Loading...
HomeMy WebLinkAbout20230339 Ver 1_E&SC Narrative_20221214Contentment Golf Course Erosion and Sediment Control Narrative December 14, 2022 Watershed Consulting PLLC PO Box 7216 Richmond, Virginia 23221 804 304-4659 Section 1.0 Project Description 2.0 Site Description 3.0 Trout Buffer Waiver Summary 4.0 Stormwater Summary 5.0 Construction Phasing and Sequencing 6.0 Erosion and Sediment Controls 7.0 Grassing 8.0 Wetland Delineation and Section 404 Permits Figures 1-1 Vicinity Map 1-2 Location Map 1-3 Aerial Map 1-4 Master Plan 3-1 Buffer Treatment Plan 4-1 Stormwater Management 5-1 Phasing Plan 6-1 Color E&S Plan Appendices A. Trout Buffer Waiver B. Outlet Protection C. Skimmer Basin Design D. Sediment Basin 1 Design E. Sediment Basin 2 Design F. Grassing Specifications G. Pond Routings 1.0 PROJECT DESCRIPTION The purpose of the project is to construct a new golf course in Wilkes County, North Carolina. The project requires land disturbance of approximately 227 acre of land. The project includes construction of fairways, roughs, greens, and tees of various grass types as specified in the Grassing Plan. The project also includes construction of an irrigation system and sand bunkers. An irrigation lake is proposed which will also provide stormwater attenuation benefits. Eight foot wide cart paths are proposed at various locations and open pile bridges are proposed at stream crossings. The project requires that golf holes play over streams that are designated as trout streams or High Quality Waters. Thus, hand clearing methods are specified in the buffer areas. These areas will be enhanced with native shrubs or native grasses in accordance with the buffer restoration plan prepared by George Golf Design. 1 �e s o 0 o 0 o' N 5 (. 3 LonOboltom It,/ 0 O as �gd� leo O� ryk ryC^ eel � o � r v �a o*fey M a reek. n C7 O� O Y U ��lr 11 ou sE J j Sn�na hbu—n Goff One YQ ��, L- In�t. 9� t a 0 o u 1�Oe m o' U e'tG SWO M`le Ix �k�,°llow Dr O 9a oveMeW Py d MOXIoy s� 0.25 0.5 1 %2 Sources: Esri, Mi, Esri Japan, METI, °r Esri China (Ho etMap contributors, and the GIS User Community �I0 u a a bA r, o N > O N •0 V < a, G �GJ N > LO m X o 0 3 O M 3dU rWr^ VJ 0 V 71 I O � W W W�✓V� z W H z 0 V f ♦9�/ fie• t� \�a� la `�`�-r��. Double CCeem e I is )n / r�oa — SM a —Cem.', Little taoeMtn o ■ _ 1493 1 CA N Bp TT M. �� Ppl@ Brid Z 1 v Joynes o 39 O0 ° Cem: �Abshers Cu*oo rre m •'_= p ° 144 rui •� , Cem - - _ - �(f� '� � %" _ /� ' r 4A!38 J ` " ♦ t BM 132 l �� �� i J AY o ; 1 r� 0.25 0.5 1 jCopyrig�ht:© 2013' Nafi'onal Geographic Sociei-cubed U a a bA 451 0 w 0 40 04 0 e••1 C7�w w c � � w z W z 0 u \ 1 I \\\\`I Q \'/ I / / \\\\1\1\1\I\111 11 / / \ 11llII��I�Illlllll jl BASEMAP PROVIDED By GEORGE GOLF DESIGN. CONTOURS WERE DERIVED FROM CIS FILES OBTAINED FROM TXE NORTX CAROLINA DEPARTMENT OF TRANSPORTATION. RINTERVAL CONT CONTOUR = 10.0' GRAPHIC SCALE: 1- 300' NORTH 3000' 300' 600' �U '6 wyb'y pit 9 �J p(9 2 0 WT Z N rn ou i N N w O V w YI X d N o In ()W mZ 0o 5:06 3° U PROJECT MANAGER: EA DESIGNED: EA DRAWN: SK DESIGN FILE: SP3_MASTER DATE: 11/22/10 REVISIONS: ':I6 I REVISED PER NCDENR COMMENTS 822-11 REVISED PER NCDENR COMMENTS FIGURE 1-4 2.0 SITE DESCRIPTION The site occupies roughly 740 acre of rural undeveloped land. The property consists of a mixture forest, pasture, meadows, and logged property as shown on Sheet SP2 of the Plans. The site drains to a number of perennial and intermittent streams which bisect the property and flow to the south west corner of the property. These streams are designated trout streams and contain an associated 25-foot buffer. Many of these streams contain buffers of various conditions including wooded, pasture, pasture with intermittent trees, and shrub areas. The property is steep and slopes towards the various onsite streams. The steepest areas are located along the eastern side of the property which is avoided by the golf course. The golf course will occupy the central and western portions of the property on slopes generally ranging from 5-15%. Adjacent Property Adjacent properties are similar in nature and currently function as large rural parcels of land. These properties have similar topography and streams. Soils A soils map is provided as Sheet 2A of the plans. Approximately 15 soil types occupy the property. These soils are primarily sandy clay loams and sandy loams but include clay loams, gravelly sandy loams, and various complexes. Onsite soils are predominantly Hydrologic Soil Group B soils. A small percentage of the soils are HSG A and C. Soil erodabilty K factors range from 0.05 to 0.2. Thus erodability is a concern primarily due to steep slopes versus the composition of the soil. Existing features are summarized on Sheets 2 and 2Aof the plans. 11 3.0 TROUT BUFFER WAIVER SUMMARY Watershed Consulting, PLLC worked with NCDNR in 2010/2011 to obtain a Trout Buffer Waiver for this project. The waiver was approved in September 2011. The process included significant measures towards avoidance and minimization. Final plans included detailed buffer treatment methods, 11 bioretention basins, 32 skimmer basins, detailed construction sequences, and a phasing plan which limits 20-acres of disturbed land on Harris Creek at a given time. A copy of the trout buffer waiver is provided on Sheet 1A of the plans and in Appendix A. The Buffer Treatment Plans is provided as Figure 3-1 which summarizes how the onsite buffers will be maintained. 7 CONTENTMENT- �f x � I Buffer Treatment Plan June 7, 011 I t - 7� t -,, I � iAa v O� o ❑ (� o I- 1 o D L O 7 1 � o ��� �, �. � ' a G� � o ❑ , � � �o � %, L Plant Palette / �. L���� V �. �� - ❑ �� / / a� Nat:oe Grasses. Sch:aachyr:um S—Parium Little Bluestem �.. LG ' ® / buffer Legend: AnL.pogen rirgini— Bzenmeedge V�:11 i Eragrest:s speetabills Purple I-- Grass Seale —leW:nter Rye (Ceder C—P) Shrub S"ub: /fn / ' / � � � ' � , Trea Propoee Na Grass a tment is d t��e Ceanethus amerius New Jeraay Tea Leueetheefent—iana Deg -Hubble t.eueeth- Fetterbush CePhalanthua eeeidental:s Buttes Bush Treatment 2:P p sed 5-6/5 ub hr I _ Myr:ea — fern Southern Wa= Myrtle I T_ ❑ i Cercis canadens:s Eastern Redbud i —� / / ✓ off` t f t d Betula Ni a R:oer B:rch !A oTrea most3: Proposed Re- ores eAoer—h.>rus. SugarMapleIQuercus Alba White Ok 1 Quercus £altars Southern Red Oak — — — i Caryaooata Shagbark H:ckery / 1 1 ' 1 \\ Fjdsting Intact Forested r).ffer Juglane nig— Black Walnut / i S V I I NORTH Designed F)y: FIGURE 3-1 Lehman Design Group a different angle of approach �❑ SCALE: 1 "=300 4.0 Stormwater Summary (Low Density) This site consists of 740-acre of undeveloped land located in Wilkes County, North Carolina. The property is composed of a mixture of forest, logged land, and pasture. The proposed project includes construction of turfgrass fairways, tees, greens, and surrounds as well as sand bunkers and cart paths. Paved cart path will be provided to minimize erosion in high traffic areas. The cart path is constructed as a disconnected linear system ranging from 8-12-feet in width and will sheet flow to adjacent turf areas. The cart path equates to 5.63-acres of paved surfaces which is approximately 0.76% of the site. Total Project Area= 740-acres Built Upon Area (Impervious) = 5.63-acres Impervious= 0.76% Project Designation Low Density Due to the project's minimal impervious cover, it is designated as a "Low Density Project" per 15A NCAC 2H. 1003. 15A NCAC 21-1.1003 (2) (b) requires Low density projects to maximize dispersed flow through vegetated areas and minimize channelization of flow. Dispersed flow is achieved through the following measures. 1. Minimal Impervious Surfaces- Only 0.76 percent of the site will be constructed as impervious. 2. Disconnection of Impervious Surfaces- Impervious surfaces are constructed as a disconnected linear system ranging from 8-12-feet in width. These impervious surfaces will sheet flow to pervious turf areas. 3. Bioretention Cells (11) - Where possible piped systems outfall into a bioretention cell. These areas were coordinated with NCDNR as part of the Trout Buffer Waiver Process. 4. Rip Rap Aprons- In areas where Bioretention was not possible, rip rap aprons are provided to dissipate and disperse flow into the stream buffer. 5. Golf Course Irrigation Pond -A golf course irrigation pond is provided which collects and attenuates flows prior to release into Double Creek. Stormwater Management is summarized on Sheet 6 of the plans. Sheet 6 summarizes the locations of outfall major outfalls, drainage areas, and bioretention structures. Bioretention Basin Design and details are provided on Sheet 19 of the plans. Outlet velocities for rip rap aprons are provided in Appendix B. lAJ :I'. . . �II �' .�� • • • .,;oii /%� °��///!�, //yet � ;r�,,,, c,'�✓/ /,�� 9 �,//�'/"'/ , i / /�%!G//ii i'/� � .`%'/r� ''%%'�,'/... ,/ / / / .,, /„��� •, �,,,,,� ///, „ III � / / //�/��ii/ ✓��/,.//� /6/.%s°/G �/�i a', //, // III ,�v / / // / � �'� 'i'i%o /� ,%•. // / quo' /�'/�//�'.,,, a � s f� II, ������ j/ of � '��/ / j ���/ / / �/,i �j.. •� l;.T•Sil:� / / / /' �� / i/ / �h''�//�/j W �� f" ��lisf�f'''!i"y// x > cli. . �� / R Em . . I " ZME///j//�,,e,� I •LU �rl I �;;iif,I'I�+II u may, 40 �,%/ LEGEND IIIIII %j%/ v' i EXISTING STREAM PROPOSED TREELII " // •i R .l WETLANDPROJECT MANAGER: EA ` BIORETENTION DESIGNED: EA 1 CONTOUR I• DESIGN DRAINAGE DIVIDE I. NORTH FIGURE 4-1 5.0 CONSTRUCTION PHASING AND SEQUENCING This project will rely on careful sequencing of events to ensure an orderly site and minimize sediment laden water from leaving the site. Construction Phasing is provided on Sheet 4 of the plans. The site will be constructed in phases. Phasing and sequencing will be as follows. CONSTRUCTION PHASING 1. The project shall be initiated in phases as shown on this phasing plan. 2. In general, work shall be completed in items 11a-c of the construction sequence prior to moving to the next phase of construction. 3. Multiple phases will be under construction concurrently. 4. Phases 1, 1A, 1C, and a portion of 3 are located within the Harris Creek Watershed. No more than 20-acre of land disturbance is allowed within the Harris Creek Watershed at a given time. 5. Phasing schedule can be modified upon approval of the architect and engineer. 