As we discussed in the preconstruction meeting on Tuesday, the power line will need to be permanently relocated after
the construction of the bridge. The power line will be relocated to a proposed power pole on the northwest quadrant.
The existing line and two existing poles will be removed prior to bridge construction. The attached permit drawings
indicate the location of the relocated power line. This relocation will not impact any jurisdictional waters or wetlands.
In addition, the proposed power pole will be used for the permanent location of the telephone line. It will be in the
same alignment as the relocated power line.
Let me know if you have any questions or concerns.
Paul C. Williams, Jr.
Environmental Specialist
NCDOT Division One
113 Airport Dr., Suite 100
Edenton, NC 27932
252-482-1861 office
252-482-8722 fax
252-333-9812 mobile
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
1