Loading...
HomeMy WebLinkAbout20140133 Ver 1_Email_20150430 Ward, Garcy From:Williams, Paul C Sent:Thursday, April 30, 2015 4:49 PM To:Tracey.L.Wheeler@usace.army.mil; Ward, Garcy; Daisey, Greg Cc:Willis, Thomas C Subject:Chowan 34 Powerline Relocation Attachments:Chowan 34 Powerline Relocation.pdf As we discussed in the preconstruction meeting on Tuesday, the power line will need to be permanently relocated after the construction of the bridge. The power line will be relocated to a proposed power pole on the northwest quadrant. The existing line and two existing poles will be removed prior to bridge construction. The attached permit drawings indicate the location of the relocated power line. This relocation will not impact any jurisdictional waters or wetlands. In addition, the proposed power pole will be used for the permanent location of the telephone line. It will be in the same alignment as the relocated power line. Let me know if you have any questions or concerns. Paul C. Williams, Jr. Environmental Specialist NCDOT Division One 113 Airport Dr., Suite 100 Edenton, NC 27932 252-482-1861 office 252-482-8722 fax 252-333-9812 mobile ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1