6. Work shall be performed in a systematic, orderly manner. CONSTRUCTION SEQUENCE FOR EACH PHASE 1. Call MISS Utility to mark all underground utilities. 2. Mark wetlands in field with orange safety fence or continuous flagging. 3. Contractor shall hold preconstruction meeting with Department of Environment and Natural Resources E&S Inspector, architect, and engineer prior to any land disturbance. 4. Install construction entrance. 5. Flag Limits of clearing. 6. Execute Select Hand Clearing in critical buffer areas a. Clearly mark areas for clearing. b. Trees shall be cut and lifted out of buffer. c. No mechanized equipment and no grubbing will be allowed in buffer area. d. Where necessary, contractor can grind stumps e. Upon completion of clearing, buffer shall be immediately planted in accordance with planting plan provided by George Golf Design. f. Buffer work shall be complete prior to moving to item 7. 7. Install silt fence and diversion dikes. 8. Construct skimmer basins. 9. Construct diversion dikes/channels as necessary to skimmer basins and sediment basin. 10. Install major drain pipe. 11. Execute the following tasks in a systematic orderly manner. a. Execute site clearing and grubbing. b. Strip and stockpile topsoil c. Rough grade site. 12. Execute the following tasks in a systematic orderly manner. a. Construct bunkers. b. Build greens and tees. c. Install irrigation. 10 d. Install minor drainage (4", 6", and 8" pipe). e. Prepare soil for regrassing. f. Regrass disturbed areas. g. Construct bridges h. Construct cart paths. 13. Once the contributing drainage area to each sediment basin has become mostly stabilized to the satisfaction of DEQ, fill sediment basins to final grade and stabilize with seed and mulch. 14. Once the contributing drainage area to each bioretention cell has been stabilized, finalize construction of bioretention basins. 15. Once site has been stabilized to the satisfaction of DEQ, remove all silt fence and inlet protection and install permanent grates on all stormsewers. In general, the process will move from hole to hole with these tasks being performed in this specified sequence for each hole. In order to meet the proposed construction window, these tasks will be performed concurrently, with several holes in a different phase at any given time. 11 1/ ///, 1\ _ // lI IIII I I I I / lI //�—� —_ —IIII/////��—�\I���'�\�\\��-1 IIIII / /•/f //I//%/l!////II IIIIIII I11 /�' I�r I Fr t '>,•, / di .:/r a r� rrii / is:/�:basiyi! //,o/ r,,,.,,"„ ��/7 ���io �/ / - � G �/ ' � � / v3�G�j//� is �•.,...,. ,� rr /.�%' , �1 / r / t � r � CONSTRUCTION PHASING 1. The project shall be initiated in phases as shown on this phasing plan. 2. In general, work shall be completed in items 1la-c of the construction sequence prior to moving to the next phase of construction. 3. Multiple phases will be under construction concurrently. 4. Phases 1, IA, 1C, and a portion of3 are located within the Harris Creek Watershed. No more than 20-acre of land disturbance is allowed within the Harris Creek Watershed at a given time. 5. Phasing schedule can be modified upon approval of the architect and engineer. 6. Work shall be performed in a systematic, orderly manner. CONSTRUCTION SEQUENCE FOR EACH PHASE 1 1. Call MISS Utility to mark all underground utilities. 2. Mark wetlands in field with orange safety fence or continuous flagging. 3. Contractor shall hold preconstruction meeting with Department of Environment and Natural Resources E&S Inspector, architect, and engineer prior to any land disturbance. 4. Install construction entrance. 5. Flag Limits of clearing. 6. Execute Select Hand Clearing in critical buffer areas a. Clearly mark areas for clearing. b. Trees shall be cut and lifted out of buffer. c. No mechanized equipment and no grubbing will be allowed in buffer area. d. Where necessary, contractor can grind stumps e. Upon completion of clearing, buffer shall be immediately planted in accordance with planting plan provided by George Golf Design. E Buffer work shall be complete prior to moving to item 7. 7. Install silt fence and diversion dikes. 8. Construct skimmer basins. 9. Construct diversion dikes/channels as necessary to skimmer basins and sediment basin. I0.Install major drain pipe. I I. Execute the following tasks in a systematic orderly manner. a. Execute site clearing and grubbing. b. Strip and stockpile topsoil c. Rough grade site. 12. Execute the following tasks in a systematic orderly manner. a. Construct bunkers. b. Build greens and tees. c. Install irrigation. it. Install minor drainage (41, 6", and 811pipe). e. Prepare soil for regrassing. E Regrass disturbed areas. g. Construct bridges h. Construct cart paths. 13.Once the contributing drainage area to each sediment basin has become mostly stabilized to the satisfaction of DEQ, fill sediment basins to final grade and stabilize with seed and mulch. 14.Once the contributing drainage area to each bioretention cell has been stabilized, finalize construction of bioretention basins- 15.Once site has been stabilized to the satisfaction of DEQ, remove al silt fence and inlet protection and install permanent grates on all stormsewers. In general, the process will move from hole to hole with these tasks being performed in this specified sequence for each hole. In order to meet [he proposed construction window, these tasks will be performed concurrently, with several holes in a different phase at any given time. • . /Sl URBANCE BY PHASE �% /y B e45.70 ACRES 26.09 ACRES LEGEND EXISTING STREAM TROUT BUFFER BASEMAP PROVIDED BY GEORGE GOLF DESIGN. G Ill Ili III x�$ag ®[gg( 130 i N 0 Z U N TT X F N Q p O In m 0 Z tl W Z r W y Cj 0 v a Z 4 U CO 3° U — _ �_ ' .� _ _ 1 \ \ /� �� \\\\., d� —_ \\\\l' _ \ \r 1 \1 \\ 1 I DESIGNED: _rAS,— EA \ I l / / —• I I' -- I \ \ \ 1 — \ \ �— °0 PHASING LINE DRAWN: SC --� ���� CONTOUR INTERVAL 10.0' DESIGN FILE: SP4 — PHASINGGRAPHIC SCALE: 1= 300' \ TREELINE DATE: 11/22/10PROPOSED 6 NORTH REVISIONS: 300" 01 300' 600' 6-14.11 REVISED PER NCDENR COMMENTS _- / - \\ �-�////'�-� 8-22-II REVISED PPRNGDENR COMMENTS FIGURE 5-1 6.0 Erosion and Sediment Controls The project relies on perimeter erosion and sediment controls to minimize runoff during construction. Erosion and Sediment Control is summarized on Sheets 11-15 of the plans. In addition to sequencing, the general approach to minimizing downstream sediment impacts includes the following. 1. Skimmer Basins- Where possible, storm runoff will be diverted to Skimmer basins to reduce sediment runoff. 2. Diversion Dikes- Diversion dikes will be used to divert onside disturbed areas into the skimmer basins. Diversion Dikes will also be used to divert offsite drainage from undisturbed areas around the site. 3. Sediment Basins- Two sediment basins with skimmers will be provided to treat areas where the drainage area to the basin exceeds 10-acres. 4. Sequencing of drainage pipe- Plans call for key drainage pipe to be installed as a first phase of construction. This allows diversion of offsite drainage and onsite treated drainage through the site in a more orderly manner. 5. Inlet Protection- Inlet protection shall be provided at each inlet. 6. Silt Fence- Where skimmer basins cannot be constructed due to topographic slopes, silt fence will be used to detain sediment. 7. Super Silt Fence- Where silt fence is proposed in areas where contributing slopes are significant, super silt fence (Chain -link) is proposed to capture runoff. 8. Construction Entrances -Construction entrances are proposed to provide orderly access and minimize tracking of sediment on and off of the site. Skimmer Basin Designs Skimmer Basins are designed in accordance with the "North Carolina Erosion and Sediment Control Planning and Design Manual". Major design parameters are as follows Basin Area- minimum basin area = 325 sf per CFS (10-yr) Basin Volume -minimum basin volume is = 1800 per acre disturbed Min Length to Width Ration = 2:1 Embankment height shall be less than 5-feet. Our basins are designed with a height of 2-feet. Spillway Conveyance- Spillways are designed to convey the 10-year storm event with 1-ft of freeboard Earthen Spillways- Where earthen spillways are used, maximum depth of flow shall be 0.5-feet and conveyed in a non -erosive manner. Baffles- Three baffles are provided to ensure trap efficiency. Skimmers- Skimmers are designed to dewater in 2-5 days. 13 Skimmer basin designs are summarized on Sheet 18 of the plans and in Appendix C of this document. Sediment Basin Designs Skimmer Basins are designed in accordance with the "North Carolina Erosion and Sediment Control Planning and Design Manual". Major design parameters are as follows Basin Area- minimum basin area = 435 sf per CFS (10-yr) Basin Volume -minimum basin volume is = 1,800 per acre disturbed Min Length to Width Ration = 2:1 Embankment height shall be less than 5-feet. Our basins are designed with a height of 2-feet. Spillway Conveyance- Spillways are designed to convey the 10-year storm event with 1-ft of freeboard Earthen Spillways- Where earthen spillways are used, maximum depth of flow shall be 0.5-feet and conveyed in a non -erosive manner. Baffles- Three baffles are provided to ensure trap efficiency. Skimmers- Skimmers are designed to dewater in 2-5 days. PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES 1. Sediment Basin -- Practice 6.61 Two sediment basins will be constructed to serve areas that collect drainage from more than 10-acres. Sediment Bain 1 treats hole number 13. Sediment Basin #2 will treat the proposed range and will collected drainage from a 30.4 acre watershed. The basin will be converted to a 6.5-acre irrigation storage lake upon completion of the project. The lake will also serve as a source of fill for the project. As demonstrated on Sheet 14 of the plans, the basin will ultimately provide more than 10-times the required storage capacity. Sediment Basin summaries are provided on Sheets 20 and 21 of the plans and Appendix D and E of this report. 2. Hand Clearing No mechanized clearing or grubbing shall be allowed within 25-feet of any trout streams (all streams) or 30-feet of any high quality waters (Harris Creek) as designated on these plans. Hand clearing methods shall be used as shown in the clearing plan (Sheets). These areas shall be stabilized in accordance with the Buffer Plan prepared by George Golf Design. 