \ �� \ N/F Joshua B. Allen Secti Lot 213, DButhchase 1664 PG 700 on VII—A C \ Plat Slide 2646 I \ IN, PIN 9652683119 I I / I � N/F 1�22R/ The City of Hendersonville, A North Carolina \ \ / \RSET Municipality \ i ;z I � I I Part of Lot 189, Southchase DB 3173 PG 331 I \ 66 \ \ Plat Slide 11091 do \ PIN 965267288 \ 6' \ \ O \ \\\\ CLEAR AND GRUB / r- AS REQUIRED TO Z \ � I CONSTRUCT IMPROVEMENTS I � � - � _ FD I i i i 2068 re EXISTING CONCRETE TO I i 2068 _ — — — — — �o oT a \ o BE REMOVED (TYP.) EXISTING CONCRETE TO I /2069 �' _ _2069— — BE REMOVED (TYP.) �I `� \ — — — — — — N6.26 04 E 2070 j - 2069 TEMP \ PP O 0 � \ t _ _ � � 2066 � FD Ben \ 04 20)0 I • EXISTING POWER POLE — _ — \ \�y— EXISTING STRUCTURE TO \ TO BF REMOVED (TYP. OF 5) — \ I \ \ \ rvie+rikin nn�innrrr rn ° -----r--. BE REMOVED (TYP.) I 0 N EXISTING PROPERTY LINE EXISTING ASPHALT TO i BE REMOVED (TYP.) —ss — S MSD #15-29289 i TOP=2072.05' / INVERT=2064.55' (PER RECORD)\ 15 METERS FROM C/L ROAD W — — OHE OH W w )o N/F Youngblood Oil Company> INC DB 436 PG 409 PIN 9652685237 EXISTING GRAVEL TO BE REMOVED (TYP.) ss --0 SSMH BOLTED MSD #15-80647 TOP=2072.89' � 10" SANITARY SEWER (PER RECORD) �R Set I 15 Meters from C/L Road PP 073 / ry EXISTING 8" DIP OVERHEAD W W / I — WATER LINE ELECTRICAL LINE (TYP.)-- — — — — I EXISTING CURB TOW W W W 074-' W W W W W W W W _ 1SL,I�-�— BE REMOVED (TYP.) I 2 m EXISTING 16" DIP I WATER LINE I --- - - - -I - - - - - - ------ - - - - - - I — — _ U.S. Highway 25 EXISTING SIDEWALK AND h CURB TO BE REMOVED (TYP.) II JI — � I Edge of Asphalt \ I \218339 -----SO-----SD-----SD-----SD-----SD--- SD -- -- ----- -- -- ----- ---- \\— — — — -- —SD DI m PP ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com Zo o 10 20 40 �Go DODGE'S STORE GRAPHIC SCALE DIVISION VALUE = 20 FEET PERFECTION OIL COMPANY 0 OFFICE MANAGER DESIGNER M. CATHEY G.ORR Q� GING PPF L ETCHER NORTH CARO L I NA PROJECT MANAGER REVIEWER NO. DATE BY DESCRIPTION R. WILL S. BURWELL EXISTING CONDITIONS AND DEMOLITION PLAN DATE PROJECT # FUNDING # JANUARY 2023 22.00108 N/A SHEET CE=1 00 DEVELOPMENT DATA BLOCK NAME AND LOCATION OF PROJECT: (PRE —DEVELOPMENT) TOTAL DRAINAGE PERVIOUS AREA: DODGE'S STORE 1.15 ACRES (50,166 SF) (49.5%) HENDERSONVILLE ROAD (PRE —DEVELOPMENT) TOTAL DRAINAGE IMPERVIOUS AREA. FLETCHER, NC 28732 1.17 ACRES (51,167 SF) (50.5%) PROPERTY OWNER(S): (POST —DEVELOPMENT) TOTAL DRAINAGE PERVIOUS AREA: 0.55 ACRES (23,784 SF) (23.5%) NAT LEATHERS (POST —DEVELOPMENT) TOTAL DRAINAGE IMPERVIOUS AREA: D&H COMPANY 1.78 ACRES (77,545 SF) (76.5%) 447 EAST MAIN STREET TUPELO, MS 38804 PHONE:662-346-6114 REQUIRED PARKING: CONTACT PERSON: 2 SPACES PER PUMP, 40 SPACES TOTAL NAT LEATHERS D&H COMPANY PARKING PROVIDED: 447 EAST MAIN STREET 57 SPACES TUPELO, MS 38804 PHONE: 662-346-6114 ENGINEER: ROBERT WILL, P.E. McGILL ASSOCIATES, P.A. 55 BROAD STREET ASHEVILLE, NORTH CAROLINA 28801 828.252.0575 R OB. WI LLCM CGI LLASSOCI ATES. COM SURVEY INFORMATION BY: EAS PROFESSIONALS PIN NUMBER: 9652673798 9652674962 9652684073 9652673975 9652684005 ZONING DISTRICT: PROPOSED USE: RS8 COMMERCIAL — GAS STATION/CONVENIENCE STORE PROPERTY SIZE: TOTAL DISTURBED AREA: 1.57 ACRES 1.79 ACRES 1 1-5,670 SF BUILDING ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com GENERAL: • PER FEMA FIRM MAP 3700965200J, EFFECTIVE OCTOBER 2, 2008, NO PORTION OF THE SUBJECT SITE IS WITHIN THE 100—YEAR FLOODPLAIN. • SITE IS LOCATED WITHIN FRENCH BROAD RIVER BASIN. • DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB WHERE APPLICABLE. • LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. • SITE SLOPES PREDOMINATELY TOWARDS THE EAST SOIL TYPE(S): KINKORA LOAM PLAN N /F / Alvis Downs, Jr., and India L. Downs / IV Southchase Section DB 1462 PG 690 / Plat Slide 2649 PIN 9652671879 / EXISTING WETLANDS (-0.24 ACRES) I N /F John Robert Greaves & Sheila E. Akina—Greaves Lot 209, Southchase Section 7—A DB 1462 PG 690 Plat Slide 2646 PIN 9652682011 N /F Justin M. Speer Lot 211, S u3167ase Section 7—A Plat Slide 2646 PIN 9652682142 ' ADJACENT PROPERTY LINE (TYP.) I \ 1 N /F ° The City of Hendersonville, A North Carolina s ° ° d ° Municipality d Southchase � '� Part of Lot 189, 1 ° ° S d s ° EXISTING PROPERTY LINE DB 3173 PG 331 PROPOSED RETAINING WALL ° ° ° ° ° d Plat Slide 11091 OTHERS) (BY ° 14 PIN 965267288 �° ° 1 °° a pd ° ° t• j d ^ ° f ° d PROPOSED WOOD GUARD RAIL z 4 < 4 A' (SEE DETAIL ST-36 ON C-503) A a ° s t t t 1 - \ ° PROPOSED BOLLARD (TYP.) ° t t t �° d (SEE DETAIL M 7 ON C-502) ° t t a s ° \ ° S PROPOSED LIGHTPOLE (TYP.) � — , s d d ° u (SEE ELECTRICAL FOR LOCATION I S ° ° d AND DETAILS) I ° s °° ° d 4 d d ° ° ° ° R15.00' PROPOSED STORM WATER MANAGEMENT SYSTEM (SEE SHEET C-104) d m d / ° I J d 1 d ° ° d ° � 1 1 ° A� 4 XA R6.00' ° s a o y t. ' d ° ° s° ,� s ° s ° ° d ° d d ° ° s ° S ° . DODGE'S STORE ° d ° d s s R6.00' d ` s ° ° ° 41 5,670 SF —SINGLE STORY t' ' ° ° 1 g ° ° ° ° d ° d s ° ° FFE = 2076.00' t' s ° ° d s d ° ° ° s, d ° d 8 PROPOSED d ° (SEE ARCH./STRUCT FOR ' ', ACCESSIBLE STRIPING (TYP.) ° —}�— ° a d — SEE DETAIL ST-31 ON C-502 ° e °� ° d 1 ° °-1� ° �— ° 1 o d I � R4.00 ° d°1 ° ° ° d ] ° ° 1 DIMENSIONS AND DETAILS) r' ° ° ( ) 1° ° s 1 ° t'' J C ° 41 ° �l ° ° ° d ° I I ° ° 1 • I ° ° d d d ° S ° ° ° ° a , — — — ,,,---,,, ° ����� ° 1° d ° ° 1 t •• 1 • •, t °° ° °d ° I ° ° d ° d d ° 1 ° d ° ° I d — T — ° Y I -- --��� p ° d d ' ' • , • ° ° d S °d ° 32.75'd ° s ° ° ° °I° s ° ° , ° `' s s '° d d° n ° d ,s I °s a s d a ° °s ° ° d 1 �. PROPOSED HANDICAP PARKING ° ° d ° S d d ° I ° s , s ° d ° s d ° d ° ° s -- t ° SIGNAGE (TYP.) > ° I ° ° s °° R2.00' ° s ° s ° I° ° ° ° 41 I ° a ° ,� 1'' 't t, (SEE DETAIL ST-28 ON C-502) J° ° d ° ° b d I I� '1 ° ° d d ° ° j • .. . , t'. .1 ' ' ' is 1 •' J. a d I g 1 ° ° d., t r• , .J d ° I ° d 8 •. t• .G 1 t 1 d ° N /F Joshua B. Allen Lot 213, Southchase PG 700 on VII—A DB Plat Slide 2646 PIN 9652683119 PROPOSED RETAINING WALL (BY OTHERS) N /F Youngblood Oil Company INC DB 436 PG 409 PIN 9652685237 ° ° d d .1 I I ° ° ° d d IJ u ° ° d ° d ° ° 4° ° s ° ° ° d ° ° I ° PROPOSED GAS PUMP (TYP. OF 10) ° J d ° ° ° _ ° ° ° s ° ° d ° _ (SEE ARCH./STRUCT. FOR 41 d 01 wT E 3-T_ —� l ° ° ° ° ° 1 ° ° d >° ° ° ° ° ° ° d ° , ° ° 1 ° DIMENSIONS AND DETAILS) ° d — — --- -- — V G h I °/°d ° / ° ° ° °` ° dl / I ° ° J / ° " d-1 J ° 1 d J ° ° ° ° ° ° 5 ° s ° d -1 J ° ° ° d ° 1 ° ° d ° d ° ° ° d °�O- 1 ° ° 1 d ° ° r1(° 1 1 d1 ° ° ° I1 d ° PROPOSED 4" ° ° ° s ° ° 1° ° s d 20.00 TYP\1° . V 1 ° d ° dO a d° d ° ° ° d� d ° ° A d I °° I ° WHITE STRIPING (TYP.) ° ° d d ° ° ° ( d ° d ° ° --11/ � ° ° ° ° ° d ° ° ° 30.00' d ° d ° ./ ° d ° d t, ° d d ° ° J ° I ° ° ° d ° z 1 ° ° ° ° d z ° ° Cn ° d PROPOSED WATER LINE d d d ° ° d J ' \ ° d ° � ° �" s ° d d ° d s s ° � d ° °s � � d s dC SEE SHEET C-107 � \ s °d I I ° d d s R/2.00 ° d d s R2.50 s° °s d / d ° ° ° ° °d ° ° ° ° ° d d ° J ° ° d d ° ° ° ° I ° d 1 ° ° d O S d ° ^ ° ° S ° d d ° d ° ° d ° ° ° d °z d ° d ° L ° I ° d d ° ° Z d ° d ° ° d d d — R10.00' /° d \'A d ° d J °d °S°d dd d d d°1 ° ° d�t. d ° d d d ° z ° d d -1z I PROPOSED SITE IDENTIFICATION ° ° d — °R3.50' d z d - �s , 0 / ° , °S s d I SIGN (BY OTHERS) • t. d d O ° d -J d d ° ° O ° ° d •` • t 36.00' 11.00' (TYP.) s l 36.00' PROPOSED CONCRETE SIDEWALK (TYP.) �t'• 1 .l •/ :'( t+. .t „ •'r•• .t' ••l, ° ° ° t' •.t'' 1 1 •t •.( 11 �l ,d ! j,•I• 1. (SEE DETAIL ST-23 ON C-502) 9 1 e PROPOSED CONCRETE PAVEMENT (TYP.) R15.00' (SEE DETAIL ST-10 ON C-502) PROPOSED DETECTABLE WARNING SURFACE (TYP.) R15.00' R15.00' (SEE DETAIL ST-2 ON C-501) PROPOSED SANITARY SEWER J (SEE SHEET C-107) R15.00' PROPOSED RETURNED CURB RAMP (TYP.) (SEE DETAIL ST-1 ON C-501) U.S. Highway 25 �gEF0R,6 y0 DODGE'S STORE PERFECTION OIL COMPANY INC. � o 0, GING PP FLETCHER, NORTH CAROLINA NO. DATE BY DESCRIPTION 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER DESIGNER M. CATHEY G.ORR PROJECT MANAGER REVIEWER R.WILL S. BURWELL SITE LAYOUT PLAN DATE PROJECT # FUNDING # JANUARY 2023 22.00108 N/A SHEET C=1 00 00 0 0 0 N N i i i i I ADJACENT PROPERTY LINE (TYP.) O \ O 4 o ? � r � Q L - OHE - - W — EXISTING 8" DIP WATER LINE N /F / Cheryl Redmon, Alvis Downs, Jr., and India L. Downs / Lot 187, Southchase Section IV DB 1462 PG 690 / Plat Slide 2649 PIN 9652671879 PROPOSED SILT FENCE OUTLET (TYP.) (SEE DETAIL EC-2 ON C-501) -EXISTING 6" PVC WATER LINE N /F The City of Hendersonville, A North Carolina Municipality Part of Lot 189, Southchase DB 3173 PG 331 Plat Slide 11091 PIN 965267288 i i 9,06 2068 2066 W - - OHE W - 2073 - - - -SD- - - - -SD- - - - -SD- 'BEFORE y 2 � C ® 55 Broad Street Asheville, NC 28801 ICJ` Q o 828.252.0575mcgi NC Firm License # C-0459 �— 9'�F A mcgillassociates.com Q GING PP NO. 1 DATE I BY EXISTING WETLANDS (N0.24 ACRES) NW O EXISTING 15" RCP 1 SD - - SD - - - SD DI DESCRIPTION W W 1 N /F John Robert Greaves & ' Sheila E. Akino—Greaves Lot 209, Southchase Section 7—A ' DB 1462 PG 690 Plat Slide 2646 PIN 9652682011 ' N/F Justin M. Speer ' Lot 