HomeMy WebLinkAboutNCC231011_Site Plan or Location Map_20230414 APPROVED EXCEPTIONS
C O O7
J
c
THE FOLLOWING ITEMS HAVE BEEN APPROVED AS EXCEPTIONS FOR THIS DRAWING cl
BY THE TOWN OF APEX DEPARTMENT DIRECTOR(S),AND TO THE BEST OF MY
KNOWLEDGE AND BELIEF,THIS DRAWING CONFORMS TO THE REQUIREMENTS d
ESTABLISHED BY THE DIRECTOR(5)ALLOWING DEVIATION FROM THE STANDARD RTKAT "2
SPECIFICATIONS AND STANDARDRD QUESTI G NGI TOWN OF APEX. RAN SIGNATURE AT O
HUMIE OLIVE RD. (� J
BELOW REPRESENTS THAT THE REQUESTING ENGINEER HAS BEEN GRANTED A z
VARIANCE ONLY FOR THE ITEMS LISTED.THE DEVELOPER/ENGINEER/CONTRACTOR IS
SOLELY RESPONSIBLE FOR MEETING ALL APPLICABLE REQUIREMENTS. CC N
APPROVED EXCEPTION DIRECTOR GRANTING EXCEPTION 5ne 06 w E
PHASE 6 c:::ONSTRUCTION El) RAWINGS ww
OFF-CENTERED (SEWER OTA Michael S.Deabn,P.E.•Water Resources Director 4 C
F /.. C
V/ (0
BY:William Norton P.E. DATE: f/SO/2n23 1 0 C
Z
(REQUESTING ENGINEER) 0,0 OS w .tc,
BUILDING INSPECTIONS*PERMITS-TOWN OF APEX CERTIFICATION -THIS S WING HAS EECTI a
0
PERMIITDEPARTME T AND TO THE BESTN REVIEWED BY HOF MY KNOWLEDGEE TOWN OF APEX UANDNBELIEF G P CONFORMS ' V
.„,
TO THE REQUIREMENTS ESTABLISHED WITHIN THE TOWN'S CODE OF ORDINANCES AND HUMIE OLIVE ROAD VICINITY MAP
THE NORTH CAROLINA STATE BUILDING CODES.HOWEVER,THIS SIGNATURE DOES NOT _ N.T.S.
CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY FEDERAL,STATE,
OR LOCAL CODE,LAW,SPECIFICATION,RULE OR ORDINANCE.IT IS THE SOLE ��- SITE DATA
RESPONSIBILITY OF THE OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR CONTRACT C
PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE PROJECT NAME RETREAT AT FRIENDSHIP-PHASE 6 CONSTRUCTION DRAWINGS •�
AFOREMENTIONED REQUIREMENTS. PREPARERS CONTACT INFORMATION JONES 6 CNOSSEN ENGINEERING,PLLC C
\\ YUMEEWARRA FARM I11
BY: Approved DATE: SUBDIVISION P.O.BOX I062
sevens 01/10/2023 9:48:14 AM (CURRENTLY IN CD APEX,NORTH CAROLINA 27502 >
REVIEW) FUTURE PHONE-(919)387-I 74 (�
PARKS,RECREATION,AND CULTURAL RESOURCES-TOWN OF APEX CERTIFICATION TOWN OF FAX-(91 9)387-3375
AJI- CONTACT PERSON-PATRICK L.KIERNAN
THESE PLANS HAVE BEEN REVIEWED BY THE TOWN OF APEX,AND TO THE BEST OF MY APEX PARK OWNER/DEVELOPER CONTACT INFORMATION M/I HOMES-RALEIGH• 221 N.SALEM ST.
KNOWLEDGE AND BELIEF,CONFORM TO REPRESENTATIONS MADE BY THE DEVELOPER 151 15UNDAY DRIVE SUITE# I 0 SUITE 001
TO MYSELF AND THE PARKS,RECREATION,AND CULTURAL RESOURCE ADVISORY ', RALEIGH,NG 27607 1 PO BOX 1062
PHONE-(91 9)205-9980
COMMISSION CONSISTENT WITH THE PROJECTS REQUIREMENTS FOR PUBLIC PARKS I. 1111111.