3. Temporary Sediment Trap -- Practice 6.60 14 More than 25 sediment traps are proposed to treat sediment laden runoff from areas of concentrated drainage. Most traps will use standard outfalls. Several traps will be constructed within sump areas of proposed stormsewer inlets and the inlets will be modified to serve as outfall structures. Details are provided on Sheet 17 of the plans. Calculations are provided on Sheets 18 of the plans. 4. Temporary Diversions --Practice 6.20 Temporary diversions will be used to divert clean water through the site during construction. These will be facilitated by construction of diversion dikes and installation of specific pipes as an initial phase of the construction process. Diversion dikes are proposed on upslope portions of the property in a number of locations to force clean water in to drain pipes. The diversion dikes are also used in a number of locations to divert drainage into sediment traps. All pipes designated as initial drainage must be installed as part of the erosion and sediment control measures to convey clean water through the site and minimize drainage areas to traps. 5. Silt Fence -- Practice 6.62 Silt fence is proposed in numerous locations as shown on the plans to capture sediment from slopes. Silt fence details are provided on Sheet 17 of the plans. 6. Super Silt Fence Super Silt Fence (chain link reinforced silt fence) is proposed in several areas which collect drainage from long and/or steep slope lengths in areas that cannot be treated by traps due to slope constraints. Super Silt Fence specifications are provided on Sheet 17 of the plans. 7. Temporary Gravel Construction Entrance/Exit -- Practice 6.06 Nine temporary gravel construction entrances will be installed at various locations on the property. These are needed to fully access construction areas while minimizing stream crossings during construction. Entrance locations are provided on Sheet 4 and Sheets 11-16 of the plans. Specifications are provided on Sheet 17 of the plans. 8. Inlet Protection -- Practice 6.52 All inlets will require inlet protection in accordance with specifications provided on Sheet 17 of the plans. 9. Outlet Stabilization Structure -- Practice 6.41 Riprap aprons will be located at the outfalls of systems 1-1, 1-2, 5-1, 7-1, 10-1, 13-1, 18-1, 18-2, and P-1 to prevent scour. See Sheet 17 for outlet protection details and Sheet 16 for sizing details. 10. Level Spreader -- Practice 6.40 Level spreaders are proposed at the outfalls of storm sewer systems 3-1, 3-2, 16-1, 16-2, 17-1, and 17- 2. A level spreader detail is provided on Sheet 17 of the plans. 15 12. Surface Roughening -- Practice 6.03 Any 3:1 cut slopes shall be lightly roughened by disking just prior to vegetating, and the surface 4 to 6 inches of the 2:1 fill slopes will be left in a loose condition and grooved on the contour. 13. Surface Stabilization Surface stabilization will be accomplished with vegetation and mulch as specified in the Grassing Plan Sheet G1. Areas should be vegetated as soon as final grade is reached. Areas that require only clearing and grubbing shall be stabilized immediately upon finalizing grubbing activities. Areas where grading is proposed shall be vegetated upon reaching final grade and implementation of an irrigation system. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every runoff -producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. The sediment basin will be cleaned out when the level of sediment reaches 1.0 ft below the top of the riser. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. 3. Sediment will be removed from the sediment trap and block and gravel inlet protection device when storage capacity has been approximately 50% filled. Gravel will be cleaned or replaced when the sediment pool no longer drains properly. 4. Sediment will be removed from behind the sediment fence when it becomes about 0.5 ft deep at the fence. The sediment fence will be repaired as necessary to maintain a barrier. 5. All seeded areas will be fertilized, reseeded as necessary, and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. 16 .�+.�• ` / \ \\ \\ `N, X0 I I — \ \ \ `\ ` — �.`__ — // 1/ —\ f/^ �— \ 1 I / / I / 1 /% \ \ \ \ \ \ \ \ } 1 1 1 \ \ \ / / / \ \� \\\ \\ - / \ / / J 1 \ 1 I y\ \ \\\ \\ \ \ \ \ I �--�� \ \ - \-- / / / / \ 1 ! f _ -- / - --•`• \ \\ 1 \ \\\ 1 \\ t \ 1 / _ _ __ / r - - _, \ \ \ \\ J _ - - \ 1 \ \\ \ 1 \ \ \� \\ // 1 I / r - \I SEDIMENT BASINS *7,•9,*10,*,11,12A,•20,•26,*27 MAY BE PHASED OUT AND CLOSED LEGEND I \ I r I / / 1 A5 PART OF THE GRASSING PROCESS UPON APPROVAL OF NCDENR. ALTERNATE - 1 / f- _ �• I 1 \ \\\ \ \ I \\ \ \\ 4 // 1\ / \\ \ \ \ \\\ •�-- 1 I I \ \` \` ` / / / / �� 1 ! / { / / I - -\ `' ) \ \I 1\I\ \I \ \ \\ \ I / \ I �`` \\ _ _ \ ly \\ '_\ -- \- J,/ / / / // I/ / I BASIN CLOSEOUT PLANS CAN BE SUGGESTED BY THE CONTRACTOR AND SUBMITTED 1\ // 1 11 \ I f - - ' 1 1 \ \ \y y 1 \ _ y \ \ ` I ,+ \ \ `� I ' � I 1 - - ` / / 1 I I FOR APPROVAL BY NCDENR. I i■memompnim■mmmom PROPERTY LINE I \ { \ \ \ \ �� _--�-� \ \\ \ 1 I / 1 I \ } -�, --� - -- I I I 1 1 \ 1 I I ( / / /,%J. \- \ \\ \ - 1 / 11/ I I \ \ \ \ / 1 I I ! I I f / I /�/ \ = — / /} 1 I I\ \ //f / I/ I I I\ \ \\ EXISTING STREAM I 1 'T 1 1 I \ \ ,� 1 y` \ \ \ \ 1 \ ,� /�/ / / 1 \\ �- �' I �� \ -� I I y \ I 1 i I I 1 I /// //ram\,, y _ / \ I \ ,FF. 1 / / I I I .�.�, -- I l \ \ \._ - -_ \ \ \ \ \ \ \ / / I 1,\ \ � 1 I I 1 1 1 / // � I \ \ } // ! I \-/ // I \ \ 1 / / �_ ♦• \ - \ \ y y \ / / - I I / \ \ \ 1` 1 / I I J�,,� - / �Ifrl \ \ ?, / -__� J'�. -�____ �\ ` \ \ \ \ \ \ `� /' /� �' ' \ \ -- 1 / / / I r�r ! 1 } \1 t `\ \ 1 1 1 \ _- f /,/ // I I \ \ R 1 \ 1 r ♦ I \ \ � \ I I / / 1 �I 1 / / // \-1 11 \ \ \ \ \ \ \ - / // \ \ , \ 0 , , \ \ r / . ` - / / 1 I 1 1 \ \ \ 1 1 ,- /I / \ \ \ / / - \ \ \ , / i \ 1 1 I / / / / \ _ _ _ -_ y�.� \ \ \ - / f / c I\ , 5 I I I - - . f / // 1 1 \ \ \ \ \ \ / I/// \ \ \ \ \ TROUT BUFFER \ \ I ► �/ 1/ / _ .�*' - -- _ - �, _ \ \ \\\ \ \\y \ \\ \ I / / , / I \ / I I / / __ / J_/ / / J / \ \ f // / I i I 1\-_- �. / /I/// ! L_�I ! I I \\\\\ \ \--f//// - `\y\\\\` `j--__._-____ __* �'�•-. - \ \ 1 \ \ 1 1 / /� I I 1 { I / 1 { y// / 1 \�/ / / 1 \ / / //r ! -,7 \ \ //// \ \ \ \ \_I% \ - \ _ \ \ \ \ \ti \ r \ / �� I i 1 \ / r --��-� �, I I \, 1 I ! \ ` \ `_-/ ./_/ , // � 1 1 I \ \ \ \ \ ��///f/r.\.\ r\. `. _.,..__ \, 1 r I --\iiiiI 07o \ \ \ � \ \ \ \ \ \ � I \ \ 1, \ \ _ _ \� \\ \ • _ — _ _ J� r.� —_ J r1 // // // r I l \ \ / �I �/ 1 \ \ EXISTING TREELINE 1 I , ..\ \ � \ /NO* \ \ L/ f _ ,)0 /9-35­­ - - ___ . - \ 11'__ \ I I I 1 \ \ 1 � � 1 I I \ \ \ 1 �� \ \ \ �� �� --'I, � - \ / +' I _ -` 1 1' \ / 1 1 I I I I \ 1 \ \ 1 \ 1 \ _ -_- �r __ \ \ \ __/ I 11 I f l _ - \ \ \ \ 1 / J`r1 / •, \ I I I I _--_� -_r - WETLAND I \ / 1 I I ■ _ \ � \ l \ � / I 11 I _.. '' I ,.-' ' � � \\ / / r/ ,/ / / r 1 1 >' �\ \ \ \ 1 \, \, \\ / ,I I _/ \ � C \ ` � \ //,// �//I/// I I II �--_ �//��\y`\ � - T \ \ z- _ \ z- 1/ r I \ / , / I / i I I '', \ \ \ \ \ v/ 1 - -- \ -_ \ , I \/ /// / I / t--- r - `\--- \\ \ I I r \ \ j . / / / \ ,, \ , . ti `-� /„ / / I I t / __ \\ \ 1 I I I I r ,, \ \ -� _� / / / / /I 1 / / I I r \ y / 1 / f r ___ \ I + / f I t t I \ �/ /.r- - \ _ / __ \ \ / I I 1 1 / \ - -- -/ / - -\ \ \ • 1 I SIB / \ / / / / ./ %I // / I // / I I / /// / ,/--� ` - -- // // r/ / 1 I l 1 \ / -/ / � ��� I / \ r _ : r / / / f \ \ / / / I / _ _ MAJOR STORM PIPE \ \ I I I I / , ,%, ♦ 1 -�_ / / / / 1 -� /1 / \ 1 / / -`� - I I I \ \ � / / / / / / / I ti } \ `- -�~- / /.� -� \_ ` \\ \� 1 I I I I I , /,.-� •'1 i • / // / I \� // / I I . / / / /f / / / \ �/ I \ I I / / / 1l\\\\` ---_" / I / ///"/,�,-��`z� � i I ( I , ` . -; \ -` / / / 1 I / I / \ \ ,- / I - /// - \ \ I / / / / �_ _� .. \ ` I 1 1 1 !+ \_-�- / / / 1 fl / / I I \ 1 / I / / ( I I 1 ---` \ �� �`//-s// - �� / / / / \ 11 \ y �' i \\ \ \ S� �` / , / / / / / 1 / I \�c�- / �� 1 I / I I / / ( I 1 \ / �� , / / I� / .11 ��� /i /// // / / =�``�� \\ \ 1 l / / _ r 1 I l \ - / /� _ / / / rF \1 ,1 \\ \\\ \\\ +� - - 1 17.98_--' "' •�/ / / / / 1 1 1.-. // // /,tip I \ \ // / \ -- //` / /� - / / / SILT FENCE \\ \ 1 \ \\ \ I 1 I r I \ \\ \\ / / ,/ ,/ // / / I 1 1 - 1 \ `�- � \ \ \ \ ,� _ .I --.��- � 1 1 I \ / 1' / I I / \ - � �\ ~\ . �/// J l/ 11, / / / / // //ire/r/ I /1 I // /� � I11 \ \ \ \ \ \ \ \ SB � I f I I \ / I I I I \ /III IIIIIII -� \\ \ \ - y/ / // `//l 1 I / f // / / / // // // / / / / %\� \\ >_ •� I 1 \ \ \ \ '\ �� I �\�,�� "; I/ ♦ I I 1 \ /fit ; I \�"Mil \ \� - -_ - / / r� -/ /// / // �/ I // l f / / I / / I / // / // / \I\� \- `� \ ` — � • ._ I \ \ \� - — \ \ `.`_-: I 1 \ °SEDIMENT BASIN # 1 ,/ 1/ I ` - — r — f/ /// / / / / / / I I / / // / / / / /I / / DIVERSION DIKE \ \ . \ \ a- 1 \ \ \ \ ..,��4 .I'll y 1 / / - / / / / / / / I I / / / / I / 1 r 1 \ I y \\\ \ ' I I I ` SEE DETAIL SHEET 20 ` / I /-- -1 // -- — 70I_ / / / / / / / // / / / / / / / Q i j \\ ` f I I —� I —�—_ r—� // / / I \`� 1, \ _ F / I \ \\ \ / / J ' / I I I 1 I /~ -/ / - -� ` 1 /� ///� // I I / ///fr,// 1 /l I l I I 1 / SEDIMENT TRAP _ �\ \ `� '� I 1 / 1. 4 / ( / 39p \� I r� , I \---��—� \ //_� - / / / / t / / / / \ I f I \ \\\ / / / \ I �00 / , \ I t /- // -_ s- ��� \ / //// / // / �/ / 1 I / ( �\ \- , 11 I I I I \ \ / / - I I \ 1 1 1 I /� / --- \ \ _ / - ///// / //// I/ -- I 1 4- y `� \ X 1 / I I t ,. - � __ t , 1 \\ \ \\\\ \\ II I / / \ i // r / ,- / / // / // / / . / . _ _ ') II RAI A AR A • a , 1\ ` / ///. /. / / / 1 D N GE E S / I I I ,>i 8.8, � \ /- -- \ \ \ / / / / / / / / / I / / I / 0 / � �� j 1 \ \ `\ _ �_ 1 / I / 1 I I { �' 00 , 1 • ` _ --- I r . O ,\ /I \ \\ \ \ 1 \ \ I \ \ \ / / / / / / / / / / / 1 / / / �b O . - _ / / ! I �•_•_"� TO TRAPS \ \ - - 1 ./ / I I \ � O \ _. __ ' 1 I 1 -I \ \ { \ 1 1 \ I r - \ \ \ \ \ / l I 1 / 1 / / / I / / / I / ��9 I / / � / / \ \ 1 I 1\IJI : l ". 4\ �.♦ / rjyf7� 1 \\ 1-0 \ 1 \ I 1 1 1 1 1\ I I 1 \\\\ \ / // 1 1 1 I I I / I / /// I I I �k I I I r / I) } \11 -� / I l p I S ■7 ,1., S \ \ / \ I I 1 I I I I I i / \\\\\ / 1/ I I I I I I I { ( I I I I I r I I, \ I / I \ I ;, l ' __ •`' ,�.-. .