211, Southchase Section 7—A DB 3167 PG 339 Plat Slide 2646 ' PIN 9652682142 EXISTING PROPERTY LINE � \ 2066\� I � PLAN U.S. Highway 25 W — N—PROPOSED TEMPORARY _ 20% CONSTRUCTION ENTRANCE W (SEE DETAIL EC-24 ON C-500) (35.4247,—82.5031) i EXISTING OVERHEAD — — ELECTRIC LINE (TYP.) 0 m PP LIMITS OF DISTURBANCE (1.79 ACRES) �0 0 N O W — W W W W �L EXISTING 16" DIP WATER LINE II \ I � JI DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. CATHEY DESIGNER G.ORR PROJECT MANAGER R.WILL REVIEWER S. BURWELL N /F Joshua B. Allen Lot 213, Southchase Section VII—A DB 1664 PG 700 Plat Slide 2646 PIN 9652683119 N /F Youngblood Oil Company, INC DB 436 PG 409 PIN 9652685237 PROPOSED SILT FENCE (TYP.) (SEE DETAIL EC-1 ON C-500) w 0 w SS --0 218339 INITIAL EROSION AND SEDIMENT CONTROL PLAN DATE JANUARY 2023 PROJECT # FUNDING # 22.00108 N/A SHEET C=101 w 0 0 0 (V N PLAN N/F and India L. Cheryl Redmon, Alvis Downs, Jr., Downs Lot 187, Southchase Section IV DB 1462 PG 690 Plat Slide 2649 PIN 9652671879 PROPOSED SILT FENCE OUTLET (TYP.) (SEE DETAIL EC-2 ON C-501) PROPOSED PIPE OUTLET PROTECTION (SEE DETAIL EC-17 ON C-502) -EXISTING 6" PVC WATER LINE N /F The City of Hendersonville, A North Carolina 'ci ality Munl p Part of Lot 189, Southchase / DB 3173 PG 331 Plat Slide 11091 PIN 965267288 i PROPOSED SILT FENCE (TYP.) (SEE DETAIL EC-1 ON C-500) 0 0 O Q o ? _ r � O G I � PROPOSED INLET PROECTION (TYP.) (SEE DETAIL EC-15 ON C-501) N /F John Robert Greaves & Sheila E. Akina—Greaves Lot 209, Southchase Section 7—A DB 1462 PG 690 Plat Slide 2646 PIN 9652682011 CVIC'TIAIl% \A/CTI AAIMC- PROPERTY LINE (TYP.) N /F Justin M. Speer Lot 211, uose Sec DB3167339ion 7—A Plat Slide 2646 PIN 9652682142 PROPOSED SLOPE MATTING (TYP.) (SEE DETAIL EC-11 ON C-500) \\ LIMITS OF DISTURBANCE (1.89 ACRES) N /F Joshua B. Allen Lot 213, Southchase Section VII—A DB 1664 PG 700 Plat Slide 2646 PIN 9652683119 N /F Youngblood Oil Company INC DB 436 PG 409 PIN 9652685237 PROPOSED SILT FENCE (TYP.) (SEE DETAIL EC-1 ON C-500) 0 d ° / d d C d .1 " - d °! d 1 d ° ° d ° ° /)�J/ ° d d ° ° ° ° A / EXISTING 8" PVC 1 °s d cS I ° d ° ° ° d ° ° d ° s ° ° \ d 1 ° d X SANITARY SEWER (TYP.) ° d a ° ° ° 1 ° a ° ` ° d i a fi , ° s d 1 ° ° a ° ° a d Q s° ° ° 1 ° ° '/° ° s ° 1 ° ° d ° d ° _l ° d ° ° ° ° ° d s ° °1 2075 _mod, ° d s ° ° ° ,I s ° I ° ° s °°—�� °/�� _ PROPOSED INLET PROECTION TYP. s d1 d s ° ° s ,° (TYP.) ° ° s PROPOSED CONCRETE WASHOUT ° ° s ° ° SEE DETAIL EC-15 ON C-501 ° d s ° � ( ) d ° ° (SEE DETAIL W-15 ON C-500) ° — — — ° ° d�41MWI ° d d / ° � O 1 C ° W W W s O W _ d \� Wyy d ° EXISTING 8" DIP �� J` - WATER LINE _J JW oW W W W __W to I EXISTING 15" I �PROPOSED TEMPORARY RCP I CONSTRUCTION ENTRANCE � (SEE DETAIL EC-24 ON C-500) EXISTING 16" DIP i (35.4247,—82.5031) WATER LINE U.S. Wiigh-way 25 JI — — —SD— — — — —SD— — — —SD - — — — — — — — — — — — — — — — — — — — — zu— — — - DI �,�,BEFORF y 20 0 10 20 40 SHEET Q�' \V oGo� DODGE'S STORE FINAL EROSION AND SEDIMENT CONTROL ® 55 Broad Street `� V , � GRAPHIC SCALE DIVISION VALUE = 20 FEET PLAN Asheville, NC 28801 `� , o OFFICE MANAGER DESIGNER 828.252.0575 !,� N9 �� C=1 02 NC Firm License # C-0459 `C/ �F INC.PERFECTION OIL COMPANY M. CATHEY G.ORR me illassociates.com Q� �IGGING QP� FLETCHER NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# C9 9 NO. DATE BY DESCRIPTION ' R.WILL S. BURWELL JANUARY 2023 22.00108 N/A co 0 0 0 N N PLAN / i / / 1 I 1 / I I I I I I I I I i / \ N /F Cheryl Redmon, Alvis Downs, Jr., and India L. Downs / i Lot 187, Southchase Section IV / DB 1462 PG 690 / Plat Slide 2649 \ PIN 9652671879 / 1 I \ 1 � \ 1 I \ , 1 1 I EXISTING 6" PVC f WATER LINE I I I I N/F The City of Hendersonville, A North Carolina Municipality Part of Lot 189, Southchase DB 3173 PG 331 Plat Slide 11091 PIN 96526728E EXISTING WETLANDS (N0.24 ACRES) I ><' PROPOSED RETAINING WALL (BY OTHERS) I / I / / / /20 —���� Z06g —/— I PROPOSED STORM WATER MANAGEMENT SYSTEM (SEE SHEET C-104) / OHE — — — W— OHE - W - EXISTING 8" DIP WATER LINE 2073 SD— — — — —SD— — — — —SD ,BEFOR,.-)C ® 55 Broad Street Asheville, NC 28801 Q o 828.252.0575 NC Firm License # C-0459 �- 9'�F A C9 mcgillassociates.com Q GING V NO. I DATE I BY W o — EXISTING 15" RCP v I I N /F John Robert Greaves & Sheila E. Akina—Greaves Lot 209, Southchase Section 7—A DB 1462 PG 690 Plat Slide 2646 PIN 9652682011 i / / / / / 2066 �I 7 2�6� 2�6i2% I I I ' N /F Justin M. Speer I ' Lot 211, Southchase Section 7—A DB 3167 PG 339 I Plat Slide 2646 ' PIN 9652682142 I ADJACENT PROPERTY LINE (TYP.) \ n�-7 \ 2075.23 + \ \ \ \ \ 1,0 1 > EXISTING PROPERTY LINE 2076.35 \ \�:?O' \\ �/ `-----2069 N W W W W / 2p74- o / U.S. Highway 25 ` `2074. — m EXISTING OVERHEAD _ ELECTRIC LINE (TYP.) I ` II flBir- - - - - Ju DI o m DESCRIPTION N /F Joshua B. Allen Lot 213, southchase PG 700 on VII—A DB Plat Slide 2646 PIN 9652683119 PROPOSED RETAINING WALL (BY OTHERS) j PROPOSED SANITARY SEWER (SEE SHEET C-107) J ry0 / I N Ill 0 W - W W W W EXISTING 16" DIP WATER LINE \ 101, \ \ I DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. CATHEY PROJECT MANAGER R.WILL DESIGNER G.ORR REVIEWER S. BURWELL N /F Youngblood Oil Company, INC DB 436 PG 409 PIN 9652685237 GRADING PLAN DATE PROJECT # FUNDING # JANUARY 2023 22.00108 N/A SHEET C=1 03 00 0 0 0 (V N w 0 w 0 0 0 od 0 00 a a 0 N N N N 0 N N/F The City of Hendersonville, A North Carolina Municipality Part of Lot 189, Southchase pB 3173 PG 331 Plat Slide 11091 PIN 965267288 PROPOSED OCS N: 627865.98 PROPOSED JB-A4 - N: 627824.84 E: 956454.69 RIM: 2073.53 INV IN: 2068.96 (S) INV. IN: 2068.96 (E) INV OUT. 2068.96 54 LF 12" HDPE ® 1.00% 12" TRENCH DRAIN TOP: 2071.46 INV. OUT. 2069.50 \I PROPOSED STORMTECH UNDERGROUND STORM WATER MANAGEMENT SYSTEM (SEE SHEET C-106 FOR DIMENSIONS AND DETAILS) 54 LF 18" HDPE ® 1.007. PLAN / N/F ' I John Robert Greaves & ' / Sheila E. Akina-Greaves I N/F Lot 209, Southchase Section 7 Jr., an -A ' d India L. pB 1462 PG 690 Cheryl Redman, Alvis Downs, Downs / Plat Slide 2646 I Lot 187, Southchase Section IV PIN 9652682011 ' N/F pB 1462 PG 690 / Justin M. Speer I - Plat Slide 2649 ' Lot 211, Southchase Section 7 PIN 9652671879 pB 3167 PG 339 I / Plat Slide 2646 ' PIN 9652682142 I PROPOSED OUTLET N: 627947.74 E: 956411.34 z \ \ \ RETAINING WALL (SEE ARCH./STRUCT. INV OUT. 2065.84 \� \ FOR DIMENSIONS AND DETAILS)00000 EXISTING WETLANDS (N0.2434 ACRES) A, PROPOSED JB-A2 A, \ \ \ \ N: 627872.34 A, E: 956450.38 / RIM: 2074.32 INV IN: 2066.67 // 28 LF 18" HDPE O 0.93% INV OUT: 2066.67 N/F Joshua B. Allen Lot 213, Southchose PG 700on VII-A Plat Slide 2646 PIN 9652683119 RETAINING WALL (SEE ARCH./STRUCT. FOR DIMENSIONS AND DETAILS) N/F Youngblood Oil Company, INC pB 436 PG 409 PIN 9652685237 PROPOSED SANITARY SEWER (SEE SHEET C-107) 1 I "' `" """' " PROPOSED JB-B3 ` \ PROPOSED JB-B2 N: 628060.17 RIM: 2073.65 - INV IN: 2068.00 - _ N: 627990.69 E: 956611.86 INV OUT: 2068.00 -\� RIM:2075.32 8.07 PRORIFFE HE TIC-107E� IN 4.98 \\\ \ \\ PR OPOSED PROPOSED ICS-2 N: 627807.29 E: 956505.93 \ \ �' - - / 18 LF 15" HDPE ® 1.59% L - RIM: 2073.48 - - -31111111111� - l • _-' / INV IN: 2067.60 121 LF 15" HDPE O 1.00% ' ` 70 LF 15" HDPE ®1.00% 73 LF 12" HDPE O 1.00% INV OUT: 2069.50 / - ' II 'T 16 LF 12" HDPE ®1.00% S _ - I � S � I - - 15 LF 12" HDPE ® 1.00% PROPOSED GI-A8 \�j �� \\r - _ - - - - 16 LF 12" HDPE O 1.00% N: 627783.78 E: 956531.74 RIM: 2072.90 INV OUT: 2069.00 , _ �� PROPOSED JB-B1 I N: 627924.24 E: 956565.31 12" TRENCH DRAIN I RIM: 2074.87 TOP: 2073.39 12" TRENCH DRAIN I INV IN: 2069.50 (N) TOP: 2073.95 f I PROPOSED JB-A7 INV. OUT. 2070.39 INV. OUT. 2071.09 - I I N: 627809.85 INV. IN: 2070.23 (E) PROPOSED GI-62 I E: 956526.13 INV OUT: 2069.50 N: 627985.72 I 27 LF 15" HDPE ® 0.807o RIM: 2073.67 E: 956602.57 I INV IN: 2068.79 (S) RIM: 2074.29 INV IN: 2068.29 (N) INV OUT: 2071.42 INV OUT. 2068.29 U.S. Highway 25 I J �,�gEF FORy 20 0 10 20 40 SHEET \' �Go, DODGE'S STORE STORMWATER MANAGEMENT PLAN ® 55 Broad Street `� V � GRAPHIC SCALE DIVISION VALUE = 20 FEET Asheville, NC 28801 , o PERFECTION OIL COMPANY INC.OFFICE MANAGER DESIGNER 828.252.0575 !,� N9 �� M. CATHEY G.ORR C=1 04 NC Firm License # C-0459 me illassociates.com Q� GING QP� FLETCHER' NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# 9 NO. DATE BY DESCRIPTION R.WILL S. BURWELL JANUARY 2023 22.00108 N/A 00 0 0 0 N N a PROPOSED LAYOUT PROPOSED ELEVATIONS PROJECT INFORMATION ENGINEERED PRODUCT A ❑■ ;�'�t 91 MANAGER ! -s =s KL SiteAssist W'r AFOR STORMTECH �-�' ADS SALES REP • •�� //A1r*1r1M INSTALLATION INSTRUCTIONS Advanced Drainage Systems, Inc. VISIT OUR APP s' a PROJECT NO. 122.00108 MC-3500 STORMTECH CHAMBER SPECIFICATIONS DODGE'S CONVENIENCE STORE STORMTECH FLETCHER, NC IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-3500 CHAMBER SYSTEM 1. CHAMBERS SHALL BE STORMTECH MC-3500. 2. CHAMBERS SHALL BE ARCH -SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT -MODIFIED POLYPROPYLENE COPOLYMERS. 