HomeMy WebLinkAboutNCC201060_Annual Fee Unpaid Email with NOD_20230416Georgoulias, Bethany
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Sunday, April 16, 2023 12:08 AM
To: scottjohnson@beazer.com
Cc: Georgoulias, Bethany; Holloman, Tevye L; scottjohnson@beazer.com
Subject: [External] Notice of Deficiency: Unpaid Permit Fee for NCC201060
Attachments: Notice of Deficiency.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
This email is to convey a Notice of Deficiency for failure to pay the 2023 annual permit fee per the requirements of NC
General Statute 143-215.3D(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to avoid
duplicate payments.
Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because
the annual fee payment (Invoice No. NCC201060-2023) was not received. The payment is 15 day(s) overdue. A Notice of
Deficiency is attached.
Please contact the Stormwater Program at tev.holloman@ncdenr.gov or (919) 707-3649. Please reference:
COC no. NCC201060
This COC is for Roberts Crossing in Wake County, issued to Beazer Homes LLC.
Annual fee payment can be made through this website:
https://deq.nc.gov/sw-epayments
If this project has been closed -out or sold, it is important that you submit a Notice of Termination request here:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination
Please visit https://deg.nc.gov/NCG01 for more information about this permit.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.