-.... - �...... . �• E \ \ \ / I 1 \ 1 I { I I I 1 I \ \ \ \ _ _ / 1 1 I I I { \ \ I { { 1 I I I o I \ o \ 1 I\ I CONSTRUCTION I \ \. s 1 1-- / `r• + Rrr \ 1 o I 1\ 1 1 I } i I I + I. \\\\\ / I 1 1 I I I I o \ \Itt\ j i �. __ -, =- � \ 1 I I \ __ 1 1 l I l _ 1 \ \ \ 16 ,o - ENTRANCE 1 '�! 1 ROCK OUTLET / / / rn � l 1] I l l l l I I I � \\ / 1 ` Q 1 1 1\ I I .r� 1 1 \ \ � - \ , ♦ _ ♦ ►f 1 I I \ 1 \ 1 \ / I \ \ �a \ 1 1 I \ 1 1 -- 16 - - , . j' ! / 5, 3\ \ \ J I I , �- •J _ f f/ . 1 ■� �, I 1 I l l I I - \ \\ y \ / I 1 \ \ \ :� \ 1 1 0 \ 3 \ -+ ■ 1 \ .3 - 1 I . rn \ 1 l r / \ ��. I \ � ■ 1 I � 1 0 \ \ �4. r 1 \ I 1 I_ _. I 1 1 - \ 1 I 1 1 1 / 1 1 � ■ 1 - I \ 1 \ o \ 1 1 / I \ 1 \ 1 � 1 r 1 I � - 1 1 } 1 \ -. D 1 \ \ I � 1 1 1 AC. ■ I I \ 1 \ 1 \ 7 / \ \ \ I T R AR A \ ■ \ I \ DSUBED E 1 \ 1 �\ I 1 \ \ ■ �♦ 1 \ \ \ \ 1 �` t 1 1 1 1 1 4 1 \ ,'' i 1 1 I cr \ . I _3 l I \ .r --__� \\ 1: / SB•3y\ \� `17.. o \ \ \ �� / �\ - �\ \\ \ �� / j/ �1-1 ,_;' ��I _ / 1 / I I 1 \ \\\y 1 \. \ \ o \ \ 0 1 1 ` o \ \ \ \ \-��� / I I . :;:, �;.: "_t ■- t \ I 1. t_ � \ i - -- — — `. / _ _* \ - / / / I I t I f 1 \ r % ~ � 1 \ \ \ \ \ \ \, \ \ \ \, \ \ — � 1 / I /r _ 1 1 — J INLET PROTECTION i' \ \ ' \ / ^,� --�F _ 1 1 I i I I I 1 ` \ \ 1 \ \ r y r \ \ \ \ ` J / Z �, 8 A \ \ 1,G ♦w 1 I \ \ ■ / �. -" 1 \ •�' ` /` ,t AC. \ \% \ 0 1 1 \I yl 1 —y 1 I `'� 1\ \\ \\a\ \\ \\0 \\ \` ` 1 1 -- I / -_ \ \ \ // 4• 1 S6 5 , * - / 1 1 �; . \ 1 � J \ 1 I I I 1 o I \-- I I \ f X_ �_- I \ -_ / / .01 v \ \ \ �� / / ' �' � • _. _._ ___ - ___ -- �� \ o \ \ \ � • / � F AC. , ) ' I 1 � �, �5. \`' f I I 1 { ' �. I I O \ \ \ \ \ ❑ \ \ \ �. � o � \ / 1 � - _ � � - - I 11 \ ._ _4 I \ , ` �"' "r \ \ .-, _ I I I 11 , f I I I \ ``, '. , \ ( I , , I - - I 1 ( I 1 , \ \ ` -_ ' ' r I \ \ / / �05 t I �• _..� _ \ I 1 \ 3.64 i ' /� � .13 a-' / / / 1 i \ I ` \ � �,' � \ I I \ \ \ \ Stockpile Notes I 1 i I \ / - \ �� 1 _., . -- 1: ' ' � ~ ` � } 1 AC . / / ,, ' ' ♦/ - - -. f s� I I I II I' '', t \ ` . 1 / I /' \ i } � \ \ \ 1 / 1 i 1 / f I t / 1 \ / \ / I ■' / - .>� \ 1 \1- ~ . I / I 1 \ \ \ - _ o - - / I \ \ \ \ \ N❑ permanent soil stockpiles are proposed. / / / SB 4 - ,�•/1 \ •� \ I I I 1 . i / • - - - - 1/ / ��. .� 1 1 ( ////5 �10 \ 9.12A '\ i 1\ ' .\ \ \\ `� _ -,_ /y, / I / \ 1 \ \1 \\ \ , 1 1 :\�� j / / / '` _ I / 1 Contractor shall strip and reuse existing topsoil. Temporary stockpiles shall be used to facilitate storing // \ ■ r _ � .v t•� I I I I I I / / I `�� _ ,� \ \ \ \ \ / / 3 P P P Y P g � - ` 1 J \ \.� O I I I - f 1 / � -- `•� \ \ \ _ _ \ \ / J. / \ { / \ o \ /// / \ ■ ! I I 1 _ ._ -, _ -,\ \ \\ -1 \ ,O / \ / \ � topsoil for reuse. Temporary stockpiles shall be located within the limits of disturbance shown on the `l 11 \ // I \I I I I I ..�_ / t. . _ ' \\.\ �-- \\ \, \ rk-// / \ 1 \-- — - II / � - _ \ � `, � /I / I 1111 I' , 1 \ R - \ y ; ' v / \ 1 N \` J __ - plans. Any stockpile to remain in place for more than 21 consecutive days shall receive temporary l I I I I - _ �- _ - -- / / 1 I I r 1 i ( • '_ GTL E T - .• • - _ ....... .. � � _ \ \ � '\ / \ y 1 0 !! N I f � \ \ I / _. �o . / '4\ \ � \ \ \\ ','` / / \ I \ seeding in accordance with the North Carolina Sediment Control and Planning Design Manual . III \ \ �-� - \ _ / / / I r I\ �' - -- ROC \, - - - - - - - - - -I- \ \\ \ - �� , / \ `-1 �- // I \ _ - - - -- - \1 \� \ - - - - / / // / I' L1 OI fWW OUTLET , ram_... \ F'T \ \ ` \ - - / r 1 1 1 } _ ,,'• 1 , 1 I 1 \ \ \ - - - - \ \ - / / 1 ,r \ �� I % _ _ __ .._ • _ 1 \ \ lug 3 0 __ \ - � 1 I \ �# I / // / / \ � ) / , I 1 1 I I \ } I I , r 11111 �1 � I' \ ` / / / �� , 4.03 _� - \ / \ \ 1 \ .� • I / 1 / I l / 1 / I / I I 1 I 1 \ 11 I , I \I \ - ~ / / ,aw • I ' • - AC. / --- - / _ - i � `� _ \ �' �� \ \\ \ \ \ y \�•� ✓ / �; ;� - - - / / , / 1 1 \ ,_ _� / / / I 1 I 1 \ 1 1\ I 1 \\ 1 /' \ \ - -- \ / / f-' SB 11 - , . / .- t / / / / / / \ \I I I l I t \ 1 I ( 1 1 1 X, 11 \\\ \,' - - - -- f \ \ - / 1 r � 4,19 / \ / \ AC. . I \ 1 - \ \ \ \ - t - - - \ ! __ - / -- SB 29 �` \, �_,,�_, _- \ , ; - AC \ _ o / / / / � I 1 ! 1 \ \ \ 1 l � _ - - \ \\ \ \ \\ I _ __ \ -� - - - . - -.- / ,_ 1 ) --� - 0 1 \ �_- // I I I i \ \ 1 \ \ \1 _�� \ \ \\ \\ 11I \ ` \ \ \ \ - � _ - _ - / � � - - ' / / / / ,A. ' - 58 �3Q / '- -_ - - , ` _ � • ,- ! \ _ - / / / \ \ \\ \ \ I I I I \ \ SB 15 - 1 \ _ I \ -- \ I - - / I /♦ " -_ ...- _ - _ _ ._ -_ 1 \ - --- ^L , I / \ '\` \ 1 I 11 z -- r __ � 1 1/ � \\ \ \ I I I I\ . -, - / - I I 1 11 \ \ \ \\ \1 I II ._ -- � �• `• • _ - __ _ � 1 / / I I I - 1 -1 -\",.--- I I 1 I I III 1\ \ \ \ / \ _-_ �/ r r /., r / / / r ""_ .. _ - - __ �-,SB•14 - ♦1 \ r \ / _ / / I I / , - \ \\ \\ \\ I l I I1 I 11 \ \ \ -- l l e, y , - / _ h -�� - _ - / I 1 t 1 �- -� 1 (I I 1 11 / t `~r / / E5- J BE INSTALLS❑ 7. - , _ROCK 1 - - _ i ' 1 \ \ - - - I III \ 1 c 1> __ \ \ \ / I /_ �/ 1 \\ I I 11 I 11 \ \ \ l / / / c '�.0 / -_- AC. _ _�_ 1 ' -- __ / �. / 1 i , i / / - ~ 1 1 I l 1 111\ 1 - _ -- / / l I •�O - LEARING OF HOLE __ I \ / 1._ _ _._ r_ I ♦ PUTCE T -- \ \ / I ' -~- � , ;� _ - - \� � ...... -. _ I. \ {-..__ ry , I -� - - -\ ,• _. - / , I ' �__- / I I -- ~` \ 111111\1`1�11\\\, \ \ \ \ I \ 1 - / / _ - _ -. 1 G, -�/ bC, / ♦ \ ._ \ . - / I I E I�US -BENV A1ED 1 \1\ \ \1 \ 1\ \\\\ \ \ \ \ I - ` __ / f i / ♦ . _ _ / \ • r _ . __ __/ 1 I e i _ _ ; ' / ) r" \ q y� \ \ \ %_ I1/ i I y� r \ l • I �. - / \ i I / __ -a'�7 , Y / - / / - I F�IOR TO �_LE�tRIRG OF �OL`E \ \ \ 1 \ \ 1 \ 1 \ \ \I / \\ \\ \\ \' \"I I \ /-� -o I i i � i / 44•�/r - - -- - �'It \ \�� ...------__-_ __ �' I ( \. �• \ I h �J AC �` / / / . r \_� \ � \ \\\ \\\\\1\\�1 �\\` ----- , r _- / � \ \ \ \ \ / f 1 `\ `` - \` _ I I i,�..-[ �1 .'�, '�# ►.`• .- - - \ -5.02- 1 _ _ SB 31 `�`_ �, ,� \ \ I / / / / / // \ / III 1 1 I} I I1\ \\ \\. \ - I • / \ \ / I / / / / - �� \ \ \ 1 1 1\ \\ / . . - _ 1-1 \ - \ I � \ \ \ \ \ \ '\ - • \ \ A`C. - -* \ _ -- - 1 \ ' �.. ,r1 \, I ■ _ / / / / r / \ I r - � �,r�.'.. / 1 1 / / / III I I I 1 1 \ I \ � \ • \ 1 S6 16 ■ ,_ - �. r I \ - / i / / l \11\ 1 ■ \ \ \ \ . \ / ` \ / j j`1i I / / I / I / 1 I 1 I t 1 I \ I _ � - - \ \ \ 'I \ \ \ / r. ♦, - --- / , 1 ./ ) / I I k \ I / 1 / / / r. I / 1 \ \ \ \ \ \),\ \ \ } I1rf-- '� ` \ 1 1 r \\\\ \ \ \ \. 0 \\ / - 1 ` \ AC• ii.7+ _... 1 .I / / 1 J,I - t ; S8'�2 // i // // / / 1 / / I \ \ I \ \ )1111 1f{ / 1 \ I 4► \ \ \ �, r-� 1 � /Y / / / l v �y'� /v�1 \ �� _ ._ ,, / // ! I I- \ 1 1 / 1 4r \ \\ i <I \ / •f // l / 1( I l 1 I I l I1 I1 1 1 1 1 I I I - - � � - / ' ' � 1 \ ` l 1 / l Q - \ \ \ \ \ \ \ .. ` -_ � \ \ � __.---- \ j .._- - - ;�I '� / / / 7 AC, / \\ '; . � / / I l ,l � � `_- -- --- .' / / - -- / ! / / - 1 \ 1 I 1 / / / 1 1 I 1 I 1 I I \ \ \ -- \ l -� , / i I 1I 1 --- -- ' I \ \ \ I / I / /Gr � o / \ \ \. ` •_ I - ' - _. \ \ ♦• -' f1- ` _ __ ! - . 1 / / / / / 1 I _' . / / / / - - I l I I 1 I 1 1 I I 1 / / I _ I 1 , 1 / / / �► _ - - _- __ _ _ - __ ..-. `3 - \� � � \ ` � \ \ ♦, t ` 4 - -- �.' / / 5. � BeB• 1 - { 1 I -� o ''� ` / / / / - / / / I l I I } I / / 1 i I 1 I \ \ `-- \ \ I I /c� \ \o_- \ ` f ` \ ♦, ` 1 - 1 4 ti / •/ . 1 0 \` _- I // / / I1 11 _ \ \ I / \ \ \ \ - .p / - t 3 &) \ \ .� , _ 1 / / \� / j /� I i f� o - _ t I 1 / ` - i / / I l 11 ) / l I 1 1 I I - �_ / / 0 3 f / ,. _. I - ,� / I 1 \`_-- -_ _ I / / I ( 1 / III. / _1 \ --- __ --- \ \ \ / / � \ \ \ \ \ ,, �- \ _','�� - ` \ ,\ �' � ,✓1: zg • - ` � ' ..� . , .. ; .. , ... / \ \ j / / / 1 � I _ '� I I 1 ' 0 - - , ' / ,- _ _ - I I I f 1 / / I J � I x \, � '\ t f 1 1 1 I - _ --- _ - �\ \ I � \ \ \\ `\ - -.-- . - \` • / - \- a� `� ��� J f I *, / _ I. yr� I - I \ �3� _-J/ ./ + �, I I / I /- -/ /� ;\ \\\\\\ 1\I I I - . _ ,% \, V 1 I ` \ ` \ 3Q.41 ` \ \` / - - \ __U_ �. / f I+ ! I 4.44 ,,..,, „R ,I I / / - , - - - ` - - / I - ROCK 1 1 l - - J \\\\\k\ / - I \ \ \ AC. \ ` - - I \ \ l I ` - 1 1 37o _/ i OUTLET \ I / / // - _/ 1\ 1 � - r � l I 1 I / \ \ -_ - \ \ ` , i\ , I ` \ __, _ I • / ) I j AC, / I I(] / / / - i I I 1 I 1 I I / / /� - ! I \ 1 , Y_ / I I \ 1 \ _) - \ \`\.,. \ ` \ / 1 / \ \ -� 1 7.�1 i I /I • / I --136o I I f/1/ _ J 1 ; I /, / I / ////; ` .)\\\ ' ,' SEDIME_N-T BASIN I■Z I } \ 1 / ` \ \.,, \ \ \ \ / / _ j / /•� I I ! \ I I - / / / / I // // // 1 I\ \ _ \, ' 'l - - ` \ ,... I ! , s `\ '• \ , , `'\ \\ \ . , / �' \ .��� `` -.-■-- -- �_ __ 1- i / '�, ,' �/ I �--�[ � (/ ' � — - - — - ( f i } I I \ 1 / / /I `I \ ; / \ SEE -DETAIL__ -SHEET ?1 I 1 I 1 . _ � \\ \ y\, �• _ J 4 � • , / sB•23 � \ I - _ /! 1 I I I ;, \ -I / f/ Il If 1 I I I/ - -I 4 / ,_ I / / / / / / , / y I / / z \ y 1 \ ;�, _ \ 6 � 1 \ems` \ \ \ \ � / / / / \ - r-_ _ 2 �_ _ 1 / / / / � . ` \ a 1 i •C. I _ / I I I i t \ /- _ ) i ( ; I I I - / / / _% / - \ \ \ - �, 1 �,/ \ \ \ / \ - / / i SI , l - I \ I. I \ \ \ 1 I 1 I / I I SIN • 2 \ i \ \ / / \ - / � I I '�* c 1 I \ I \ \ \ 1 \ \ \ \ 1 \ 1 \ / I / i \ \ 1 1 I a, 1/ \\ \ \ / / / \ _ ` / / / / S- u I 1 I �' t J' l /( / \\`'1, / j \,\1\\\\1\ \\ I / , / I \ \ \ 1� { `�` S `/ l \ \ \ // / / ^� \ \ - ,I { / •�' l • ,' / _- / I / _� \ \I 1\ \ \� / J I� I 1 11\ \ \ 11 • 1 / I ` 1 / \ \ / S8.18 - \ , �/ / / I f / / ) \ I 1 / 1 �1. I 1�\ I `% \ / / B17\ - 1 \ s� 1 / I / / 1 Il}\ \ \ / / // / I 11\ % a 1 I , ,. , o I w 1 1 /--------- / = '., %\ ` .. / / ` , I / \\ `\ \ `N I / I /�`.� \\ / \ 1 1 I I ( / / / I / I / / // / I 1 , __. \ ,, \ % / / / \�\\ ; \ t r / r / 1 r �\ � / / / I f / / _j I / / / / // / / / // / \ -- -- - - / I "' 1 I i \ / \ \ / / / / % , ^► , ' / / i \ \ \ ` ' \��\`' S6 � 28 / 1 / ` \ \ I I I / / ') l l l / / / / / / / / i \ o o / / y '� •� �s / ��� / o \ �I II1I i I// / ///////// \ \ ,., I I I _... _._ r \ _- - / �• / , \ M AC. , / \ \ / I ! ! 1,,,--,--,/// / / / / / / / / / / / -- \ ` \ rn I I I } - _. 1 / _ - 1 ` ` / / ` / ' ♦ : I \ \ lI .�c� 1 t ! 1 o �-] B _ 7 1 °' / h0 � - // i I t 1 I 1 / / / / / / / , / / / / / \ - / \ - .T .�. — -- I // / / / / �.11 __ ---J / 1 a / 1 i �� \ \ \` - \ - % / / \ ' /' / / ! ��, \ \ C , ,,� 14t.... A�/�i, �O ti �'_�/" J I // l / //// �� /// / / r/ // // \ \ / / / / I I } - - . _ / \ 1 \ \ \ - \ \ ` �, / / \ I r ` \ \ qk _ ROCK OUTLETOF / / �• / O / _- // I / // / / / / / I / / / // K - / / / / / r / \ \, � ! I � - -- ' r- ` / I / / I \ t �� *� � � � f � '\ / 1 \ \ \ �` ` \ \ � \ �-- --� / / / \ ��. \ `` 1 1 1 I , I SB■ 6A � - / /♦ O / � / / I / / / / / / I I / / / - \ �- 1 I / - / \� h / I- // / /,// / / / / / / / // I, ' \ \ / / / i \ \ \ �. \ \ . .�* +' \ \ \ _ / ~ 1 l _ _ I / \ \ I ,._.� �.