3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS. 4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG -DURATION DEAD LOADS AND 2) SHORT -DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7. REQUIREMENTS FOR HANDLING AND INSTALLATION: • TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. • TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3". • TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: • THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. • THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. • THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. ©2022 ADS, INC. 1. STORMTECH MC-3500 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: • STONESHOOTER LOCATED OFF THE CHAMBER BED. • BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. • BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7. INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS. 8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43 DESIGNATION OF #3 OR #4. 9. STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROW SPACING. 10. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 11. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1. STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 2. THE USE OF EQUIPMENT OVER MC-3500 CHAMBERS IS LIMITED: • NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. • NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". • WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS AASHTO MATERIAL MATERIAL LOCATION DESCRIPTION COMPACTION / DENSITY REQUIREMENT CLASSIFICATIONS FINAL FILL: FILL MATERIAL FOR LAYER'D' STARTS FROM THE TOP OF THE'C' PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED D LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE'D' CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. PREPARATION REQUIREMENTS. LAYER AASHTO M145' INITIAL FILL: FILL MATERIAL FOR LAYER'C' STARTS FROM THE TOP OF THE GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR A-1, A-24, A-3 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE PROCESSED AGGREGATE. THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN C CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE'C' OR 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR LAYER. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR LAYER. AASHTO M43' PROCESSED AGGREGATE MATERIALS. 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE 'C' CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' NO COMPACTION REQUIRED. FOUNDATION STONE ('A' LAYER) TO THE LAYER ABOVE. 3, 4 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,1 THE FOOT (BOTTOM) OF THE CHAMBER. 3, 4 PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. PERIMETER STONE (SEE NOTE 4) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 6" (150 r ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS • C-3500 END CAP PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) &� _ D 'TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED 8' INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, 18" G` INCREASE COVER TO 24" (600 mm). 2.4 (450 mm) MIN' ( m ) MAX 12" (300 mm) MIN 6„ SUBGRADE SOILS (150 mm) MIN (SEE NOTE 3) 45" (1140 mm) L DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 9" (230 mm) MIN 77" (1950 mm) 12" (300 mm) MIN NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS. 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: • TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. • TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3". • TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 2� gEFORc F y `C- � P ® 55 Broad Street �� Asheville, NC 28801 9 0 828.252.0575C9 I NC Firm License # C-0459 me9 illassociates.com Q� GING QP� NO. I DATE I BY DESCRIPTION < o Z O p 2 w 00 CD z w C)2 0 U O U CVLu ~ CV df N- U w F O o of 0 O `u c 2 u U F u r u u ® O s � cn C_ v E 3 °' 33:u 0 F - c u rn au L N u 6 N s O E 0? 0) *I 00 < Vi U pC, J C,m o z� _ Cl) V wU" D p r> OfofCl) C) -i 0O v J W V = SHEET 3OF5 12 7628 ( PERIMETER STONE INCLUDED) OVER STONE INCLUDED) STONE INCLUDED) \� ISOLATOR ROW PLUS \\\\\ (SEE DETAIL) PLACE MINIMUM 17.50' OF ADSPLUS175 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS - BED LIMITS TOP OF MC-3500 CHAMBER: 2071.33 24" ISOLATOR ROW PLUS INVERT: 2067.75 OTTOM OF MC-3500 CHAMBER: F E H COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT PART TYPE =ABRICATED END CAP =ABRICATED END CAP I IFOLD RE RE 2067.69 W/WEIR 2067.58 UNDERDRAIN 56.29' WU DESCRIPTION A 24" BOTTOM CORED END CAP, PART#: MC35001EPP24BC / TYP OF ALL 24" BOTTOM CONNECTIONS AND ISOLATOR PLUS ROWS B 12" BOTTOM CORED END CAP, PART#: MC35001EPP12B / TYP OF ALL 12" BOTTOM C C INSTALL FLAMP ON 24" ACCESS PIPE / PART#: MC350024RAMP D 12" x 12" BOTTOM MANIFOLD, ADS N-12 E 12" x 12" BOTTOM MANIFOLD, ADS N-12 F OCS (DESIGN BY ENGINEER / PROVIDED BY OTHERS) G (DESIGN BY ENGINEER / PROVIDED BY OTHERS) H 6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAIN 'INVERT ABOVE BASE OF CHAMBER NVERT MAX FLOW 2.06" 1.35" 1.35" 7.4 CFS IN NOTES • MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE. DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. • THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. • THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE -SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. • NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE. INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE PART #: MC350024RAMP MC-3500 CHAMBER 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE -CORED END CAP PART #: MC35001EPP24BC OR MC35001EPP24BW MC-3500 ISOLATOR ROW PLUS DETAIL A. INSPECTION PORTS (IF PRESENT) A. 1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR PLUS ROWS B. 1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ff) FOLLOW OSHA REG(fLATTONVS FOR CONFfNNED SPACE ENTRY fF EIVTERfIVG MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA NTS OPTIONAL INSPECTION PORT MC-3500 END CAP ONE LAYER OF ADSPLUS175 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS AS NOTED STORMTECH DETAILS OFFICE MANAGER DESIGNER M. CATHEY G.ORR PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # R.WILL S. BURWELL JANUARY 2023 22.00108 N/A Q z 2 W o z W C= O 0 U O U CV F_ LU (V _j ILL. 0 O `u _ U 2 u U c W u H z u ® O ~ c U E o u rn r L N� u L � N C O E rn o, °0 C. Vim 00` f p� J N In co Z� = v WUI� Coco <o V J W 12 v=� 3 SHEET 2OF5 w H w < O Z r (D - 2 W z0 O z Q w x C:) W 0 U o C:)= U N F o CV _j o LL z 3 xf o ~ N W H O w o a J 2 w wy z z Uz C) w 2 zw a 0� R WW U W IY w (� LL1 (a w p W 'o ~a > O �z Q< zZ w 0 Y �a U x Fw U� ou, C, ag w� W x< Q0 O U p oQ w� wQ Z, w w w O 2 5 U � 2 U ow 0 ~ ~w u w¢ ® O � LLO s � oN vE �Q 4).2 3:o 12 Cn W w ~~ U Nw w L °o Q E *0 � 00CC) °o () o a ww .am 8o_ Ir Q a p zw �p Ow J CD u)Cl) wz Z V 0. 7 Ir w°� ow �J)f 0 CM a Z ch w - I Q< <Z mw J Cp ❑ Z J °p w 0 V= ao �W 0. I co ww mx <o X� 0 _ zd z SHEET 4OF5 SHEET C=1 05 UNDERDRAIN DETAIL NTS STORMTECH CHAMBER )RMTECH END CAP -LET MANIFOLD FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE STORMTECH END CAP FOUNDATION STONE BENEATH CHAMBERS ADS G EOSYNTH ETI CS 601T NON -WOVEN GEOTEXTILE -ITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS MC -SERIES END CAP INSERTION DETAIL 12" (300 mm) MIN INSERTION MANIFOLD STUB MANIFOLD HEADER 12" (300 mm) MIN SEPARATION I 18" HDPE INV. OUT.: NTS STORMTECH END CAP 12" (300 mm) MIN INSERTION NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL FOR A PROPER FIT IN END CAP OPENING. NOTE: INLET CONTROL STUCTURE: 5'X5' BOX (INSIDE DIMENSIONS) TOP: (2) MANHOLE LIDS PIPE A9 IV IIVI V INV. IN: 2068.00 MC-3500 TECHNICAL SPECIFICATION NTS VALLEY STIFFENING RIB CREST CREST WEB STIFFENING RIB LOWER JOINT CORRUGATION FOOT it"�Mj WALL UPPER JOINT CORRUGATION -GRATED BUILD ROW IN THIS DIRECTION b RDRAIN I SECTION B-B 12" (300 mm) MIN SEPARATION O MANIFOLD HEADER MANIFOLD STUB 77.0" (1956 mm) 75.0" (1905 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m') MINIMUM INSTALLED STORAGE* 175.0 CUBIC FEET (4.96 m') WEIGHT 134 Ibs. (60.8 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 ma) MINIMUM INSTALLED STORAGE* 45.1 CUBIC FEET (1.28 ml) WEIGHT 49 Ibs. (22.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" PART # STUB B C MC35001EPP06T 6" (150 mm) 33.21" (844 mm) MC35001EPP06B --- 0.66" (17 mm) MC35001EPP08T g" (200 mm) 31.16" (791 mm) --- MC35001EPP08B --- 0.81" (21 mm) MC35001EPP10T 10" (250 mm) 29.04" (738 mm) --- MC35001EPP10B --- 0.93" (24 mm) MC35001EPP12T 12" (300 mm) 26.36" (670 mm) --- MC35001EPP12B --- 1.35" (34 mm) MC35001EPP15T 15" (375 mm) 23.39" (594 mm) --- MC35001EPP15B --- 1.50" (38 mm) MC35001EPP18TC 18" (450 mm) 20.03" (509 mm) --- MC35001EPP18TW MC35001EPP18BC 1.77" (45 mm) MC35001EPP18BW MC35001EPP24TC 24" (600 mm) 14.48" (368 mm) --- MC35001EPP24TW MC35001EPP24BC 2.06" (52 mm) MC35001EPP24BW MC35001EPP30BC 30" (750 mm) 2.75" (70 mm) NOTE: ALL DIMENSIONS ARE NOMINAL )PE MANIFOLD V. IN: 2067.69 P 2 Ir PIPE A6 18" HDPE INV. OUT:2 PIPE A7 18" HDPE INV. IN: 2068.01 INLET CONTROL STRUCTURE. NOT TO SCALE - ® 55 Broad Street Asheville, NC 28801 828.252.0575 C9 I NC Firm License # C-0459 mcgillassociates.com !