Loading...
HomeMy WebLinkAboutNCC211478_Annual Fee NOD Letter (2023 Fee)_20230416 ROY COOPER Commar ELIZABETH S.BISER secretary 0 DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality 4/16/2023 Caviness&Cates Building and Development Company Attn:Christopher Cates 639 Executive Place Fayetteville, NC 28305 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC211478-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 3/1/2023 and was due on 4/1/2023.The annual fee applies to the following construction site: Berkley Estates Phase 1 Dolce Drive,Legato Lane,and Adagio Circle,Wake Forest Township, NC Wake County Certificate of Coverage No. NCC211478 NC Reference No. NCG01-2021-1478 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@ncdenr.gov. Sincerely, William E.Vinson,Jr. Chief of Program Operations Division of Energy, Mineral,and Land Resources D_E Q'" NcnihCumliniDepo%VM arEivkamienldQmm ty I DMalnnooErww.WeralwW Land Reaaorees 511 N��lh Seliabury Street 116i2 MNl So vtoe Cells I Raleiph,North Carapna ZM9-WR 919.707.9200