�. / ,� . %, ./ / / //// / / /// / 11 I \ \. - \ / -E AS IlV— ��� I I B � --- T. i 00�• i / \ ` � ` - - / / � 9'I . ° \ / ,- " _`. \ dpw \ \ I/ ( • r'1 \ I / / / O // / / / / ///// // i \ \ \ - / { \ �.� \__ / ` -- \_ / \ \ \ ti^ / / i♦ I \ \ \\ \ / / /I / / ///I // l// 1-1 \ MOST, BE � P-L-ACE / . FU C �01 ♦,_..�• -- - - - - , \ I sac. \ I / / \ ` \ \ \ \ I I / / // / / / / / / / / / \ 1 \_ \ - _ ' / ti- �320 / �' �.\ -__`�,_/ / \ \ \. \ / / .♦ _ - ` \ \\ \\\ I I 1 I 1 / / / ( I / / / / / / // lI I / \ \ \ BE-F-OR � ---- _C-LE AR'I 0 , ,/ THE E D nV I G — — - _ — — \ — r \ \ \ I I , � \ \ _ / / / / \ / %� - - _ _ - __ - __ � ` - - - \ \ \ \ \I" ; . '.._/ / _ \ - \ 1 1 \� `� I\ h / O / / / `'1 f / I \ I I G ,�ra►KE A . - 1 t3io -- - -- - \ - / \\ ,/ i .� \ ROCK_ - _ \ \ I\; i 1 1�\I I / / p / / of II OI 1 \ \ \ - J � /I / ` - z - -� - r Sao _ - - - ; \ \ \ \ -j \ �k / f Oi E T - - \ \ \ \ 1 1 l I y \ 1 (/ / / / / / / I I 1 \ - J \ \ \ \ \ / \ \ \ \ \\ \\\\ I J/— I / , Tom.+ ~`� `\ \ 1 \ `• // ` �— ^v / / If .- / �" � \i — \ \\ \\ 1\\ \\\\\1 /� / / / // 11, / \ ` — / — tl 1-1 / _ - % \ \ / r \ I-� \ ` PIPE'S S • / / - \ -- / / _ \ \ \ \ \ 1 \ 11 \ \ \ \ \ \ \ \\\ \ / / \ \ \ / � / 1 - - _ / ~ .. �'� - t PRl T75 LARII OF I:�JLE / 'w� / _ __ \ / \ \ / � � — / / __--_ --_ ----- \ I\ I- ;, 1 / / / ` I ( / �� / I- — — - - -_ — — f • \ - - / / 1 TR -�'� \ y� /I \ _ -- - - `- — — — — — \ 1 \ — — _ j / — 1 — / / / / _ — f y >^ ROCK LET. \ � -_ r`-� y .� � \ \ / /, / — ) \ ,- \ -, \ \ , \ \ 11 \ - , — % 1 - ❑ I - � � / / - % _ 1 -- __ r , ` — __ _ \ ` — — _ — — — — � _ 4 ` — Y —, — _ \ \ / \ \ \ ` Y - ' -- / - �` .7 FI -- - ` � / ' / \ 7 / / — — — `/ / \ \ \ \ \ , \ \ �. \ / \ ,�, / \ - / / / _ ~- - - - '� 1�� -- -'`\-�\`- - - II\�,''' \ _ }J`" - �- // / / I I �I / I / r— rr��0ad/ LWI 1 // \�- - O / • - - - ---�1-wd -- \ \ / -- - � I-- _ SB 20 , / -- _ j 3 \ I / - a ) // / \ l \ / � — / I h / / I r J , — ~ ` — — — _ — — _ _^ — \ _— — — — � \ /_ __ — __ \ / / / — \ — \ O / \ I I I — / / — / / / / / / d _ \ \ \ _ \ �� IJ — \ \ I / IJ / / // / / l I / / /! �O O O�'7 / 1�i �/ / \O �ZO� tq�j0 --� `-� �� �` -�� � � ---�` ", \\ //�- _\� `„ -�, �;, i//- -� \�\ \ 1 \ ` I / i I \ 1/ // / / // /I/ / �/ / ( \ \ 1 / I / / / / O 16 �`7 \ . 1-1 / / t�--50 �/ _ - \\ / I / ,- - -1,� -_ ��� ` - / ( / \ \` \ - -- 1 \ \ \ \ - \ / / // - _ ----- - � � \ ! -- - -__ �' 1 l \ \- AC 4' R bF •57 STONE \ \ ---\-\ \ \ \ I I / / / / / \,�/\ / // // ,/ / /- _ i46©- --__`11\ -/" ,_ \ \/ \I I I / / / / -`\,_ \--\ ,-�/ - / \ 1 ( \ \ \\ 13s --` -\0 WETL" RF`AGSE PR T \ \ \ �/ l / J CONTOUR INTERVAL = 10.0' I I / / / / / / - - 1470 - - - _ \ — //_ \ \ \ \\ \ I I / I f ( / \ -,_� \ \ D/GO////OOir r / — J I \ I i3 0 — — — — — — � FILL. \ ` 1 \ \ / ` I I GRAPHIC SCALE. 1' = 200' -I \ \ \ ( / I I / / / ( / / / / _ ___ 1+80 , \ ��/ -, \ \ I I 1 \\\\ \ -\ I / -- , -- - - \ � I \ 1 / r, \ 1 \ 1 \\ \ 1 1 \ I 1 I / / / / / - ------ - \ \\ \ I I 1 \ I \ \ l /- - \ / / - - \✓ o --- ----- -\ \ / / / \ J/ ) I I _ I \ \ \ I I I I / / / / // ---- - II y\\ \\\ -- \ I 1 \ \ \ \ `\ \\-\;/� \ 1 / / I -_ 1 / `-- j \ \ \ \ I ( / I/ I \ 1 I \ \ \\ \ \ \ 1 I I /----_90 \- --\ \ �- \ \ I \ \ �` \ I/ \ I rri-r. ----- \ \ \ \ \ \ \ / 1 500 , - - _ _ \\ \ \1 \ \\ \\ > / I l _ - -. \` \A , ," I - 38 I 1 / // - / \ \ \ \ \ \ \ \ \ \ l I I / / --- -- � \ -�\ \ \\ / / / / /� �\ \/\ \ / 4# __ / / / / - ^�L )> �- /_ o -- ----_ \\ \ \ \ I \ I / I \�- / \ \ \�\`�1\ \ \ \ \ \ \ \ \ \ I I / / / /- 1510 - \\ ", \\\\, \ \\\ y\ / // / / // / y` \\\\\ . \ ��,\ / / / / // \I / - _ \\ \ \ \ I i , //\ y NORTH500 , \ \ \ \ �\ \ \ \ \ 1 / / i 520 - _ - \ \ \ -" ` � \ \ \\ \ / / / - \ . \ \ \ \ I / / y / \ J /' 90 - / , \� \ \ \ \ \ \ \I I II 1 - / / /� / 11� / � \ 200 0 200 400 \ \ \ \ \ I / - - \\\ \ / - \ \ /c / - \ \ \ P_� II1­01 d W r�rf) V� i U Q O �14 4 04 �1I.-) z �; w �� o 4 (Z) �� C/� U wO a �) 3 W 9 allor.- c J Ml rLti M s v w , , �U Q N N OO 0 > '- 10 cr , [I tI A 2OZoam #�W00 ,_.. = x P m v - -V o r LO cr Ij LL � a 0 2 IT— � �0 T_ (0 l �I Lo 0 CIO 11­_ � < q 1A . LO0 o M Lr) 1 LU D L13 _ � _ LLl I�1, ,;_;" 0 �r. IIIIIIIIIIIIIIIIIIIII11- z EL I I y CO I—, �, .� 0 � U PROJECT MANAGER: EA DESIGNED: EA DRAWN: SK DESIGN FILE: SP 12 EELS II DATE: 11 /22/ 10 REVISIONS: 6-14-11 REVISED PER NCDENR COMMENTS 8-22-11 REVISED PER NCDENR COMMENTS FIGURE 6-1 7.0 Grassing All permanent seeding will be in accordance with grassing plans and specifications prepared by George Golf Design. Grassing will include a combination of seeded and sodded areas. Grass types include Bentgrass tees, greens, and fairways, Fescue surrounds and Native Seed Mixes in roughs and open areas. When required, temporary seed mix will be provided in accordance with section 6.10 of the "North Carolina Erosion and Sediment Control Planning Manual". Grassing Specifications are provided in Appendix F. 17 8.0 Wetland Delineation and Section 404 Permits A wetland delineation was performed on the site by Balzer and Associates and confirmed by the US Army Corps of Engineers in 2008. Wetlands from the 2008 delineation are depicted on the plans. The team has taken great measures to avoided and minimize impacts to wetlands and streams. Brec Engineering has been contracted to reevaluate wetlands and work with NCDNR and the US Army Corps of Engineers to obtain necessary Section 404 permits. No work will occur in jurisdictional areas prior to obtaining necessary permits. IM. Appendix A Trout Buffer Waiver AAAARA NCDENR "forth Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, P.G., P.E. Land Quality Section Beverly Eaves Perdue, Governor Director and State Geologist Dee Freeman, Secretary September 6, 2011 Contentment Holdings, LLC Attention: Mr. Curtis A_ Sidden, Jr., Registered Agent 1021 Hudson Place Davi sQn,-N Contentment Holdings, LLC Attention: Mr. Curtis A. Sidden, Member P O Box 185 Roaring Gap, NC 28668 Subject: Trout Buffer Zone Waiver Contentment Golf Course Wilkes County Dear Messrs. Sidden: This office has received your plan for Contentment Golf Course in Wilkes County, North Carolina. Your plan was submitted to this office for approval because of the proposed encroachments into the buffer zone of designated trout waters. In accordance with NCGS 113A- 57(1) and Title 15A NCAC 413 .0125(c) this letter will serve as written approval to encroach on the buffer zones of Harris Creek, Class C, ORW, Trout and Double Creek, Class C, Trout and their unnamed tributaries. This authority has been delegated to me by the Director, Division of - Land--Reg6titces� Tares- D.' Siih&s; in accordance with- NCGS-1-43B=T0. The following_ conditions will apply to this approval: This approval is based on the plans received August 23, 2011, and revised Sheets SP-15 and SP-17 received via electronic message on September 2, 2011. 2. Land -disturbing activity shall not commence until an erosion and sedimentation control plan is approved by the N.0 Division of Land Resources, Land Quality Section through the Winston-Salem Regional Office. 3. This approval does not supercede any permitting requirements from the U. S. ArMy Corps of Engineers or the N.C. Division of Water Quality. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • 919-7334574 / FAX: 919-733-2876 512 North Salisbury Street Raleigh, North Carolina, 27604 Trout Buffer Zone Waiver Contentment Golf Course September 6, 2011 Page 2 of-2 - 4. This approval does not absolve the permittee from compliance with the surface water quality turbidity standard. More protective erosion and sedimentation control measures may be required in order to comply with this water quality standard. Your cooperation in protecting our environment is most appreciated. If you have any questions about this approval, please contact me at gray.hauserQncdenz_gov or (919) 733-4574. Sincerely, T. Gray Hauser, Jr., PE State Sedimentation Specialist cc: Matthew Gantt, PE, Winston-Salem Regional Engineer Corey Basinger, DWQ, WSRO Erik Allen, Watershed Consulting, PLLC Appendix B Outlet Protection O Ln 'o _ LA f11 Li N A L � O O C; O O O p a N N N N N rl Lq N m Ln n rn N to C O LO C O [O O N .Ni C O L O C O C C C O O O •C = O G O L O 0y C •C G C p C C C C C O O CO O p F 1 0J N Lo 01 a a `o 01 v i Lo i `1 `a a L a a a a 0 o o ? o o 8 o m is m m m [O m to m m m n, N th 00 N N N p 00 00 N N N N N N N N N 00 Q d .- ri N e-I ei M rl 'i ri rl rl 'i ri ei rl 'i ri rl N a 7 m N 00 N N N K! Lf1 V d N n h N O uT M M N 00 M Ln c4 00 a-i O F C L N N O 00 n N L! N M M LO 00 N OS 00 00 M C a a v V Q Ln LA Ll1 u C O M en h 01 01 L{3 d LOj O N 00 M .-! N N N � 01 E V N N N N N N 1n-1 N r q 14 �1 N F a x =� r1 4t N LC N LO C1 IR ''1 Q 01 to N r1 h rl 01 [� O h N N W h LO Q 49 T 00 O1 N O 00 N M O F x Q 00 N to N N ri ch LA N t0 d -1 N U .i r1 O b0 61 O O L u O O ei O M O ri O O O O O O O O C Q) W Vcn N N N n Q LD N t--i N N N N N e-1 N ei N .-1 N N N N O {J N N ei N r-1 O O O O O O p O O C 3 m 07 OD %NL i d O H m 00 d N ko M Lp d a J N to N D h 00 M 1 loo N 00 "� ,m, v Oi r-i v cT n r+i „mi Ll1 H1 cP n ,'"1-1Q1-L O F J J J J J J J J J a J a J a J a J J a a J a LaL LL J "� J a J a LL F- LL F LL F- LL F LL LL F- F LL F J Lai Lai LLLL LL LL LL 7 0 o a o o a a d, o 0 o a o o > j o 0 0 0 o a o 0 o p J O O O a O O G O ei -1 N N cn o 0pN H 0N0 � C? d F N r1 m [%1 N Ln to -1 'A -1 14 1 ri M rl 'i e-I ei iy i..1 rF N a-1 N 'i N M 0) r1 N o to tD Lc h n 06 00 00 J r-I ri M M d N LO n aq 1-1 r1 .