\I\V JLVr 11\V 1 LV PATH TOWARDS THE INVERT OUT OF THE STRUCTURE - ICS-1 86.0" (2184 mm) INSTALLED 90.0" (2286 mm) ACTUALLENGTH 22.2" (564 mm) INSTALLED 25.7" 'I (653 mm) I� F w a o Z � 0 Z w o Y I 00 O Z Q W oe T__O W 0 U o O Q U O N w CN j o U- ¢ a z a U w H O w a af > ❑ a w a ° w w� Z z 0Z O ww Z w wO w U � 0 w� w v w ❑ w° wa >0 �Z Qa Z. wZ °o Y r a U rw wc6 w 3: ❑ as �. w =Q QO U ❑ °a wa J Z 2 0w ww O 2 U (o U ow w w� F- �o ° � wa_ ® o �° 0 s U) ow Za E O� 1Q A' w ❑ F- (� _ o w° ~~ L N U � x a Z L .n w C E 0� ViU �00 ` °0 1� wa w 0 o~ �Q a= ❑ Z F Ow C)Q Cl) z aw J� z1. ZM v Lu r� a w CUSTOM PRECORED INVERTS ARE Q CO Q M w w w AVAILABLE UPON REQUEST. v ::10 o z INVENTORIED MANIFOLDS INCLUDE 00 X. 12-24" (300-600 mm) SIZE ON SIZE xw AND 15-48" (375-1200 mm) Z ECCENTRIC MANIFOLDS. CUSTOM w INVERT LOCATIONS ON THE MC-3500 a o END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES Z J m GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' 00 ARE THE HIGHEST POSSIBLE FOR SHEET THE PIPE SIZE. 5OF5 2073.65 OLE STEPS OF WEIR:2068.30 ?" HDPE MANIFOLD INV. IN: 2067.69 OF RE ELEV.:2067.69 6" HDPE i INV. IN:2C PIPE A3 18" HDPE INV. OUT: 2066.82 NOTE: INLET CONTROL STUCTURE: 4'X4' BOX (INSIDE DIMENSIONS) TOP: (1) MANHOLE LID INV. IN: ZV00.0L 2071.33- 2066.83- NOTE: INLET CONTROL STUCTURE: 4'X4' BOX (INSIDE DIMENSIONS) TOP: (1) MANHOLE LID PIPE A5 18" HDPE BYP INV. IN:2061 ORIFICE V. : 2066.83 WEIR DETAIL DETAIL BELOW HDPE MANIFOLD IN: 2067.69 6" HDPE INV. IN: A PIPE A4 18" HDPE B INV. IN: 206E PIPE A3 18" HDPE INV. OUT:: in VCR 1 vv i yr i nr- INV. IN: 2067.69 STRUCTURE OUTLET CONTROL STRUCTURE - OCS NOT TO SCALE R PIPE 18" HDPE BYP INV. IN: 2061 46 DPE BYPASS INV. IN: 2067.60 INLET CONTROL STRUCTURE. NOT TO SCALE /'II\V JLVr II\V 1 LV 1 PATH TOWARDS THE INVERT OUT OF THE STRUCTURE - ICS-2 1.33 OF URE ELEV.:2066.83 5 2070.60 A6 HDPE BYPASS IN: 2067.60 067.53 gEFORFYD SHEET DODGE'S STORE AS NOTED ��Q' • STORMTECH DETAILS o PERFECTION OIL COMPANY OFFICE MANAGER DESIGNER ad INC. M. CATHEY G.ORR C=1 06 PROJECT MANAGER REVIEWER DATE PROJECT # FUNDING # GING PF L ETC H E R� NORTH CARO L I NA NO. DATE BY DESCRIPTION R.WILL S. BURWELL JANUARY 2023 22.00108 N/A 00 0 0 0 N N / PLAN / N/F ' I \ / John Robert Greaves & Ain a—Greaves I I \ / Sheila E. N/F Lot 209, Southchase Section 7—A ' Jr., and India L. pg 1462 PG 690 Alvis Downs, I Cheryl Redman, Downs / Plat Slide 2646 Section IV PIN 9652682011 I N/F Justin Lot 187, Southchase Southchase Speer I DB 1462 PG 690 / Section Plat Slide 2649 Lot 211, 7—A pg 3167 PG 339 PIN 9652671879 I / Plat Slide 2646 IPIN 9652682142 / I < ;�\ \ I ADJACENT PROPERTY LINE (TYP.) EXISTING 6 PVC WATER LINE EXISTING WETLANDS / / \\ N/F n+ 066 / \\ \ Joshua B. Allen ( 0.24 ACRES) z \ \ Lot 213, Southchase Section VII—A I I s pg 1664 PG 700 I / �r Plat Slide 2646 06, �o6a 2o6g 20� O ZO, 2Q7 2 ZQ7 3 \ \ \ \ o\ \ PIN 9652683119 N/F / / North Carolina / The City of Hendersonville, A / 8 \ \ ?06' �\ Municipality / Part of Lot 189, Southchase / / \ \ \\ pg 3173 PG 331 Plat Slide 11091 / ti / 9 \� �o\\ PIN 965267288 / / / / /� SEE PLUMBING DRAWINGS FOR 2� \ \ ��0 �\\ CONTINUATION \ i 6s' / _ /_ — — _ �' SEE PLUMBING DRAWINGS FOR / ` i 2D r 'A.r CONTINUATION \011 69 .2°69 / _ / — , 1111110 —2p6% _ i \ \ `, i \ \ _ I �� // _ EXISTING PROPERTY LINE PROPOSED STORM WATER FJ MANAGEMENT SYSTEM (SEE SHEET C-105 AND C-106)� PROPOSED MH #1 N: 327796.08 E: 956510.99 RIM: 2073.21 INV IN: 2065.05 INV. OUT: 2064.95 (FIELD VERIFY) SSMH BOLTED / MSD #15-29289 / TOP=2072.05' / INVERT=2064.55' / (PER RECORD) W OHE — — — W W EXISTING 8" DIP WATER LINE 207 PROPOSED MH #2 N: 627805.90 E: 956534.61 RIM: 2073.21 INV IN: 2065.34 INV OUT: 2065.24 oW EXISTING 15" o RCP W W W CONNECTION WITH CITY OF HENDERSONVILLE / 2pj4- WATER DEPARTMENT / U.S. Highway 25 0 2074.E m EXISTING OVERHEAD ELECTRIC LINE (TYP.) —SID — — — — — — — — — — — DI o I W W �,�,BEFORF y �\V OGo�� DODGE'S STORE ® 55 Broad Street �� Asheville, NC 28801 Q o 828.252.0575 !,� N9 �� PERFECTION OIL COMPANY INC. NC Firm License # C-0459 pPQ�� mcgillassociates.com Q GING FLETCHER, NORTH CAROLINA NO. DATE BY DESCRIPTION N/F Youngblood Oil Company, INC Dg 436 PG 409 PIN 9652685237 PROPOSED MH #4 N: 628132.96 E: 956597.06 RIM: 2073.45 INV. IN:: 2068.18 (FIELD VERIFY) INV OUT. 2068.08 ss --e SSMH BOLTED MSD 615-80647 TOP=2072.89' � II EXISTING 16" DIP WATER LINE \ 2p7s, I J� 20 0 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. CATHEY PROJECT MANAGER R.WILL DESIGNER G.ORR REVIEWER S. BURWELL UNDERGROUND UTILITY PLAN DATE JANUARY 2023 PROJECT # FUNDING # 22.00108 N/A SHEET C=1 07 O O O N N 12" 5' STE (MIN. ' STEEL POST WIRE FENCE 24" \� / 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE MIN. 14 GAUGE 6"X6" WIRE 6' MAX EXTRA STRENGTH FABRIC WITHOUT unnr rr•,nr SLOPE SLOPE LENGTH(FT) <2% 100 2 TO 5% 75 5 TO 10% 50 10 TO 20% 25 >20% 15 THE TRENCH SECTION VIEW FILTER FABRIC EXISTING GROUND BACKFILL TRENCH AND COMPACT THOROUGHLY �f \\ UPSLOPE 8„ (DISTURBED AREA) MIN. MAXIMUM AREA(SQFT) 10,000 7,500 5,000 2,500 1,500 JG NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.62. rE'C'\ SILT FENCE Q_�') UPDATED JANUARY, 2023 NOT TO SCALE ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com PLAN SYMBOL NOTES: m) 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP'S), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP'S IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF RECP'S EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP'S WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF RECP'S BACK OVER SEED AND COMPACTED SOIL. SECURE RECP'S OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECP'S. 3. ROLL THE RECP'S DOWN OR HORIZONTALLY ACROSS THE SLOPE. RECP'S WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING AND SPACING STAPLES/STAKES IN APPROPRIATE LOCATIONS PER MANUFACTURER RECOMMENDATIONS. 4. THE EDGES OF PARALLEL RECP'S MUST BE STAPLED WITH APPROXIMATELY 2"-5" OVERLAP DEPENDING ON RECP'S TYPE. 5. CONSECUTIVE RECP'S SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE RECP'S WIDTH. 6. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE RECP'S. 7. INSTALLATION OF MATTING SHALL CONFORM TO MANUFACTURER'S REQUIREMENTS. 8. SEE GRADING PLAN FOR LOCATIONS 0 CUT AND FILL SLOPES. 9. MATTING SHALL BE : NORTH AMERICAN GREEN S150. INSTALL ON ALL DISTURBED SLOPES. 10. ALLOW 3" MIN. OVERLAP BETWEEN PARALLEL STRIPS. 11. BURY THE TOP OF THE MAT IN A TRENCH 4" OR MORE IN DEPTH. TAMP THE TRENCH FULL SOIL. SECURE WITH ROW OF STAPLES, 10" SPACING, 4" DOWN FROM THE TRENCH. OVERLAP END OF TOP STRIP 4" AND STAPLE. EROSION CONTROL BLANKET EXCAVATED CU' SLOPE 10" I� METAL STAPLE EXISTING ROAD 6" HUMP TO DIVERT RUNOFF FROM EXISTING ROAD / v / v 0 0 / v o 6" HUMP TO DIVERT RUNOFF" FROM EXISTING ROAD 2"-3" COARSE AGGREGATE (RAILROAD BALLAST) 71�1aa7_1-i:1[y Im 36' MIN. 50' MIN. 4'_ 1,01 1z.1 •M ' 'Oo- 1p NOTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. STONE TO BE 2 - 3 INCH WASHED STONE RAILROAD BALLAST. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.06. EC TEMPORARY CONSTRUCTION ENTRANCE 24 UPDATED JANUARY, 2023 NOT TO SCALE 6" 11 10'-0" WASHOUT AREA MAINTENANCE \\ \ 1. INSTALL SIGNAGE IDENTIFYING THE LOCATION OF CONCRETE WASHOUT SYSTEMS. 2, INSPECT DAILY AND AFTER EACH STORM EVENT. \�\\\ 3. NSPECT THE INTEGRITY OF THE OVERALL STRUCTURE INCLUDING, WHERE APPLICABLE, THE i�//�//\ „'., ;• CONTAINMENT SYSTEM. 4. INSPECT SYSTEM FOR //\\//\\// GI ' ~ i • ' SOIL BY EQUIPMENT. 5. INSPECT POLYETHYLENE LIN LEAKS, F RSFAILURE,, INCLUDI G, AND TRACKINGF TEARS AND PUNCTURES. 6. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF MATERIAL EROSION CONTROL BLANKET 7. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES FIFTY \\ \\ \\ \\ \ Q STRAW BALES PERCENT OF DESIGN CAPACITY. USE OF THE SYSTEM SHOULD BE DISCONTINUED UNTIL TYP. APPROPRIATE MEASURES CAN BE INITIATED TO CLEAN THE STRUCTURE. �j/\\//\\//\\//\\//\\ • 8. UPON REMOVAL OF SOLIDS, INSPECT THE STRUCTURE. REPAIR STRUCTURE AS NEEDED OR CONSTRUCT A NEW SYSTEM. /\\ \ \ \ \ • • • 9. DISPOSE OF ALL CONCRETE IN A LEGAL MANNER. REUSE THE MATERIAL ON SITE, RECYCLE, OR HAUL THE MATERIAL TO AN APPROVED CONSTRUCTION/DEMOLITION LANDFILL SITE. RECYCLING COMPACTED FILL OF MATERIAL IS ENCOURAGED. THE WASTE MATERIAL CAN BE USED FOR MULTIPLE SLOPE ;j,• • APPLICATIONS INCLUDING BUT NOT LIMITED TO ROADBEDS AND BUILDING. THE AVAILABILITY FOR RECYCLING SHOULD BE CHECKED LOCALLY. 