Loading...
HomeMy WebLinkAbout20140175 Ver 2_Email_20150429Wanucha, Dave From: Slaughter, Johnathan H Sent: Wednesday, Apri) 29, 2015 11:01 AM To: Wanucha, Dave Subject: RE: R-5525, Blowing Rock Acute Care Facility Sc�unds good. Thanks. From: Wanucha, Dave Sent: Wednesday, April 29, 2015 10:52 AM To: Slaughter, Johnathan H; Alexander, Tasha Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: RE: R-5525, Blowing Rock Acute Care Facility OK, I found th� original application vvhich �xplain�d th� mitigation issu� r�lat�d to th� pip�. Thanks. W�°II g�t this out of th� mill this w��k. �f�.11� Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s. From: Slaughter, Johnathan H Sent: Wednesday, April 29, 2015 9:55 AM To: Wanucha, Dave; Alexander, Tasha Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: RE: R-5525, Blowing Rock Acute Care Facility � . . . From: Wanucha, Dave Sent: Wednesday, April 29, 2015 9:17 AM To: Slaughter, Johnathan H; Alexander, Tasha Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: RE: R-5525, Blowing Rock Acute Care Facility H�ath, NCDWR mitigation is r�quir�d sinc� th� n�vv p�rman�nt impacts �xc��d th� 150° thr�shold. W�°II n��d an NCDMS I�tt�r. Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s From: Slaughter, Johnathan H Sent: Monday, April 27, 2015 4:48 PM To: Wanucha, Dave; Alexander, Tasha Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: RE: R-5525, Blowing Rock Acute Care Facility � W� w�r� I�d to b�li�v� that th�r� would b� no p�rmitt�d impacts at th� bridg� location but that turn�d out to not b� th� cas�. You can consid�r this a s�cond p�rmitt�d sit� on th� proj�ct so th� impacts will b� 97° of bank stabilization and 75° of d�vvat�ring (vvork pad) at th� bridg� location. �oth impacts ar� in addition to th� pr�viously p�rmitt�d pip� addition. . . 102' pip� 107° riprap 115' d�wat�ring From: Wanucha, Dave Sent: Monday, April 27, 2015 3:56 PM To: Slaughter, Johnathan H; Alexander, Tasha Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: RE: R-5525, Blowing Rock Acute Care Facility � Ar� you r�qu�sting an additional 97 f��t of p�rman�nt riprap impacts orjust an additional 87° bringing th� total to 97°? Th� original application has 10° of riprap list�d. Eith�r way, this would bring th� total p�rm impacts to 209 f��t. Th� 75' of t�mp impacts is cl�ar. L��� Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s From: Slaughter, Johnathan H Sent: Thursday, April 23, 2015 8:51 AM To: Alexander, Tasha; Wanucha, Dave Cc: Eller, Douglas W; Beaver, G Trent; Laws, Joseph L Subject: R-5525, Blowing Rock Acute Care Facility Importance: High Tasha/Dave, Looks like we need a permit modification on this project. We anticipated no impacts at the new bridge location coming off of US 321 but after staking out the bridge, that appears to not be the case now. Due to the stream eroding/moving or due to some sort of surveying error by the consulting firm, the stream bank is too steep to prevent the riprap abutment protection from entering the edge of the water. Total distance of bank stabilization will now be 97 linear feet. Additionally, in order to shore up the bank for the drill rig and protect the stream from the drill spoils, we will need a work pad on the east side of the creek. This temporary impact will be 75 linear feet or 0.0086 acres (see attached drawing). Complicating matters is the fact that the drill rig will be moved to the site next week and it will jam up the drillers work schedule if we can't get the modification back very quickly. Anything you can do to expedite the request would be appreciated. Action ID No. 2013-01974 DWR # 20140175 WBS # 43761.3.FD1 DWR Permit Fee = $570 -----Original Message----- From: toshiba 453 [rn�a_i.ltcr.:nca.re.pl.y(�_n�d_crt:.�crv] Sent: Thursday, April 23, 2015 11:58 AM To: Slaughter, Johnathan H Subject: Scanned from MFP-05331194 04/23/2015 07:58 Scanned from MFP-05331194. Date: 04/23/2015 07:58 Pages:l Resolution:600x600 DPI Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.