CONTACT PERSON-PATRICK ADAMSAPEX.NC 27502
AND RECREATION,EITHER IN TOTAL OR IN PART,AS OUTLINED IN THE TOWN OF APEX './ FUTURE II Office:919-387-1174
UNIFIED DEVELOPMENT ORDINANCE AND TOWN OF APEX CODE OF ORDINANCES. RELY CURRENT ZONING PUD-CZ Registration: P-0151
HOWEVER,THIS SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY '' SITE LAND ZONING CASE NUMBER #19CZ2 1 6#2 1 CZ I G
REQUIREMENTS CONTAINED IN ANY FEDERAL,STATE,OR LOCAL CODE,LAW, DEDICATION FOR ■ www•Jonesaltoawn•com
SPECIFICATION,RULE OR ORDINANCE.IT 15 THE SOLE RESPONSIBILITY OF THE I TOWN OF APEX ANNEXATION NUMBER 676
,/ WAKE COUNTY PINS 0710-98-7950,0720-07-5965,0720-09-0188 UHII/
OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR CONTRACT PROFESSIONALS TO J If, PARKS 6 REC I / �,.,H OAR�XO
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED LAND : --_ / PHASE 6 CONSTRUCTION ADDRESS 3 108 OLIVE FARM ROAD ,"t,,•••••j O��
REQUIREMENTS. DEDICATION a - '�'•�"-"�'J - ---- TOTAL PROJECT AREA 142.42 ACRES \.'p•OFE88 O•.!l
FRIE IP'- �?: y•
/[i
`1'JAS7E 4• AREA WITHIN OLIVE FARM RD.RAW 0.47 ACRES p SEAL 7'
BY: are..01P°zoz3ed3s2 AM DATE: \ I'll/�`,:.:L R J SITE "`-'--I t( E„" ( j NET AREA OF PHASE G 7.33 ACRES 8980�+7rt�'
; " I N) _ MAXIMUM TOTAL NUMBER OF UNITS FOR PROJECT 520 UNITS(3.65 UNITS/ACRE) ''4.1.4'OINEEPb?�
WATER RESOURCES UTILITY ENGINEERING-TOWN OF APEX CERTIFICATION • (PHASE G) PROPOSED NUMBER OF UNITS IN PHASE G 19 UNITS 4 f7""•
TOTAL REQUIRED RCA/BUFFER AREA 42.73 ACRES(30.0%) �iZ qM Oj1N0 �'3�22
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX WATER RESOURCES PI-1/`- ' --- PROVIDED RCA/BUFFER AREA FOR PHASES I-3 12.45 AC.
DEPARTMENT,AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,CONFORMS TO THE j 1 -----.,\ PROVIDED RCA/BUFFER AREA FOR PHASE 6 1.58 AC.
REQUIREMENTS ESTABLISHED IN THE STANDARD SPECIFICATIONS AND STANDARD MAXIMUM BUILT UPON AREA FOR PUD 99.69 ACRES(70%) z
DETAILS OF THE TOWN OF APEX.HOWEVER,THIS SIGNATURE DOES NOT CONSTITUTE A "
VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY FEDERAL,STATE,OR LOCAL rt ESTIMATED PHASE 6 BUILT UPON AREA 2.55 ACRES p
CODE,LAW,SPECIFICATION,RULE OR ORDINANCE.IT 15 THE SOLE RESPONSIBILITY OF PLAY LAWN AREA REQUIRED FOR PUD 2.00 ACRES
THE OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR CONTRACT PROFESSIONALS TO N.• ® c PLAY LAWN AREA PROVIDED IN PHASE 6 0 ACRES c�^) O
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED �__-- -" _ _ 12
_
REQUIREMENTS. �•, fj f�, _-___ PUBLIC RECREATION REQUIREMENT X$ 3 .54/LOT=$p 2 62 9 SINGLE FAM.DETACHED UNITS X$3,446.98/LOT $65 49 r
0 ° __ - 0 SINGLE FAM.ATTACHED UNITS2, 2 V 0
Approved "� - PHASE 6 FEE_$65,492.62
BY: ,m,.avv>�r",r�r" DATE: {'.� / ,,.� ll ff° �_
r.• MGR ADVISORY COMMISION MEETING DATE I/29/20 (1 Z
WATERSHED INFORMATION PRIMARY;BEAVER CREEK BASIN 4L \
