HomeMy WebLinkAboutNCC231045_ESC Approval Submitted_20230414 ROY COOPER 4i
Governor � �' ilTG;1''
ELIZABETH S.BISER voie:;:
Secretary
DOUGLAS R.ANSEL nm nttal Qualify
um ty
Interim Director
March 10, 2023
LETTER OF APPROVAL
Terminix Service, Inc.
ATTN:Ms.Susan M.Douglas
105-A Center Lane
Huntersville,NC 28708
RE: Project Name:Terminix
Acres Approved: 1.75
Project ID:TRANS-2023-017
County:Transylvania
City: Brevard
Address:Rosman Hwy
River Basin: French Broad
Stream Classification:C;Tr
Submitted By: Empire Engineering,LLC-Thomas Durante,PE
Date Received by LQS:March 9,2023
Plan Type: Commercial
Dear Ms.Susan Douglas,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site.This plan shall expire three (3)years following the
date of approval, if no land disturbing activity has been undertaken,as is required by Title
15A NCAC 4B.0129.
As of April 1, 2019,all new construction activities are required to complete and submit an
electronic Notice of Intent(eN01) form requesting a Certificate of Coverage (COC)under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed,you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to
commencement of any land disturbing activity. The eN01 form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eN01 form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
4 North Carolina Department of Environmental Quality I Division of Energy.Nlineral and Land Resources
1 D �J Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa.North Carolina 28778
Letter of Approval
Terminix Services,Inc.
ATTN:Ms. Susan M.Douglas
March 10, 2023
Page 2 of 3
Title 15A NCAC 4B.0118(a)and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project,it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973(North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws,regulations, and rules. In addition,local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition,it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
geiuua
Laura Christiansen
Engineer II
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
Modifications Required for Approval
ec: Mr.Thomas Durante,PE(tdurante@empireeng.com)
Mr. Samuel Foust(sfoust@terminix.com)
Mr.Mike Hoffman(mhoffman@trustterminix.com)
Mr.Bryan ShambIin(br an.shamblin@ncdenr.gov)
cc: Regional Office file
Letter of Approval
Terminix Services,Inc.
ATTN: Ms.Susan M.Douglas
March 10,2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Terminix
Project ID:TRANS-2023-017
County: Transylvania
1. Please correct the start date in Part A.3 of the Financial Responsibility/Ownership
(FRO)form.{G.S. 113A-54.1}
2. Please provide a numbered street address for the project site in Part A.2 of the FRO
form.{G.S. 113A-54.1}
3. Please provide a construction sequence and details for the conversion of the
sediment basin to the permanent dry pond.(G.S. 113A-57.3)
4. Please extend the limits of disturbance(LOD)to include all work being to install the
waterline across the road.Note that any change to the LOD may impact the total
disturbed acreage indicated on the plans and the FRO.{G.S.113A-57.3}
•
i n I
d C
etf A4: e)-D 3 00fna-174 1f:43. 0Pg 4 0 = ., 0
Vet.
n 0 mi E (I) 0 "0 = tz eD z
— ;=, me, PD. g• 1 pl 0
CD C 0 a �' ..' E• t 0
\
va o �,pz it,„„ Cr ii 14o ,� tgil
0 W 4 r) n r•
•
y0,or w c - - . M...� •
.1,..:W
0- o 61 vto :.-1- i '
,v, .,2,--0,,,,,, ,r,, 11:-Iii „I:1'71 .
4C) 0
ow rae
o o' g 1.:::1 r mgdo 1 - .- ---
sl -30 . 0) ot.
4Zil ''0 ca• 0 '61 ,—, L.L.1 ,p.
si fa a CD 0_4. O O
.0
.. ,,
,.i. 1
5tg s 1 n
i '4!
t0 litiU
�� w C 1. El eD O•
OD lab
4 CD o
F-+ OW. Vi P* o 'CD