Loading...
HomeMy WebLinkAboutSWA000187_Response To Comments_202304035410 Trinity Road P 919.866.4951 T I M M O N S GROUP Suite 102 F 919.859.5663 Raleigh, NC 27607 www.timw.timmons.com Date: April 3, 2023 Project: Circle K — HSD Addition 2723997 — Stedman, NC Project ID: CUMBE-2023-086 Subject: Comment response letter for Fast -Track ATC post -construction stormwater permit comments via email on 03/30/2023. Project Contact: Mike Davidson Phone: 984.222.1610 Email: mike.davidson@timmons.com To: Jim Farkas — NCDEQ State Stormwater Engineer Response to review comments have been added below each comment in bold font. As designed, the project will not meet the definition of low -density: o 15A NCAC 02H .1003(2)(c) — The proposed design uses too much non -vegetated conveyances. A minimal amount of piping underneath driveways/roadways can be used (such as the piping from the low point near YI #3 underneath the pavement to the vegetated area), but other piping (such as Yard Inlet #1 and the downstream pipe & Yard Inlet #2 and the pipe to Yard Inlet #3) are avoidable. ■ Yard Inlet #1 and the downstream pipe — In the prior design iteration, the area that is currently shown draining to YI #1 was allowed to flow over vegetated area to the roadside ditch on the south side of the NC-24 entrance. Adding this yard inlet & pipe made the situation worse from the previous design by changing a vegetated conveyance to a non -vegetated conveyance. ■ Yard Inlet #2 and the pipe to Yard Inlet #3 — It is noted that this grassy area is located in a depression and some form of piping (YI #3 & downstream pipe) is needed to transport the stormwater runoff underneath the BUA, however YI #2 seems unnecessary due to the proximity to YI #3 (overland positive drainage should be able to be provided from the area of YI #2 to YI #3). - The following items do not appear to have been uploaded to the electronic file repository (hard copies were provided): o Updated plans. The revised plans submitted on 3/24/23 were not uploaded. Response: We have removed the two (2) yard described above and uploaded plans to the portal as requested. END OF RESPONSES ENGINEERING I DESIGN � TECHNOLOGY You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)