-1 e-4 r1 -1 N -4 a Appendix C Skimmer Basin Sizing DRAINAGE AREA TO SEDIMENT TRAPS Skimmer Basin DRAINAGE AREA DA BREAKDOWN C FACTOR COMPOSITE C AREA WOODED AREA GRA55 AREA DISTURBED (ACRES) (ACRES) (ACRES) {ACRES) WOODED GRASS DISTURBED 1 17.64 4.40 337 9.87 0.25 0.3 0.5 0.40 2 8.50 3.30 0"28 4.92 0.25 0.3 0.5 0.40 2A 3.12 0-00 0.00 3.12 0.25 0.3 0.5 0"50 3 5A3 0.84 0.00 4.59 0.25 0.3 0.5 0.46 4 2-05 0.00 0.00 2.05 0.25 0.3 0.5 0.50 5 0.99 0.00 0.00 0.99 0.25 0.3 0.5 0.50 6 3.92 0.35 0.00 3.57 0.25 0.3 0.5 0.48 7 124 0.13 0.03 3.08 0.25 0.3 0.5 0.49 8 1.84 0.00 0.05 1.79 0.25 0.3 0.5 0.49 8A 4.56 0.00 0.00 4.56 0.25 0.3 0.5 0.50 9 3.64 0.00 0.00 3.64 0.25 0.3 0.5 0.50 10 8.40 2.26 0.29 5.85 0.25 0.3 D.5 0.43 11 4.19 0-23 0.00 3.96 0.25 0.3 0.5 0.49 12 4.03 0.05 0.50 3.48 0.25 0.3 0.5 0.47 12A 1.03 0.00 0-00 1.03 0.25 0.3 0.5 0.50 13 1.65 0.00 0.16 1.49 0.25 0.3 0.5 0.48 14 4.31 0.00 0.00 4.31 0.25 0.3 0.5 0.50 15 2.89 0.00 0.00 2.89 0.25 0.3 0.5 0.50 16 3.75 0.00 0.00 3.75 0.25 0.3 0.5 0.50 17 4.93 0A0 0.00 4.93 0.25 0.3 0.5 0.50 18 2.84 0.07 0.00 2.77 0.25 0.3 0-5 0.49 19 3.20 1.33 0.00 1.87 0.25 0.3 0.5 0.40 20 9.88 0.47 0.00 9.41 0.25 0.3 0.5 0.49 21 4.30 1"32 0.00 2"98 0.25 0.3 0.5 0.42 22 4.41 0.00 0.00 4.41 0.25 0.3 0.5 0.50 23 4.44 0.11 0.25 4.08 0.25 0.3 0.5 0.48 24 5.81 0.06 0.21 5.54 0.25 0.3 0.5 0.49 25 1.49 0.00 0.00 1.49 0.25 0.3 0.5 0.50 26 5.57 1.53 0.37 3.67 0.25 0.3 0.5 0.42 26A 1.41 0.00 0.00 1.41 0.25 0.3 0.5 0.50 27 2.69 0.00 0.00 2.69 0.25 0.3 0.5 0.50 28 6.47 0.74 0.00 5.73 0.25 0.3 0.5 0.47 29 0.00 0.00 7.23 0.25 0.3 0.5 0.50 30 _ ('"' 0.00 0.00 5.02 0.25 0.3 0.5 0.50 31 0.00 0.00 4.61 0.25 0.3 O.5 0.50 Sediment Basin Basin 1 17.64 4.40 3.37 9.87 0.25 0.3 0.5 0.40 Basin 2 30.41 30.41 0.25 0.3 0.5 0.50 Skimmer Basin COMPOSITE C Tc I A Q10 AREAMULTIPLIER Volume Multiplier REQUIRED AREA REQUIRED VOLUME (MIN) (IN/HR) (AC) (CFS) (SF) (CU-FT) 1 0.40 10 6.00 17.64 42.28 325 1800 13,740 17,766 2 0.40 10 6.00 8.50 20.21 325 1900 6,570 8,856 2A 0.50 10 6.00 3.12 1 9.36 325 1800 3,042 5,616 3 0.46 10 6.00 5.43 1 15.03 325 1800 4,885 8,262 4 0.50 10 6.00 2.05 6.15 325 1800 1,999 3,690 5 0.50 10 6.00 0.99 2.97 325 1800 965 1,782 6 0.48 10 6.00 3.92 11.24 325 1800 3,651 6,426 7 0.49 10 6.00 3.24 9.49 325 1800 3,084 5,544 8 0.49 10 6.00 1.84 5.46 325 1800 1,775 3,222 8A 0.50 10 6.00 4.56 13.68 325 1800 4,446 8,208 9 0.50 10 6.00 3.64 10.92 325 1800 3,549 6,552 10 0.43 10 6.00 8.40 21.46 325 1800 6,975 10,530 11 0.49 10 6.00 4,19 12.23 325 1800 3,973 7,128 12 0.47 10 6.00 4.03 11.42 325 1800 3,710 6,264 12A 0.50 10 6.00 1.03 3.09 325 1800 1,004 1,854 13 0.48 10 6.00 1.65 4.76 325 1800 1,546 2,682 14 0.50 10 6.00 4.31 12.93 325 1800 4,202 7,758 15 0.50 to 6.00 2.89 8.67 325 1800 2,818 5,202 16 10 6.00 3.75 11.25 325 1800 3,656 6,750 17 10 6.00 4.93 14.79 325 1900 4,807 8,874 18 E0,491 10 6.00 2.84 8.42 325 1800 2,735 4,986 19 10 6.00 3.20 7.61 325 1800 2,472 3,366 20 10 6.00 9,88 28.94 325 1800 9,404 16,938 21 0,42 10 1 6.00 4.30 10.92 325 1800 3,549 5,364 22 0.50 10 6.00 4.41 13.23 325 1800 4,300 7,938 23 0.48 10 6.00 4.44 12.86 325 1800 4,178 7,344 24 0.49 1 10 6.00 5.81 17.09 325 1800 5,554 9,972 25 0.50 10 6.00 1.49 4.47 325 1800 1,453 2,682 26 0.42 10 6.00 5.57 13.97 325 1800 4,541 6,606 26A 0.50 10 6.00 1.41 4.23 325 1900 1,375 2,538 27 0.50 10 6.00 2.69 8.07 325 1800 2,623 4,842 28 0.47 10 6.00 6.47 18.30 325 1800 5,948 10,314 29 0.50 10 6.00 7,23 21.69 325 1800 7,049 13,014 30 0.50 10 6.00 5.02 15.06 325 1800 4,895 9,036 31 0.50 10 6.00 4.61 13.83 325 1800 4,495 8,298 Sediment Basin Basin 1 0.40 10 6,00 17.64 42.28 325 1800 13,740 17,766 Basin 2 0.50 10 6.00 30.41 91.23 325 1800 29,650 54,738 W OC � W LD LN a N lD V N N m 0 N Ln p M CY N tD N N w W L/1 N O O [1l V n LD 00 LD Lo 00 "I LA w M V V N n N 00 LD o m m fV "'*A c- m LD �-i m O M ta LA n m M n J nj. Ln 00 H LD LD N Dl 0 W i, N t Ln N rV Ln L' C,I- ei N 00 LD n N n 00 fi) 4 m m Q) m 1� 0) al W N LD l6 Ln N' 00 0 O M O N W CS b ( 1 00 V7 00 M' a 1 U5 Lf m W ' cO ,--i N r- L'' cO 00 m � u] I� Ln w W W O LL C)g N lfl V o 1 m CDN m CD V m N m �T �r � 0 Lb Do m m N O tD N 0 V 0 Ln Lo c-I z r-I V Q) O N 00LD V 00 -1 co m LD 00 � m m L, Dl cY a ull m Ln ko m Ln N D7 M O tD Ll n 0) Lo 07 Ln N O O_ n m 0 n `- M O m N O) m V m !� T Ln .--� M '"') Ln W m N 4 ew m ItD) 0 0 U N cf7 d r-i n LfJ V 00 n m O0 rV m 00 Lr) n 61 Ln LTl 01 n a 00 m d1 N Lfi 0) N Ln rm-1 r--1 > R F- Z W 0 g p O o 0 0 0 C) o 0 0 0 0 0 C) o 0 0 0 0 0 0 o 0 0 o O o o O o 0 0 0 d o O X ..� �/'] Lrl k.n Ln rd) Lq -i Ln 0 Ln ll1 l.n 111 LP Uf Ln Lq - Ln - In N Ln Ln Ln Ln - Lq - - m Ln Ln Ln Lf] A Uf Ln a z Lf1 D) Q) n c-i 00 L!) f- m n m M et M O V Ol CN Ln N 1� rV M W n N rV NM M Lf) M n lO ci m m n m W M -1 11 ry m N In Ln m Ln m M m kn m n Ln v -4 n d' ), 14 m 0) Lf) It m C) o Q >- m F ,T m M Iti m e-I M ri m e 3 M a-1 m ra m _4 m e j m _I m r-1 m ri m ri m m m e-i r 4 cq m m -1 -4 m r1 m ri m r-1 m �--1 m M m e-I m ri m 1-4 m 1--1 m r-I m 1-4 m� m m to m m m m W H 2 i� UJ x 0 0 rj O O o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 O p 0 0 O 0 0 0 O 0 O 0 0 0 0 O 0 o 0 0 a 0 0 o 0 0 a d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O °C Z Q .,e. v-! ri _4 rl M r-I e-I r-I r-3 r-I N e-1 ri -1 -4 ri ri r-1 .-I N ri ri ri r-I 11 ri ri ei ri .-I e-1 ri r-I ri r-E m LU w LL CW_) Q LL � °C x N(?] LL o 0 0 0 fn 0 Ln 0 LqLn 0 0 Lo o Lf) 0 Ln a Ln o i!) 0 0 0 Ill ul Ln 0 o Ul M g Ln o 0 Ln o Lf) n U o Ll 0 Lq 0 Ln 0 Lf) a Ln d Le) o Il 0 Ln 0 L0 O L0n 0 0 IfLnl0 0 ln 00 Ll JY w-- LqLn o CD Lf) 0do 00000000 o0o 0o00000a o00 000 00 � x z p V) 0 Cl0 g g 0 o 0 0 0 0 0 0 0 0 0 0 0 0 o 0 CD 0 0 0 o a o 0 0 0 0 g 0 q 0 o 0 0 0 0 0 0 0 0 0 q p p q a o o 0 0 0 0 0 0 0 o o C) o p a 0 o 0 o 0 p 4� Ln N d L6 n LD n M rV o 0 Ln F4 M r, LO NN N 4 O Vl V 0 (V M n L CO O fV 00 0 4 V 1 q r N L a L LD M o Ln 0 N 00 CO ' %T � 00 MMM�O OD rV 0 w LL MmM 1 H M -1 1-4 ra1r1- MMmmm 1-4 -1 m M mJ W = N d o C:. 0 O 0 g p 0 o 0 0 0 0 0 0 0 0 0 0 O 0 p 0 O O CDO 0 0 0 O o 0 0 Clg 0 q q 4 C)0 CD 0 O 0 o 0 0 0 d a p o a 0 0 0 0 0 0 0 o a q d 0 p 0 0 0 0 0 N N N N N N N N N N N N N rV N N N N N N N N N N N N N N N N N N N N N N Q aQ q O O O 0 O 0 o a 0 0 0 0 O CJ g O O O 0 o 0 0 0 0 0 0 0 0 0 0 d g o O 0 0 00- 0 0 0 0 CJ 0 n CD O O O 00 C:) O 00 o CD 0 0: 0 a 0 0 0 0 0 C. 0 0 0 ? Q 7 2 4 a 00 n w n O ao V n N n eV m m m Ln m 00 N V N LD N N n LD N N N [V m Ln l0 LO O 00 rV n V W N I LO ri rV N - Ln N n w M N L1l N n tl' d 0 LD a ID O m O C - N O a J M M m m M M M m M M m m m M m m m m m M r�7 m rn rn Kl m m m m rn m m n] m m rl' ti ei 1-4 1-1H r-4 e-7 r-1 -1 1-1r-1 1-1ri 'A r-L' r-i 1- X In W L m m 00 m Ln C:, -It O m N N Ln d p zt N m n Gt Cf m Ln LD Ln I-w V N n N [>0 M M Gf' O Lnm m M m q N w V� LO m N o m Im df n N n m Ln Ln M 0 Ln u) 00 o mf 06 N 4 m -_- L D Ln V W N LD m Om0 ON) M Lfn) m n 00 kD n � 00 m m lIf Qn) ILn n Dom) m a l�O Leo z Ln Q m CD LD Lnn N C 1 Lf) ¢j CT w Ln +"1 w mq N 0 n M d' Ln LQ LO N N N m m m .--I Ln M LP q N Ln n W M n In Gr CY n m 0 CO 'L7 n q w L7l m 6) -1 m n m n -1 Ql Ln n N L/) N a n n o co Ll LL Lo r CSN w m e--I 0 'Z 00 O N O. LO d' m n of w m m n In N Ln n n V U3 r-1 C. 0h Ih m' m u M LD rf I N Cfl M r i r m n -* V M r-i V N' M .4 rV N 0) (Y1 a 'Z Ln r-i :J c-I' N' tO {� 7 � N Q W -4ri Q EMERGENCY SPILLWAY DESIGN Spillway Skimmer Basin SPILLWAY TYPE Q1p DEPTH Weir Length Velocity (CFS) (FT) (FT) FPS 1 GRASS 42.28 0.50 45.0 1.9 2 G RASS 20.21 0.50 22.0 1.8 2A G BASS 9.36 0.50 10.0 1.9 3 G RASS 15.03 0.50 16.0 1.9 4 GRASS 6.15 0.50 7.0 1.8 5 GRASS 2.97 0.50 4.0 1.5 6 GRASS 11.24 0.50 12.0 1.9 7 GRASS 9.49 0.50 10.0 1.9 8 G RASS 5.46 0.50 6.0 1.8 8A GRASS 13.68 0.50 15.0 1.8 9 RISER 10.92 1.00 4.0 Apron 10 GRASS 21.46 0.50 23.0 1.9 11 GRASS 12.23 0.50 13.0 1.9 12 GRASS 11.42 0.50 12.0 1.9 12A G RASS 3.09 0.50 4.0 1.5 13 G RASS 4.76 0.50 5.0 1.9 14 RISER 12.93 1.00 4.0 Apron 15 GRASS 8.67 0.50 10.0 1.7 16 RISER 11.25 1.00 4.0 Apron 17 GRASS 14.79 0.50 16.0 1.8 18 G RASS 8.42 0.50 9.0 1.9 19 G RASS 7.61 0.50 8.0 1.9 19 G RASS 7.61 0.50 8.0 1.9 20 GRASS 28.94 0.50 31.0 1.9 21 GRASS 10.92 0.50 12.0 1.8 22 GRASS 13.23 0.50 14.0 1.9 23 RISER 12.86 1.00 4.0 Apron 24 GRASS 17.09 0.50 18.0 1.9 25 G RASS 4.47 0.50 5.0 1.8 26 GRASS 13.97 0.50 15.0 1.9 27 GRASS 8.07 0.50 9.0 1.8 28 RISER 18.30 1.00 6.0 Apron 29 RISER 21.69 1.00 7.0 Apron 30 RISER 15.06 1.00 5.0 Apron 31 RISER 13.83 1.00 5.0 Apron Sediment Basin Basin 1 RISER 42.28 1.00 13.0 Apron Basin 2 RISER 91.23 1.00 2&0 Apron SKIMMER DESIGN VOLUME SKIMMER SIZE ORIFICE HEAD DEWATERING TIME ORIFICEDIAMETER ROUNDED TO NEAREST .25 Skimmer Basin (CU-FT) (IN) {FT} (DAYS) (IN) (IN) 1 27,520 3.0 0.25 3 2.82 3.00 2 13,250 2.5 0.208 3 2.05 2.25 2A 6,394 2.0 0,167 3 1.50 1.75 3 10,090 2.0 0.167 3 1.89 2,00 4 4,568 1.5 0.125 3 1.37 1.50 5 1,970 1.5 0.125 3 0.90 1.00 6 7,962 2.0 0.167 3 1.68 1.75 7 6,258 2.0 0.167 3 1.49 1.50 8 4,000 1.5 0.125 3 1.28 1.50 8A 8,974 2.0 0.167 3 1.78 2.00 9 7,708 2.0 0.167 3 1.65 1.75 10 14,132 2.5 0.208 3 2.11 2.25 11 8,504 2.0 0.167 3 1.73 1.75 12 8,064 2.0 0.167 3 1.69 1.75 12A 2,384 1.5 0.125 3 0.99 1.00 13 3,228 1.5 0.125 3 1.15 1.25 14 8,908 2.0 0.167 3 1.77 2.00 15 5,926 2.0 0.167 3 1.45 1.50 16 7,440 2.0 0.167 3 1.62 1.75 17 9,950 2.0 0.167 3 1.87 2.00 18 5,716 2.0 0.167 3 1.42 1.50 19 5,914 2.0 0.167 3 1.45 1.50 20 19,688 2.5 0.208 3 2.50 2.50 21 7,594 2.0 0.167 3 1.64 1.75 22 9,120 2.0 0.167 3 1.79 2.00 23 8,548 2.0 0.167 3 1.74 1.75 24 11,160 2.0 0.167 3 1.99 2.00 25 3,518 1.5 0,125 3 1.20 1.25 26 9,438 2.0 0.167 3 1.83 2.00 26A 2,886 2.0 0.167 3 1,01 1.25 27 5,394 1.5 0.125 3 1.48 1.50 28 12,234 2.5 0.208 3 1.97 2.00 29 14,159 2.5 0.208 3 2.12 2.25 30 9,849 2.5 0.208 3 1.77 2.00 31 9,050 2.5 0.208 3 1.69 1.75 Sediment Basin Basin 1 27,539 5.0 0.333 3 2.62 2.75 Basin 2 59,360 5.0 0.333 3 3.85 4.00 Appendix D Sediment Basin 1 Sediment Basin #1 Design Summary Total Area Draining to Basin 17.64 acre Disturbed Area 9.87 acre Basin Volume Design Required Storage Volume 17766 cubic feet Volume Before Cleanout Req'd 8883 cubic -yards Distance from Top of Riser to Cleanout Level 1 ft (msl) 10-year runoff Rate 43 cfs (Rational Formula) Required Surface Area (135 sf per Q10 cfs) 18705 square feet Basin Volume Provided Storage Volume Provided cubic feet Area Provided square feet Design Elevations Top of Dam Elevation 1348.5 ft (msl) Designed High Water 1347.04 ft (msl) Principal Spillway Crest 1344 ft (msl) Dewatering Orifice Invert 1342 ft (msl) Cleanout Elevation 1343 ft (msl) Bottom of Basin 1342 ft (rnsl) Barrel invert Elevation Up 1340 ft (msi) Barrel Invert Elevation Down 1340.3 ft (msl) Hydrology Summary (SCS Methodology) Curve Number 73 2-year 24-hour Rainfall 4.39 incheslhr 10-year 24-hour Rainfall 6.61 incheslhr 2-year peak runoff 34.3 cfs (Hydraflow) 10-year peak runoff 70.2 cfs (Hydraflow) Routed 2-year Outflow 27.5 cfs (Hydraflow) Routed 10-year Outflow 36.1 cfs (Hydraflow) 2-year elevation 1344.93 ft (msl) (Hydraflow) 10-year elevation 1347.04 ft (msl) (Hydraflow) Spillway Design Riser Diameter 48 inches Riser Crest 1344 feet Barrel Diameter 24 inches Barrel Length 37 feet Barrel Invert Elevation Up 1340 ft (msl) Barrel Invert Elevation Down 1340.3 ft (msl) Emergency Spillway Crest Elevation 1345 ft (msl) Crest Length 35 feet Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ---- ----- 34.31 ----- ------- 70.20 - — --- — Pond Runoff 2 Reservoir 1 ------ 27.48 — — - -- — 36.13 - -- - — — — — — <no descriptions Proj. file: Contentment Sediment Basin #1 12 6-22.gpw Tuesday, Dec 6 2022, 1:37 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak Time Time to Volume Inflow flow interval peak hyd(s) (cfs) (min) (min) (cuft) Maximum Maximum elevation storage (ft) (cuft) Hydrograph description 1 SCS Runoff 34.31 6 720 108,844 --- ----- ---- Pond Runoff 2 i Reservoir 27.48 6 732 108,843 1 1344.93 40,359 ono descriptions i Contentment Sediment Basin #1 12 o FMgplinPeriod: 2 Year Tuesday, Dec 6 2022, 1:37 PM Hydraflow Hydrographs by lntelisolve 3 Hydrograph Plot Hydratiow Hydrographs by lntelisolve Tuesday, Dec 6 2022, 1:37 PM Hyd. No. 1 Pond Runoff Hydrograph type = SCS Runoff Peak discharge = 34.31 cfs Storm frequency = 2 yrs Time interval = 6 min Drainage area = 17.64 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10 min Total precip. = 4.