10. THE PLASTIC LINER SHOULD BE REPLACED AFTER EACH CLEANING; THE REMOVAL OF MATERIAL \\ \\ \\ \\ \\ \\ \ 2" X 2" WOOD STAKES TWO WILL USUALLY DAMAGE THE LINING. / EROSION PER BALE REQUIRED 11. THE CONCRETE WASHOUT SYSTEM SHOULD BE REPAIRED AND ENLARGED AS NECESSARY TO \\ \\ \\ \\ \\ \\ \\ \\ \ \\ \\ \\ \\ \ MAINTAIN CAPACITY FOR CONCRETE WASH. o \ CONTROL 12. CONCRETE WASHOUT SYSTEMS ARE DESIGNED TO PROMOTE EVAPORATION. HOWEVER, IF THE \\/ j\\j\\j\\j\\j\\j\\j\\j\ \\\\\\j\\j\\jQi /\\\j\\ \ 2, A BLANKET o VCUUMLOR REMOVE THE EDUATDTHE D D POANITARY HEM INAUT ACCRITY PTABPRODEDETHEIR D. \�/�\\�/��/��%�/\\\� 3 419 j • . NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMITS ALLOW FOR THE ACCEPTANCE OF S MATERIAL ANOTHER � SYSTEMFOR THEBASNOPTION WOULD BE TO UTILIZE A SECONDARY CONTAINMENT RFURTH RDEWATERINUTILIZE w M 13. INSPECT CONSTRUCTION ACTIVITIES ON A REGULAR BASIS TO ENSURE SUPPLIERS, CONTRACTORS, AND OTHERS ARE UTILIZING DESIGNATED WASHOUT AREAS. IF CONCRETE WASTE / /\\\/\\/\\/\\ \\ �A �: IS BEING DISPOSED OF IMPROPERLY, IDENTIFY THE VIOLATORS AND TAKE APPROPRIATE ACTION. \\\\ 14. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED, THE CONCRETE WASHOUT LINING, POLYPROPYLENE ENEOVER SYSTEMS SHALL BE CLOSED. DISPOSE OF ALL HARDENED CONCRETE AND OTHER MATERIALS BALES USED TO CONSTRUCT THE SYSTEM. 15 BE BACKFILLED,SGR DED,DAND STTABILIN ED.ISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD \\/\\/\\/, /\\j�\//\\//\\/\\/\\//\\ \/� •� WASHOUT PROCEDURES 1. DO NOT LEAVE EXCESS MUD IN CHUTES R HOPPER AFTER THE POUR. EVERY EFFORT SHOULD BE MADE TO EMPTY THE CHUTES AND HOPPER AT THE POUR. THE LESS MATERIAL LEFT IN THE CHUTES AND HOPPER, THE QUICKER AND EASIER THE CLEANOUT. SMALL AMOUNTS OF PLAN EXCESS CONCRETE (NOT WASHOUT WATER) MAY BE DISPOSED OF IN AREAS THAT WILL NOT RESULT IN FLOW TO AN AREA THAT IS TO BE PROTECTED. 2. AT WASHOUT LOCATION, SCRAPE AS MUCH MATERIAL FROM THE CHUTES AS POSSIBLE BEFORE ECSLOPE MATTING INSTALLATION WASHING THEM. USE NON -WATER CLEANING METHODS TO MINIMIZE THE CHANCE FOR WASTE TO FLOW OFF SITE. 3. REMOVE AS MUCH MUD AS POSSIBLE WHEN WASHING OUT. 10 MIL POLYETHYLENE LINER 4. STOP WASHING OUT IN AN AREA IF YOU OBSERVE WATER RUNNING OFF THE DESIGNATED AREA OR SYSTEM IS11 KING UPDATED JANUARY, 2023 5. DO INOTEBACKAIFL FLUSH EQUIPMENT LETHERPROJECTOWING SITE.AND BACKEFLUSHING SHOULD BE NOT TO SCALE RESTRICTED TO THE PLANT AS IT GENERATES LARGE VOLUMES OF WASTE THAT MORE THAN 17. LIKELY WALL EXCEED THE CAPACITY OF MOST WASHOUT SYSTEMS. IF AN EMERGENCY ARISES, BACK FLUSH SHOULD ONLY BE PERFORMED WITH THE PERMISSION OF AN ON -SITE MANAGER O- OF THE PROJECT. COMPACTED SOIL CO 6. DO NOT USE ADDITIVES WITH WASH WATER. DO NOT USE SOLVENTS OR ACIDS THAT MAY BE USED AT THE TARGET PLANT. DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA AS NOTED OFFICE MANAGER M. CATHEY PROJECT MANAGER R.WILL DESIGNER G.ORR REVIEWER S. BURWELL CONCRETE WASHOUT UPDATED JANUARY, 2023 NOT TO SCALE DATE JANUARY 2023 STANDARD DETAILS PROJECT # FUNDING # 22.00108 N/A SHEET C=500 00 0 0 0 N N NO. I DATE I BY DESCRIPTION OUTLET PIPE - SEE PLAN Mal REBAR FOR . FROM INLET (*E�­C SILT SACK DETAIL 16 UPDATED JANUARY, 2023 NOT TO SCALE .y2I=aA1'1 PLAN rTOP EL. - SEE PLAN FRAME & GRATE TO BE NEENAH R-4990-DX-C OR APPROVED EQUAL `.e e e OUTLET PIPE - SEE PLAN INV. EL. - INV. OUT - SEE PLAN SEE PLAN SLOPE 1% SLOPE 1% ° e, ° = ` a �= SECTION I Fri® 55 Broad Street Asheville, NC 28801 828.252.0575 Mcgill NC Firm License # C-0459 mcgillassociates.com I SECTION SD TRENCH DRAIN DETAIL j 2 UPDATED JANUARY, 2023 NOT TO SCALE — 3" TYP. #4 0 12" 4" TYP. BENTONITE WATERSTOP CONT. (4) #4(TYP.) 4'-0" MIN. x 4'-0" MIN. LANDING SLOPE 1:48 MAX. IN ALL DIRECTIONS PLANTING OR OTHER W NON -WALKING SURFACE �o, o W W SLOPE 1: 12 MAX. PLANTING OR ° OTHER Z NON -WALKING - FACE OF SURFACE y y CURB W W `L 4- W W .0 .0 W W W y 61 W W W W 0.s 0. Z ,EBAR FOR _ FROM INLET OVERLAP WATTLE AND SECURE WITH CABLE TIES SECURE WATTLE TO GRATE WITH CABLE TIES - (TYP.) STREET SECURE WATTLE TO ASPHALT WITH PK NAILS (TYP.) OVERLAP WATTLE AND NOTES: ST RETURNED CURB RAMP 1 UPDATED JANUARY, 2023 NOT TO SCALE ._e!i!i o � INKI?' i!o�:lolil A!iliY. GRATE PLAN SECTION PLACE WATTLE IN GUTTER, ACROSS OPENING IN HOOD AND AROUND GRATE OF CURB INLET PLACE WATTLE AROUND GRATE OF CURB INLET CURB INLET i01R FIBRE WATTLE STREET LEVEL J W U- Q 0 Z O Za W 0fw 00 w IL 4'-0" MIN. (VARIES WITH WIDTH OF RAMP) 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 000000000000000000000000 TRUNCATED DOME PLAN VIEW 1.6"-2.4" 0 O O �- Z @ 0 0 O O O O N 0.6 5" MIN. TRUNCATED DOME SPACING N C I 50%-65% 0 OF BASE DIAMETER 00 o 0.9" - 1.4" TRUNCATED DOME SECTION NOTE: 1. DETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS: a. WHERE A SIDEWALK CROSSES A VEHICULAR WAY, EXCLUDING UN -SIGNALIZED DRIVEWAY CROSSINGS. b. WHERE A RAIL SYSTEM CROSSES A PEDESTRIAN FACILITY THAT IS NOT SHARED WITH VEHICLES. c. AT ISLANDS AND MEDIANS THAT ARE CUT THROUGH LEVEL WITH THE ROADWAY. 2. AT CURB RAMPS AND BLENDED TRANSITIONS, DETECTABLE WARNING SURFACES SHALL BE LOCATED SO THE EDGE NEAREST THE GUTTER LINE IS 6" MINIMUM AND 8" MAXIMUM DISTANCE FROM THE GUTTER LINE. THE SURFACE SHALL EXTEND A MINIMUM OF 24" ONTO THE RAMP IN THE DIRECTION OF TRAVEL FOR THE FULL WIDTH OF THE CURB RAMP (MINIMUM 4 FEET). 3. AT RAIL CROSSINGS, THE DETECTABLE WARNING SURFACE SHALL BE 24" DEEP AND FULL WIDTH OF THE SIDEWALK (MINIMUM 4 FEET). THE EDGE OF THE SURFACE NEAREST THE RAIL CROSSING IS 6" MINIMUM AND 8" MAXIMUM DISTANCE FROM THE VEHICLE DYNAMIC ENVELOPE (6' FROM THE NEAREST RAIL) UNLESS OTHERWISE NOTED BY THE RAILROAD. 4. ALL DETECTABLE WARNING DEVICES USED IN NEW CONSTRUCTION SHALL BE OF A RIGID PRECAST OR EMBEDDED PRODUCT APPROVED BY THE ENGINEER. RETRO FIT MATS WILL ONLY BE ALLOWED ON EXISTING RAMPS WITH PRIOR APPROVAL BY THE ENGINEER FOR MATERIAL TYPE AND INSTALLATION (I.E. RESURFACING PROJECTS). 5. DETECTABLE WARNING SURFACES SHALL CONSIST OF AN AREA OF TRUNCATED DOMES ALIGNED IN A SQUARE GRID PATTERN. THE BASE OF THESE DOMES SHALL BE 0.90" - 1.40". THE TOP DIAMETER OF THE DOMES SHALL BE 50% - 65% OF THE ACTUAL BASE DIAMETER, WITH A MINIMUM INDIVIDUAL HEIGHT OF 0.180" AND A MAXIMUM HEIGHT OF 0.249". THE AVERAGE OF TEN (10) INDIVIDUAL NODES PICKED AT RANDOM IN ANY SQUARE FOOT AREA SHALL MEASURE 0.180" - 0.249" IN HEIGHT. THE DETECTABLE WARNING DOMES SHALL HAVE A CENTER -TO -CENTER SPACING OF 1.6 - 2.4". 6. DETECTABLE WARNING DOMES SHALL BE ALIGNED ON A SQUARE GRID IN THE PREDOMINANT DIRECTION OF TRAVEL TO PERMIT WHEELS TO ROLL BETWEEN DOMES. 7. IF PAVERS ARE TO BE USED, PAVERS SHALL BE 6" THICK AND CAST FROM 5000 PSI CONCRETE. 8. IF PANELS ARE TO BE USED, PANELS SHALL BE RIGID WITH TURN DOWN EDGES EMBEDDED IN CONCRETE TO REDUCE TRIP HAZARD. 9. FOR ALL DETECTABLE WARNING SURFACES, THE COLOR IS BRICK RED. WHEN A COLOR OTHER THAN BRICK RED IS SELECTED, IT MUST MEET THE APPROVAL OF THE ENGINEER. THE COLOR SELECTED SHALL CONTRAST EITHER LIGHT -ON -DARK OR DARK -ON -LIGHT. THE MANUFACTURER MUST CERTIFY THAT THE COLOR SELECTED MEETS THE 70% CONTRAST SPECIFICATIONS OF THE ADAAG. rS_T_ DETECTABLE WARNING SURFACE 2 UPDATED JANUARY, 2023 NOT TO SCALE STANDARD HARDWARE CLOTH - EXTEND 12" POST BELOW GRADE RIP RAP FACED WITH #57 WASHED STONE - 6" THK. MIN. 0 12a GROUND N \ OPTIONAL 5' x 10' x 2' DEEP SEDIMENT TRAP u 8„ EXCAVATE 8" x 12" TRENCH UPSLOPE ALONG LINE OF POSTS. EXTEND HARDWARE CLOTH INTO TRENCH. BACKFILL TRENCH AND COMPACT SOIL. SECTION ADDITIONAL HORIZONTAL BRACE AT OPENING 8'-0" MAX. 4' O.C. I SECURE WATTLE TO ASPHALT WITH PK NAILS (TYP.) II I u II SECURE WATTLE TO GRATE WITH CABLE TIES (TYP.) STANDARD HARDWARE ili ATTACH HARDWARE CLOTH TO t CLOTH - EXTEND 12" i i i i i i POST SECURELY WITH TIES BELOW GRADE u u u 1. WATTLES MUST BE SECURED AS SHOWN, OR PER MANUFACTURER'S RECOMMENDATIONS. 2. ALL MATERIALS INSTALLED WITHIN NCDOT RIGHT-OF-WAY MUST MEET NCDOT STANDARDS. EC INLET PROTECTION -WATTLE 15 UPDATED JANUARY, 2023 NOT TO SCALE SILT FENCE OUTLET TO BE LOCATED AT LOW POINT IN ELEVATION SILT FENCE OR AS SPECIFIED NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. SILT FENCE OUTLETS SHALL BE LOCATED AT LOW POINTS IN CONTINUOUS RUNS OF SILT FENCE. EC SILT FENCE -OUTLET 2 UPDATED JANUARY, 2023 NOT TO SCALE yo SHEET �' Go�� DODGE'S STORE AS NOTED ��Q' • STANDARD DETAILS o PERFECTION OIL COMPANY OFFICE MANAGER DESIGNER INC. M. CATHEY G.ORR C=501 Q� GING pP�� FLETCHER NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION ' R.WILL S. BURWELL JANUARY 2023 22.00108 N/A U) J_ a H W 0 0 a 0 z a U) 00 0 O O N N 1 /2" EXPANSION JOINT B PIPE OUTLET TO FLAT AREA — NO WELL DEFINED CHANNEL INSTALL FI FABRIC k I INST SECTION A —A FABRIC OR PIPE OUTLET TO WELL—DEFINED CHANNEL L �-I a INSTALL FILTER FABRIC INSTALI NOTES SECTION C—C FABRIC 1. La IS THE LENGTH OF THE RIPRAP APRON 2. d= 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL—DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 5. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.41. RIPRAP APRON SIZING PLAN �La a SECTION B—B PLAN I— La~I C OUTLET PIPE DIAMETER 3 x Do APRON LENGTH APRON WIDTH RIPRAP SIZE No. (Do) (La) (W=Do+La) (d50xTHICKNESS) ALL PIPES 18" 4.5' 9.5' 11' 3.6" 1 /2" EXPANSION JOINT SAWC4JT EDGE OE °(ISTPNG WALK' ' TOOLED JOINT ; a a �• .CONCRETE SIDEWALK, ° . SAWCUT EDGE OF . , . 