FIRE DEPARTMENT-TOWN OF APEX CERTIFICATION p // *-""' '� �~ APEX BUFFER DETERMINATION APEX 19-003 — U
,.I�,`'i \,.." HISTORIC STRUCTURE? NO L
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX FIRE DEPARTMENT,AND TO J 2, FEMA FLOODPLAIN INFORMATION MAP#3720072000J(DATED MAY 2,2000)* g
THE BEST OF MY KNOWLEDGE AND BELIEF,CONFORMS TO THE REQUIREMENTS P1A:�E S #372007 1 I OOK(DATED FEB.2,2007) •
ESTABLISHED WITHIN THE TOWN'S STANDARD SPECIFICATIONS,FIRE PROTECTION k 100 YEAR FLOODPLAIN 15 PRESENT
ORDINANCES,AND THE NORTH CAROLINA INTERNATIONAL FIRE CODE.HOWEVER,THIS ./ ! CENTROID OF PUD 35.696°,-78.932°
' CI
DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS
OLIVE RIDGE
SUBDIVISION SANITARY SEWER CAPACITY REQUEST 19 SINGLE FAM./TOWNHOME UNITS Q 300 GAUDAY=5,700 GAUDAY
CONTAINED IN ANY FEDERAL,STATE,OR LOCAL CODE,LAW,SPECIFICATION,RULE OR -- 4Z ORDINANCE.IT 15 THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER,OR ANY OF (UNDER FL-}AJ .
ONSTRUCTIONI -. - f II I
HIS AGENTS OR CONTRACT PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION I I I !1 11 1 O LI
PLAN MEETS ALL THE AFOREMENTIONED REQUIREMENTS. / ` "- ' "` '^''''',,J'°.,,. PROPOSED NC FRIENDSHIP LLI W
Approved ( CONSERVATION STATION PH.5-6 MINIMUM BUILDING SETBACKS n/
BY: ^�^r•^a^,. ,,.w<=^M DATE: I I I I` EASEMENT (CURRENTLY IN CD SINGLE FAMILY DETACHED L.L H L
MITIGATION REVIEW) NOTES: r(1
PLANNING/ZONING-TOWN OF APEX CERTIFICATION - AREA FRONT 10' U 1
i� I. THIS PROJECT SHALL BE MASS GRADED. _DRIVEWAYS(5/W TO GARAGE) 20'
THIS CONSTRUCTION DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX PLANNING ` ^ 2. 90%OFPRE-DEVELOPMENTDRAINAGE AREAS TO BE REAR 20' / DZ
I I IA,)I 1P '"t ten NCDOT, THEIR NATURAL DRAIN1N5. LL 11 I
DEPARTMENT,AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,CONFORMS TO THE 3. ALL NECESSARY PERMITS SHALL BE OBTAINED PROM NCDENR, SIDE ---5' LL.J
SUBDIVISION OR SITE PLAN THAT WAS APPROVED BY THE TOWN OF APEX TOWN , p NCDOT,DWO,THE ARMY CORPS OP ENGINEERS OR OTHER SIDE(CORNER) 5' I--'
COUNCIL OR TECHNICAL REVIEW COMMITTEE,AS APPROPRIATE,AND MEETS THE —� ,«-� AUTHORIZED AGENCIES PRIOR TO CONSTRUCTION DRAWING >
FROM BUFFER OR RCA 10'
STANDARDS OF THE TOWN OF APEX UNIFIED DEVELOPMENT ORDINANCE,THISN J ""ay APPROVAL. O
SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS OF THE 1
...,•...•°w 4. THE RETREAT AT FRIENDSHIP SUBDIVISION PLAN EXPIRATION
ORIGINALLY APPROVED SUBDIVISION OR SITE PLAN CITED ABOVE,OR ANY FEDERAL, A DATE IS JULY 22,2025. Q
STATE,OR LOCAL CODE,LAW,SPECIFICATION,RULE,GUIDELINE,OR ORDINANCE.IT 15 f Opp P IAJ[._ PARKING SUMMARY 0
THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR LLL 1d 9 TOTAL SPACES REQUIRED: W
CONTRACT PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL `J
THE AFOREMENTIONED REQUIREMENTS.