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Pond Runoff Hyd. No. 1 -- 2 Yr Hydrograph Volume = 108,844 cuft Q (cfs) 35.00 30.00 25.00 OF M 15.00 10.00 5.00 0.00 L_ L. I _.. - —L 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 1 Hydrograph Plot 4 Hydraflow Hydrographs by Inteiisolve Tuesday, Dec 6 2022, 1:37 PM Hyd. No. 2 ono descriptions Hydrograph type = Reservoir Peak discharge = 27.48 cfs Storm frequency = 2 yrs Time interval = 6 min Inflow hyd. No. = 1 Max. Elevation = 1344.93 ft Reservoir name = Sediment Basin 1 Max. Storage = 40,359 cult Storage Indication method used. Wet pond routing start elevation = 1344.00 ft. Q (cfs) 35.00 30.00 25.00 P10101 15.00 10.00 5.00 0.00 0 2 4 Hyd No. 2 C ono descriptions Hyd. No. 2 -- 2 Yr Hydrograph Volume = 108,843 cuft 0 (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 1 Pond Report 5 Hydraflow Hydrographs by Intelisolve Tuesday, Dec 6 2022, 1:37 PM Pond No. 1 - Sediment Basin 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Irl Storage (cult) Total storage (tuft) 0.00 1342.00 13,760 0 0 2.00 1344.00 13,760 27,520 27,520 4.00 1346.00 13,760 27,520 55,040 6.00 1348.00 13,760 27,520 82,560 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 1340.30 0.00 0.00 0.00 Length (ft) = 30.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orl Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.48 35.00 0.00 0.00 Crest El. (ft) = 1344.00 2345.00 0.00 0,00 Weir CoefF. = 3.33 3.33 0.00 0.00 Weir Type = Riser Ciplti --- -- Multistage = Yes No No No Exfiltration = 0.000 inthr (Contour) Tailwater Elev. = 0.00 ft Notes Culvert10r'fiice outflows have been analyzed under [inlet and outlet control. Stage 1 Discharge 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 - Total Q Stage (ft) 6.00 5.00 4,00 3.00 2.00 1.00 0.00 40.00 Discharge (cfs) Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type now interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (tuft) (ft) (cult) 1 SCS Runoff 70.20 6 720 216,188 - — — — --- Pond Runoff 2 Reservoir 36.13 6 732 216,187 1 1347.04 69,311 <no description> Contentment Sediment Basin #1 11, 26 RQtgpnnPeriod: 10 Year Tuesday, Dec 6 2022, 1:37 PM Hydraflow Hydrographs by Intelisolve 7 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pond Runoff Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 17.64 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 6.61 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 40 M G 11 ON M 10.00 Pond Runoff Hyd. No. 1 -- 10 Yr Tuesday, Dec 6 2022, 1:37 PM Peak discharge = 70.20 cfs Time interval = 6 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 10 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 216,188 tuft Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 i I i 0.00 m 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 1 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Dec 6 2022, 1:37 PM Hyd. No. 2 <no description> Hydrograph type = Reservoir Peak discharge = 36.13 cfs Storm frequency = 10 yrs Time interval = 6 min Inflow hyd. No. = 1 Max. Elevation = 1347.04 ft Reservoir name = Sediment Basin 1 Max. Storage = 69,311 cult Storage Indication method used. Wet pond routing start elevation = 1344M ft. Hydrograph Volume = 216,187 cult <no description> Q (cfs) Hyd. No. 2 -- 10 Yr Q (cfs} 80.00 �- - $0.00 70.00 - - 70.00 60.00 - - 60.00 50.00 - - 50.00 40.00 - - 40.00 30.00 30.00 20.00 - - 20.00 10.00 - 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (errs) Hyd No. 2 Hyd No_ 1 Pond Report 9 Hydraflow Hydrographs by Intehsolve Tuesday, Dec 6 2022, 1:37 PM Pond No. 1 - Sediment Basin 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (tuft) 0.00 1342.00 13,760 0 0 2.00 1344.00 13,760 27,520 27,520 4.00 1346.00 13,760 27,520 55,040 6.00 1348.00 13,760 27,520 82,560 Culvert I Orifice Structures [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 1340.30 0.00 0.00 0.00 Length (ft) = 30.00 0.00 0.00 0-00 Slope M) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 12.48 35.00 0.00 0.00 Crest El. (ft) = 1344.00 2345.00 0.00 0.00 Weir CoefF. = 3.33 3.33 0.00 0.00 Weir Type = Riser Ciplti - Multi -Stage = Yes No No No Exfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note, CulvertlOrifice outflows have been analyzed under inlet and outlet control. Stage I Discharge 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 -- Total Q Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 40.00 Discharge (efss) Appendix E Sediment Basin 2 Sediment Basin #2 Design Summary Total Area Draining to Basin 30.4 acre Disturbed Area 30.4 acre Basin Volume Design Required Storage Volume 54720 cubic feet Volume Before Cleanout Req'd 27360 cubic -yards Distance from Top of Riser to Cleanout Level 1 ft (msl) 10-year runoff Rate 106 cfs Required Surface Area (135 sf per Q10 cfs) 46110 square feet Basin Volume Provided Storage Volume Provided (ultimate) 565918 cubic feet Area Provided (ultimate) 282959 square feet Design Elevations Top of Dam Elevation 1304 ft (msl) Designed High Water 1303 ft (msl) Principal Spillway Crest 1302 ft (msl) Dewatering Orifice Invert 1300 ft (msi) Cleanout Elevation 1301 ft (msl) Bottom of Basin 1284 ft (msl) Barrel Invert Elevation Up 1300 ft (msl) Barrel Invert Elevation Down 1299 ft (msl) Hydrology Summary Curve Number 76 2-year 24-hour Rainfall 4.39 incheslhr 10-year 24-hour Rainfall 6.61 incheslhr 2-year peak runoff 99 cfs (Hydraflow) 10-year peak runoff 168 cfs (Hydraflow) Routed 2-year Outflow 1 cfs (Hydraflow) Routed 10-year Outflow 3 cfs (Hydraflow) 2-year elevation 1300.9 ft (msl) (Hydraflow) 10-year elevation 1301.4 ft (msl) (Hydraflow) Spillway Design Riser Diameter 18 inches Riser Crest 1302 feet Barrel Diameter 12 inches Barrel Length 40 feet Barrel Invert Elevation Up 1300 ft (msl) Barrel Invert Elevation Down 1299 ft (msl) Emergency Spillway Crest Elevation NA ft (msl) Crest Length NA feet a. 0 N N N L) W 7. (4 "C3 N a N N I I N C f{S 03 C E N U) q 1 E Y C Q� C O U U N �O ^^L LL W n 0 O O 0 U .p YJ v Q L. ❑ a- c O L C D C i C 0� ? U) _O qr fl w iY Hydrograph Return Period Recap Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 2 SCS Runoff Reservoir ---- 1 4.67 0.03 98.72 1.00 --- --- -- - ----- 168.28 3.13 — — - -- --- -- — — - -- Sediment Basin Runoff <no description> Proj. tile: Contentment Sediment Basin 2 12_622.gpw Wednesday, Dec 14 2022, 12:31 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 98.72 1 725 309,992 --- ----- ---- Sediment Basin Runoff 2 Reservoir 1.00 1 1449 81,064 1 1300.92 3,983,889 <no description> Contentment Sediment Basin 2 12_6 27 4pw Period: 2 Year Wednesday, Dec 14 2022, 12.31 PM Hydraflow Hydrographs by intelisolve Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Sediment Basin Runoff Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 30.40 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.39 in Storm duration = 24 hrs Q (cfs) 100.00 .1 rtk 40.00 20.00 0.00 0 2 5 Hyd No. 1 7 Wednesday, Dec 14 2022, 12:31 PM Peak discharge = 98.72 cfs Time interval = 1 min Curve number = 85 Hydraulic length = 0 ft Time of conc. (Tc) = 20 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 309,992 cut# Sediment Basin Runoff Hyd. No. 1 -- 2 Yr 9 12 14 16 19 21 Q (cfs) 100.00 40.00 oil 0.00 23 26 Time (hrs) Hydrograph Plot 4 Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:31 PM Hyd. No, 2 <no description> Hydrograph type = Reservoir Peak discharge = 1.00 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 1300.92 ft Reservoir name = Contentment Irrigation Po Max. Storage = 3,983,889 cuft Storage Indication method used. Wet pond routing start elevation = 1300.00 ft. Hydrograph Volume = 81,064 cuft Q (cfs) 100.00 •1lfl B6161t, 20.00 0.00 0 5 Hyd No. 2 ono descriptions Hyd. No_ 2 -- 2 Yr 10 15 19 24 29 34 39 44 Hyd No. 1 Q (cfs) 100.00 U911fl11 20.00 0.00 48 Time (hrs) Pond Report Hydraflow Hydrographs by intelisolve Wednesday, Dec 14 2022, 12:31 PM Pond No. 2 - Contentment Irrigation Po Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 1284.00 180,183 0 0 16.00 1300.00 282,959 3,706,136 3,705,136 20.00 1304.00 323,833 1,213,584 4,918,720 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 12.00 12.00 0.00 0.00 Span (in) = 12.00 12.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert Et. (ft) = 130.00 1300.00 0.00 0.00 Length (ft) = 20.00 1.00 0.00 0.00 Slope (%) = 1.00 1.00 0.00 0.00 N-Value = .013 .013 .000 .000 Qrif. Coeff. = 0.70 0.69 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 21.00 18.00 15,00 12.00 9.00 6.00 3.00 V. 