'd " TOOLED JOINT EXISTING WALK A ASPHALTIC EXPANSION JOINT ® 30' O.C. SEAL i� FINISH GRADE WITH RUBBERIZED ASPHALT B PLAN BROOM FINISH SURFACE PERPENDICULAR TO DIRECTION OF TRAFFIC V—SHAPED 5' TOOLED JOINT 1 /8" TO 1 /4" 4" CONCRETE SIDEWALK JOINT SEALER 1/8 RADIUS 1„ SLOPE 1/4" PER FOOT 1 /2" JOINT FILLER �I� 1 /2" EXPANSION JOINTS ® SIDEWALK V—SHAPED 30' 0. C. & ADJACENT TOOLED JOINTS SPACING j\\jj\\jj\�j\\jj\jj\\jj\\jj\\j/\\jj\\jj\\jj\\jj\\jj\\jj\\j\\❑\jj\\jj\\jj\\jj\\jj\\jj\\jj\\jj\\� TO ALL RIGID OBJECTS AT WIDTH OF SIDEWALK ```\\\\\\❑%\%\i\\\i\\i\�\i\�j;�%\�\i��\i\�\i\\\i\\ \\i�\i❑��\\\�\\�\\�\\��� 4" MIN. COMPACTED ABC OUIRIM612_111:1I VAN ACCESSIBLE _ I SIGN R7-8P (AS REQUIRED) 0 0 BOTTOM OF SIGNS 0 0 w O Of w J m N a_ W O U Z Q 0 0 L� z 0 m II II I u I SECTION A -A SECTION B-B L J CONSTRUCTION NOTES: 1. SIDEWALK SHALL BE CONSTRUCTED WITH 4000 PSI CONCRETE. 2. SIDEWALK SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PERPENDICULAR TO THE TRAFFIC. ST CONCRETE SIDEWALK 23 UPDATED JANUARY, 2023 NOT TO SCALE 12" RESERVED PARKING R7-8 SIGN APPROVED FOR USE UNDER GENERAL STATUTES 20-37.6 AND 136-30 COLORS: (ALL SIGNS) LEGEND AND BORDER — GREEN WHITE SYMBOL ON BLUE BACKGROUND BACKGROUND — WHITE ARROW — GREEN 18" R = 1-1/2" (TYPICAL) VAN O) ACCESSIBLE 3/8" (T3YPICAL) R7-8P (TYPICAL) 12" R = 1-1/2" (TYPICAL) MAXIMUM PENAL3 8�� TY (TYPICAL) 3 8" R7-81D(TYPICAL) GENERAL NOTES: 1. REGARDLESS OF AGE, ALL ACCESSIBLE SPACES SHALL BE IDENTIFIED BY ABOVE— GROUND SIGNS ONLY. (SEE N.C.G.S.) SPACES SHALL NOT USE GROUND — PAINTED SYMBOLS. ST 28 HANDICAP PARKING SIGNAGE UPDATED JANUARY, 2023 NOT TO SCALE rEC_ PIPE OUTLET PROTECTION Q J7 UPDATED JANUARY, 2023 20' MAX. (U.O.N.) 2' MAX. NOT TO SCALE 24%24%4" CONC. PAD I 1 /2" TOOLED CONCRETE RADIUS CAST IRON CLEANOUT BOX WITH "SEWER" CAST IN TOP AND THREADED COUNTERSUNK PVC PLUG OR PVC PLUG ALONE PER OWNER PREFERENCE CAST IRON WITH "SEWER" CAST IN w TOP AND THREADED CLEANOUT BOX I CL COUNTERSUNK PVC PLUG OR PVC w 1/2" TOOLED PLUG ALONE PER OWNER PREFERENCE I w RADIUS > w N w � 6" SCH. 40 STEEL OR IRON ifl z HANDICAP T N \ \ • 4" PVC I K Z 0 PIPE FILLED WITH CONCRETE, '`� PARKING SIGN 4�. • /�/� I } N PAINTED YELLOW. PRIME PIPE ❑� I 0 X PRIOR TO PAINTING A 24" SQUARE IN LINE WYE MATCHING SANITARY WYE a_ I = ��� �� �❑ \ CONCRETE PAD MAIN LINE MATERIAL c) \�\\�' o \\�\��❑ SEE NOTE. BEND LATERAL MIN. GRADE 2% I o 0CAST ❑������ ��/❑ SERVICEOBOX 4" SCH. 40 PVC OR I p Q D.I.P. — — N NOTE: 4" WIDE WHITE HC HC o PARKING SPACE TO / --- PAINTED STRIPES N SLOPE MAXIMUM 2% IN THREADED PVC EXISTING w #57 WASHED COUNTERSUNK PLUG ❑ \\ GROUND ❑\ a \\�� ����� z ANY DIRECTION \ a / CONNECT TO EXISTING SEWER 1" MIN. SERVICE WITH TRANSITION COUPLING 45' BEND +\� OR INSTALL PLUG FOR FUTURE CONCRETE �� d ��2 8' MIN. 8' MIN. SERVICE. WHEN REQUIRED BACKFLOW \/ VALVES SHALL BE INSTALLED ON PORTION OF LATERAL TO BE ❑� �� 5' STANDARD UNDISTURBED EARTH MAINTAINED BY PROPERTY OWNER. �j a ° /i 8' VAN 4%4" WYE BARREL OF PIPE SHALL REST PROVIDE STONE ON UNDISTURBED SOIL \\ " \ \ / ACCESSIBLE STRIPING FOR \ BEDDING UNDER WYE 1IN AND BEND FULL LENGTH OF SERVICE TRENCH M'N HANDICAP PARKING ` SHALL BE COMPACTED IN 6" LIFTS 4" PLUG NOTES: M BOLLARD DETAIL BOLLARD ACCESSIBLE STRIPING DETAIL EXTEND 1. TAPPING SADDLES ARE APPROVED FOR CONNECTIONS STUBOUT TO EXISTING SEWER LINES ONLY. MIN. 12" 4" SEWER LINE 2. DUCTILE IRON PIPE REQUIRED UNDER PAVED ROADS. 7 UPDATED JANUARY, 2023 31 UPDATED JANUARY, 2023 NOT TO SCALE NOT TO SCALE S CLEANOUT DETAIL 3 UPDATED JANUARY, 2023 NOT TO SCALE ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com S SANITARY SEWER SERVICE 2 UPDATED JANUARY, 2023 NOT TO SCALE �,�,�gEFORF yo SHEET DODGE'S STORE AS NOTED ��Q' • STANDARD DETAILS o PERFECTION OIL COMPANY OFFICE MANAGER DESIGNER INC. M. CATHEY G.ORR C=502 Q� GING PFLETCHER NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION R.WILL S. BURWELL JANUARY 2023 22.00108 N/A 00 0 0 0 N N CONCRETE ANCHOR BOLTS (4) IN NON- V-10" DIA. STANDARD STORM DRAINAGE TOP AS NOTED ON ROADWAY LOCATIONS DRAWINGS (SEE SD2-CATCH BASIN TOP FOR DETAILS) 2'-0" DIA. BITUMINOUS GASKET (BOLT DOWN ONLY) NON -SHRINK GROUT WITHIN 1" ON MANHOLES SET IN ROADS X 12" MAX. CONSTRUCT CONCRETE BRICK RISERS AS NECESSARY TO BRING TOP OF RIM AND COVER i-4 ¢ TO GRADE OR USE PRECAST CONCRETE RINGS. e 1 1/4 a GROUT ALL JOINTS AND PLASTER INSIDE AND OUTSIDE OF RISERS MINIMUM 1 /2" THICK. = U O � I ECCENTRIC CONE SECTION MAY VARY IN VERTICAL HEIGHT WITH SUPPLIER BUT SHALL BE 2'-8" MIN. AND 4'-0" MAX. 00 N LIFTING HOLES SHALL BE FILLED AND w PLASTERED ON BOTH EXTERIOR AND 0° INTERIOR WALLS WITH MORTAR. J a-5- U) X N Q z 4'-0" VERTICAL PRECAST MANHOLE o WIDTH VARIES COMPONENTS MAY VARY IN VERTICAL HEIGHT WITH SUPPLIER BUT SHALL BE w V-4" MIN. AND 4'-0" MAX. z � STEPS FULL DEPTH OF w MANHOLE TO BE ALL JOINTS BETWEEN PRECAST SECTIONS = I INSTALLED IN VERTICAL SHALL BE SEALED WITH A DOUBLE ROW w ALIGNMENT ON STRAIGHT m OF AN APPROVED BITUMINOUS SEALANT a RUBBER SIDE OF MANHOLE. (USE OR GASKET. INTERIOR JOINTS PLASTERED ZE BOOT W/ STANDARD STEPS AS 5" WITH MORTAR. j S.S. CLAMP SHOWN THIS SHEET.) EXTEND PIPE MIN. 1-1/2" CONSTRUCT SMOOTH FLOW INVERT BETWEEN r PIPES. FORM TO MATCH 2/3 DIAMETER INTO MANHOLE OF OUTLET PIPE. SEE INVERT DETAIL I I � WATERTIGHT SEAL WITH APPROVED L ° MATERIAL WATERTIGHT SEAL WITH APPROVED MATERIAL RUBBER BOOT WITH STAINLESS STEEL CLAMP MANHOLE BASE SHALL BASE FOUNDATION TO BE CONSTRUCTED LEVEL BE PRECAST. WITH EXISTING MATERIAL OR CONDITIONED WITH STONE AS REQUIRED BY SPECIFICATIONS ELEVATION VIEW PRECAST MANHOLE NOTES: 1. ALL PRECAST MANHOLE COMPONENTS SHALL MEET REQUIREMENTS OF ASTM C-478, LATEST REVISION AND ASTM C-890. 2. ALL MANHOLES SHALL BE CONSTRUCTED PLUMB 3. THE PRECAST SUPPLIER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE AND, WHEN REQUESTED BY THE ENGINEER, SHALL SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS WHICH HAVE BEEN SIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER. 4. ALL MANHOLE GRADES SHOWN ON THE PLANS ARE FOR THE INVERT OF THE MANHOLE CENTER. 5. IF MANHOLE IS SET IN LOCATION OF HIGH WATER TABLE OR UNDERGROUND WATER IS ENCOUNTERED, THE CONTRACTOR SHALL INSTALL UNDERDRAINS AND STONE AS DIRECTED IN THE FIELD BY THE ENGINEER. 6. STEPS SHALL BE INSTALLED ON STRAIGHT SIDE OF MANHOLE. PRECAST CONCRETE STORM MANHOLE A� ELEVATION 5/ 1/4" /4" 3/4" 1 /4" SIDE ELEVATION POLYPRI PLASTIC #4 DEFORMED J STEEL ROD SECTION A -A CONSTRUCTION NOTES 1. ALL STEPS SHALL PROTRUDE A MINIMUM OF 5" AND A MAXIMUM OF 7" FROM INSIDE FACE OF STRUCTURE WALL. 2. STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SAID STEPS. MANHOLE STEPS 8" CONCRETE PAD 2" X 2" KEYWAY d ° d d d ° d d ° 42" MIN. ° d °d ° d 1-4 ',a� d d d d d 2" ° d ° 9 ° J d CONSTRUCTION JOINT J 20'-0" O.C. EACH WAY 6x6x2.9x2.9 WWF CONTINOUS 6" MIN. COMPACTED ABC (100% STANDARD) MICONCRETE SLAB SECTION 14 UPDATED JANUARY, 2023 NOT TO SCALE 6" CONCRETE TOP WITH MANHOLE RING AND COVER CAST IN UNLESS NOTED OTHERWISE MANHOLE RING AND COVER TO BE EXTENDED SO THAT ITS TOi IS FLUSH WITH PROPOSED GRADE AND/OR PAVING 6" CONCRETE TOP WITH GRATE AND FRAME CAST I" UNLESS NOTED OTHERWISE GRATE AND FRAME FOR THIS TOP TO BE 24"x24" ("NEENAH R3339A") OR ("U.S. FOUNDRY 4190-6259) OR APPROVED EQUAL; VERIFY TRAFFIC LOAD REQUIREMENTS ON ALL GRATE AND FRAME ASSEMBLIES JUNCTION BOX TOP CATCH BASIN SCHEDULE SYMBOL-(JB) RIM = TOP OF COVER NOTE: STRUCTURES SPECIFIED TO HAVE FLAT JUNCTION BOX (FJB) TOP WILL BE THE SAME TOP AS YARD INLET WITHOUT THE OPEN THROAT OF THE YARD INLET -TES PLACED IN PEDESTRIAN "FIC AREAS TO SHALL BE NTED WITH OPEN SLOTS VING PERPENDICULAR TO "FIC FLOW (TYP. ALL GRATES) FLAT CATCH BASIN TOP CATCH BASIN SCHEDULE SYMBOL-(FCB) RIM = TOP EDGE OF GRATE HEAVY I%11TV ^MATr A"IM FRAME I UNLESS NOTED OTHERWISE GRATE AND FRAME ASSEMBLY FOR THIS TOP SHALL BE 24"x36" ("NEENAH R3233D") OR ("U.S. FOUNDRY 5181-6420") OR APPROVED EQUAL CONFORMING TO N.C.D.O.T. ROADWAY STANDARDS 840.03 ,OLID CONCRETE TOP; -H AND LENGTH TO CH CATCH BASIN CAST IN 2 LIFTING "EYES" NOT TO BE REMOVED UNLESS OTHERWISE NOTED SI CONCRETE _ ALL TOPS SOLID TOP CATCH BASIN SCHEDULE SYMBOL-(ST) RIM = TOP OF COVER WITH AME LESS NOTED OTHERWISE GRATE D FRAME FOR THIS TOP TO BE 11 x24" ("NEENAH R-3339A") OR S. FOUNDRY 4190-6259) OR PROVED EQUAL; VERIFY TRAFFIC AD REQUIREMENTS ON ALL GRATE D FRAME ASSEMBLIES CATCH BASIN TOP CATCH BASIN SCHEDULE SYMBOL -(CB) RIM = TOP EDGE OF GRATE kF NLET SHALL RECEIVE P WITH MANHOLE RING 'ap VER CAST IN FLUSH USE PRE CAST BOX, 4" AND 2" CONCRETE BLOCK, OR BRICK TO ELEVATE TOP TO ACHIEVE THE DESIRED THROAT OPENING "-8" THROAT OPENING ALL FOUR SIDES UNLESS NOTED OTHERWISE CURB INLET TOP YARD INLET TOP CATCH BASIN SCHEDULE SYMBOL -(CI) CATCH BASIN SCHEDULE SYMBOL-(YI) RIM=TOP OF GRATE DIRECTLY UNDER RIM=BOTTOM OF THROAT OPENING HOOD OPENING SD CATCH BASIN TOP DETAILS 2 UPDATED JANUARY, 2023 4'-0" MIN. NOT TO SCALE PRECAST BASE EXTEND PIPE SECTION IN. 1-1/2" RUBBER BOOT W/ S.S. CLAMP rIN`ATO MANHOLEMOOTH FLOW RUBBER BOOT W/ S.S. CLAMP INVERT 2/3 PIPE DIAMETER -7� 4" MIN. = z�l a a co a SECTION A -A ALL PIPES SET SO THAT CENTERLINE OF PIPE IS RADIAL TO MANHOLE CENTER. EXTEND PIPE MIN. 1-1/2" INTO MANH FLOW = HORIZONTAL AND VERTICAL LOCATION FOR MANHOLE AS SHOWN ON PLANS IS FOR CENTERLINE OF MANHOLE AND ALL INTERSECTING PIPES. 