HomeMy WebLinkAboutNCC211478_Annual Fee NOD Letter (2023 Fee)_20230416 ROY COOPER
Commar
ELIZABETH S.BISER
secretary 0
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
4/16/2023
Caviness&Cates Building and Development Company
Attn:Christopher Cates
639 Executive Place
Fayetteville, NC 28305
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC211478-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The
annual fee was billed on 3/1/2023 and was due on 4/1/2023.The annual fee applies to the following construction site:
Berkley Estates Phase 1
Dolce Drive,Legato Lane,and Adagio Circle,Wake Forest Township, NC
Wake County
Certificate of Coverage No. NCC211478
NC Reference No. NCG01-2021-1478
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@ncdenr.gov.
Sincerely,
William E.Vinson,Jr.
Chief of Program Operations
Division of Energy, Mineral,and Land Resources
D_E Q'" NcnihCumliniDepo%VM arEivkamienldQmm ty I DMalnnooErww.WeralwW Land Reaaorees
511 N��lh Seliabury Street 116i2 MNl So vtoe Cells I Raleiph,North Carapna ZM9-WR
919.707.9200