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 4.50 0.00 0.00 0.00 Crest El. (ft) = 1302.00 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Riser - - - Multi -Stage = Yes No No No Exfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: CulvertfOrifice outflows have been analyzed under inlet and outlet control. Weir riser chocked for orifice conditions - Stage 1 Discharge 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Total Q Stage (ft) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 22.00 Discharge (cfs) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 168.28 1 725 538,581 --- -- — - Sediment Basin Runoff 2 Reservoir 3.13 1 1134 272,191 1 1301.39 4,127,885 <no descriptions Contentment Sediment Basin 2 12_6 224pw Period: 10 Year Wednesday, Dec 14 2022, 12:31 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 7 Hydratlow Hydrographs by Intelisolve Hyd. No. I Sediment Basin Runoff Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 30.40 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 6,61 in Storm duration = 24 hrs Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 a.0o 0 2 5 Hyd No. 1 Wednesday, Dec 14 2022, 12:31 PM Peak discharge = 168.28 cfs Time interval = 1 min Curve number = 85 Hydraulic length = 0 ft Time of conc. (Tc) = 20 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 538,581 cuft Sediment Basin Runoff Hyd. No. 1 --10 Yr 7 9 12 14 16 19 21 23 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:31 PM Hyd. No. 2 <no description> Hydrograph type = Reservoir Peak discharge = 3.13 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 1301.39 ft Reservoir name = Contentment Irrigation Po Max. Storage = 4,127,885 cuft Storage Indication method used. Wet pond routing start elevation = 1300.00 ft. Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60,00 40.00 20.00 0.00 0 ono descriptions Hyd. No. 2 -- 10 Yr Hydrograph Volume = 272,191 cult 5 10 15 19 24 29 34 39 44 Hyd No. 2 Hyd No. 1 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 48 Time (hrs) Pond Report 9 Hydraflow Hydrographs by intelisolve Wednesday, Dec 14 2022, 12:31 PM Pond No. 2 - Contentment Irrigation Po Pond Data Pond storage is based on known contour areas_ Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (tuft) Total storage (tuft) 0.00 1284.00 180,183 0 0 16.00 1300.00 282,959 3,705,136 3,705,136 20.00 1304.00 323,833 1,213,584 4,918,720 Culvert 1 Orifice Structures [A) LBl [C] [D] Rise (in) = 12.00 12.00 0.00 0.00 Span (in) = 12.00 12.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 130.00 1300.00 0.00 0.00 Length(ft) = 20,00 1.00 0.00 0.00 Slope (%) = 1.00 1.00 0.00 0.00 N Value = .013 .013 .000 .000 Qrif. Coeff. = 0.70 0.69 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 21.00 T- 18.00 15.00 -� 12.00 9.00 6.00 3.00 0 oa Weir Structures [A] [B] [C] [Dl Crest Len (ft) = 4.50 0.00 0.00 0.00 Crest El. (ft) = 1302.00 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Riser --- - - Multistage = Yes No No No Exfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: Galvertl0rifice ouMows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage 1 Discharge Stage (ft) 21.00 18.00 15.00 12.00 - 9.00 6.00 3.00 - a.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18,00 20.00 22.00 Discharge (cis) Total Q Appendix F Grassing Specifications Appendix G Pond Routings Hydrograph Return Period Recap nyuldllVW "yUlUYICI 110 uy llmvllz nvv Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 44.79 1 727 156,077 ---- ---- ---- Pond Runoff 2 Reservoir 0.66 1 1452 68,162 1 1302.03 4,322,385 Contentment Pond Routi Contentment Pond Design 12622.0 pRieturn Period: 2 Year Wednesday, Dec 14 2022, 12:42 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:42 PM Hyd. No. I Pond Runoff Hydrograph type = SCS Runoff Peak discharge = 44.79 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 30.60 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of cone. (TO = 20.9 min Total precip. = 4.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 MI M I 10.00 0.00 0 3 5 Hyd No. 1 3 Pond Runoff Hyd. No. 1 -- 2 Yr Hydrograph Volume = 156,077 tuft Q (cfs) 50.00 40.00 DROI] 10.00 0.00 10 13 15 18 20 23 25 Time (hrs) Hydrograph Plot 4 Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:42 PM Hyd. No. 2 Contentment Pond Routi Hydrograph type = Reservoir Peak discharge = 0.66 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 1302.03 ft Reservoir name = Contentment Irrigation Po Max. Storage = 4,322,385 cuft Storage Indication method used. Wet pond routing start elevation = 1301.60 ft. Q (cfs) 50.00 40.00 30.00 20.00 10.00 M Contentment Pond Routi Hyd, No. 2 -- 2 Yr 5 10 15 19 24 29 Hyd No. 2 Hyd No. 1 34 Hydrograph Volume = 68,162 tuft Q (cfs) 50.00 40.00 30.00 FX1I7 10.00 0.00 39 44 48 Time (hrs) Pond Report Hydrat3ow Hydrographs by intelisolve Wednesday, Dec 14 2022, 12:42 PM Pond No. 9 - Contentment Irrigation Po Pont! Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (1t) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 1284.00 180,183 0 0 16.00 1300.00 282,959 3,705,136 3,705,136 20.00 1304.00 323,833 1,213,584 4,918,720 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0-00 Invert El. (ft) = 1301.65 0-00 0.00 0.00 Weir Type = - Length (ft) = 20.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.70 0.00 0.00 0,00 Multi -Stage = n/a No No No EAltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: CulverVOnfice outllows have been analyzed under inlet and outlet controk. Stage (ft) Stage 1 Discharge Stage (ft) 21.00 _ _ 21.00 18.00 - 18.00 1 15.00 5.00 12.00 �- - 12.00 9 9.00 ,00 6.00 I: - �_ 6.00 3.00 - 3.00 0.000.00 1.00 2.00 3.00 4.00 5.00 - - 6 ao0.00 Discharge (cfs) Total Q Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak Time flow interval (cfs) (min) Time to peak (min) Volume Inflow hyd(s) (cuft) Maximum Maximum elevation storage (ft) (cuft) Hydrograph description 1 SCS Runoff 101.41 1 726 336,320 -- - - - ----- Pond Runoff 2 Reservoir 1.78 1 1441 180,597 1 1302A7 4,455,444 Contentment Pond Routi Contentment Pond Design 1262 turn Period: 10 Year Wednesday, Dec 14 2022, 12:42 PM rtyaranow Hyarograpns oy intensoive Hydrograph Plot 7 Hydraflow Hydrographs by lntelisolve Hyd. No. 1 Pond Runoff Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 30.60 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 6.61 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 2 5 7 9 Hyd No. 1 Pond Runoff Hyd. No. 1 10 Yr Wednesday, Dec 14 2022, 12:42 PM Peak discharge = 101.41 cfs Time interval = 1 min Curve number = 67 Hydraulic length = 0 ft Time of conc. (Tc) = 20.9 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 336,320 cult Q (cfs) 120.00 100.00 .1 M 40.00 POIXII 0.00 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 8 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Contentment Pond Routi Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 1 Reservoir name = Contentment Irrigation Po Storage Indication method used. Wet pond routing start elevation = 1301.60 ft Q (cfs) 120,00 100.00 - M [0111181 40.00 20.00 0.00 0 5 10 Hyd No. 2 Wednesday, Dec 14 2022, 12:42 PM Peak discharge = 1.78 cfs Time interval = 1 min Max. Elevation = 1302.47 ft Max. Storage = 4,455,444 cult Hydrograph Volume = 180,597 cult Contentment Pond Routi Hyd. No. 2 -- 10 Yr Q (cfs) 120.00 TI019IC 40.00 0.00 15 19 24 29 34 39 44 48 Time (hrs) - Hyd No. 1 Pond Report 9 Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:42 PM Pond No. 1 - Contentment Irrigation Po Pond Data Pond storage is based on known contour areas_ Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 1284.00 180,183 0 0 16.00 1300.00 282,959 3,705,136 3,705,136 20.00 1304.00 323,833 1,213,584 4,918,720 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 1301.65 0.00 0.00 0.00 Weir Type = -- -- -- - Length (ft) = 20.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 arif. Coeff. = 0.70 0.00 0.00 0.00 Multi -Stage = Na No No No EAItration = 0.000 inlhr (Contour) Tailwater Elev. = U0 ft Stage (ft) 21.00 18.00 15.00 12.00 9.00 6,00 3.00 0.00 0.00 Dote: CulverVOririce outflows have been analyzed under inlet and outset control_ Stage 1 Discharge 1.00 2.00 3.00 4.00 5.00 Stage (ft) 21.00 18.00 15,00 12.00 9.00 6.00 3.00 0.00 6.00 Discharge (cfs) Total 0 1Q Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 218.35 1 726 717,987 -- -- — - Pond Runoff 2 Reservoir 4.23 1 1178 427,831 1 1303.41 4,740,972 Contentment Pond Routi Contentment Pond Design 12_6_22. pReturn Period: 100 Year Wednesday, Dec 14 2022, 12:42 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Inkelisolve Wednesday, Dec 14 2022, 12:42 PM Hyd. No, 1 Pond Runoff Hydrograph type = SCS Runoff Peak discharge = 218.35 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 30.60 ac Curve number = 67 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of cone. (Tc) = 20.9 min Total precip. = 10.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 240.00 210.00 180.00 150,00 120.00 90,00 60.00 30.00 r) M 0 2 5 7 9 Hyd No. 1 Hydrograph Volume = 717,987 tuft Pond Runoff Hyd. No. 1 -- 100 Yr Q (cfs) 240.00 210.00 180M 150.00 120.00 90.00 60.00 30.00 0.00 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 12 Hydraflow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:42 PM Hyd. No. 2 Contentment Pond Routi Hydrograph type = Reservoir Peak discharge = 4.23 cfs Storm frequency = 100 yrs Time interval = 1 min inflow hyd. No. = 1 Max. Elevation = 1303.41 ft Reservoir name = Contentment Irrigation Po Max. Storage = 4,740,972 cult Storage Indication method used. Wet pond routing start elevation = 1301.60 ft. Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 O.Oo 0 Contentment Pond Routi Hyd. No. 2 -- 100 Yr Hydrograph Volume = 427,831 tuft 5 10 15 19 24 29 34 39 44 Hyd No. 2 Hyd No. 1 Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 48 Time (hrs) Pond Report 13 Hydraftow Hydrographs by Intelisolve Wednesday, Dec 14 2022, 12:42 PM Pond No. 1 - Contentment Irrigation Po Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 1284,00 180,183 0 0 16,00 1300.00 282,959 3,705,136 3,705,136 20.00 1304.00 323,833 1,213,584 4,918,720 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0A0 No. Barrels = 1 0 0 0 Invert El. (ft) = 1301.65 0.00 0.00 0.00 Length (ft) = 20.00 0,00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0,00 N Value = .013 .000 .000 .000 4rif. Coeff. = 0.70 0.00 0.00 0,00 Multi -Stage = n/a No No No Stage (ft) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 ri nn 0.00 Weir Structures [A] Crest Len (ft) = 0.00 Crest El. (ft) = 0.00 Weir Coeff. = 0.00 Weir Type = --- Multistage = No [B] [C] [Dl 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 No No No ExIfiltration = 0.000 inlhr (Contour) Tailwater Elegy. = 0.00 ft Note: CulverMriFlce outflows have been analyzed under inlet and outlet conirof_ Stage 1 Discharge 1.00 2.00 3.00 4.00 5.00 Stage (ft) 21.00 18.00 16.00 12.00 9.00 6.00 3.00 0.00 6.00 Discharge (cfs) Total Q