' 2 SPACES PER SF UNIT X 19 UNITS=38 SPACES
Approved TOTAL.REQUIRED=38 SPACES f 1LLr/.
BY: =mom+ 234:2107 PM DATE: TOTAL SPACES PROVIDED:
EXISTING 11111111, 19-2 CAR DRVEWAY SPACES=38
STANDARD SPECIFICATIONS 6 STANDARD DETAILS GUEST SPACES=3 WI 1 I
PUBLIC WORKS*TRANSPORTATION-TOWN OF APEX CERTIFICATION WOODBURY VERSION:APRIL 12,2022 TOTAL PROVIDED=41 L.C.. LL
SUBDIVISION r(1
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX PUBLIC WORKS 6TRANSPORTATION DEPARTMENT,AND TO TI1E BEST OF MY WLEDGE AND BELIEF, �.7 �� -�-�� 2� U�1
ELEMENTS CONTAINED ESTABLISHEPROVIDES AN ACCEPTABLE TRANSPORTATION THE TRANSPORTATION
IOSPECIFICATIONSNPLAN
O CONFORMING
TO DETAILS PUBLIC IMPROVEMENT SUMMARY(Ph. G) CONSTRUCTION DRAWING SHEET INDEX
I A COVER SHEET
AND THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF APEX.HOWEVER,THIS 15 ZONING CONDITIONS O
0 I50 300 Soo LINEAR FOOTAGE OF NEW PUBLIC ROADS 2,730
SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS 1 2 OVERALL LOT LAYOUT PLAN
CONTAINED IN ANY FEDERAL,STATE,OR LOCAL CODE,LAW,SPECIFICATION,RULE OR LINEAR FOOTAGE OF PUBLIC ROAD WIDENING 680 3 LOT LAYOUT PLAN-I
ORDINANCE.IT IS THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER,OR ANY OF LINEAR FOOTAGE OF PUBLIC CURB 6 GUTTER 3,30G 4 OVERALL EXISTING CONDITIONS PLAN
HIS AGENTS OR CONTRACT PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION LINEAR FOOTAGE OF PUBLIC SIDEWALK 2,078 5 EXISTING CONDITIONS PLAN-I scpLE DRAY.
PLAN MEETS ALL THE AFOREMENTIONED REQUIREMENTS. GRAPHIC SCALE LINEAR FOOTAGE OF PUBLIC GREEN WAY 0 6 OVERALL GRADING 6 DRAINAGE PLAN I"=300' WCN
LINEAR FOOTAGE OF PUBLIC MULTI-USE PATH I,055 7 GRADING*DRAINAGE PLAN-I
BY: Approved DATE:
rdal1on 12/29/202210:4941 AM LINEAR FOOTAGE OF PUBLIC SANITARY SEWER 888 9 EROSION CONTROL PLAN-18 DATE
LINEAR FOOTAGE OF PUBLIC WATERLINE 8"DIW-350 0 OVERALL UTILITY PLAN JULY I,2022
ELECTRIC-TOWN OF APEX CERTIFICATION WATER RESOURCES SOIL EROSION*SEDIMENTATION CONTROL-TOWN OF APEX CERTIFICATION WATER RESOURCES STORMWATER ENGINEERING-TOWN OF APEX CERTIFICATION 6"DIW-115 I UTILITY PLAN-I aenslo9
LINEAR FOOTAGE OF PUBLIC STORM DRAINAGE 788 2 OVERALL STAGING*.DEMOLITION PLAN 8/30/22 PERTRC
THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX ELECTRIC DEPARTMENT, THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX,AND TO THE BEST OF MY THIS DRAWING HAS BEEN REVIEWED BY THE TOWN OF APEX WATER RESOURCES 3 STAGING 6 DEMOLITION PLAN-I
AND TO THE BEST OF MY KNOWLEDGE AND BELIEF,CONFORMS TO THE KNOWLEDGE AND BELIEF,CONFORMS TO THE REQUIREMENTS ESTABLISHED IN THE SOIL STORMWATER*UTILITY ENGINEERING DIVISION AND TO THE BEST OF MY 4 JUNE LAKE STATION 11/21/22 PERTRC
REQUIREMENTS ESTABLISHED IN THE STANDARD SPECIFICATIONS AND CONSTRUCTION EROSION AND SEDIMENTATION CONTROL ORDINANCE OF THE TOWN OF APEX.HOWEVER,THIS KNOWLEDGE AND BELIEF,CONFORMS TO THE REQUIREMENTS ESTABLISHED IN THE 5 KINGSCUP COURT,SEWER OUTFACES A*B I2/13/22 SIGNATURE SET
SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY STANDARD SPECIFICATIONS AND STANDARD DETAILS AND THE UNIFIED 6 OLIVE FARM ROAD _ .