1/2" MIN. CONSTRUCT SMOOTH FLOW INVERT PLAN A FLOW NOTE: MANHOLES ON PLANS NOTED AS HIGH VELOCITY MANHOLES SHALL RECEIVE TWO COATS OF SIKAGARD 62, HIGH -BUILD, EPDXY RESIN COATING OR APPROVED EQUAL ON INVERT CHANNEL. MANHOLE INVERTS Sn PRECAST CONCRETE STORM MANHOLE 5 UPDATED JANUARY, 2023 NOT TO SCALE ® 55 Broad Street Asheville, INC 28801 828.252.0575 INC Firm License # C-0459 mcgillassociates.com <511- EFORFY o �jV cP 9�F A I'?- Q SING PP 6" X 8" WOOD RAIL 10'-0" TYP 10'-0" TYP. BEVEL END OF RAIL V-6" TYP. GROUND LEVEL ---- --T— -- —7--- -- �--- -- -----------i— -- --�--------�------ ------ TOOLED EDGE 2" TOOLED RADIUS I I 6» EXISTING GROUND I I I I I I m a 12" SPACING I I I BITUMINOUS TACK COAT / \\/ I I o TYP. I I I I STAGGERED I I I I 8" X 12" WOOD POST PAVEMENT L J L J 2-1/2" CARRIAGE BOLTS NOTE: ALL WOOD SHALL o \\ \ 4000 psi CONCRETE 6" WIDE X J"THICK STEEL BE PRESSURE TREATED o \//\ BAND FULL LENGTH OF r RAIL (TYP.) :::�X 4" MIN. COMPACTED ABC COMPACTED SUBGRADE EXPANSION JOINTS ® 30' O.C. AND ADJACENT TO ALL RIGID OBJECTS ST STAND-UP CONCRETE CURB 17 UPDATED JANUARY, 2023 NOT TO SCALE DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA NO. DATE BY DESCRIPTION 2-3/4" BOLTS 6" LONG X 3" WIDE X J"THICK STEEL PLATE AS NOTED OFFICE MANAGER DESIGNER M. CATHEY G.ORR PROJECT MANAGER REVIEWER R.WILL S. BURWELL TOP VIEW TOP VIEW END VIEW ALTERNATIVE ST WOOD GUARD RAIL 36 UPDATED JANUARY, 2023 NOT TO SCALE STANDARD DETAILS DATE PROJECT # FUNDING # JANUARY 2023 22.00108 N/A 8" X 12" WOOD POST SHEET C=503 00 O 0 0 N N CONCRETE THRUST BLOCK APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL \\//\ COMPACTED IN 6" LIFTS \ j \12" BACKFILL //\//\//\//\//\//\//\ MAX MATERIAL \/%\/�\/%\ ��% `�%`IN COMPACTED IN 3" LIFTS � /�\\�/���/� �\P,• /��/��� No.12 COATED COPPER TRACING WIRE UNDISTURBED EARTH STANDARD EXCAVATION APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL COMPACTED--,,, /x IN 6" LIFTS \\\\\\\\\ \\\\\\\\\\\ ////// /\/�\\�\/�\ //\ \ 16" MIN BACKFILL MATERIAL COMPACTED �X /,\" X���\P' IN 3" LIFTS No.12 COATED / COPPER TRACING WIRE 6" UNDISTURBED EARTH OVERCUT EXCAVATION DUCTILE IRON GRAVITY SEWER APPROVED WARNING TAPE 94" ARnVF PIPE BACKFILL MATERIAL COMPACTED IN 6" LIFTS / SPRING LINE OF PIPE \i N0.12 COATED —L COPPER TRACING j WIRE / CLASS I EMBEDMENT 6" MI UNDISTURBED) EARTH STANDARD EXCAVATION PVC GRAVITY SEWER APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL COMPACTED N 6" LIFTS OFRPIPEING LINE No.12 COATED COPPER TRACING o WIRE o 0 CLASS I o EMBEDMENT / // UNDISTURBED EARTH BACKFILL MATERIAL COMPACTED \ IN 6" LIFTS SPRING LINE OF PIPE \ No.12 COATED /COPPER TRACING " MIN WIRE / �\ CLASS I EMBEDMENT X FOUNDATION STONE FOR UNDERCUT i EXCAVATION ONLY AS DIRECTED BY ENGINEER UNDISTURBED J STANDARD EXCAVATION EARTH IN WET CONDITIONS APPROVED WARNING TAPE 24" ABOVE PIPE UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES PIPE IN WET OR UNSTABLE CONDITIONS ALL PIPE TYPES (AS DIRECTED BY ENGINEER) NOTES: 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. 3. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR FOUNDATION STONE UNDERCUT SHALL BE FOR THE LENGTH OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED. 4. CLASS I EMBEDMENT SHALL BE NCDOT STANDARD # 67 STONE OR APPROVED EQUAL. FOUNDATION STONE SHALL BE NCDOT STANDARD # 57, # 67 STONE, RAILROAD BALLAST OR APPROVED EQUAL. S GRAVITY SEWER 4 TRENCHING DETAILS UPDATED JANUARY, 2023 NOT TO SCALE ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com <511- EFORFY o (CPO 9�F A Q %SING PP UNDISTURBED EARTH CONCRETE THRUST BLOCK -� A �i BEND J \ '�\ UNDISTURBED EARTH TYPICAL THRUST BLOCKS FOR BENDS B�OCKETE THRUST i24' MIN. TRENCH WI D TH / \ /\//\/\\/\\/ '. 12" MIN. %\\ \\%\\/ ORRBITUMINOUS COATED IZED \\\\\/\\ 12" MIN. /\\\ / / / / _ / / / ) \\\\\ \\\ I' 120' MIN. • ,.. ��/�\ .° '•I `�• 7 12".° /\\ MIN. TRENCH 9 °/ WIDTH r---- \j12 " MIN\ \\ \\ \ \/i/4 /�\/ IPE THREADED ROD (GALVANIZED \\\\jj DIAMETERS OR BITUMINOUS COATED) UNDISTURBED EARTH TYPICAL THRUST BLOCK FOR REDUCERS CONCRETE THRUST BLOCK MIN.// \\\ TRENCH \\\/\/\/ WIDTH ///\�//\�// \//\ \�//\\ THREADED ROD (GALVANIZED 12" M N. 12" MIN. //\ \//\// OR BITUMINOUS COATED) i�- 12" MIN. PLUG 4,\//\ j\ ._ //\ .° '•I `1,° 7 :L 12,,.° /\\ MIN.- TRENCH 9 // � WIDTH r---- \ \ \ \ \ \ \i \/\\/\\/\ °° • .. /\\/\\/\\\ CORPORATION 12" MIN. \ \ \ \ \ \ \� r \ \ \ \ \ \\\� /// /// /// /// /// /� STOP FOR AIR PRESSURE RELIEF THREADED ROD (GALVANIZED OR BITUMINOUS COATED) UNDISTURBED EARTH TYPICAL THRUST BLOCK FOR PLUGS A A/2 A/2 UNDISTURBED EARTH • a 4 ' CONCRETE THRUST BLOCK CONCRETE THRUST BLOCK \/ 4' A. ° 1 _ - O O. - A/2 - A ° • O O O ° A/2 TEE TEE UNDISTURBED EARTH TYPICAL THRUST BLOCKS FOR TEES NOTES: 1. FITTING JOINTS SHALL NOT BE POURED IN CONCRETE OR HAVE CONCRETE SPILLED ON THE BOLTS OR NUTS. THE FITTING SHALL BE WRAPPED IN A LAYER OF POLYETHYLENE PLASTIC PRIOR TO POURING THE THRUST BLOCK. 2. ROD AND EYE BOLT DIAMETER SHALL BE A MINIMUM OF 3/4" AND SHALL MATCH THE SIZE OF THE BOLT PROVIDED WITH THE FITTING. 3. CONTRACTOR SHALL REPLACE FITTING BOLTS WITH THREADED ROD FOR 1/2 OF THE BOLTS SUPPLIED WITH EACH FITTING. RODS SHALL BE EQUALLY SPACED. 4. ALL DIMENSIONS SHOWN ARE IN INCHES. TYPE SIZE 11-1/4' BEND 22-1/2' BEND 45' BEND 90' BEND TEE PLUG 2-6 12 12 12 16 16 14 8 12 12 16 22 22 18 10 12 14 20 28 28 22 12 12 18 24 32 32 28 14 14 20 28 38 38 32 16 16 22 32 42 42 36 18 18 26 36 48 48 40 20 20 28 40 52 52 44 24 24 34 46 64 64 54 30 30 42 58 78 78 66 36 1 36 50 70 94 94 80 42 40 58 80 108 108 92 48 1 46 66 90 124 124 1 104 THRUST BLOCK DIMENSION "A" THRUST BLOCKING -ALL 6 UPDATED JANUARY, 2023 NOT TO SCALE CONCRETE ANCHOR BOLTS (4) IN NON- 2'-10" DIA. STANDARD OR WATERTIGHT MANHOLE FRAME ROADWAY LOCATIONS AND COVER W/ GASKETS AND STAINLESS STEEL 2'-0" DIA. BOLTS AS NOTED ON DRAWINGS BITUMINOUS GASKET (BOLT DOWN ONLY) NON SHRINK GROUT WITHIN 1" ON MANHOLES SET IN ROADS I� X 12" MAX. CONSTRUCT CONCRETE BRICK RISERS AS NECESSARY TO BRING TOP OF RIM AND COVER 04 x¢ TO GRADE OR USE PRECAST CONCRETE RINGS. x GROUT ALL JOINTS AND PLASTER INSIDE AND OUTSIDE OF RISERS MINIMUM 1/2" THICK. � O I U a ECCENTRIC CONE SECTION MAY VARY IN � VERTICAL HEIGHT WITH SUPPLIER BUT Z SHALL BE 2'-8" MIN. AND 4'-0" MAX. 00 CV 4. LIFTING HOLES SHALL BE FILLED AND PLASTERED ON BOTH EXTERIOR AND m J INTERIOR WALLS WITH MORTAR. J Q 5" x N X Q 112 z 4'-0" VERTICAL PRECAST MANHOLE 0 4'-0" DIA. COMPONENTS MAY VARY IN VERTICAL w I HEIGHT WITH SUPPLIER BUT SHALL BE w t 1'-4" MIN. AND 4'-0" MAX. Z 2 _ STEPS FULL DEPTH OF w MANHOLE TO BE ALL JOINTS BETWEEN PRECAST SECTIONS = I INSTALLED IN VERTICAL SHALL BE SEALED WITH A DOUBLE ROW w ALIGNMENT ON STRAIGHTOF AN a RUBBER SIDE OF MANHOLE. (USE OR GASKETR INTERIOR JOINTSSPLASTERED R BOOT W/ STANDARD STEPS AS 5" WITH MORTAR. > S.S. CLAMP-1SHOWN THIS SHEET.) EXTEND PIPE CONSTRUCT SMOOTH FLOW INVERT BETWEEN MIN. 1-1/2" r PIPES. FORM TO MATCH 2/3 DIAMETER o INTO MANHOLE OF OUTLET PIPE. SEE INVERT DETAIL v Ell � I WATERTIGHT SEAL WITH APPROVED L ' MATERIAL WATERTIGHT SEAL WITH APPROVED MATERIAL RUBBER BOOT WITH STAINLESS STEEL CLAMP MANHOLE BASE SHALL BASE FOUNDATION TO BE CONSTRUCTED LEVEL BE PRECAST. WITH EXISTING MATERIAL OR CONDITIONED WITH STONE AS REQUIRED BY SPECIFICATIONS ELEVATION VIEW PRECAST MANHOLE NOTES: 1. ALL PRECAST MANHOLE COMPONENTS SHALL MEET REQUIREMENTS OF ASTM C-478, LATEST REVISION AND ASTM C-890. 2. ALL MANHOLES SHALL BE CONSTRUCTED PLUMB 3. THE PRECAST SUPPLIER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE AND, WHEN REQUESTED BY THE ENGINEER, SHALL SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS WHICH HAVE BEEN SIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER. 4. ALL MANHOLE GRADES SHOWN ON THE PLANS ARE FOR THE INVERT OF THE MANHOLE CENTER. 5. IF MANHOLE IS SET IN LOCATION OF HIGH WATER TABLE OR UNDERGROUND WATER IS ENCOUNTERED, THE CONTRACTOR SHALL INSTALL UNDERDRAINS AND STONE AS DIRECTED IN THE FIELD BY THE ENGINEER. 6. STEPS SHALL BE INSTALLED ON STRAIGHT SIDE OF MANHOLE. PRECAST CONCRETE MANHOLE DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA NO. DATE BY DESCRIPTION A-j PLAN ELEVATION 4'-0" MIN. PRECAST BASE EXTEND PIPE SECTION MIN. 1-1/2" RUBBER BOOT W/ S.S. CLAMP INTO MANHOLE SMOOTH FLOW RUBBER BOOT W/ S.S. CLAMP INVERT 2/3 PIPE DIAMETER T47'M IN. SECTION A -A ALL PIPES SET SO THAT CENTERLINE OF PIPE IS RADIAL TO MANHOLE CENTER. EXTEND PIPE MIN. 1-1/2" INTO MANHOLE FLOW HORIZONTAL AND VERTICAL LOCATION FOR MANHOLE AS SHOWN ON PLANS IS FOR CENTERLINE OF MANHOLE AND ALL INTERSECTING PIPES. 