HomeMy WebLinkAboutSW4221202_Supplement-EZ Form_20230404SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 lProiectName
Project Area (ac)
Coastal Wetland Area (ac)
Surface Water Area (ac)
Is this project High or Low Density?
Does this project use an off -site SCM?
Dollar General Store #08606
1.74
0
0
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
1500
8
Will the vegetated setback remain vegetated?
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
10
1 Is streambank stabilization proposed on this project?
NUMBER AND TYPE OF SCMs:
11
Infiltration S stem
12
Bioretention Cell
13
Wet Pond
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
1
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
Ba filter
lFilterra
25
26
FORMS LOADED
NER CERTIFICATION
Name and Title:
Organization:
Street address:
City, State, Zip:
Phone number(s):
Email:
Justin Church. PE -
BREC, PA
1520 Meadowview Drive
Wilkesboro, NC 28697
(336) 844-4088
justin(&brec.biz
ineer
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
o0'FEssio'�G�
SEAL 9<
035736 =
`�G'•�NGIN���'•G�
/ T,N C. CND
/��/I111111\\`\\
C�
Signature Designer
04/04/2023
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this roject have low density areas?
No
4
If so number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
T pe of SCM
SAND FILTER
5
Total drainage area (sq ft
76,063
52,496
6
Onsite drainage area (sq ft
76,063
46,951
7
Offsite draina a area (sq ft
0
5545
8
Total BUA in project (sq ft
36769 sf
41446 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
sf
sf
10
New BUA not on subdivided lots (subject to
permitting) s
36769 sf
41446 sf
11
Offsite BUA (sq ft
sf
5545 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft
23694 sf
22826 sf
- Sidewalk (sq ft
2292 sf
2292 sf
- Roof (sq ft
10783 sf
10783 sf
- Roadway s ft
sf
sf
Future (sq ft
sf
sf
- Other, please specify in the comment box
below (sq ft
sf
sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
sf
sf
15permitting)
Existing BUA that will remain (not subject to
s ft
sf
sf
16
lExistina BUA that is already permitted (sq ft
sf
sf
17
Existing BUA that will be removed (sq ft
6584 sf
6584 sf
18
Percent BUA
48%
79%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
3051 cf
21
Calculation method for design volume
SHULER
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Offsite drainage areas draining to SCM are assumed to be 100% BUA for
design purposes; however, current conditions are a mix of grass and
roadway pavement.
SAND FILTER
MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
YFes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V ?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
Yes
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
N/A
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
SAND FILTER
MDC FROM 02H .1056
18
SHWT elevation (fmsl)
786
19
Type of sand filter (open or closed)
Closed
20
If closed, will the filter will be pre -cast or pour -in -place?
Pre Cast
21
If closed, top of grate elevation (fmsl)
791
22
Is this sand filter designed to attenuate peak flows?
No
I Sediment Chamber
23
Volume that can be retained in the sediment chamber (cubic feet)
1848 cf
24
Will there be a permanent pool in the sediment chamber?
No
25
Bottom of the sediment chamber (fmsl)
788.00
26
Area of the sediment chamber (square feet)
616 sf
27
Physical depth of the sediment chamber (inches)
24 in
28
Ponding depth in the sediment chamber, above any permanent
pool (inches)
24 in
29J
Elevation of top of weir between chambers (fmsl)
788.25
I Sand Chamber
30
Volume that can be retained in the sand chamber (cubic feet)
1203 cf
31
Bottom of the sand chamber (fmsl)
788.00
32
Area of the sand chamber (square feet)
650 sf
33
Physical depth of the sand chamber (inches)
24 in
34
Ponding depth in the sand chamber, above the sand surface
(inches)
24 in
35
Elevation of the bypass device (fmsl)
790
36
Type of bypass device
WEIR
37
Mechanism for distributing flow over the sand surface
LEVEL
SPREADER
38
Sand specification for sand chamber
ASTM C33
39
Depth above underdrain pipe (inches)
18 in
40
Will the media be maintained to drain at least two inches per hour at
the sand surface?
Yes
41
Is at least one clean -out pipe provided at the low point of each
underdrain line?
Yes
42
Will clean -out pipes be capped?
Yes
ADDITIONAL INFORMATION
43
Please use this space to provide any additional information about
the sand filter(s):
Design is a hybrid above ground/below ground solution. The sediment
chamber is split between above ground and below ground, and all of the
sand chamber is below ground (closed bottom).
Sand Filter 3 10:29 AM 4/4/2023