DETAILS AND THE UNIFIED DEVELOPMENT ORDINANCE OF THE TOWN OF APEX. FEDERAL,STATE,OR LOCAL CODE,LAW,SPECIFICATION,RULE OR ORDINANCE.IT 15 THE SOLE DEVELOPMENT ORDINANCE OF THE TOWN OF APEX.HOWEVER,THIS SIGNATURE THE REQUIRED ROAD IMPROVEMENTS TO THE HUMIE OLIVE ROAD AND OLIVE 7 SCM WET POND#5
HOWEVER,THIS SIGNATURE DOES NOT CONSTITUTE A VARIANCE FROM ANY RESPONSIBILITY OF THE OWNER/DEVELOP FARM ROAD INTERSECTION WERE APPROVED WITH FRIENDSHIP STATION SEC.
ER,OR ANY OF HIS AGENTS OR CONTRACT DOES NOT CONSTITUTE A VARIANCE FROM ANY REQUIREMENTS CONTAINED IN ANY
REQUIREMENTS CONTAINED IN ANY FEDERAL,STATE,OR LOCAL CODE,LAW, 1 8 SIGN PLAN
9 EASEMENT PLAN
SPECIFICATION,RULE OR ORDINANCE.IT IS THE SOLE RESPONSIBILITY OF THE PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED FEDERAL,STATE,OR LOCAL CODE,LAW,SPECIFICATION,RULE OR ORDINANCE.IT 15 4-6 PH.2-4 CD'S AND SHALL BE INSTALLED AS PART OF THAT PROJECT AS 201 OLIVE FARM ROAD CROSS SECTIONS
REQUIREMENTS. THE SOLE RESPONSIBILITY OF THE OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR
OWNER/DEVELOPER,OR ANY OF HIS AGENTS OR CONTRACT PROFESSIONALS TO SHOWN ON PAGES 44*45 IN THAT PLAN SET.CONSTRUCTION OF COMMITTED 121 EROSION CONTROL DETAILS I ,,,E,
ENSURE THAT THIS CONSTRUCTION PLAN MEETS ALL THE AFOREMENTIONED THIS SIGNATURE DOES NOT CONSTITUTE PLAN APPROVAL,ONLY PLAN REQUIREMENTS.A CONTRACT PROFESSIONALS TO ENSURE THAT THIS CONSTRUCTION PLAN MEETS 22 EROSION CONTROL DETAILS 2
SEPARATE LETTER OF PLAN APPROVAL WILL BE MAILED TO THE FINANCIALLY RESPONSIBLE PERSON ALL THE AFOREMENTIONED REQUIREMENTS.THIS SIGNATURE SERVES AS THE TRANSPORTATION IMPROVEMENTS"BY OTHERS"DOES NOT REMOVE THE 23 CONSTRUCTION DETAILS I 1 A
REQUIREMENTS. Approved AT A LATER DATE ACCORDING TO THE CONSTRUCTION SEQUENCE. STORMWATER PERMIT FORTHIS PROJECT. RESPONSIBILITY FOR THE TRANSPORTATION ZONING CONDITIONS COMMITTED 24 CONSTRUCTION DETAILS 2 Pw,rm
BY: rsmith 01/02/2023 11:41:27 AM BY: Approved I ✓ I O-E
DATE: re„Approved BY THE DEVELOPMENT TO BE CONSTRUCTED PRIOR TO FIRST PLAT. LA-I LANDSCAPE PLAN I
_
rPanre a°n o3roelzoz3l:oz:oz PM - BY: ,aa, °n ovmaml+oz osPM -
DATE: LA-2 POND#5 LANDSCAPE PLAN