1/2" MIN. CONSTRUCT SMOOTH) FLOW INVERT PLAN A FLOW NOTE: MANHOLES ON PLANS NOTED AS HIGH VELOCITY MANHOLES SHALL RECEIVE TWO COATS OF SIKAGARD 62, HIGH -BUILD, EPDXY RESIN COATING OR APPROVED EQUAL ON INVERT CHANNEL. POL PLA 5/ MANHOLE INVERTS 1/4" /4" SIDE ELEVATION #4 DEFORMED J STEEL ROD SECTION A -A CONSTRUCTION NOTES 1. ALL STEPS SHALL PROTRUDE A MINIMUM OF 5" AND A MAXIMUM OF 7" FROM INSIDE FACE OF STRUCTURE WALL. 2. STEPS DIFFERING IN DIMENSIONS, CONFIGURATION, OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SAID STEPS. MANHOLE STEPS S PRECAST CONCRETE SANITARY MANHOLE DETAILS UPDATED JANUARY, 2023 NOT TO SCALE AS NOTED OFFICE MANAGER DESIGNER M. CATHEY G.ORR PROJECT MANAGER REVIEWER R.WILL S. BURWELL STANDARD DETAILS DATE PROJECT # FUNDING # JANUARY 2023 22.00108 N/A SHEET C=504 U) J_ a w 0 0 a 0 z a co 0 0 0 N N THRUST BLOCK PER DETAIL W6 24"x24"x6" CONCRETE PAD w/ 1z" TOOLED EDGE (UNLESS OTHERWISE SPECIFIED) NOTE: NO CONCRETE PAD REQUIRED IN PAVED AREAS O ;�O WATER LINE 00 - - - ' a NOTES: 1. TAPPING SLEEVE SHALL BE " MUELLER, CLOW, AMERICAN OR APPROVED EQUAL. Z 2. TAPPING VALVE SHALL BE PLAN MUELLER, CLOW, AMERICAN OR 1z w Q I FINISHED GRADE i i i CONCRETE BRICK SUPPORT SLEEVE I THRUST BLOCK PER DETAIL W6 APPROVED EQUAL. 3. SOLID CONCRETE OR BRICK BLOCKING SHALL BE USED AS FOOTING FOR DUCTILE IRON PIPE. PVC PIPE SHALL REQUIRE A 3000 PSI FOOTING. 4. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL WORD "WATER" CAST IN TOP 5. JOINT FITTINGS. SEE APPROPRIATE STANDARD DETAIL FOR THRUST BLOCK \ DIMENSIONS. 6. COVER FITTINGS WITH POLYETHYLENE PLASTIC PRIOR TO POURING THRUST BLOCKS NO. 12 COPPER TRACING WIRE NOTE: PROVIDE SUFFICIENT EXTRA WIRE TO EXTEND MIN. 2' ABOVE TOP OF VALVE BOX ADJUSTABLE CAST IRON VALVE BOX (SCREW TYPE) VALVE COMPACTED BACKFILL 12"x12%6" CONCRETE SUPPORT PAD SECTION NEPTUNE T10 METER (BY OTHERS) 2" PIPE GALVANIZED STEEL METER VAULT METER (BY OTHERS) UNDISTURBED EARTH- (TYP.) r 5" MIN. GALVANIZED STEEL METER VAULT 15" 2" PIPE 1 2"X4"X8" BRICKS ®- 90 DEGREE SPACING O BALL VALVE ON INLET O2 DUAL CHECK ON OUTLET O BY—PASS INCLUDES A FORD BALL VALVE WITH PADLOCK WINGS ® BRACE PIPE EYELETS 5� DIFFERENT FLANGE SPACING MAY BE SPECIFIED © BE SURE THAT COPPER SETTER IS INSTALLED IN THE CORRECT POSITION IN RELATION TO WATER FLOW TAPPING SLEEVE AND W VALVE WITH BOX 31 UPDATED JANUARY, 2023 NOT TO SCALE ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 C9 mcgillassociates.com BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS No.12 COATEC COPPER TRAC WIRE APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL COMPACTED IN 6" 1 BACKFILL MATERIAL COMPACTED IN 3" No.12 CC COPPER WIRE VIV VIJ I VI\ULV EARTH NOTE: BELL HOLES NOT SHOWN STANDARD EXCAVATION i 0 TO SERVICE (BY OTHERS) i o THREADED BRASS NIPPLE TO EXTEND OUTSIDE METER BOX PLAN 12" MIN. LENGTH �10"x10" HINGED READER DOOR i LID, 3/16" STEEL PLATE WITH NON—SKID SURFACE 24" MIN. 30" 5.25" I \--#57 WASHED ELEVATION STONE (TYP.) THREADED BRASS NIPPLE TO EXTEND OUTSIDE METER BOX 12" MIN. LENGTH NOTES: 1. ANGLE BALL VALVES SHOULD NOT BE USED ON THE OUTLET SIDE AS A CUSTOMER SHUT OFF. FLANGED ANGLE INVERTED KEY VALVE SHOULD BE USED FOR THIS PURPOSE. METER MUST BE SET BEFORE CONNECTION TO BRASS NIPPLE. 2. METER VAULT MATERIAL: COPPER —STEEL GALVANIZED .064 METHOD OF CONSTRUCTION: RIVETED TWO PIECE CONSTRUCTION LID: 3/16" FLOOR PLATE STEEL —REINFORCED WITH 10"X10" READER DOOR AND 1 1/2 X 1 1/2 ANGLE IRON FITTING BRACKETS ® 90' SPACING. WEIGHT: 1001bs SIZE: 38"L X 18"W X 26" D WATER METER VAULT UPDATED JANUARY, 2023 NOT TO SCALE EARTH OVERCUT EXCAVATION NOTE: 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. WATER LINE TRENCHING UPDATED JANUARY, 2023 NOT TO SCALE EXISTING SEWER LINE APPROVED TRANSITION ADAPTER w/ S.S. CLAMPS PER DETAIL 10' MIN. ELECTRICAL SERVICE SHALL BE PROVIDED BY CONTRACTOR TO ELECTRICAL RECEPTACLE FOR HEAT SOURCE DRAIN SIZED TO MEET ASSE 1060 REQUIREMENTS (TYPICAL 2) POSITIVE DRAINAGE AWAY FROM SLAB 4" CONCRETE` PAD FIBERGLASS, HEATED AND INSULATED PROTECTIVE ENCLOSURE C REDUCED PRESSURE ZONE 2" MIN. BACKFLOW PREVENTER PER SPECIFICATIONS ISOLATION VALVES 18" MIN. TRANSITION COUPLING AS REQUIRED 4" MIN. OVERSIZED HOLE w/ SEALANT (TYPICAL 2) LOCKING TAB ATTACHED TO SLAB THROUGH FLANGE ON EACH END a a a (TYPICAL 2) 4 MIN.7/\\�/// SEE PLANS FOR WATER LINE SIZE AND MATERIAL REDUCED PRESSURE ZONE BACKFLOW PREVENTER NOTES: 1. ENCLOSURE SHALL MEET STANDARDS FOR ASSE 1060 FOR OUTDOOR ENCLOSURES FOR BACKFLOW PREVENTION ASSEMBLIES. 2. HEAT SOURCE SHALL BE PROVIDED TO PROTECT TO —30 DEGREES. HEAT SOURCE MAY BE HEAT TAPE, CABLE OR HEATER PER MANUFACTURERS STANDARD. HEAT SOURCE SHALL BE RATED FOR USE IN DAMP ENVIRONMENTS PER NATIONAL ELECTRICAL CODE. 3. ENCLOSURE SHALL BE DESIGNED TO BE REMOVED OR OTHERWISE PROVIDE ACCESS FOR NORMAL MAINTENANCE. 4. ENCLOSURE SHALL BE DESIGNED TO BE ABLE TO BE SECURED TO SLAB FOR SECURITY. RPZ BACKFLOW PREVENTER UPDATED JANUARY, 2023 NOT TO SCALE REPLACEMENT SECTION OF DUCTILE IRON PIPE 12" MIN. �MIN. 20' DIP WATER LIP AT POINT OF CROSSING 10' MIN. NOTE: THIS DETAIL SHALL ONLY BE USED IF WATER AND SEWER SEPARATIONS AS REQUIRED IN NOTE 8 OF THE GENERAL WATER NOTES CANNOT BE MET WATER AND SEWER CROSSING UPDATED JANUARY, 2023 NOT TO SCALE APPROVED TRANSITION ADAPTER w/ S.S. CLAMPS PER DETAIL EXISTING SEWER LINE ,�gEFORF yo SHEET �' Go�� DODGE'S STORE AS NOTED • STANDARD DETAILS o PERFECTION OIL COMPANY OFFICE MANAGER DESIGNER INC. M. CATHEY G.ORR C=505 Q� GING pPFLETCHER NORTH CAROLINA PROJECT MANAGER REVIEWER DATE PROJECT# FUNDING# NO. DATE BY DESCRIPTION R.WILL S. BURWELL JANUARY 2023 22.00108 N/A U) J Q w 0 0 Q 0 z a co 00 0 0 0 N N 22" MIN. ` t IN ROADS 7 3/4" MIN. 4"MIN. CLEARANCE FROM BOTTOM OF COVER TO TOP OF CLEANOUT COUNTERSUNK PLUG 3"MIN. EXISTING SOIL EXISTING SOIL 12" OF FINE LOOSE EARTH FREE FROM LARGE CLODS, STONES, DEBRIS, VEGETABLE MATTER, OR OTHER OBJECTIONABLE MATERIALS. 4" OR 6" SEWER CLEANOUT RISER PIPE DRYS ❑ ❑ ❑ UNDISTURBED o TRENCH BACKFILL MATERIAL ❑ ❑ ❑ ��\, EARTH N COMPACTED TO 85% STANDARD ((0101 ❑ ❑ ❑ ❑ ❑ ❑ PROCTOR IN 12" LIFTS. OD 0 ® ❑ ❑ ❑ INITIAL BACKFILL SEE��❑TRENCH DETAILS. ❑ ❑ ❑00 TRENCH BACKFILL IN MSD RIGHTS OF WAY N.T.S. STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Carolina TRENCH BACKFILL DATE APPROVED: MARCH 2O17 1.16 - 01 eEFOR, ® 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 C9 mcg i I lassociates. com NOTE: 1. ALL SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL BE MANUFACTURED FROM GRAY IRON (CAST IRON) MEETING THE REQUIREMENTS OF AWWA C110 AND ASTM A536. 2. ALL SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL CONFORM TO PARAGRAPH 2.01(d) OF ITEM II, SECTION VI OF MSD's TECHNICAL SPECIFICATIONS (MADE IN THE U.S.A.) 3. NON -TRAFFIC LOCATIONS; SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL BE AS MANUFACTURED BY EAST JORDAN IRON WORKS MODEL 1566 (OR APPROVED EQUAL) 4. TRAFFIC LOCATIONS; SANITARY SEWER CLEANOUT BOXES AND COVERS SHALL BE AS MANUFACTURED BY EAST JORDAN IRON WORKS MODEL 1574 (OR APPROVED EQUAL) NO1DATEIBY z 6"MIN. WASHED STONE BASE STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Carolina CLEANOUT BOX DATE APPROVED: MARCH 28, 2019 2.07 - 05 DESCRIPTION FLOW MATCH CROWNS WHEN CONNECTING SERVICES TO MANHOLES eCrTinni SEWER SERVICE STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Carolina SERVICE CONNECTIONS AT MANHOLES DATE APPROVED: MARCH 2O17 2.11 - 07.1 DODGE'S STORE PERFECTION OIL COMPANY INC. FLETCHER, NORTH CAROLINA CONCPCTM AnirunD BOLTS 5/8" 0 LIFTING BAR (TYP.) 0 5/8" 0 LIFTING BAR (TYP.) STANDARD RING AND COVER N.T.S 2'-0" 0 �w rn a U< J - � -F Z = 0 z 2"x1/4" BUTYL Q GROUT BRICK -GROUT ALL JOINTS NOTE: PRECAST MANHOLE MATCH FRAME TO EXISTING GRADE FOR LANDSCAPED LOCATIONS FRAME SET IN NON -ROADWAY LOCATION N.T.S X Q 2 MACHINED SURFACES X < 1*16 iv 2"x1/4" BUTYL CONCRETE ANCHOR BOLT FOUR (4) MIN. —PAVEMENT PRECAST CONCRETE GRADE RING 3 BRICKS (MAX.) PRECAST MANHOLE FRAME SET IN ROADWAY LOCATION N.T.S 1. WHERE M.H. IS IN ROAD SHOULDER AND ROAD DOES NOT HAVE CURB AND GUTTER, DO NOT USE ANCHOR BOLTS IN FRAME. 2. "MSD OF BUNCOMBE COUNTY" TO APPEAR ON COVERS ONLY WHEN THE SEWER SYSTEM IS TO BE MAINTAINED BY MSD AS NOTED OFFICE MANAGER M. CATHEY PROJECT MANAGER R.WILL DESIGNER G.ORR REVIEWER S. BURWELL STANDARD DETAIL Metropolitan Sewerage District of Buncombe County, North Carolina STANDARD MANHOLE FRAME & COVER DATE APPROVED: MARCH 2O17 2.11 - 08.1 STANDARD DETAILS DATE PROJECT # FUNDING # JAN UARY 2023 22.00108 N/A SHEET C=506 Action ID Number: SAW-2022-01261 County: Henderson Permittee: D&H Company / Attn: Nat Leathers Project Name: Dodge's Convenience Store Date Verification Issued: April 17, 2023 Project Manager: Brooke Davis Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: Brooke Davis 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date